Loading...
HomeMy WebLinkAboutNOA_Notice_of_Application_DNS_ThunderHillsSewer_181119.pdfDEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE (DNS) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: November 19, 2018 PROJECT NAME/NUMBER: PR18-000551 Thunder Hills Sewer Interceptor Rehabilitation / LUA18-000678, ECF PROJECT LOCATION: Gated entrance at Grant Ave S and S 18th St and runs the length of Thunder Hills Creek North just up to before it goes under I-405 APPLICANT/PROJECT CONTACT PERSON: Dave Christensen, City of Renton - Wastewater Utility / Dchristensen@Rentonwa.gov / 1055 S Grady Way, Renton, WA 98057 LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://bit.ly/2QQkU3Q PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for improvements to approximately 2,050 lineal feet of sewer main. The sewer line would be improved through a mix of parallel HDPE pipelines and rehabilitation of the existing line using a cured-in-place lining technology. In addition, improvements are proposed to the 37,574 square foot maintenance access road and slope stability measures are proposed to alleviate erosion in the future. The project site includes Thunder Hills Creek, a type Np stream with a 75-foot buffer, and seven tributary streams, all classified as Type Ns streams with 50-foot buffers. There are six wetlands (Wetlands A-F). Of the six wetlands, four (Wetlands B, D, E, and F) would have a standard buffer of 100 feet, Wetland A would have a standard buffer of 75 feet, and Wetland C would have a standard buffer of 50 feet. The proposal would include 20,703 square feet of temporary wetland and stream buffer impacts, 1,332 square feet of wetland impacts (Wetland E and F), and 41,000 permanent buffer impacts including the removal of 36 trees. The project site includes RM-F and R-8 zoning designations. Access to the site would be provided via a gated entrance off of Grant Ave S and S 18th St as well as an existing entrance at the cleared PSE easement access along S 18th St. DATE OF APPLICATION: November 15, 2018 NOTICE OF COMPLETE APPLICATION: November 19, 2018 OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS. PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000551 Thunder Hills Sewer Interceptor Rehabilitation / LUA18-000678, ECF NAME: MAILING ADDRESS: CITY/STATE/ZIP: EMAIL: ___________________________________________________ TELEPHONE NO.: □ I prefer to receive project information and documents hard copy via US mail OTHER PERMITS WHICH MAY BE REQUIRED: Construction Permit REQUESTED STUDIES: Biological Assessment, Critical Areas Report, Drainage Report, Geotechnical Report, Hydraulic Project Approval (Army Corps) CONSISTENCY OVERVIEW: Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-8 (R-8) and Residential Multi-Family (RMF) on the City’s Zoning Map. Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-050, and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting. Comments on the above application must be submitted in writing to Jill Ding, Senior Planner, CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on December 3, 2018. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request. CONTACT PERSON: Jill Ding, Senior Planner; Tel: (425) 430-6598; Email: JDing@Rentonwa.gov