Loading...
HomeMy WebLinkAboutSR_HEX_Solera_Master_Plan_181127.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Project Location Map SR_HEX_Solera_Master_Plan_181127 A. REPORT TO THE HEARING EXAMINER Hearing Date: November 27, 2018 Project File Number: PR18-000333 Project Name: Solera Master Plan Land Use File Number: LUA18-000490, SA-M, PP, CU-H, MOD Project Manager: Matt Herrera, Senior Planner Owner: Greater Hilands LLC C/O JSH Properties, 20415 72nd Ave S Suite 180, Kent, WA 98032 / Renton Housing Authority, 2900 NE 10th St, Renton, WA 98056 Applicant: Corey Watson, Quadrant Homes, 15900 SE Eastgate Way, Suite 300, Bellevue, WA 98008 Contact: Jeremy Febus, KPFF, 1601 5th Ave, Suite 1600, Seattle, WA 98101 Project Location: 2902 NE Sunset Blvd, Renton, WA 98056 Project Summary: The applicant is requesting Master Site Plan Review, Preliminary Plat Approval, Conditional Use Permit, and Street Modification Approval for a proposed mixed use development that would provide approximately 673 multi-family residential units and 39,000 square feet of commercial space located on a 10.8 acres site at 2902 NE Sunset Blvd. The subject property would contain two mixed-use buildings along the NE Sunset Blvd frontage with six stories above grade and up to 85 feet in maximum height. The two mixed-use buildings would contain approximately 521 multi-family units with ground floor commercial space. The subject property would also contain approximately 152 fee-simple townhomes under the unit lot subdivision provisions. Net residential density on the subject property would result in approximately 70 dwelling units per acre. The site would contain a total of 906 parking spaces located within the mixed use buildings, townhome units, and a six-space surface lot. The existing Greater Hi-Lands Shopping Center would be demolished with the exception of the US Bank building. A new public street alignment would be constructed providing access through the site with alleys for vehicle access to residences. Street frontage improvements would be constructed along the site’s periphery. Site Area: 10.8 acres City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 2 of 60 SR_HEX_Solera_Master_Plan_181127 B. EXHIBITS: Exhibits 1-24: As shown in the Environmental Review Committee (ERC) Memo Exhibit 25: Staff Report to the Hearing Examiner Exhibit 26: Neighborhood Meeting Materials Exhibit 27: Critical Areas Assessment Exhibit 28: Sunset Master Site Plan Exhibit 29: Sunset Area Planned Action Ordinance Exhibit 30: Sunset Area Planned Action EIS Exhibit 31: Ground Floor Building A Exhibit 32: Ground Floor Building B Exhibit 33: Subdivision Plan Exhibit 34: Architectural Site Plan Exhibit 35: Code Interpretation #134 Exhibit 36: Conceptual Landscape Plan (Black & White) Exhibit 37: Architectural Project Summary Sheet Exhibit 38: Floor Plans Building A Exhibit 39: Floor Plans Building B Exhibit 40: Unit Mix Summary Exhibit 41: Site Section Building A Exhibit 42: Site Section Building B City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 3 of 60 SR_HEX_Solera_Master_Plan_181127 C. GENERAL INFORMATION: 1. Owner(s) of Record: Greater Hilands LLC C/O JSH Properties, 20415 72nd Ave S Suite 180, Kent, WA 98032 / Renton Housing Authority, 2900 NE 10th St, Renton, WA 98056 2. Zoning Classification: Center Village (CV) Urban Design District ‘D’ and Residential Design and Open Space Standards 3. Comprehensive Plan Land Use Designation: Commercial Mixed Use (CMU) 4. Existing Site Use: Shopping Center 5. Critical Areas: None 6. Neighborhood Characteristics: a. North: Multifamily Residential and Fire Station / CV zone b. East: Commercial Retail / CV zone c. South: Commercial Retail, Public Library, and Public Park / CV zone d. West: Multifamily Residential / CV zone 7. Site Area: 10.8 acres D. HISTORICAL/BACKGROUND: Action Land Use File No. Ordinance No. Date Comprehensive Plan N/A 5758 06/22/2015 Zoning N/A 5758 06/22/2015 Epstein Annexation N/A 1246 04/16/1946 Sunset Area Planned Action EIS LUA10-052 N/A 06/06/2011 Renton Sunset Terrace Redevelopment Master Site Plan LUA14-001475 N/A 01/14/2015 Sunset Area Planned Action Ordinance (Revised) N/A 5813 08/08/2016 E. PUBLIC SERVICES: 1. Existing Utilities a. Water: Water service is provided by the City of Renton. There are existing water mains in the following locations:  There is an existing (low-pressure) 8-inch City water main located in Sunset Lane NE with a capacity of 1,000 gallons per minute (gpm).  There is an existing 12-inch City water main located in NE 10th Street.  There is an existing 8-inch City water main located in NE 12th Street with a maximum capacity of 2,000 gpm. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 4 of 60 SR_HEX_Solera_Master_Plan_181127  There is an existing 10-inch City water main located in Kirkland Ave NE with a maximum capacity of 3,300 gpm.  There is an existing 12-inch City water main located in NE Sunset Blvd with a maximum capacity of 4,000 gpm.  There is an existing 12-inch City water main stub located within a public easement in the parking lot of the neighboring Sunset Court Apartments. b. Sewer: Sewer service is provided by the City of Renton. There are existing sewer main in the following locations:  There is an existing 8-inch wastewater main located in Sunset Lane NE  There is an existing 8-inch wastewater main located in the vacated right-of-way of Harrington Place NE  There is an existing 8-inch wastewater main located in NE 10th Street.  There is an existing 18-inch wastewater main located in NE Sunset Blvd  There is an existing 8-inch wastewater main located in NE 12th Street  There is an existing private 8-inch wastewater main located in parcel number -1405 and the northwest portion of parcel -1205 which connects into a catch basin in NE 12th Street c. Surface/Storm Water: There are existing stormwater mains in the following locations:  There is an existing 36-inch stormwater main located in NE 12th Street.  There is an existing 12-inch stormwater main located in Harrington Place NE.  There is an existing 18-inch stormwater main located in NE Sunset Blvd.  There is an existing 12-inch stormwater main located in NE 10th Street. The proposed project is within the City of Renton’s Sunset Lane NE Improvement Plan, which includes the following drainage improvements recently completed by the City:  Installation of a new 12-inch City storm main located in NE 10th Street.  Installation of a new bioretention filtration unit located in the planter strip along NE 10th Street. The Sunset Regional Stormwater Facility, which consists of bioretention cells to infiltrate stormwater, is located in the northeast corner of Sunset Neighborhood Park. A portion of the tributary area directed to the regional facility includes approximately 0.77 acres of the Greater Hi-Land Shopping Center north of NE 10th Street. 2. Streets: The proposed development contains frontage along the following public streets:  Sunset Lane NE along the west property line(s) (internal to the site) of parcel number 7227801205. Sunset Lane NE is classified as a Residential Access Road. Existing right-of-way (ROW) width is approximately 50 feet. No frontage improvements currently exist along Sunset Lane NE.  NE 10th Street along the south property line(s). NE 10th Street is classified as a Residential Access Road. Existing right-of-way (ROW) width is approximately 60 feet. Existing frontage along NE 10th Street includes a new 8-ft sidewalk, landscape strip (width varies from 8-ft to 14-ft based on roadway alignment), 6-foot parking lane with pedestrian bulb-outs on both the north and south sides, 0.5-ft curb and gutter.  NE 12th Street along the north property line(s). NE 12th Street is classified as a Collector Arterial Road. Existing right-of-way (ROW) width is approximately 50 feet. Existing frontage along NE 12th Street includes a 5-ft sidewalk and 0.5-ft curb and gutter.  Kirkland Ave NE along the northeast property line(s). Kirkland Ave NE is classified as a Residential Access Road. Existing right-of-way (ROW) width is approximately 60 feet. Existing frontage along Kirkland Ave NE includes a 6-ft sidewalk, 6-ft landscape strip, and 0.5-ft curb and gutter. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 5 of 60 SR_HEX_Solera_Master_Plan_181127  NE Sunset Blvd (SR 900) along the east property line(s). NE Sunset Blvd is classified as a Principal Arterial Road. Existing right-of-way (ROW) width is approximately 100 feet. Existing frontage along NE Sunset Blvd includes a 5-ft sidewalk and 0.5-ft curb and gutter.  Harrington Place NE along the west property line(s). Harrington Place NE is classified as a Residential Access Road. Existing right-of-way (ROW) width is approximately 50 feet. Existing frontage along Harrington Place NE includes a 6-ft sidewalk and 0.5-ft curb and gutter. 3. Fire Protection: Renton Regional Fire Authority (RRFA) F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE: 1. Chapter 2 Land Use Districts a. Section 4-2-020: Purpose and Intent of Zoning Districts b. Section 4-2-060: Zoning Use Table – Uses Allowed in the Zoning Designations c. Section 4-2-115: Residential Design and Open Space Standards d. Section 4-2-120A: Development Standards for Commercial Zoning Designations (CN, CV, and CA) 2. Chapter 3 Environmental Regulations and Overlay Districts a. Section 4-3-100: Urban Design Regulation 3. Chapter 4 City-Wide Property Development Standards 4. Chapter 6 Streets and Utility Standards a. Section 4-6-030: Drainage (Surface Water) Standards b. Section 4-6-040: Sanitary Sewer Standards c. Section 4-6-060: Street Standards d. Section 4-6-080: Water Service Standards 5. Chapter 7 Subdivision Regulations 6. Chapter 9 Permits – Specific a. Section 4-9-030: Conditional Use Permits b. Section 4-9-200: Master Plan and Site Plan Review c. Section 4-9-250: Variances, Waivers, Modifications, and Alternates 7. Chapter 11 Definitions G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN: 1. Land Use Element 2. Transportation Element 3. Housing and Human Services Element H. FINDINGS OF FACT (FOF): 1. The Planning Division of the City of Renton accepted the above master application for review on July 12, 2018 and determined the application complete on August 7, 2018. The project was placed on-hold on September 24, 2018 to request additional information and was subsequently taken off-hold on October 17 following the submittal of requested items. The project complies with the 120-day review period. 2. A neighborhood meeting facilitated by the applicant was held on February 20, 2018 at the Renton Highlands Library. Approximately 17 members of the public not associated with the project attended the meeing and provided comments and questions regarding the following issues: land uses; parking; traffic; size, bulk, and massing; existing business leases; crime; noise; and population increase to area. See Exhibit 26. 3. The project site is located 2902 NE Sunset Blvd, Renton, WA 98056. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 6 of 60 SR_HEX_Solera_Master_Plan_181127 4. The project site is currently developed with strip retail (Hi-Lands Shopping Center) and a vacant parcel (Piha Site) 5. Access to the site would be provided via NE 10th Street, NE Sunset Blvd, NE 12th St, and Harrington Place NE. A new internal street alignment would extend from NE 10th St and align with Jefferson Ave NE and extend from Harrington Place NE and connect to NE Sunset Blvd. 6. The property is located within the Commercial & Mixed Use (CMU) Comprehensive Plan land use designation. 7. The site is located within the Center Village (CV) zoning classification and within Design District ‘D’. 8. There are approximately 31 trees located on-site. The applicant proposes to retain approximately six (6) trees on the subject property. 9. The site is mapped with isolated regulated slopes up to 25-percent grade however those grades are due to retaining walls and paved slopes abutting buildings. The geotechnical report (Exhibit 22) found no steep slopes on the site and the Critical Areas Assessment (Exhibit 27) found no critical areas on or within 300-feet of the subject property. 10. Approximately 30,000 cubic yards of material would be cut on-site and approximately 15,000 cubic yards of structural fill is proposed to be brought into the site. 11. The applicant is proposing to begin construction in the second quarter of 2019 and end in the fourth quarter of 2022. 12. Staff received no public comment letters on the application. One (1) agency letter was submitted by King County Metro Transit (Exhibit 23) regarding bus stop improvements and the upgrade to RapidRide service to the area. 13. The proposal is a master site plan review with five (5) proposed phases (Exhibit 12) encompassing approximately 10.8 of the subject property. Individual administrative site plan review applications would be submitted with each phase of the proposal prior to submitting civil construction and building permit applications. 14. Portions of Sunset Lane NE within the existing development would require a street vacation based on the proposed improvements on the master site plan. The street vacation process requires separate approval from City Council. The street vacation would be required to occur prior to civil construction permit issuance. 15. The master site plan application includes a preliminary plat with a unit lot subdivision component for the townhome portion of the development. The two (2) mixed use buildings and the existing US Bank building are proposed on two (2) separate lots. 16. The Piha Site, also known as Site ‘G’ of the Renton Sunset Redevelopment Master Site Plan (Exhibit 28), was planned to provide 64 units of housing within the master plan following a minor modification to the plan issued June 20, 2016. 17. The subject property is located within the Sunset Planned Action Area where a Planned Action Ordinance (Ord. 5813) (Exhibit 29) was adopted in accordance with the State Environmental Policy Act (SEPA) for redevelopment of the Sunset Highlands Area. The Final EIS document was issued April 1, 2011 (Exhibit 30). 18. The Environmental Review Committee (ERC) reviewed the Solera Master Plan application and issued a Concurrence Memo designating the proposal a planned action (Exhibit 1) and therefore the project would not require a SEPA threshold determination, preparation of an EIS, or be subject to further environmental review pursuant to SEPA. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 7 of 60 SR_HEX_Solera_Master_Plan_181127 19. Representatives from various city departments have reviewed the application materials to identify and address issues raised by the proposed development. These comments are contained in the official file, and the essence of the comments has been incorporated into the appropriate sections of this report and the Departmental Recommendation at the end of this report. 20. Comprehensive Plan Compliance: The site is designated Commercial & Mixed Use (CMU) on the City’s Comprehensive Plan Map. The purpose of the CMU designation is to allow residential uses as part of mixed-use developments, and support new office and commercial development that is more intensive than what exists to create a vibrant district and increase employment opportunities. The intention of this designation is to transform strip commercial development into business districts through the intensification of uses and with cohesive site planning, landscaping, signage, circulation, parking, and the provision of public amenity features. The proposal is compliant with the following development standards if all conditions of approval are met: Compliance Comprehensive Plan Analysis  Policy L-2: Support compact urban development to improve health outcomes, support transit use, maximize land use efficiency, and maximize public investment in infrastructure and services.  Goal L-H: Plan for high-quality residential growth that supports transit by providing urban densities, promotes efficient land utilization, promotes good health and physical activity, builds social connections, and creates stable neighborhoods by incorporating both built amenities and natural features.  Goal L-I: Utilize multiple strategies to accommodate residential growth, including:  Development of new single-family neighborhoods on large tracts of land outside the City Center,  Development of new multi-family and mixed-use in the City Center and in the Residential High Density and Commercial Mixed Use designations, and  Infill development on vacant and underutilized land in established neighborhoods and multi-family areas.  Goal L-J: Develop well-balanced, attractive, convenient Centers serving the City and the region that create investment opportunities in urban scale development, promote housing close to employment and commercial areas, reduce dependency on automobiles, maximize public investment in infrastructure and services, and promote healthy communities.  Goal L-L: Transform concentrations of linear form commercial areas into multi-use neighborhood centers characterized by enhanced site planning, efficient parking design, coordinated access for all modes of transportation, pedestrian linkages from adjacent uses and nearby neighborhoods, and boulevard treatment.  Policy L-32: Emphasize the use of open ponding and detention, vegetated swales, rain gardens, clean roof run-off, right-of-way landscape strips, open space, and stormwater management techniques that mimic natural systems, maximize water quality and infiltration where appropriate, and which will not endanger groundwater quality.  Goal L-BB: Maintain a high quality of life as Renton grows by ensuring that new development is designed to be functional and attractive. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 8 of 60 SR_HEX_Solera_Master_Plan_181127  Goal L-EE: Build neighborhoods that promote community resiliency through healthy lifestyles, active transportation, proximity to goods and services, access to local fresh food, environmental sustainability, and a feeling of community.  Goal L-FF: Strengthen the visual identity of Renton and its Community Planning Areas and neighborhoods through quality design and development.  Policy L-47: Accommodate change in a way that maintains Renton’s livability and natural beauty.  Policy L-48: Address privacy and quality of life for existing residents by considering scale and context in infill project design.  Policy L-51: Include human-scale features such as pedestrian pathways, quality landscaping, and public spaces that have discernible edges, entries, and borders to create a distinctive sense of place in neighborhoods, commercial areas, and centers.  Policy L-52: Orient buildings in developments toward the street or a common area, rather than toward parking lots.  Policy L-56: Complement the built environment with landscaping using native, naturalized, and ornamental plantings that are appropriate for the situation and circumstance and provide for respite, recreation, and sun/shade.  Policy L-57: Provide complete arranged as an interconnecting network or grid. Locate planter strips between the curb and the sidewalk in order to provide separation between cars and pedestrians. Discourage dead-end streets and cul-de-sacs.  Policy T-1: Develop a connected network of transportation facilities where public streets are planned, designed, constructed, and maintained for safe convenient travel of all users – motor vehicle drivers as well as, pedestrians, bicyclists, and transit riders of all ages and abilities.  Policy T-26: Ensure provision of safe and convenient storage and parking facilities for bicyclists.  Policy T-45: Ensure that new development contributes its fair share of the cost of transportation facilities, programs and services needed to mitigate growth related transportation impacts.  Policy HHS-9: Foster and locate new housing in proximity to Employment Centers and streets that have public transportation systems in place, and complements existing housing.  Policy HHS-23: Support the link between land development and physical activity by increasing options for transit use, walking, and bicycling, such as providing physical connections between residential areas and schools and/or commercial development. 21. Zoning Development Standard Compliance: The purpose of the Center Village Zone (CV) is to encourage redevelopment of existing suburban patterns of commercial and residential development into compact urban development with a pedestrian-oriented, mixed-use center, and community focal point. The zone is intended to revitalize an area, creating a vibrant, urban center where surface parking is discouraged. The proposal is compliant with the following development standards, as outlined in RMC 4-2-120.A, if all conditions of approval are met: Compliance CV Zone Development Standards and Analysis City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 9 of 60 SR_HEX_Solera_Master_Plan_181127 Compliant if condition of approval is met Use: The applicant has proposed to construct attached dwelling units on the subject property in the form of mixed use style apartments on the NE Sunset Blvd frontage and fee simple townhomes west of the proposed apartments. Staff Comment: Pursuant to RMC 4-2-060C, the CV zone allows attached dwelling units subject to special condition 73 which states: Garden style apartments are prohibited. Within the Center Village Zone, ground floor commercial development at a minimum of seventy-five percent (75%) of the frontage of the building is required for all residential projects on parcels abutting NE Sunset Boulevard east of Harrington Avenue NE. The applicant does not propose garden style apartments. The subject property abuts NE Sunset Blvd east of Harrington Ave NE, therefore ground floor commercial at a minimum of 75-percent of the frontage of the building is required for the two (2) buildings identified as Block A and Block B on the site plan (Exhibit 4). The proposed Block A building as shown on sheet A-16 (Exhibit 31) identifies 9,800 square feet of commercial space that is 36-feet in depth along 100-percent of the building’s frontage. The proposed Block B building as shown on sheet A-25 (Exhibit 32) identifies 5,900 square feet designated as a child care facility, a 5,263 square foot area with 40-foot depth identified as commercial/residential amenities, and a 6,435 square foot area with approximately 53-foot depth identified as commercial/residential amenities space. After subtracting the mechanical room, lobby, and stairway, the frontage of Block B consists of commercial and residential amenity space along approximately 80-percent of the building’s frontage. Residential amenity space is not a commercial development and therefore would not meet the special condition requirements for the ground floor. However, the City does acknowledge that ground floor spaces remain underutilized when searching for a commercial tenant and vacant storefront spaces do not contribute to a vibrant pedestrian experience along the building’s frontage. Therefore staff recommends as a condition of approval, the applicant submit revised plans with the administrative site plan review application for Block B that ensures the amenity space shall be temporary in nature and not credited to the open space requirement under Urban Design Regulations District D. The applicant shall construct the space to commercial standards identified in FOF 26 Conditional Use Analysis. The revised plans shall be reviewed and approved by the Current Planning Project Manager prior to Administrative Site Plan issuance. Compliant if condition of approval is met Density: The density range required in the CV zone is a minimum of 20.0 dwelling units per net acre to a maximum 80 dwelling units per net acre. Assisted living bonus: 1.5 times the maximum density may be allowed subject to conditions of RMC 4-9-065. Net density is calculated after the deduction of sensitive areas, areas intended for public right-of-way, and private access easements from the gross site area. Staff Comment: The density calculation is based on the entire master plan site of 470,595 square feet or approximately 10.8 acres. Approximately 54,448 square feet or approximately 1.25 acres would be dedicated as right-of-way or subdivided into tracts (vehicle alleys) resulting in 416,147 square feet or 9.55 net acres. The proposed 673 dwelling units would result in a net density of approximately 70 dwelling units per acre thereby meeting the density requirements of the master plan site. To ensure any future redevelopment or changes to unit count on the master plan site is with the required density range of the zone, staff recommends as a condition of approval, the applicant City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 10 of 60 SR_HEX_Solera_Master_Plan_181127 record a covenant on the underlying properties within the plat requiring that any future division of the lots or increases to density must be consistent with the maximum density requirements as measured within the master site plan as a whole. The applicant shall submit a draft of the covenant with the final plat application for review and approval by the Current Planning Project Manager prior to recording with the King County Recorder’s Office. Compliant if condition of approval is met Lot Dimensions: The minimum lot size required in the CV zone is 25,000 sq. ft. There are no minimum lot width or depth requirements. Staff Comment: The proposed master plan includes a preliminary plat with a unit lot subdivision component for the townhome portion of the site. Unit lot subdivision requirements (RMC 4-7-090F.3) requires the parent site to meet the minimum lot size requirement. As provided on the subdivision plan sheet C1.2 (Exhibit 33), the proposed parent site contain the following lot sizes: R1-20,340 square feet; R2-116,213 square feet; R3-59,328 square feet; and R4-31,376 square feet. Parent site R1 does not contain the minimum lot size for the CV zone therefore staff recommends as a condition of approval the applicant submit a revised master site plan for parent site R1 that contains a minimum lot size of 25,000 square feet. The revised parent site plans shall be reviewed and approved by the Current Planning Project Manager prior to Administrative Site Plan issuance or construction permit issuance whichever occurs first. The remaining lots identified as MU1 and MU2 contain 65,354 square feet and 619 square feet, respectively and therefore meet minimum lot size standards. Partial compliance if conditions of approval are met and Partial compliance to be demonstrated at site plan review Setbacks: The minimum front yard setback is 15 ft. The minimum setback may be reduced to 0 ft. through the site plan review process, provided blank walls are not located within the reduced setback. A maximum front yard setback of 20 ft. is required. The minimum secondary front setback is 15 ft. The minimum setback may be reduced to 0 ft. through the site plan review process, provided blank walls are not located within the reduced setback. The maximum secondary front yard setback is 20 feet. There are no minimum side or rear yard setbacks, except 15 ft. if the lot abuts or is adjacent to a lot zoned residential. Staff Comment: As shown on the architectural site plan sheet A-2 (Exhibit 34), a majority of the site complies with the 15-foot minimum and 20-foot maximum front yard and secondary front yard setbacks. The subject property does not abut or is adjacent to a residential zoned lot therefore not minimum side or year setbacks would apply. Those areas that encroach into the 15-foot minimum setback include the following areas that also contain staff recommendations for moving forward: Mixed Use Buildings A and B along NE Sunset Blvd – The applicant has proposed to construct these two (2) buildings approximately two (2) feet behind the 12-foot wide sidewalk. Staff supports this encroachment based on the following. In order to construct the modified frontage road and parallel parking lane along NE Sunset Blvd, the applicant would dedicate additional ROW frontage along NE Sunset Blvd to provide the space needed to construct these improvements. The frontage road and parking lane provides a benefit for the ground floor commercial as it provides an on-street parking feature that is important to the viability of retail tenants. Additionally the structures would be setback considerably from the vehicle lanes of NE Sunset Blvd by the parking strip, frontage road, and 12-foot wide sidewalks. The effects of the bulk and scale of the buildings directly behind the sidewalk along NE Sunset Blvd would be mitigated by recommended conditions of approval in FOF 22 Design District D Regulations and FOF City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 11 of 60 SR_HEX_Solera_Master_Plan_181127 26 Conditional Use Analysis that would require additional modulation, materials, and articulation features beyond what is typically required and increased floor to ceiling heights for the ground floor retail spaces. Staff support of the setback reduction for the buildings is contingent upon these key features and compliance with the recommended conditions of approval. Mixed Use Building A and B along NE 11th St –The applicant has proposed encroachments for these two (2) buildings along this secondary front yard resulting in a six (6) foot setbacks along NE 11th St. As the Master Site Plan application contain building elevations that are preliminary in nature along this frontage staff does not yet support this modified setback as part of the master plan. Any considerations for minimum setback modifications for this frontage would occur with the Administrative Site Plan for each respective phase and would be based on, in part, on an increased level of detail of the building elevations. Mixed Use Building A along Jefferson Ave NE – The applicant has proposed ground level two story townhomes along this frontage that would be setback approximately 12.5- feet from Jefferson Ave NE. One intent of the front yard setback for ground floor dwelling units is to provide privacy and a comfortable separation for the residents from the public realm. Therefore staff recommends as a condition of approval, the applicant raise the ground floor of the townhome units on Mixed Use Building A a minimum of three (3) feet above the grade of the Jefferson Ave NE sidewalk and provide an elevated stoop entrance for each unit. These ground level features shall be shown on the elevation plans submitted with the Administrative Site Plan Review application to be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. To reduce the bulk and scale of the building along this reduced setback, additional conditions of approval are included in the Conditional Use Analysis (FOF 26) that would step back the upper floors of the building above the townhomes. A key feature to this reduced setback is the townhome style units that provide a transition to the townhomes located across Jefferson Ave NE and the stoops adding privacy to these units. Townhomes along Harrington Pl NE (Block R3 on Subdivision Plan (Exhibit 33)) – The applicant has proposed three (3) townhome clusters to be setback from 3.75 feet at the radius of Harrington Pl NE and NE 11th St and between eight (8) and 10 feet along Harrington Pl NE. Similar to the analysis for Mixed Use Building A, the setback is intended to provide a separation and a transition resulting in privacy for the residents. Additionally, two (2) of these unit cluster would have a decreased setback along the side elevation of the townhome, which is typically an exterior that does not contain the level of articulation and detail that a front elevation would contain. Therefore staff recommends as a condition of approval, the applicant raise the ground floor of the units in the three (3) townhome unit cluster buildings in Block R3 a minimum of three (3) feet above the grade of the NE 11th St and Harrington Pl NE sidewalk and provide an elevated stoop entrance for each unit. Additionally, the applicant shall provide articulation, materials, and glazing along the side elevations of the townhomes facing the street that is similar to a front elevation. These ground level features and additional exterior side wall articulation shall be shown on the elevation plans submitted with the Administrative Site Plan Review application to be reviewed and approved by the Current Planning Project Manager. Compliant if condition of Building Standards: The CV zone has a maximum building coverage 65% of total lot area or 75% if parking is provided within the building or within an on-site parking City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 12 of 60 SR_HEX_Solera_Master_Plan_181127 approval is met garage. The maximum building height permitted is 50 ft., except 60 ft. if the ground floor of the building is in commercial use. Staff Comment: The proposed master plan indicates all parking would be provided within a building, structured parking for the two mixed use buildings and individual parking garages for the townhomes. Building coverage would be calculated for each parent site (R1 through R4) for the townhome unit lot subdivision portion of the site. Building coverage for the two (2) mixed use blocks (MU1 and MU2) would each have their own calculation. The applicant has not provided how each parent site and mixed use lot meets the building coverage limitation of 75-percent. Therefore staff recommends as a condition of approval the applicant submit building coverage calculations with exhibit graphic that identifies compliance with the 75-percent lot coverage limitation for each parent site and mixed use lot with each Administrative Site Plan Review application. The building coverage calculations shall be reviewed and approved by the Current Planning Project Manager prior to Administrative Site Plan issuance. The applicant is requesting a conditional use permit to exceed the 60-foot height limitation for Mixed Use Buildings A and B, see Conditional Use Analysis FOF 26. The townhomes are residential only and therefore would be limited to 50-feet in height. The proposed townhome elevations (Exhibit 10) indicate three-story structures that would be approximately 40-feet in height. Compliance to be demonstrated at site plan review Building Orientation: See urban design regulations in RMC 4-3-100. Commercial and civic uses shall provide entry features on all sides of a building facing a public right-of- way or parking lot. The front entry of residential only uses shall be oriented to a public or private street developed to the required standards in RMC 4-6-060. Staff Comment: The proposed commercial uses on the ground floor of Mixed Use Building A and B are shown with entries along NE Sunset Blvd on site plan sheet A-2 (Exhibit 34). As this is a Master Plan Review application, the building elevations are preliminary in nature. Further review of the specific entry features would occur with refined elevation plans submitted with the Administrative Site Plan Review and associated building permit application. The townhome component of the master site plan (residential only uses) identifies front entries both oriented to public streets and also those that orient toward a pedestrian court such as those townhomes on the west side of parent site R2 and R3 or pedestrian only areas such as those townhomes on the north side of parent site R1 and south side of parent site R4. The land use application is subject to Code Interpretation #134 effective March 1, 2018 (Exhibit 35) that provides an exception to the residential only use public street orientation standards of the CV zone as the townhomes are a unit lot subdivision. Compliance to be demonstrated at site plan review Landscaping: The City’s landscape regulations (RMC 4-4-070) require a 10-foot landscape strip along all public street frontages. Additional minimum planting strip widths between the curb and sidewalk are established according to the street development standards of RMC 4-6-060. Street trees and, at a minimum, groundcover, are to be located in this area when present. Spacing standards shall be as stipulated by the Department of Community and Economic Development, provided there shall be a minimum of one street tree planted per address. Any additional undeveloped right-of- way areas shall be landscaped unless otherwise determined by the Administrator. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 13 of 60 SR_HEX_Solera_Master_Plan_181127 All parking lots shall have perimeter landscaping as follows: Such landscaping shall be at least ten feet (10') in width as measured from the street right-of-way. Standards for planting shall be as follows: Trees shall be two inches (2") in diameter at breast height (dbh) for multi-family, commercial, and industrial uses at an average minimum rate of one tree per thirty (30) lineal feet of street frontage. Shrubs at the minimum rate of one per twenty (20) square feet of landscaped area. Up to fifty percent (50%) of shrubs may be deciduous. Ground cover in sufficient quantities to provide at least ninety percent (90%) coverage of the landscaped area within three (3) years of installation. Surface parking lots with more than fourteen (14) stalls shall be landscaped as follows: Surface parking lots with between 15 and 50 spaces shall provide 15 sf of landscaping per parking space, 51 and 99 spaces shall provide 25 sf of landscaping per parking space, and 100 or more spaces shall provide 35 sf of landscaping per parking space. Perimeter parking lot landscaping shall be at least 10 feet in width, interior parking lot landscaped areas shall have a minimum width of 5 feet. Staff Comment: The conceptual landscape plan (Exhibit 36) generally provides the 10- foot wide landscape strip along public street frontages with the exception of those areas shown with setback encroachments. Street trees are shown in planter strips along each right of way including the separated planter along NE Sunset Blvd. The site does not contain a surface parking lot and therefore no parking related landscaping would be necessary. Compliance with the street frontage landscaping and street tree species/spacing would occur as a component of each individual Administrative Site Plan Review application and/or civil construction permit application. Compliant if condition of approval is met Tree Retention: The City’s adopted Tree Retention and Land Clearing Regulations (4- 4-130) require the retention of 10 percent of trees in commercial developments. Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater than twenty percent (20%); significant trees adjacent to critical areas and their associated buffers; and significant trees over sixty feet (60') in height or greater than eighteen inches ( 18") caliper. Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen or deciduous trees; and other significant non-native trees. Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods are used as part of an approved enhancement project within a critical area or its buffer. Staff Comment: The applicant’s arborist report prepared by Creative Landscape Solutions, dated March 3, 2018 (Exhibit 13) and Tree Retention Plan (Exhibit 14) was submitted with the land use application. The 31 onsite trees are located in and around the US Bank building located on proposed lot MU2. The remaining trees are located in future right of ways and are not considered significant trees. Of the 31 trees, the report identifies 13 as being viable and mentions that no trees would be retained but instead City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 14 of 60 SR_HEX_Solera_Master_Plan_181127 replaced at the rate of 12 caliper inches per protected tree removed. As the site would be required to retain one (1) tree or 10-percent of the 13 significant trees a total of 12 caliper inches was identified as replacement in the arborist report. The Tree Retention Plan differs from the arborist report as it identifies the retention of six (6) significant trees near the US Bank building. It appears there was no consideration of attempting to retain trees 856-859 although they are located outside of a proposed building and within a future open space. Additionally, existing street trees 862 and 863 are proposed to be removed which appear they may be able to remain as the planter strip will increase in size. The general landscaping standards (RMC 4-4-070G.3) require the redevelopment of properties to retain existing trees when possible and minimize the impact of tree loss during development. Therefore staff recommends as a condition of approval, the applicant submit a revised arborist report and tree retention plan with the civil construction permit application that considers the retention of trees 856-859 and 862-863. The arborist report shall identify best practices for working in and around drip lines of the retained trees. The revised arborist report and tree retention plan shall be reviewed and approved by the Current Planning Project Manager prior the permit issuance. N/A Vehicular Access: A connection shall be provided for site-to-site vehicle access ways, where topographically feasible, to allow a smooth flow of traffic across abutting CA lots without the need to use a street. Access may comprise the aisle between rows of parking stalls, but is not allowed between a building and a public street. Staff Comment: Not applicable. The subject property does not contain any surface parking lots or aisles ways to connect offsite. Compliance to be demonstrated at site plan review Parking: Residential Uses: Required parking shall be located underground or under building (on the first floor of the structure), or in an attached or detached structure. Any additional parking may not be located between the building and public street unless located within a structured parking garage. Commercial Uses: Parking may not be located between the building and the public street unless located within a structured parking garage. Mixed Use: Joint use of parking facilities may be authorized for those uses that have dissimilar peak-hour demands or when it can be demonstrated that the parking facilities to be shared are underutilized per RMC 4-4-080.E.3 Parking regulations require that a minimum of one (1) space and maximum of 1.75 spaces per dwelling unit be provided for attached dwelling units Standard parking stall dimensions are 9 feet by 20 feet, compact stall dimensions are 8 ½ feet by 16 feet. Staff Comment: For the Master Site Plan level of review the applicant has generally provided the number of required parking spaces for the dwelling units and has accounted for parking for future commercial uses. The applicant proposes a total of 906 vehicle parking spaces for the development. The parking requirements for each building and townhome with regard to quantity and stall dimensions will be verified with each Administrative Site Plan Review application. The applicant would be required to demonstrate adequate parking is provided as each site development plan is more refined in later stages of City review. The following is a summary of parking proposed by the applicant for the Master Plan. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 15 of 60 SR_HEX_Solera_Master_Plan_181127 The applicant proposes to provide all parking in structured parking within Mixed Use Buildings A and B or in individual townhome unit garages. Surface loading spaces are proposed off Alley Tract C to accommodate the daycare center in Mixed Use Building B. No parking is proposed between a building and public street. Proposed Mixed Use Building A would contain 296 dwelling units with approximately 9,800 square feet of gross ground floor commercial. The applicant has proposed to provide a total of 378 parking spaces within Mixed Use Building A. The project summary sheet (Exhibit 37) identifies 329 spaces allocated for the dwelling units and 49 spaces allocated for the ground floor commercial. Proposed Mixed Use Building B would contain 225 dwelling units, a 5,900 square foot daycare, and 11,698 square feet of gross floor area of commercial space. The applicant has proposed to provide a total of 284 spaces within Mixed Use Building B. The project summary sheet identifies 229 spaces for the dwelling units, 30 spaces for the ground floor commercial, and 25 spaces for the daycare. The proposed unit lot subdivision would provide 152 fee simple townhomes. The applicant has proposed 244 parking spaces within the garages of the townhomes. Additional public parking would be provided via public on street parking along Jefferson Ave NE, NE 11th St., and the new frontage road proposed off of NE Sunset Boulevard. These public parking stalls would not be including in the minimum parking requirements for each development, private off street parking would be required to be provided to meet the codes minimum standards. Compliance to be demonstrated at site plan review Bicycle Parking: For commercial development, the number of bicycle parking spaces shall be equal to ten percent (10%) of the number of required off-street vehicle parking spaces. For the attached residential, bicycle parking is required at a rate of one-half (0.5) bicycle parking space per one (1) dwelling unit. Staff Comment: The applicant has stated on the project summary sheet (Exhibit 37) that 449 bicycle parking spaces would be provided for the Master Site Plan. Mixed Us e Building A would provide 153 spaces, Mixed Use Building B would provide 144 spaces, and each townhome would provide one (1) space per dwelling unit. The master plan application does not provide the level of detail to verify compliance with the bicycle parking standards of RMC 4-4-080F.11, however these requirements would be verified with each Administrative Site Plan Review application.  Fences and Retaining Walls: A maximum of eight feet (8') anywhere on the lot provided the fence, retaining wall or hedge does not stand in or in front of any required landscaping or pose a traffic vision hazard. There shall be a minimum three-foot (3') landscaped setback at the base of retaining walls abutting public rights-of-way. Staff Comment: The master site plan’s proposed grading plan (Exhibit 18) and landscape plan (Exhibit 36) does not identify any fences or retaining walls. The Administrative Site Plan Review applications for each phase will confirm compliance with fence and retaining wall standards should they be proposed in further refined plans. Compliance to be demonstrated Refuses and Recycling: A minimum of one and one-half (1-1/2) square feet per dwelling unit in multi-family residences shall be provided for recyclables deposit areas, except where the development is participating in a City-sponsored program in which City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 16 of 60 SR_HEX_Solera_Master_Plan_181127 at site plan review and Compliant if condition of approval is met individual recycling bins are used for curbside collection. A minimum of three (3) square feet per dwelling unit shall be provided for refuse deposit areas. A total minimum area of eighty (80) square feet shall be provided for refuse and recyclables deposit areas. Multi-family residences using 35-gallon garbage carts or smaller, when allowed, shall meet the storage space, screening, and location requirements of RMC 4-4-090D.2 In retail developments, a minimum of five (5) square feet per every one thousand (1,000) square feet of building gross floor area shall be provided for recyclables deposit areas and a minimum of ten (10) square feet per one thousand (1,000) square feet of building gross floor area shall be provided for refuse deposit areas. A total minimum area of one hundred (100) square feet shall be provided for recycling and refuse deposit areas. Staff Comment: Mixed Use Buildings ‘A’ and ‘B’ have proposed to provide refuse and recycling space within their respective parking garages (Exhibits 31 and 32). The required space allocation for refuse and recycling would be reviewed for compliance with the Administrative Site Plan Review applications. Refuse and recycling space allocation is unclear for unit lot townhome units. No exterior garbage enclosures are shown on the site plan and therefore it is likely the applicant would request these units to utilize individual carts for each unit per RMC 4-4-090D.2. Therefore staff recommends as a condition of approval, the applicant submit a refuse and recycling plan with the Administrative Site Plan applications for each unit lot subdivision block that identifies the required refuse and recycling space for each townhome unit and the exterior space allocated for pick-up day. Additionally, the applicant shall provide written approval from the City’s refuse and recycling contracted collector that adequate space for truck maneuvering is provided. The refuse and recycling plans and refuse/recycling written approvals shall be reviewed and approved by the Current Planning Manager prior site plan issuance. Compliance to be demonstrated at site plan review Screening: All onsite surface mounted utility equipment shall be screened from public view. Screening shall consist of equipment cabinets enclosing the utility equipment, solid fencing or a wall of a height at least as high as the equipment it screens, or a landscaped visual barrier allowing for reasonable access to equipment. Equipment cabinets, fencing, and walls shall be made of materials and/or colors compatible with building materials. All operating equipment located on the roof of any building shall be enclosed so as to be screened from public view. Staff Comment: As the master plan is preliminary in nature, the location of surface mounted utility equipment is not clear and any potential utility equipment shown on the utility plan (Exhibit 17) may change when final engineering of the site is being prepared. Landscape plans with the civil construction permit would be reviewed to ensure a visual barrier is provided when needed. Additionally, for those utility cabinets in rights-of-way that cannot be screened with landscaping or solid fencing, can be screened with artists wraps to soften their appearance and add a placemaking feature to the development. Similar to the ground surface mounted equipment, roof top equipment is not provided on the building elevations. The building elevations are intended to convey scale and massing and would be reviewed further for rooftop equipment screening at the time of Administrative Site Plan Review. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 17 of 60 SR_HEX_Solera_Master_Plan_181127 22. Design District Review: The project site is located within Design District ‘D’, however only the Mixed Use Building Blocks A and B would be subject to District D review as the townhome unit lot subdivision is subject to the R-10 and R-14 Design and Open Space Standards of RMC 4-2-115 per Code Interpretation #134 (Exhibit 35). The following table contains project elements intended to comply with the standards of the Design District ‘D’ Standards and guidelines, as outlined in RMC 4-3-100.E, however the building elevations submitted with the master site plan application are preliminary in nature and intended to convey massing and height. Detailed building elevations would be required with each individual Administrative Site Plan Review application to confirm compliance with District ‘D’ requirements: Compliance Design District Guideline and Standard Analysis 1. SITE DESIGN AND BUILDING LOCATION: Intent: To ensure that buildings are located in relation to streets and other buildings so that the Vision of the City of Renton can be realized for a high-density urban environment; so that businesses enjoy visibility from public rights-of-way; and to encourage pedestrian activity. a. Building Location and Orientation: Intent: To ensure visibility of businesses and to establish active, lively uses along sidewalks and pedestrian pathways. To organize buildings for pedestrian use and so that natural light is available to other structures and open space. To ensure an appropriate transition between buildings, parking areas, and other land uses; and increase privacy for residential uses. Guidelines: Developments shall enhance the mutual relationship of buildings with each other, as well as with the roads, open space, and pedestrian amenities while working to create a pedestrian oriented environment. Lots shall be configured to encourage variety and so that natural light is available to buildings and open space. The privacy of individuals in residential uses shall be provided for.  Standard: The availability of natural light (both direct and reflected) and direct sun exposure to nearby buildings and open space (except parking areas) shall be considered when siting structures. Staff Comment: As provided in the solar study (Exhibit 11), the mixed use buildings would not shade neighboring civic spaces at the Sunset Neighborhood Park or Highlands Library. The proposed townhome pedestrian courts would be outside of any afternoon shading. Summer afternoon shading would occur on NE Sunset Blvd and on the existing US Bank building. Shading would extend into the morning hours during the Spring Equinox and Winter Solstice, however these months the sun is often obscured by clouds.  Standard: Buildings shall be oriented to the street with clear connections to the sidewalk. Staff Comment: The mixed use buildings are located on NE Sunset Blvd with glazing and commercial uses along the frontage. Connections to the sidewalk are identified on the architectural site plan (Exhibit 34).  Standard: The front entry of a building shall be oriented to the street or a landscaped pedestrian-only courtyard. Staff Comment: The commercial entries of the proposed buildings are oriented to NE Sunset Blvd. The residential entry for Mixed Use Building ‘A’ is located on NE 11th St. The residential entry for Mixed Use Building ‘B’ identifies a prominent entry on NE 11th St and potential subordinate residential entries on NE Sunset Blvd. To ensure adequate on street parking remains for the ground floor commercial along the frontage road City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 18 of 60 SR_HEX_Solera_Master_Plan_181127 and to ensure privacy for residents, ground floor entrances along NE Sunset Blvd shall be reserved for the retail component of the building. Therefore staff recommends as a condition of approval the applicant submit revised floor plans with the Administrative Site Plan Review application for Building ‘B’ that limits residential entries to the NE 11th St frontage. The revised floor plans shall be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. Compliant if condition of approval is met Standard: Buildings with residential uses located at the street level shall be: a. Set back from the sidewalk a minimum of ten feet (10') and feature substantial landscaping between the sidewalk and the building; or b. Have the ground floor residential uses raised above street level for residents’ privacy. Staff Comment: Mixed Use Building ‘A’ proposes residential units along Jefferson Lane NE that is setback approximately 11-feet from the sidewalk, which does not meet the CV zone minimum secondary setback requirement of 15-feet. Staff recommended a condition of approval in FOF 21 Zoning Development Standard Compliance: Setbacks that the applicant raise the ground floor height a minimum of three feet above the grade of the sidewalk and provide an elevated stoop entrance for those units. b. Building Entries: Intent: To make building entrances convenient to locate and easy to access, and ensure that building entries further the pedestrian nature of the fronting sidewalk and the urban character of the district. Guidelines: Primary entries shall face the street, serve as a focal point, and allow space for social interaction. All entries shall include features that make them easily identifiable while reflecting the architectural character of the building. The primary entry shall be the most visually prominent entry. Pedestrian access to the building from the sidewalk, parking lots, and/or other areas shall be provided and shall enhance the overall quality of the pedestrian experience on the site. Compliance to be demonstrated at site plan review Standard: A primary entrance of each building shall be located on the facade facing a street, shall be prominent, visible from the street, connected by a walkway to the public sidewalk, and include human-scale elements. Staff Comment: The building elevations are preliminary for the master site plan application and intended to convey massing and height. Detailed elevations would be provided with the individual Administrative Site Plan Review application phase to confirm compliance with the entrance requirements. Compliance to be demonstrated at site plan review Standard: A primary entrance of each building shall be made visibly prominent by incorporating architectural features such as a facade overhang, trellis, large entry doors, and/or ornamental lighting. Staff Comment: See discussion above. Compliance to be demonstrated at site plan review Standard Building entries from a street shall be clearly marked with canopies, architectural elements, ornamental lighting, or landscaping and include weather protection at least four and one-half feet (4-1/2') wide (illustration below). Buildings that are taller than thirty feet (30') in height shall also ensure that the weather protection is proportional to the distance above ground level. Staff Comment: See discussion above. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 19 of 60 SR_HEX_Solera_Master_Plan_181127 N/A Standard: Building entries from a parking lot shall be subordinate to those related to the street. Staff Comment: Not applicable. Parking would be provided within the building’s structured parking garage. Compliance to be demonstrated at site plan review Standard: Features such as entries, lobbies, and display windows shall be oriented to a street or pedestrian-oriented space; otherwise, screening or decorative features should be incorporated. Staff Comment: See discussion above.  Standard: Multiple buildings on the same site shall direct views to building entries by providing a continuous network of pedestrian paths and open spaces that incorporate landscaping. Staff Comment: Mixed Use Block A would contain two (2) buildings. Pedestrian connections are provided as shown on the colored landscape plan (Exhibit 4) between the existing bank and Mixed Use Building A. Compliance to be demonstrated at site plan review Standard: Ground floor residential units that are directly accessible from the street shall include entries from front yards to provide transition space from the street or entries from an open space such as a courtyard or garden that is accessible from the street. Staff Comment: The ground floor units in Mixed Use Building A are accessed from a landscaped setback of approximately 11-feet. Street frontage landscaping consisting of trees, shrubs, and groundcover would be required. Compliance with this requirement would be confirmed with the Administrative Site Plan Review application. c. Transition to Surrounding Development: Intent: To shape redevelopment projects so that the character and value of Renton’s long-established, existing neighborhoods are preserved. Guidelines: Careful siting and design treatment shall be used to achieve a compatible transition where new buildings differ from surrounding development in terms of building height, bulk and scale. Compliant is condition of approval is met and Compliance to be demonstrated at site plan review Standard: At least one of the following design elements shall be used to promote a transition to surrounding uses: 1. Building proportions, including step-backs on upper levels in accordance with the surrounding planned and existing land use forms; or 2. Building articulation to divide a larger architectural element into smaller increments; or 3. Roof lines, roof pitches, and roof shapes designed to reduce apparent bulk and transition with existing development. Additionally, the Administrator may require increased setbacks at the side or rear of a building in order to reduce the bulk and scale of larger buildings and/or so that sunlight reaches adjacent and/or abutting yards. Staff Comment: The building elevations are preliminary for the master site plan application and intended to convey massing and height. Detailed elevations would be provided with the individual Administrative Site Plan Review application phase to confirm compliance with the transition requirements, however a recommended City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 20 of 60 SR_HEX_Solera_Master_Plan_181127 condition of approval from FOF 26 Conditional Use Analysis would provide a step-back above the ground floor townhome units in Mixed Use Building ‘A’ along the Jefferson Ave NE elevation. d. Service Element Location and Design: Intent: To reduce the potential negative impacts of service elements (i.e., waste receptacles, loading docks) by locating service and loading areas away from high-volume pedestrian areas, and screening them from view in high visibility areas. Guidelines: Service elements shall be concentrated and located so that impacts to pedestrians and other abutting uses are minimized. The impacts of service elements shall be mitigated with landscaping and an enclosure with fencing that is made of quality materials. Service areas not adjacent to streets, pathways, or pedestrian-oriented spaces are encouraged to implement vegetative screening in addition to or as part of service enclosures.  Standard: Service elements shall be located and designed to minimize the impacts on the pedestrian environment and adjacent uses. Service elements shall be concentrated and located where they are accessible to service vehicles and convenient for tenant use. Staff Comment: Service elements are proposed to be located within the structured parking levels inside of Mixed Use Buildings A and B (Exhibit 31 and 32).  Standard: In addition to standard enclosure requirements, garbage, recycling collection, and utility areas shall be enclosed on all sides, including the roof and screened around their perimeter by a wall or fence and have self-closing doors. Staff Comment: The refuse and recycling areas are located within the structured parking levels of Mixed Use Buildings A and B. N/A Standard: Service enclosures shall be made of masonry, ornamental metal or wood, or some combination of the three (3). Staff Comment: Not applicable. Enclosures are within the buildings. N/A Standard: If the service area is adjacent to a street, pathway, or pedestrian-oriented space, a landscaped planting strip, minimum 3 feet wide, shall be located on 3 sides of such facility. Staff Comment: Not applicable. See above. e. Gateways: Intent: To distinguish gateways as primary entrances to districts or to the City, special design features and architectural elements at gateways should be provided. While gateways should be distinctive within the context of the district, they should also be compatible with the district in form and scale. Guidelines: Service elements shall be concentrated and located so that impacts to pedestrians and other abutting uses are minimized. The impacts of service elements shall be mitigated with landscaping and an enclosure with fencing that is made of quality materials. N/A Standard: Developments located at district gateways shall be marked with visually prominent features. Staff Comment: Not applicable. The site is not located in a district gateway. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 21 of 60 SR_HEX_Solera_Master_Plan_181127 N/A Standard: Gateway elements shall be oriented toward and scaled for both pedestrians and vehicles. Staff Comment: Not applicable. See above. N/A Standard: Visual prominence shall be distinguished by two (2) or more of the following: a. Public art; b. Special landscape treatment; c. Open space/plaza; d. Landmark building form; e. Special paving, unique pedestrian scale lighting, or bollards; f. Prominent architectural features (trellis, arbor, pergola, or gazebo); g. Neighborhood or district entry identification (commercial signs do not qualify). Staff Comment: Not applicable. See above. 2. PARKING AND VEHICULAR ACCESS: Intent: To provide safe, convenient access to the Urban Center and the Center Village; incorporate various modes of transportation, including public mass transit, in order to reduce traffic volumes and other impacts from vehicles; ensure sufficient parking is provided, while encouraging creativity in reducing the impacts of parking areas; allow an active pedestrian environment by maintaining contiguous street frontages, without parking lot siting along sidewalks and building facades; minimize the visual impact of parking lots; and use access streets and parking to maintain an urban edge to the district. a. Surface Parking: Intent: To maintain active pedestrian environments along streets by placing parking lots primarily in back of buildings. Guidelines: Surface parking shall be located and designed so as to reduce the visual impact of the parking area and associated vehicles. Large areas of surface parking shall also be designed to accommodate future infill development.  Standard: Parking shall be located so that no surface parking is located between: a. A building and the front property line; and/or b. A building and the side property line (when on a corner lot). Staff Comment: No surface parking is proposed with the project. A vehicle loading area is located in Alley Tract C for the daycare, as required by RMC 4-4-080F.10.d, behind Mixed Use Building B.  Standard: Parking shall be located so that it is screened from surrounding streets by buildings, landscaping, and/or gateway features as dictated by location. Staff Comment: See comment above. b. Structured Parking Garages: Intent: To promote more efficient use of land needed for vehicle parking; encourage the use of structured parking; physically and visually integrate parking garages with other uses; and reduce the overall impact of parking garages. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 22 of 60 SR_HEX_Solera_Master_Plan_181127 Guidelines: Parking garages shall not dominate the streetscape; they shall be designed to be complementary with adjacent and abutting buildings. They shall be sited to complement, not subordinate, pedestrian entries. Similar forms, materials, and/or details to the primary building(s) should be used to enhance garages.  Standard: Parking structures shall provide space for ground floor commercial uses along street frontages at a minimum of seventy five percent (75%) of the building frontage width. Staff Comment: The applicant would provide ground floor commercial space along NE Sunset Blvd as required by the Zoning Use Table and recommended condition of approval see FOF 21. Compliance to be demonstrated at site plan review Standard: The entire facade must feature a pedestrian-oriented facade. The Administrator of the Department of Community and Economic Development may approve parking structures that do not feature a pedestrian orientation in limited circumstances. If allowed, the structure shall be set back at least six feet (6') from the sidewalk and feature substantial landscaping. This landscaping shall include a combination of evergreen and deciduous trees, shrubs, and ground cover. This setback shall be increased to ten feet (10') when abutting a primary arterial and/or minor arterial. Staff Comment: The building elevations are preliminary for the master site plan application and intended to convey massing and height. Detailed elevations would be provided at the individual Administrative Site Plan Review application phase to confirm compliance with facade requirements. Compliance to be demonstrated at site plan review Standard: Public facing facades shall be articulated by arches, lintels, masonry trim, or other architectural elements and/or materials. Staff Comment: See discussion above.  Standard: The entry to the parking garage shall be located away from the primary street, to either the side or rear of the building. Staff Comment: The entrance to Mixed Use Building A is proposed along NE 11th St and Mixed Use Building B would provide a vehicle entrance via the alley behind the building. Compliance to be demonstrated at site plan review Standard: Parking garages at grade shall include screening or be enclosed from view with treatment such as walls, decorative grilles, trellis with landscaping, or a combination of treatments. Staff Comment: The conceptual elevations of Mixed Use Building ‘B’ identify approximately 14-feet of landscape screen along the rear alley to screen the exposed parking structure. The remaining portions of the parking structure would be screened by the daycare, commercial space and residential amenities. Mixed Use Building ‘A’ as currently designed identifies the structured parking would be completely screened along Jefferson Lane NE by residential townhomes, along NE 11th St., by residential lobby space, and along NE Sunset Blvd with commercial space. The only portion of parking structure exposed would be located between the bank and the open space on the northeast side of the building. Landscaping is proposed on this side of the building on Block A in sufficient widths to screen the structures. The details of the parking lot screening would be reviewed at site specific site plan review, however the key features of this application shall be retained which includes parking structures screened with City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 23 of 60 SR_HEX_Solera_Master_Plan_181127 commercial and residential on 3 of the 4 sides and landscape screening between 14 and 15 feet on exposed sides. Compliance to be demonstrated at site plan review Standard: The Administrator of the Department of Community and Economic Development or designee may allow a reduced setback where the applicant can successfully demonstrate that the landscaped area and/or other design treatment meets the intent of these standards and guidelines. Possible treatments to reduce the setback include landscaping components plus one or more of the following integrated with the architectural design of the building: a. Ornamental grillwork (other than vertical bars); b. Decorative artwork; c. Display windows; d. Brick, tile, or stone; e. Pre-cast decorative panels; f. Vine-covered trellis; g. Raised landscaping beds with decorative materials; or h. Other treatments that meet the intent of this standard... Staff Comment: See discussion above. c. Vehicular Access: Intent: To maintain a contiguous and uninterrupted sidewalk by minimizing, consolidating, and/or eliminating vehicular access off streets. Guidelines: Vehicular access to parking garages and parking lots shall not impede or interrupt pedestrian mobility. The impacts of curb cuts to pedestrian access on sidewalks shall be minimized.  Standard: Access to parking lots and garages shall be from alleys, when available. If not available, access shall occur at side streets. Staff Comment: Access to the parking garage for Mixed Use Building A would be provided from a side street (NE 11th St) as an alley is not available. Access to the parking garage for Mixed Use Building B would be from Alley Tract C behind the building.  Standard: The number of driveways and curb cuts shall be minimized for vehicular access purposes, so that pedestrian circulation along the sidewalk is minimally impeded. Staff Comment: A single curb cut would be provided Mixed Use Building A on NE 11th St and Mixed Use Building B would not need a curb cut as access would be provided from an abutting alley. 3. PEDESTRIAN ENVIRONMENT: Intent: To enhance the urban character of development in the Urban Center and the Center Village by creating pedestrian networks and by providing strong links from streets and drives to building entrances; make the pedestrian environment safer and more convenient, comfortable, and pleasant to walk between businesses, on sidewalks, to and from access points, and through parking lots; and promote the use of multi-modal and public transportation systems in order to reduce other vehicular traffic. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 24 of 60 SR_HEX_Solera_Master_Plan_181127 a. Pedestrian Circulation: Intent: To create a network of linkages for pedestrians to improve safety and convenience and enhance the pedestrian environment. Guidelines: The pedestrian environment shall be given priority and importance in the design of projects. Sidewalks and/or pathways shall be provided and shall provide safe access to buildings from parking areas. Providing pedestrian connections to abutting properties is an important aspect of connectivity and encourages pedestrian activity and shall be considered. Pathways shall be easily identifiable to pedestrians and drivers. Partial compliance demonstrated. Additional items to be reviewed at site plan review Standard: A pedestrian circulation system of pathways that are clearly delineated and connect buildings, open space, and parking areas with the sidewalk system and abutting properties shall be provided. a. Pathways shall be located so that there are clear sight lines, to increase safety. b. Pathways shall be an all-weather or appropriate permeable walking surface material, unless the applicant can demonstrate that the proposed surface is appropriate for the anticipated number of users and complementary to the design of the development. Staff Comment: Both mixed use buildings would contain public sidewalks along each of their respective street frontages. As shown on the colored landscape plan (Exhibit 4), the north side of Mixed Use Building ‘A’ would have a series of pedestrians connections from the building to the US Bank, open space area, and connection to the sidewalk along Kirkland Ave NE. Surface material of the pedestrian pathways would be reviewed with the Administrative Site Plan Review application. N/A Standard: Pathways within parking areas shall be provided and differentiated by material or texture (i.e., raised walkway, stamped concrete, or pavers) from abutting paving materials. Permeable materials are encouraged. The pathways shall be perpendicular to the applicable building facade and no greater than one hundred fifty feet (150') apart. Staff Comment: Not applicable. No surface parking areas are proposed.  Standard: Sidewalks and pathways along the facades of buildings shall be of sufficient width to accommodate anticipated numbers of users. Specifically: a. Sidewalks and pathways along the facades of mixed use and retail buildings 100 or more feet in width (measured along the facade) shall provide sidewalks at least 12 feet in width. The walkway shall include an 8 foot minimum unobstructed walking surface. b. Interior pathways shall be provided and shall vary in width to establish a hierarchy. The widths shall be based on the intended number of users; to be no smaller than five feet (5') and no greater than twelve feet (12'). c. For all other interior pathways, the proposed walkway shall be of sufficient width to accommodate the anticipated number of users. Staff Comment: The sidewalks along both mixed use buildings on the NE Sunset Blvd frontage would be 12-feet wide. Sidewalks along NE 11th would be 5-feet wide and pathways north of Mixed Use Building A are shown as 6-feet wide on the colored landscape plan (Exhibit 4). City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 25 of 60 SR_HEX_Solera_Master_Plan_181127  Standard: Mid-block connections between buildings shall be provided. Staff Comment: The proposed blocks MU1 and MU2 are relatively narrow (approximately 240-feet) along NE 11th Street. Curb-bulb marked crosswalks would be provided on NE 11th St at the intersections of Jefferson Ave NE and NE Sunset Blvd. Therefore a mid-block connection between Mixed Use Buildings A and B would not be necessary.  Standard: Permeable pavement pedestrian circulation features shall be used where feasible, consistent with the Surface Water Design Manual. Staff Comment: Permeable pavement may be considered during Administrative Site Plan Review. b. Pedestrian Amenities: Intent: To create attractive spaces that unify the building and street environments and are inviting and comfortable for pedestrians; and provide publicly accessible areas that function for a variety of year- round activities, under typical seasonal weather conditions. Guidelines: The pedestrian environment shall be given priority and importance in the design of projects. Amenities that encourage pedestrian use and enhance the pedestrian experience shall be included. Compliance to be demonstrated at site plan review Standard: Architectural elements that incorporate plants, particularly at building entrances, in publicly accessible spaces and at facades along streets, shall be provided. Staff Comment: The building elevations and landscaping for the master site plan are preliminary in nature and are not refined to the scale that would identify architectural elements, pedestrian amenities, and weather protection. Both Mixed Use Buildings A and B would be required to provide such amenities and the Administrative Site Plan Review application for each phase would identify how this requirement would be met. Compliance to be demonstrated at site plan review Standard: Amenities such as outdoor group seating, benches, transit shelters, fountains, and public art shall be provided. a. Site furniture shall be made of durable, vandal- and weather-resistant materials that do not retain rainwater and can be reasonably maintained over an extended period of time. b. Site furniture and amenities shall not impede or block pedestrian access to public spaces or building entrances. Staff Comment: See comment above. Compliance to be demonstrated at site plan review Standard: Pedestrian overhead weather protection in the form of awnings, marquees, canopies, or building overhangs shall be provided. These elements shall be a minimum of four and one-half feet (4-1/2') wide along at least seventy five percent (75%) of the length of the building facade facing the street, a maximum height of fifteen feet (15') above the ground elevation, and no lower than eight feet (8') above ground level. Staff Comment: See comment above. 4. RECREATION AREAS AND COMMON OPEN SPACE: Intent: To ensure that areas for both passive and active recreation are available to residents, workers, and visitors and that these areas are of sufficient size for the intended activity and in convenient locations. To create usable and inviting open space that is accessible to the public; and to promote pedestrian activity on streets particularly at street corners. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 26 of 60 SR_HEX_Solera_Master_Plan_181127 Guidelines: Developments located at street intersections should provide pedestrian-oriented space at the street corner to emphasize pedestrian activity (illustration below). Recreation and common open space areas are integral aspects of quality development that encourage pedestrians and users. These areas shall be provided in an amount that is adequate to be functional and usable; they shall also be landscaped and located so that they are appealing to users and pedestrians Compliance to be demonstrated at site plan review Standard: All mixed use residential and attached housing developments of ten (10) or more dwelling units shall provide common opens space and/or recreation areas. a. At minimum, fifty (50) square feet per unit shall be provided. b. The location, layout, and proposed type of common space or recreation area shall be subject to approval by the Administrator. c. Open space or recreation areas shall be located to provide sun and light exposure to the area and located so that they are aggregated to provide usable area(s) for residents. d. For projects with more than one hundred (100) dwelling units, vegetated low impact development facilities may be used in required or provided open space where feasible and designed consistent with the Surface Water Design Manual. Such facilities shall be counted towards no more than fifty percent (50%) of the required open space. e. At least one of the following shall be provided in each open space and/or recreation area (the Administrator may require more than one of the following elements for developments having more than one hundred (100) units): i. Courtyards, plazas, pea patches, or multi-purpose open spaces; ii. Upper level common decks, patios, terraces, or roof gardens. Such spaces above the street level must feature views or amenities that are unique to the site and are provided as an asset to the development; iii. Pedestrian corridors dedicated to passive recreation and separate from the public street system; iv. Recreation facilities including, but not limited to, tennis/sports courts, swimming pools, exercise areas, game rooms, or other similar facilities; or v. Children’s play spaces that are centrally located near a majority of dwelling units and visible from surrounding units. They shall also be located away from hazardous areas such as garbage dumpsters, drainage facilities, and parking areas. f. The following shall not be counted toward the common open space or recreation area requirement: i. Required landscaping, driveways, parking, or other vehicular use areas. ii. Required yard setback areas. Except for areas that are developed as private or semi-private (from abutting or adjacent properties) courtyards, plazas or passive use areas containing landscaping and fencing sufficient to create a fully usable area accessible to all residents of the development. iii. Private decks, balconies, and private ground floor open space. iv. Other required landscaping and sensitive area buffers without common access links, such as pedestrian trails. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 27 of 60 SR_HEX_Solera_Master_Plan_181127 Staff Comment: The Master Site Plan proposed elevations and floor plans (Exhibits 8, 9 and 38, 39) identify podium level exterior areas, courtyard, and rooftop areas that may be considered common open space. Each building would be subject to the common open space and/or recreation areas standards noted above. Compliance with these requirements would occur with the individual Administrative Site Plan Review application for each phase. Compliant if condition of approval is met Standard: All buildings and developments with over thirty thousand (30,000) square feet of nonresidential uses (excludes parking garage floorplate areas) shall provide pedestrian-oriented space. a. The pedestrian-oriented space shall be provided according to the following formula: 1% of the site area + 1% of the gross building area, at minimum. b. The pedestrian-oriented space shall include all of the following: i. Visual and pedestrian access (including barrier-free access) to the abutting structures from the public right-of-way or a nonvehicular courtyard; and ii. Paved walking surfaces of either concrete or approved unit paving; and iii. On-site or building-mounted lighting providing at least four (4) foot- candles (average) on the ground; and iv. At least three (3) lineal feet of seating area (bench, ledge, etc.) or one individual seat per sixty (60) square feet of plaza area or open space. c. The following areas shall not count as pedestrian-oriented space: i. The minimum required walkway. However, where walkways are widened or enhanced beyond minimum requirements, the area may count as pedestrian-oriented space if the Administrator determines such space meets the definition of pedestrian-oriented space. ii. Areas that abut landscaped parking lots, chain link fences, blank walls, and/or dumpsters or service areas. d. Outdoor storage (shopping carts, potting soil bags, firewood, etc.) is prohibited within pedestrian-oriented space. Staff Comment: The nonresidential uses subject to District ‘D’ regulations are Mixed Use Buildings ‘A’ and ‘B’ and the US Bank building that total approximately 33,292 square feet and therefore the pedestrian oriented space would be required. In order to determine how the applicant would meet the pedestrian oriented open space requirement for the District ‘D’ portion of the site, staff recommends as a condition of approval, the applicant submit a revised master plan detailing how the pedestrian oriented space requirements will be met based on the cumulative nonresidential use square footage of Mixed Use Buildings ‘A’ and ‘B’ and the US Bank building prior to the initial Administrative Site Plan Review application. The revised master plan shall be reviewed and approved by the Current Planning Project Manager prior to the first site plan issuance. N/A Standard: Public plazas shall be provided at intersections identified in the Commercial Arterial Zone Public Plaza Locations Map and as listed below: a. Benson Area: Benson Drive S./108th Avenue S.E. and S.E. 176th. b. Bronson Area: Intersections with Bronson Way North at: City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 28 of 60 SR_HEX_Solera_Master_Plan_181127 i. Factory Avenue N./Houser Way S.; ii. Garden Avenue N.; and iii. Park Avenue N. and N. First Street. c. Cascade Area: Intersection of 116th Avenue S.E. and S.E. 168th Street. d. Northeast Fourth Area: Intersections with N.E. Fourth at: i. Duvall Avenue N.E.; ii. Monroe Avenue N.E.; and iii. Union Avenue N.E. e. Grady Area: Intersections with Grady Way at: i. Lind Avenue S.W.; ii. Rainier Avenue S.; iii. Shattuck Avenue S.; and iv. Talbot Road S. f. Puget Area: Intersection of S. Puget Drive and Benson Road S. g. Rainier Avenue Area: Intersections with Rainier Avenue S. at: i. Airport Way/Renton Avenue S.; ii. S. Second Street; iii. S. Third Street/S.W. Sunset Boulevard; iv. S. Fourth Street; and v. S. Seventh Street. h. North Renton Area: Intersections with Park Avenue N. at: i. N. Fourth Street; and ii. N. Fifth Street. i. Northeast Sunset Area: Intersections with N.E. Sunset Boulevard at: i. Duvall Avenue N.E.; and ii. Union Avenue N.E. Staff Comment: Not applicable N/A Standard: The plaza shall measure no less than one thousand (1,000) square feet with a minimum dimension of twenty feet (20') on one side abutting the sidewalk. Staff Comment: Not applicable N/A Standard: The public plaza must be landscaped consistent with RMC 4-4-070, including at minimum street trees, decorative paving, pedestrian-scaled lighting, and seating. Vegetated low impact development facilities may be used in the plaza where feasible and designed consistent with the Surface Water Design Manual. Such facilities shall count towards no more than fifty percent (50%) of the plaza requirement. Staff Comment: Not applicable City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 29 of 60 SR_HEX_Solera_Master_Plan_181127 5. BUILDING ARCHITECTURAL DESIGN: Intent: To encourage building design that is unique and urban in character, comfortable on a human scale, and uses appropriate building materials that are suitable for the Pacific Northwest climate. To discourage franchise retail architecture. a. Building Character and Massing: Intent: To ensure that buildings are not bland and visually appear to be at a human scale; and ensure that all sides of a building, that can be seen by the public, are visually interesting. Guidelines: Building facades shall be modulated and/or articulated to reduce the apparent size of buildings, break up long blank walls, add visual interest, and enhance the character of the neighborhood. Articulation, modulation, and their intervals should create a sense of scale important to residential buildings. Compliance to be demonstrated at site plan review Standard: All building facades shall include modulation or articulation at intervals of no more than forty feet (40'). Staff Comment: The building elevations are preliminary for the master site plan application and intended to convey massing and height. Detailed elevations would be provided with the individual Administrative Site Plan Review application phase to confirm compliance with the building architectural design requirements. Compliance to be demonstrated at site plan review Standard: Modulations shall be a minimum of two feet (2') deep, sixteen feet (16') in height, and eight feet (8') in width. Staff Comment: See discussion above. Compliance to be demonstrated at site plan review Standard: Buildings greater than one hundred sixty feet (160') in length shall provide a variety of modulations and articulations to reduce the apparent bulk and scale of the facade (illustration in District B, below); or provide an additional special feature such as a clock tower, courtyard, fountain, or public gathering area. Staff Comment: See discussion above. b. Ground-Level Details: Intent: To ensure that buildings are visually interesting and reinforce the intended human-scale character of the pedestrian environment; and ensure that all sides of a building within near or distant public view have visual interest. Guidelines: The use of material variations such as colors, brick, shingles, stucco, and horizontal wood siding is encouraged. The primary building entrance should be made visibly prominent by incorporating architectural features such as a facade overhang, trellis, large entry doors, and/or ornamental lighting (illustration below). Detail features should also be used, to include things such as decorative entry paving, street furniture (benches, etc.), and/or public art. Compliance to be demonstrated at site plan review Standard: Human-scaled elements such as a lighting fixture, trellis, or other landscape feature shall be provided along the facade’s ground floor. Staff Comment: The building elevations are preliminary for the master site plan application and intended to convey massing and height. Detailed elevations would be provided with the individual Administrative Site Plan Review application phase to confirm compliance with the ground level detail requirements. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 30 of 60 SR_HEX_Solera_Master_Plan_181127 Compliance to be demonstrated at site plan review Standard: On any facade visible to the public, transparent windows and/or doors are required to comprise at least 50 percent of the portion of the ground floor facade that is between 4 feet and 8 feet above ground (as measured on the true elevation). Staff Comment: See discussion above. Compliance to be demonstrated at site plan review Standard: Upper portions of building facades shall have clear windows with visibility into and out of the building. However, screening may be applied to provide shade and energy efficiency. The minimum amount of light transmittance for windows shall be 50 percent. Staff Comment: See discussion above. Compliance to be demonstrated at site plan review Standard: Display windows shall be designed for frequent change of merchandise, rather than permanent displays. Compliance to be demonstrated at site plan review Standard: Where windows or storefronts occur, they must principally contain clear glazing. Staff Comment: See discussion above. Compliance to be demonstrated at site plan review Standard: Tinted and dark glass, highly reflective (mirror-type) glass and film are prohibited. Staff Comment: See discussion above. Compliance to be demonstrated at site plan review Standard: Untreated blank walls visible from public streets, sidewalks, or interior pedestrian pathways are prohibited. A wall (including building facades and retaining walls) is considered a blank wall if: a. It is a ground floor wall or portion of a ground floor wall over 6 feet in height, has a horizontal length greater than 15 feet, and does not include a window, door, building modulation or other architectural detailing; or b. Any portion of a ground floor wall has a surface area of 400 square feet or greater and does not include a window, door, building modulation or other architectural detailing. Staff Comment: See discussion above. Compliance to be demonstrated at site plan review Standard: If blank walls are required or unavoidable, blank walls shall be treated with one or more of the following: a. A planting bed at least five feet in width containing trees, shrubs, evergreen ground cover, or vines adjacent to the blank wall; b. Trellis or other vine supports with evergreen climbing vines; c. Architectural detailing such as reveals, contrasting materials, or other special detailing that meets the intent of this standard; d. Artwork, such as bas-relief sculpture, mural, or similar; or e. Seating area with special paving and seasonal planting. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 31 of 60 SR_HEX_Solera_Master_Plan_181127 Staff Comment: See discussion above. c. Building Roof Lines: Intent: To ensure that roof forms provide distinctive profiles and interest consistent with an urban project and contribute to the visual continuity of the district. Guidelines: Building roof lines shall be varied and include architectural elements to add visual interest to the building. Compliance to be demonstrated at site plan review Standard: Buildings shall use at least one of the following elements to create varied and interesting roof profiles: a. Extended parapets; b. Feature elements projecting above parapets; c. Projected cornices; d. Pitched or sloped roofs e. Buildings containing predominantly residential uses shall have pitched roofs with a minimum slope of one to four (1:4) and shall have dormers or interesting roof forms that break up the massiveness of an uninterrupted sloping roof. Staff Comment: The building elevations are preliminary for the master site plan application and intended to convey massing and height. Detailed elevations would be provided with the individual Administrative Site Plan Review application phase to confirm compliance with the building roof line requirements. d. Building Materials: Intent: To ensure high standards of quality and effective maintenance over time; encourage the use of materials that reduce the visual bulk of large buildings; and encourage the use of materials that add visual interest to the neighborhood. Guidelines: Building materials are an important and integral part of the architectural design of a building that is attractive and of high quality. Material variation shall be used to create visual appeal and eliminate monotony of facades. This shall occur on all facades in a consistent manner. High quality materials shall be used. If materials like concrete or block walls are used they shall be enhanced to create variation and enhance their visual appeal. Compliance to be demonstrated at site plan review Standard: All sides of buildings visible from a street, pathway, parking area, or open space shall be finished on all sides with the same building materials, detailing, and color scheme, or if different, with materials of the same quality. Staff Comment: The building elevations are preliminary for the master site plan application and intended to convey massing and height. Detailed elevations would be provided with the individual Administrative Site Plan Review application phase to confirm compliance with the building materials requirements. Compliance to be demonstrated at site plan review Standard: All buildings shall use material variations such as colors, brick or metal banding, patterns or textural changes. Staff Comment: See discussion above. Compliance to be demonstrated Standard: Materials, individually or in combination, shall have texture, pattern, and be detailed on all visible facades. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 32 of 60 SR_HEX_Solera_Master_Plan_181127 at site plan review Staff Comment: See discussion above. Compliance to be demonstrated at site plan review Standard: Materials shall be durable, high quality, and consistent with more traditional urban development, such as brick, integrally colored concrete masonry, pre-finished metal, stone, steel, glass and cast-in-place concrete. Staff Comment: See discussion above. Compliance to be demonstrated at site plan review Standard: If concrete is used, walls shall be enhanced by techniques such as texturing, reveals, and/or coloring with a concrete coating or admixture. Staff Comment: See discussion above. Compliance to be demonstrated at site plan review Standard: If concrete block walls are used, they shall be enhanced with integral color, textured blocks and colored mortar, decorative bond pattern and/or shall incorporate other masonry materials. Staff Comment: See discussion above. Compliance to be demonstrated at site plan review Standard: All buildings shall use material variations such as colors, brick or metal banding, patterns, or textural changes. Staff Comment: See discussion above. 6. SIGNAGE: In addition to the City’s standard sign regulations, developments within Urban Design Districts C and D are also subject to the additional sign restrictions found in RMC 4-4-100G, urban design sign area regulations. Modifications to the standard requirements found in RMC 4-4-100G are possible for those proposals that can comply with the Design District criteria found in RMC 4-3-100F, Modification of Minimum Standards. For proposals unable to meet the modification criteria, a variance is required. Compliant if condition of approval is met Standard: Signage shall be an integral part of the design approach to the building. Staff Comment: A sign package was not submitted with the Master Site Plan application. As there will be a combination of mixed use buildings and townhome blocks within the development, staff recommends as a condition of approval, the applicant submit a cohesive sign package for the master plan site with the initial administrative site plan review application. The sign package shall be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. Future signage will require a separate sign permit and will require compliance with the signage standards outlined in the special requirements for signs within an urban design area (RMC 4-4-100G). Compliance not yet demonstrated Standard: In mixed use and multi-use buildings, signage shall be coordinated with the overall building design. Staff Comment: See discussion above. Compliance not yet demonstrated Standard: Corporate logos and signs shall be sized appropriately for their location. Staff Comment: See discussion above. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 33 of 60 SR_HEX_Solera_Master_Plan_181127 Compliance not yet demonstrated Standard: Entry signs shall be limited to the name of the larger development. Staff Comment: See discussion above. Compliance not yet demonstrated Standard: Alteration of trademarks notwithstanding, corporate signage should not be garish in color nor overly lit, although creative design, strong accent colors, and interesting surface materials and lighting techniques are encouraged. Staff Comment: See discussion above. Compliance not yet demonstrated Standard: Front-lit, ground-mounted monument signs are the preferred type of freestanding sign. Staff Comment: See discussion above. Compliance not yet demonstrated Standard: Blade type signs, proportional to the building facade on which they are mounted, are encouraged on pedestrian-oriented streets. Staff Comment: See discussion above. Compliance not yet demonstrated Standard: All of the following are prohibited: a. Pole signs; b. Roof signs; and c. Back-lit signs with letters or graphics on a plastic sheet (can signs or illuminated cabinet signs). Exceptions: Back-lit logo signs less than ten (10) square feet are permitted as area signs with only the individual letters back-lit (see illustration, subsection G8 of this Section). Staff Comment: See discussion above. Compliance not yet demonstrated Standard: Freestanding ground-related monument signs, with the exception of primary entry signs, shall be limited to five feet (5') above finished grade, including support structure. Staff Comment: See discussion above. Compliance not yet demonstrated Standard: Freestanding signs shall include decorative landscaping (ground cover and/or shrubs) to provide seasonal interest in the area surrounding the sign. Alternately, signage may incorporate stone, brick, or other decorative materials as approved by the Director. Staff Comment: See discussion above. 7. LIGHTING: Intent: To ensure safety and security; provide adequate lighting levels in pedestrian areas such as plazas, pedestrian walkways, parking areas, building entries, and other public places; and increase the visual attractiveness of the area at all times of the day and night. Guidelines: Lighting that improves pedestrian safety and also that creates visual interest in the building and site during the evening hours shall be provided. Compliance not yet determined Standard: Pedestrian-scale lighting shall be provided at primary and secondary building entrances. Examples include sconces on building facades, awnings with down-lighting and decorative street lighting. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 34 of 60 SR_HEX_Solera_Master_Plan_181127 Staff Comment: The Master Site Plan application did not provide details regarding lighting. Lighting requirements will be reviewed for compliance with each individual Administrative Site Plan Review application and/or subsequent building permit application. Compliance not yet determined Standard: Accent lighting shall also be provided on building facades (such as sconces) and/or to illuminate other key elements of the site such as gateways, specimen trees, other significant landscaping, water features, and/or artwork. Staff Comment: See discussion above. Compliance not yet determined Standard: Downlighting shall be used in all cases to assure safe pedestrian and vehicular movement, unless alternative pedestrian scale lighting has been approved administratively or is specifically listed as exempt from provisions located in RMC 4-4- 075, Lighting, Exterior On-Site (i.e., signage, governmental flags, temporary holiday or decorative lighting, right-of-way-lighting, etc.). Staff Comment: See discussion above. 23. Design Standards: Residential Design and Open Space Standards (RMC 4-2-115) as applied to the R-10 and R-14 zones are applicable in the CV zone for townhome unit lot subdivision per Code Interpretation #134 (Exhibit 35) effective March 1, 2018. The Standards implement policies established in the Land Use Element of the Comprehensive Plan. The standards of the Site Design subsection are required to be addressed at the time of subdivision application. The standards of the Residential Design subsection are required to be addressed at the time of application for building permits. The standards of Residential Design are required to be addressed for the building for which the building permit is being issued. The proposal is consistent with the following design standards, unless noted otherwise: Compliance Design Standards R-10 and R-14 zones and Analysis  Lot Configuration: Developments of more than four (4) structures shall incorporate a variety of home sizes, lot sizes, and unit clusters. Dwellings shall be arranged to ensure privacy so that side yards abut other side yards (or rights-of-way) and do not abut front or back yards. Lots accessed by easements or pipestems shall be prohibited. Staff Comment: As provided on the architectural site plan A-2 (Exhibit 34), the unit lot subdivision consists of 27 structures. The Unit Lot Subdivision Plan sheet C-1.3 (Exhibit 5) identifies a range of lot sizes from 811 square feet to 2,229 square feet. The unit mix summary sheet A-4 (Exhibit 40) identifies eight (8) different unit types ranging in size from 1,814 square feet to 2,714 square feet. Unit clusters range in size from three (3) units to eight (8) units. As shown on the Unit Lot Subdivision Plan, side yards abut other side yards or alleys and do not abut front or back yards. All lots are accessed via alleys that will be placed in tracts per unit lot subdivision parent site requirements (RMC 4-7-090F.3).  Lots shall be configured to achieve both of the following: 1. The location of stormwater infiltration LID facilities is optimized, consistent with the Surface Water Design Manual. Building and property line setbacks are specified in the Surface Water Design Manual for infiltration facilities. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 35 of 60 SR_HEX_Solera_Master_Plan_181127 2. Soils with good infiltration potential for stormwater management are preserved to the maximum extent practicable as defined by the Surface Water Design Manual. Staff Comment: As shown on the Grading Plan (Exhibit 18), the applicant has proposed a series of bioretention areas throughout the unit lot subdivision. Locations of those areas may change due to open space requirements.  Garages: Garages may be attached or detached. Shared garages are also allowed, provided the regulations of RMC 4-4-080 are met. Carports are not allowed. One of the following is required: 1. The front porch projects in front of the garage a minimum of five feet (5’), and is a minimum of twelve feet (12’) wide, or 2. The garage is detached and set back from the front of the house and/or porch at least six feet (6'). Additionally, all of the following is required: 1. Garage design shall be of similar design to the homes, and 2. If sides of the garage are visible from streets, sidewalks, pathways, trails, or other homes, architectural details shall be incorporated in the design. If shared garages are allowed, they may share the structure with other homes and all of the following is required: 1. Each unit has garage space assigned to it, and 2. The garage is not to be located further than one hundred sixty feet (160') from any of the housing units to which it is assigned, and 3. The garage shall not exceed forty four feet (44') in width, and shall maintain an eight foot (8') separation from any dwellings. Staff Comment: As shown on the Colored Landscape Plan (Exhibit 4), the townhomes would contain attached and alley loaded garages and garages would not be located on the front façade of the home.  Standards for Parks: For developments that are less than ten (10) net acres: No park is required, but is allowed. For developments that are greater than ten (10) net acres: A minimum of one one- half (.5) acre park, in addition to the common open space requirement, is required. Staff Comment: The unit lot townhome portion of the site is approximately 6.1 net acres. The applicant has chosen not to provide a 0.5 acre park. Compliant of condition if approval is met Standards for Common Open Space: Developments of three (3) or fewer dwelling units: No requirement to provide common open space. Developments of four (4) or more units: Required to provide common open space as outlined below. Above ground drainage facilities (i.e., ponds, swales, ditches, rain gardens, etc.) shall not be counted towards the common open space requirement. 1. For each unit in the development, three hundred fifty (350) square feet of common open space shall be provided. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 36 of 60 SR_HEX_Solera_Master_Plan_181127 2. Open space shall be designed as a park, common green, pea-patch, pocket park, or pedestrian entry easement in the development and shall include picnic areas, space for recreational activities, and other activities as appropriate. 3. Open space shall be located in a highly visible area and be easily accessible to the neighborhood. 4. Open space(s) shall be contiguous to the majority of the dwellings in the development and accessible to all dwellings, and shall be at least twenty feet (20') wide. 5. A pedestrian entry easement can be used to meet the access requirements if it has a minimum width of twenty feet (20') with a minimum five feet (5') of sidewalk. 6. Pea-patches shall be at least one thousand (1,000) square feet in size with individual plots that measure at least ten feet by ten feet (10' x 10'). Additionally, the pea-patch shall include a tool shed and a common area with space for compost bins. Water shall be provided to the pea-patch. Fencing that meets the standards for front yard fencing shall surround the pea-patch with a one foot (1') landscape area on the outside of the fence. This area is to be landscaped with flowers, plants, and/or shrubs. 7. Grass-crete or other pervious surfaces may be used in the common open space for the purpose of meeting the one hundred fifty feet (150') distance requirement for emergency vehicle access but shall not be used for personal vehicle access or to meet off-street parking requirements. 8. Common open space areas shall have a maximum slope of five percent (5%). 9. Obstructions, such as retaining walls and fences, shall not be placed in common open spaces. Staff Comment: The Colored Landscape Plan (Exhibit 4) identifies pedestrian courts, pedestrian easements, and open spaces but does not provide easily identifiable dimensions or square footage calculations to determine whether the spaces meet the minimum requirements. Additionally, it does not appear that a majority of the townhomes are contiguous to the open spaces as required and many of the open spaces contain drainage facilities in the form of bioretention facilities such as rain gardens and swales. As the Master Site Plan does not indicate how the unit lot subdivision component of the plan would meet the common open space requirement, staff recommends as a condition of approval, the applicant submit a revised master plan with the first Administrative Site Plan Review application that clearly indicates the amount of common open space meeting the standards of RMC 4-2.115E.2 is provided. Any deficiencies in standards for common open space may be satisfied via a fee-in-lieu as permitted by RMC 4-1-240B.3 with the fee paid prior to the issuance of the civil construction permit. The revised master plan shall be reviewed and approved by the Current Planning Project Manager prior to the first Administrative Site Plan issuance. Compliant of condition if approval is met Standards for Private Yards: Developments of three (3) or fewer dwelling units: Each individual dwelling shall have a private yard that is at minimum six hundred (600) square feet in size. Backyard patios and reciprocal use easements may be included in the calculation of private yard. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 37 of 60 SR_HEX_Solera_Master_Plan_181127 Developments of four (4) or more dwelling units: Each ground-related dwelling shall have a private yard that is at least two hundred fifty (250) square feet in size with no dimension less than eight feet (8') in width. An additional two hundred fifty (250) square feet of open space per unit shall be added to the required amount of common open space for each unit that is not ground related. Staff Comment: The Colored Landscape Plan (Exhibit 4) appears to identify a front yard for each townhome unit however dimensions and total square footage is not easily identifiable to confirm compliance. Therefore staff recommends as a condition of approval, the applicant submit an exhibit for each townhome unit with their respective Administrative Site Plan Review application that clearly identifies the each dwelling unit contains a minimum of 250 square feet of private yard space with no dimension less than 8-feet in width. The exhibits shall be reviewed and approved by the Current Planning Project Manager prior to each individual Administrative Site Plan issuance. Compliant if condition of approval is met Sidewalks, Pathways, and Pedestrian Easements: All of the following are required: 1. Sidewalks shall be provided throughout the neighborhood. The sidewalk may disconnect from the road, provided it continues in a logical route throughout the development. Permeable pavement sidewalks shall be used where feasible, consistent with the Surface Water Design Manual. 2. Front yards shall have entry walks that are a minimum width of three feet (3') and a maximum width of four feet (4'). 3. Pathways shall be used to connect common parks, green areas, and pocket parks to residential access streets, limited residential access streets, or other pedestrian connections. They may be used to provide access to homes and common open space. They shall be a minimum three feet (3') in width and made of paved asphalt, concrete, or porous material such as: porous paving stones, crushed gravel with soil stabilizers, or paving blocks with planted joints. Sidewalks or pathways for parks and green spaces shall be located at the edge of the common space to allow a larger usable green and easy access to homes. 4. Pedestrian Easement Plantings: Shall be planted with plants and trees. Trees are required along all pedestrian easements to provide shade and spaced twenty feet (20') on center. Shrubs shall be planted in at least fifteen percent (15%) of the easement and shall be spaced no further than thirty six inches (36") on center. 5. For all homes that do not front on a residential access street, limited residential access street, a park, or a common green: Pedestrian entry easements that are at least fifteen feet (15') wide plus a five-foot (5') sidewalk shall be provided. Staff Comment: As provided on the Colored Landscape Plan (Exhibit 4), sidewalks are provided throughout the neighborhood on the public street system. Pathways are also provided between unit clusters for pedestrian cut-through access east/west through the neighborhood. Front yards contain entry walks that are 4-feet wide. Entry walk requirements will also be confirmed with the building permit application. Plantings within pedestrian easements will be reviewed with the landscape plan associated with the Administrative Site Plan Review application and associated civil construction permit. The Unit Lot Subdivision Plan (Exhibit 5) and Colored Landscape Plan (Exhibit 4) identifies Lots 7-12, 46, 54, 57, 66, 69, 116, and 125 as appearing to not front a City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 38 of 60 SR_HEX_Solera_Master_Plan_181127 residential access street, park, common green, or pedestrian entry easement. Therefore staff recommends as a condition of approval, The applicant submit a revised master site plan to identify that Lots 7-12, 46, 54, 57, 66, 69, 116, and 125 comply with primary entry requirements of RMC 4-2-115E.2 and 3. The revised master site plan shall be reviewed and approved by the Current Planning Project Manager prior to Administrative Site Plan issuance or construction permit issuance, whichever occurs first. Compliance not yet demonstrated Primary Entry: Both of the following are required: 1. The entry shall take access from and face a street, park, common green, pocket park, pedestrian easement, or open space, and 2. The entry shall include a porch or stoop with a minimum depth of five feet (5') and minimum height twelve inches (12") above grade. Exception: in cases where accessibility (ADA) is a priority, an accessible route may be taken from a front driveway. Staff Comment: Compliance for this standard would be verified at the time of building permit review. See also discussion above. Compliance not yet demonstrated Facade Modulation: Both of the following are required: 1. The primary building elevation oriented toward the street or common green shall have at least one articulation or change in plane of at least two feet (2') in depth; and 2. A minimum one side articulation that measures at least one foot (1') in depth shall occur for all facades facing streets or public spaces. Staff Comment: The Master Site Plan application elevations and renderings are preliminary in nature and do not provide the level of detail to confirm compliance with modulation standards. These standards would be reviewed for compliance with the Administrative Site Plan Review application and/or building permit review. Compliance not yet demonstrated Windows and Doors: All of the following are required: 1. Primary windows shall be proportioned vertically, rather than horizontally, and 2. Vertical windows may be combined together to create a larger window area, and 3. All doors shall be made of wood, fiberglass, metal, or glass and trimmed with three and one-half inches (3 1/2") minimum head and jamb trim around the door, and 4. Screen doors are permitted, and 5. Primary entry doors shall face a street, park, common green, pocket park, or pedestrian easement and shall be paneled or have inset windows, and 6. Sliding glass doors are not permitted along a frontage elevation or an elevation facing a pedestrian easement. Staff Comment: Compliance for this standard would be verified with the Administrative Site Plan Review application and/or at the time of building permit review. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 39 of 60 SR_HEX_Solera_Master_Plan_181127 Compliance not yet demonstrated Scale, Bulk, and Character: All of the following are required: 1. The primary building form shall be the dominating form and elements such as porches, principal dormers, or other significant features shall not dominate, and 2. Primary porch plate heights shall be one story. Stacked porches are allowed, and 3. To differentiate the same models and elevations, different colors shall be used, and 4. For single-family dwellings, no more than two (2) of the same model and elevation shall be built on the same block frontage and the same model and elevation shall not be abutting. Staff Comment: Compliance for this standard would be verified with the Administrative Site Plan Review application and/or at the time of building permit review. Compliance not yet demonstrated Roofs: Both of the following are required: 1. A variety of roofing colors shall be used within the development and all roof material shall be fire retardant; and 2. Single-family residential subdivisions shall use a variety of roof forms appropriate to the style of the home. Staff Comment: Compliance for this standard would be verified at the time of building permit review. Compliance not yet demonstrated Eaves: The following is required: Eaves shall be at least twelve inches (12") with horizontal fascia or fascia gutter at least five inches (5") deep on the face of all eaves. Staff Comment: Compliance for this standard would be verified with the Administrative Site Plan Review application and/or at the time of building permit review. Compliance not yet demonstrated Architectural Detailing: All of the following are required: 1. Three and one-half inches (3 1/2") minimum trim surrounds all windows and details all doors, and 2. At least one of the following architectural details shall be provided on each home: shutters, knee braces, flower boxes, or columns, and 3. Where siding is used, metal corner clips or corner boards shall be used and shall be at minimum two and one-half inches (2 1/2") in width and painted. If shutters are used, they shall be proportioned to the window size to simulate the ability to cover them, and 4. If columns are used, they shall be round, fluted, or strongly related to the home's architectural style. Six inches by six inches (6" x 6") posts may be allowed if chamfered and/or banded. Exposed four inches by four inches (4" x 4") and six inches by six inches (6" x 6") posts are prohibited. Staff Comment: Compliance for this standard would be verified with the Administrative Site Plan Review application and/or at the time of building permit review. Compliance to be Materials and Color: City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 40 of 60 SR_HEX_Solera_Master_Plan_181127 demonstrated at site plan review All of the following are required: 1. Acceptable exterior wall materials are: wood, cement fiberboard, stucco, stone, and standard sized brick three and one-half inches by seven and one- half inches (3 1/2" x 7 1/2") or three and five eighths inches by seven and five- eighths inches (3 5/8" x 7 5/8"). Simulated stone, wood, stone, or brick may be used to detail homes, and 2. When more than one material is used, changes in a vertical wall, such as from wood to brick, shall wrap the corners no less than twenty four inches (24"). The material change shall occur at an internal corner or a logical transition such as aligning with a window edge or chimney. Material transition shall not occur at an exterior corner, and 3. Multiple colors on buildings shall be provided. Muted deeper tones, as opposed to vibrant primary colors, shall be the dominant colors. Color palettes for all new structures, coded to the home elevations, shall be submitted for approval. 4. Gutters and downspouts shall be integrated into the color scheme of the home and be painted, or of an integral color, to match the trim color. Staff Comment: Compliance for this standard would be verified with the Administrative Site Plan Review application. Compliance not yet demonstrated Mail and Newspapers: All of the following are required: 1. Mailboxes shall be clustered and located so as to serve the needs of USPS while not adversely affecting the privacy of residents; 2. Mailboxes shall be lockable consistent with USPS standard; 3. Mailboxes shall be architecturally enhanced with materials and details typical of the home's architecture; and 4. Newspaper boxes shall be of a design that reflects the character of the home. Staff Comment: Compliance for this standard would be verified at the time of civil construction permit review. Compliance not yet demonstrated Hot Tubs, Pools, and Mechanical Equipment: Hot tubs and pools shall only be located in back yards and designed to minimize sight and sound impacts to adjoining property. Pool heaters and pumps shall be screened from view and sound insulated. Pool equipment must comply with codes regarding fencing. Staff Comment: Compliance for this standard would be verified at the time of building permit review. Compliance not yet demonstrated Utilities: Utility boxes that are not located in alleyways or away from public gathering spaces shall be screened with landscaping or berms. Staff Comment: Compliance for this standard would be verified at the time of civil construction permit review. Compliance not yet demonstrated Dumpster/Trash/Recycling Collection Area: Both of the following are required: City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 41 of 60 SR_HEX_Solera_Master_Plan_181127 1. Trash and recycling containers shall be located so that they have minimal impact on residents and their neighbors and so that they are not visible to the general public; and 2. A screened enclosure in which to keep containers shall be provided or garages shall be built with adequate space to keep containers. Screened enclosures shall not be located within front yards. Staff Comment: See FOF XX Zoning and Development Compliance: Refuse and Recycling 24. Master Plan Review: Pursuant to RMC 4-9-200.B2, Site Plan Review is required for development in the CV zoning classification. In lieu of Site Plan Review, the applicant has requested Master Plan Review of the proposal as permitted by RMC 4-9-200B.1. Master plans will be evaluated for general compliance with the criteria in the table below and to ensure that nothing in the master plan will preclude development of a site plan in full compliance with the criteria: Compliance Site Plan Criteria and Analysis Compliant if conditions of approval are met a. Comprehensive Plan Compliance and Consistency. Staff Comment: See previous discussion under FOF 20, Comprehensive Plan Analysis. Compliant if conditions of approval are met b. Zoning Compliance and Consistency. Staff Comment: See discussion under FOF 21, Zoning Development Standard Compliance. Compliant if conditions of approval are met c. Design Regulation Compliance and Consistency. Staff Comment: See discussion under FOF 22, Design District Review and FOF 23 Residential Design and Open Space Standards. Compliant if conditions of approval are met d. Planned Action Ordinance and Development Agreement Compliance and Consistency. Staff Comment: The City’s Environmental Review Committee determined the Solera Master Plan qualifies as a Planned Action as the application meets the criteria outlined in the Planned Action Ordinance (Ordinance #5813). A Planned Action Concurrence Review (Exhibit 2) identified the proposal’s impacts could be mitigated by measures identified in Attachment B of the Planned Action. Therefore staff recommends as a condition of approval, the applicant provide implementation procedures for each of the mitigation measures identified in Attachment B of the Sunset Area Planned Action Ordinance #5813 or provide a written narrative of how the particular measure is not applicable to the project. The Planned Action mitigation implementation procedures shall be submitted with each Administrative Site Plan Review application for review and approval by the Current Planning Project Manager prior to site plan issuance. A portion of the site at the southwest corner of NE 10th St and Jefferson Ave NE was a component of another master site plan identified as the Renton Sunset Terrace Redevelopment Master Plan (LUA 14-001475) and was identified as the Piha property or Site G of the master plan. The site was intended to provide 64 units of townhomes and apartments as part of the 2016 modification of the master site plan. As the Piha site would now be developed with the Solera Master Plan, staff recommends as a condition of approval, the applicant submit a minor modification application to remove the Piha site from the Renton Sunset Terrace Redevelopment Master Plan (LUA14 - City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 42 of 60 SR_HEX_Solera_Master_Plan_181127 001475). The minor modification application shall be submitted and decision issued prior to the applicant submitting the Administrative Site Plan Review application for this respective phase of the master plan. The minor modification application shall be reviewed and approved by the Current Planning Project Manager prior to issuance.  e. Offsite Impacts. Structures: Restricting overscale structures and overconcentration of development on a particular portion of the site. Staff Comment: The proposed Solera Master Plan would construct the larger mixed use buildings along NE Sunset Blvd, a principal arterial in the City and adjacent to other intensive uses such as shopping centers that are also within the CV zoning classification. The project transitions north, west, and south with 3-story townhome development as it nears less intensive multi-family and single-family development patterns. The transition in scale across the development from NE Sunset Boulevard to Harrington Place NE provides a development pattern that allows for a transition from a primary commercial center along an arterial to a residential neighborhood along residential access roads. See also FOF 22, Design District Review: Building Character and Massing. Circulation: Providing desirable transitions and linkages between uses, streets, walkways and adjacent properties. Staff Comment: The project would extend a public street from NE 10th Street, connecting the site to Sunset Neighborhood Park, and align the spine road with Jefferson Ave NE. An east/west connection would be provided via NE 11th St connecting Harrington Pl NE to NE Sunset Blvd. New sidewalks would be provided along all street frontages with a new 12-foot wide sidewalk located along NE Sunset Blvd. Pedestrian walkways internal to the development would link residents to the public sidewalk system, however they are separated by vehicle alleys in unit lot subdivision Blocks R2 and R3. Additionally the connections are not aligned across the alleys as shown on the colored landscape plan (Exhibit 4). Therefore staff recommends as a condition of approval the applicant submit revised site plans for the unit lot townhomes with each Administrative Site Plan Review application that aligns pedestrian connections across vehicle alleys and provides delineated pedestrian crossings with paving that contrasts with the asphalt paving of the alley. The revised site plans shall be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. Utilities, Loading and Storage Areas: Locating, designing and screening storage areas, utilities, rooftop equipment, loading areas, and refuse and recyclables to minimize views from surrounding properties. Locate utilities underground consistent with RMC 4-6-090. Staff Comment: Storage and garbage enclosures would be located within the mixed use buildings. An alley provides the loading area for Mixed Use Building B. The specific Administrative Site Plan Review applications for each phase of the Solera Master Plan would be required to identify compliance with these standards. Views: Recognizing the public benefit and desirability of maintaining visual accessibility to attractive natural features. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 43 of 60 SR_HEX_Solera_Master_Plan_181127 Staff Comment: The mixed use buildings along NE Sunset Blvd will provide territorial views. It is not anticipated the new buildings would result in substantially obscuring existing views of attractive natural features. Landscaping: Using landscaping to provide transitions between development and surrounding properties to reduce noise and glare, maintain privacy, and generally enhance the appearance of the project. Staff Comment: As provided on the Colored Landscape Plan (Exhibit 4), landscaping in public and private spaces will provide transitions between developments and enhance the project’s appearance. Additional examination and refined landscape plans will be reviewed during the Administrative Site Plan Review applications for each phase. See also FOF 21, Zoning Development Standard Compliance: Landscaping. Lighting: Designing and/or placing exterior lighting and glazing in order to avoid excessive brightness or glare to adjacent properties and streets. Staff Comment: Lighting was not a component of the Master Site Plan application. Lighting will be analyzed during each Administrative Site Plan Review application and/or building permit review.  f. Onsite Impacts. Structure Placement: Provisions for privacy and noise reduction by building placement, spacing and orientation. Staff Comment: The Master Site Plan arranges the buildings with larger densities and scale along NE Sunset Blvd and transitions to a smaller scale and lesser density along the north, west, and south sides of the site. The mixed use buildings would provide a buffer for the townhomes from NE Sunset Blvd and the townhomes would provide a buffer from the mixed use buildings to the neighbors to the north, west, and south. Structure Scale: Consideration of the scale of proposed structures in relation to natural characteristics, views and vistas, site amenities, sunlight, prevailing winds, and pedestrian and vehicle needs. Staff Comment: The mixed use buildings abutting NE Sunset Blvd is an appropriate scale of structure along this principal arterial with the townhomes providing a subordinate role behind the site. The Solar Study (Exhibit 11) shows limited offsite shadow impacts that would be atypical for this scale of development. Additional condition of approval are recommended to mitigate the increased height of the proposed structures, see FOF 26 Conditional Use Analysis. Natural Features: Protection of the natural landscape by retaining existing vegetation and soils, using topography to reduce undue cutting and filling, and limiting impervious surfaces. Staff Comment: The existing site is almost entirely paved or contains existing structures that will be removed. Several existing trees are proposed to be retained and staff has recommended the applicant analyze the potential to retain more existing trees into the new development, see also FOF 21 Zoning Development Standard Compliance: Tree Retention. Reducing Parking Impervious Areas: Design parking areas to minimize impervious surfaces, including but not limited to: (1) breaking up parking areas and directing City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 44 of 60 SR_HEX_Solera_Master_Plan_181127 stormwater flows to multiple low impact development features such as bioretention areas; (2) locating parking near trees to provide storm water uptake; (3) retaining or adding vegetation to parking areas; (4) placing existing parking that exceeds maximum parking ratios in permeable pavement designed consistent with the Surface Water Design Manual in RMC 4-6-030; and (5) using other low impact development techniques consistent with RMC 4-6-030 Staff Comment: The redevelopment of the Hi-Lands Shopping Center to the Solera Master Plan would remove the existing expansive surface parking lots and provide all proposed parking within the mixed use buildings or townhome garages. On-street parking would be available on Jefferson Lane NE, NE 11th St., Harrington Pl NE, and NE Sunset Blvd. Landscaping: Use of landscaping to soften the appearance of parking areas, to provide shade and privacy where needed, to define and enhance open spaces, and generally to enhance the appearance of the project. Landscaping also includes the design and protection of planting areas so that they are less susceptible to damage from vehicles or pedestrian movements. Staff Comment: No surface parking is proposed. See also FOF 21 Zoning and Development Standard Compliance: Landscaping  g. Access and Circulation. Location and Consolidation: Providing access points on side streets or frontage streets rather than directly onto arterial streets and consolidation of ingress and egress points on the site and, when feasible, with adjacent properties. Staff Comment: Access points are limited to side streets and alleys within the development. A frontage road along NE Sunset Blvd seperated by a planter strip would provide seperation and opportunity to park vehicles along the principal arterial. Internal Circulation: Promoting safety and efficiency of the internal circulation system, including the location, design and dimensions of vehicular and pedestrian access points, drives, parking, turnarounds, walkways, bikeways, and emergency access ways. Staff Comment: Public streets within the development would be designed to accommodate two vehicle lanes and a parking lane. Sidewalks would be separated from the vehicle lanes by a curb and planter strip. Curb bulbs would be provided at intersections to shorten pedestrian crossing distances and also provide a traffic calming measure. The raised table intersection as recommended as a condition of modification approval (see FOF 27) would provide additional traffic calming internal to the site. Loading and Delivery: Separating loading and delivery areas from parking and pedestrian areas. Staff Comment: Mixed Use Building B is backed by an alley with two garage entrances to accommodate loading and delivery separate from pedestrian areas. Mixed Use Building A provides a single entry to the parking garage along NE 11th St. Trash, utilities, and the back-of-house for the ground floor retail is separated from pedestrian areas of the building. The conceptual nature of the provided floor plans and elevations does not provide enough detail to ensure that loading and delivery could sufficiently be accommodated within the parking garage. Compliance with this standard would be reviewed in detail as site specific site plan review. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 45 of 60 SR_HEX_Solera_Master_Plan_181127 Transit and Bicycles: Providing transit, carpools and bicycle facilities and access. Staff Comment: As provided by comments received from King County Metro Transit (Exhibit 23), the bus stop adjacent to the site on NE Sunset Blvd is already a very active bus stop and due to the increased density proposed by the Solera Master Plan, the stop is likely to become a major RapidRide station. It is anticipated that the adjacent stop 45145 will be upgraded to RapidRide in 2021-2022. King County Metro has indicated that the applicant should provide RapidRide infrastructure as a component of their NE Sunset Blvd frontage improvements. While the site is under construction the applicant would be required to provide a bus stop or temporary zone for transit riders. Therefore staff recommends as a condition of approval, the applicant coordinate with King County Metro Transit for RapidRide improvements at bus stop #45145 on NE Sunset Blvd. Those improvements include, but are not limited to, shelter footings at the bus stop and conduit to support RapidRide signage and lighting. Coordination of those improvements with King County Metro Transit shall be shown on the civil construction permit application to be reviewed and approved by the Current Planning Project Manager prior to permit issuance. See also FOF 21 Zoning Development Standard Compliance: Bicycle Parking. Pedestrians: Providing safe and attractive pedestrian connections between parking areas, buildings, public sidewalks and adjacent properties. Staff Comment: Connections from the Mixed Use Buildings ground floor commercial tenants would be provided directly onto the 12-foot wide sidewalk along NE Sunset Blvd as the buildings will be located behind the sidewalk. Connections from the residential lobbies of those building would be provided via plazas directly connected to the sidewalks along NE 11th St. Programming of those plaza areas would be reviewed with their respective Administrative Site Plan applications. Connections from the townhome entries to the sidewalk would be provided via 4-foot wide entry walks. For those townhomes with pedestrian court entries, pathways are provided between unit clusters that connect to the public sidewalks. Programming of those pedestrian pathways would be reviewed during their respective Administrative Site Plan Review applications.  h. Open Space: Incorporating open spaces to serve as distinctive project focal points and to provide adequate areas for passive and active recreation by the occupants/users of the site. Staff Comment: See FOF 22, Design District Review: Recreation Areas and Common Open Space and FOF 23 Design Standards: Common Open Space  i. Views and Public Access: When possible, providing view corridors to shorelines and Mt. Rainier, and incorporating public access to shorelines Staff Comment: The proposed structures would not block view corridors to shorelines or Mt. Rainier. The public access requirement is not applicable as the site is not adjacent to a shoreline. Territorial views may be available from upper floors of the two (2) mixed use buildings.  j. Natural Systems: Arranging project elements to protect existing natural systems where applicable. Staff Comment: The existing property is almost completely impervious and no existing natural systems occur on the subject property. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 46 of 60 SR_HEX_Solera_Master_Plan_181127  k. Services and Infrastructure: Making available public services and facilities to accommodate the proposed use: Police and Fire. Staff Comment: See FOF 28 Availability and Impact on Public Services. Water and Sewer. Staff Comment: See FOF 28 Availability and Impact on Public Services. Drainage. Staff Comment: See FOF 28 Availability and Impact on Public Services. Transportation. Staff Comment: A Traffic Impact Analysis (Exhibit 20), was prepared by Transpo Group. The site generated traffic volumes were calculated using data from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 10th Edition, (2017). Based on the calculations provided, the proposed development would average a reduction of 522 daily vehicle trips. Weekday peak hour AM trips would generate 198 new vehicle trips, with 160 vehicles leaving and 38 vehicles entering the site. Weekday peak hour PM trips would generate 26 new vehicle trips, with 43 vehicles entering and a reduction of 17 vehicles exiting the site. As detailed in the report the proposed project is not expected to lower the levels of service of the surrounding intersections included in the traffic study. Increased traffic created by the development will be mitigated by payment of transportation impact fees. The applicant would be required to construct street improvements meeting the City’s Street Standards unless otherwise modified, see FOF XX: Modification. The applicant would construct Jefferson Ave NE and NE 11th St within the development with a 53-foot right-of-way that includes 26-foot pavement width, 0.5-foot curb and gutter, 8-foot planter strips and 5-foot sidewalks on both sides of the street. See FOF 27 Modification regarding requests to modify portions of the parking lane. Portions of Sunset Lane NE within the existing development would require a street vacation. The street vacation process requires separate approval from City Council. The street vacation would be required to occur prior to civil construction permit issuance. Additionally, there are existing ROWs within the subject property that would need to be vacated prior to civil construction permit issuance. Vehicle access to the townhomes would be via alleys. The required paved roadway width is 16-feet and no parking is permitted within the alleys. The subject property abuts the following frontages that would require improvements: NE 12th St - Frontage improvements and dedication of 9.5-feet of frontage would be required. The applicant would construct 0.5-foot curb, 8-foot rain garden, and 6-foot sidewalk. Kirkland Ave NE – Frontage improvements with no dedication. A 0.5-foot curb, an 8-foot planting strip, a 5-foot sidewalk, and storm drainage improvements would be required. NE Sunset Blvd – Frontage improvements see FOF 27 Modification. The applicant proposes a frontage road separated from the vehicular travel lanes of NE Sunset Blvd by the installation of an 8-foot planter strip/bioretention facility with 0.5-foot curb and City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 47 of 60 SR_HEX_Solera_Master_Plan_181127 gutter on both sides. The frontage road includes a 10-foot drive aisle, 7-foot parking lane, 12-foot sidewalk and 0.5-foot curb and gutter. Harrington Place NE – Frontage improvements and dedication of 1.5-feet. The applicant would construct half street improvements including a pavement width of 26 feet (13 feet from centerline), a 0.5-foot curb, an 8-foot planting strip, a 5-foot sidewalk, street trees and storm drainage improvements. The proposal has passed the City’s Traffic Concurrency Test per RMC 4-6-070.D (Exhibit 21), which is based upon a test of the citywide Transportation Plan, consideration of growth levels included in the LOS-tested Transportation Plan, and future payment of appropriate Transportation Impact Fees. Payment of the transportation impact fee is applicable on the construction of the development at the time of application for the building permit. The current rate of transportation impact fee is as follows, based on the information provided in the submittal documents: Land Use IMPACT FEE Retail (LUC 820) $13.29 per sf Daycare (LUC 565) $48.88 per sf Senior Housing (LUC 252) $1,464.90 du Apartments – Mid Rise (LUC 221) $3,358.55 du Townhomes (LUC 221) $2,822.61 du Compliant if condition of approval is met l. Phasing: The applicant proposes to construct the project in five (5) phases as shown on the phasing plan (Exhibit 12). Phase one (1) would include Mixed Use Building B along with the public infrastructure on Jefferson Ave/Lane NE, NE 11th St., Harrington Pl NE, NE 12th St, Kirkland Ave NE, NE Sunset Blvd, and Alley Tract C. Following Phase one (1), the applicant would begin Phase two (2), the townhome block R2 west of Jefferson NE and south of NE 11th St. Phase three (3) would be the Mixed Use Building ‘A’. Following Phase three (3), the remaining townhomes would begin construction. As the townhomes are subordinate to the Master Site Plan with regard to use and density in this Commercial Mixed Use land use designation, staff recommends as a condition of approval, the applicant follow the Phasing Plan as provided in Exhibit 12. Construction activities on the townhome components of the Master Plan that follow a mixed use building phase shall not be permitted until the mixed use building concrete podium is completed and passed inspection. Any requested modifications of the phasing plan shall be reviewed and approved by the Current Planning Project Manager and shall continue to result in the initial phase of construction to include one of the two mixed use buildings and public infrastructure improvements identified in orange on the phasing plan  m. Stormwater: Providing optimal locations of stormwater infiltrating low impact development facilities. Avoiding placement of buildings or impervious areas on soils with infiltration capability to the maximum extent practicable. Staff Comment: See FOF 28 Availability and Impact on Public Services. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 48 of 60 SR_HEX_Solera_Master_Plan_181127 25. Compliance with Subdivision Regulations: Chapter 4-7 RMC provides review criteria for the subdivisions. The proposal is consistent with the following subdivision regulations if all conditions of approval are met: Compliance Subdivision Regulations and Analysis Compliant if condition of approval is met Access: Each lot must have access to a public street or road. Access may be by a shared driveway per the requirements of the street standards. The maximum width of single loaded garage driveways shall not exceed nine feet (9') and double loaded garage driveways shall not exceed sixteen feet (16'). Staff Comment: The master plan’s 152 unit lot townhomes and two (2) mixed use lots would have access to a public street. The unit lot townhomes would gain vehicle access to their respective lots via a system of 16-foot wide alleys that are provided throughout the development. These alleys reduce the curb cuts along the public streets on the subject property resulting in fewer pedestrian conflicts with vehicles. The alleys have direct connections from either Jefferson Ave/Lane NE or NE 11th St. Per the unit lot subdivision parent site requirements (RMC 4-7-090F.3), the alleys would be platted as a tract and owned in common by the owners of the individual unit lots. While the parent site of each unit lot townhome would have direct vehicular access to a public street, each unit lot contains access to a private roadway (alleys) which do not meet the Unit Lot Drive standards of RMC 4-6-060K, therefore staff recommends as a condition of approval, the applicant submit a street modification request to modify the Unit Lot Drive standards and provide the private alley sections as shown on the townhome unit lot subdivision. The street modification decision shall be reviewed and approved by the Current Planning Project Manager and shall be issued prior to the submittal of the construction permit application. The mixed use lots referred to as MU1 and MU2 on the Subdivision Plan (Exhibit 33) are provided access from NE 11th St. For Lot MU1 vehicle access is gained from Alley Tract C within the unit lot subdivision block referred to as R3 on the on Subdivision Plan. No curb cuts would be needed on Lot MU1. As the alley would be platted with the R3 unit lot subdivision block, staff recommends as a condition of approval, the applicant ensure irrevocable access to Alley Tract C for Mixed Use Building B. The irrevocable access shall be shown on the final plat documents and recorded as an access easement with the King County Recorder’s Office. The irrevocable access language shall be reviewed and approved by the Current Planning Project Manager prior to final plat recording. The access easement shall be recorded with the King County Recorder’s office with the final plat. Access for Lot MU2 would be provided via a single curb cut located on the NE 11th St. Similar to Lot MU1 this would result in greater pedestrian orientation and fewer opportunities for conflicts with vehicles. This lot would serve Mixed Use Building ‘A’ and the existing US Bank building. The redevelopment of this area would result in the loss of direct access and parking for the US Bank building. Therefore staff recommends as a condition of approval the applicant prepare an irrevocable access and parking agreement with Mixed Use Building ‘A’ and the US Bank building. The access and parking agreement shall be reviewed and approved by the Current Planning Project Manager prior to final plat recording. The access and parking agreement shall be recorded with the King County Recorder’s Office with the final plat.  Blocks: Blocks shall be deep enough to allow two tiers of lots. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 49 of 60 SR_HEX_Solera_Master_Plan_181127 Staff Comment: The proposed subdivision is not a typical single-family residential preliminary plat that would contain a rectangular grid with two-tiered lots, however the Solar Master Plan does follow the intent and share traits of a two-tiered subdivision. The proposed subdivision would result in four (4) blocks (Exhibit 33) created by the north/south Jefferson Ave/Lane NE and east/west NE 11th St street improvements constructed by the applicant. The blocks south of NE 11th St (MU1 and R1-R3) are tiered by alley tracts A through E. The blocks north of NE 11th St (MU2, R3-R4) are tiered by alley tracts B and G. Compliant if condition of approval is met Streets: The proposed street system shall extend and create connections between existing streets per the Street Standards outlined in RMC 4-6-060 Street Standards. Staff Comment: As part of the proposal, the applicant would construct a new public street system meeting current City standards to serve the new lots. Jefferson Ave/Lane NE would extend perpendicular from NE 10th St and traverse through the property providing a spine road through the property. Harrington Pl NE would turn east and become NE 11th St and provide an east/west connection through the development linking to NE Sunset Blvd. The proposed street layout would mimic the recently constructed Sunset Lane NE capital improvements abutting the site to the south with two (2) ten-foot travel lanes, parking lane, curbs, curb bulbs, raised concrete intersection, planter strips, and sidewalks. The new streets provide connectivity to the existing street system and would be constructed in the initial phase of the master plan, see FOF 24 Master Plan Review: Phasing. Based on the street alignment, portions of existing right-of-way would need to be vacated. Therefore staff recommends as a condition of approval, the applicant complete the street vacation process with City Council prior to civil construction permit issuance.  Relationship to Existing Uses: The proposed project is compatible with existing surrounding uses. Staff Comment: The proposed Solera Master Plan would locate the mixed use buildings or more intensive component of the development along the site’s NE Sunset Blvd frontage, which is the main thoroughfare of the CV zone in the Sunset neighborhood. Existing uses along this principal arterial include single story shopping centers. The City’s Comprehensive Plan land use designation and zoning classification anticipates the future redevelopment of this area to include mixed uses at densities proposed by the applicant. The proposed townhomes located behind or west of the mixed use buildings creates a transition from higher densities and commercial along NE Sunset Blvd to a townhome multifamily style of development that closely matches the development pattern of the neighborhood as it extends outward from the core of the Center Village zone. 26. Conditional Use Analysis: The applicant has requested a Conditional Use Permit to exceed the maximum building height for the CV zone from 60-feet for buildings with a ground floor commercial use to a maximum of 75-feet for Mixed Use Building A and a maximum of 85-feet for Mixed Use Building B (Exhibits 41 and 42). The proposal is compliant with the following conditional use criteria, pursuant to RMC 4-9- 030.D. Therefore, staff recommends approval of the requested Conditional Use Permit with conditions noted below. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 50 of 60 SR_HEX_Solera_Master_Plan_181127 Compliance Conditional Use Criteria and Analysis  a. Consistency with Plans and Regulations: The proposed use shall be compatible with the general goals, objectives, policies and standards of the Comprehensive Plan, the zoning regulations and any other plans, programs, maps or ordinances of the City of Renton. Staff Comment: The applicant contends the additional height is for residential dwelling units in a mixed use building along NE Sunset Boulevard and has the effect of reinforcing the more desired walkable, commercial and mixed use nature of NE Sunset Boulevard, which is consistent with the plans of the City of Renton as well as with the vision for adjacent properties including the new library and proposed sites south on Sunset. Staff concurs the requested height allowance is consistent with City plans and regulations. The redevelopment of the existing Hi-Lands Shopping Center, a strip commercial development with expansive surface parking, into a compact urban development with pedestrian oriented and mixed use features is a policy objective of the Comprehensive Plan’s Commercial Mixed Use land use designation and Center Village (CV) zone. The height increase along the NE Sunset Blvd frontage allows more density to be provided along the neighborhood principal arterial and major thoroughfare thereby allowing a transition of lesser density townhomes as the development pattern tends to follow less intensive residential uses further out from NE Sunset Blvd. See also FOF 20 for Comprehensive Plan and zoning regulation compliance.  b. Appropriate Location: The proposed location shall not result in the detrimental overconcentration of a particular use within the City or within the immediate area of the proposed use. The proposed location shall be suited for the proposed use. Proximity of arterial streets that have sufficient capacity to accommodate traffic generated by the development. Developments are encouraged to locate in areas served by transit. Staff Comment: The applicant contends the mixed use units are within the allowable density for the project site. Additional height in the mixed use buildings does not increase the density of the site beyond that which would otherwise allowed, it merely provides for flexibility with respect to the location of the units on the site. This proposal would therefore not create an over concentration of this use within the city or neighborhood. Staff concurs the requested height allowance would not be a detrimental overconcentration and the location is suited for the increased height. As mentioned above, the Comprehensive Plan anticipates this type of redevelopment along NE Sunset Blvd and as stated by the applicant, the increase in height would remain within the density limitations of the CV zone. The proposed mixed use buildings would provide market rate and senior housing to the area, neither of which would contribute to an overconcentration of their respective uses in the Sunset neighborhood. The mixed use buildings would be located on NE Sunset Blvd, a principal arterial, the most intensive street classification within the City and therefore contains sufficient capacity to accommodate traffic generated by the development. The property abuts a King County Metro Transit stop that is planned to be updated to a RapidRide stop (Exhibit 23) that would provide more frequent transit options for the increased density to the area. Compliant if condition of c. Effect on Adjacent Properties: The proposed use at the proposed location shall not result in substantial or undue adverse effects on adjacent property. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 51 of 60 SR_HEX_Solera_Master_Plan_181127 approval is met Staff Comment: The applicant contends the proposed height for the mixed use buildings allows for the density of the site to be weighted towards NE Sunset Boulevard. This provides for the opportunity to have a more positive impact on adjacent properties by reducing the density towards the rear of the site. The result is a project that transitions from the single family homes and low rise multifamily neighbors to the North and West of the site to onsite three story townhomes and finally up to seven story mixed use buildings along the commercial corridor. Staff concurs, based on the recommended condition, that the height increase would not result in substantial or undue adverse effects on adjacent property. The applicant prepared a solar study (Exhibit 11) that represents the effects of shade and shadowing the mixed use buildings would create on neighboring properties. Shading impacts would be limited to the Master Plan area and NE Sunset Blvd based on Summer Solstice and Spring Equinox solar exposures. During Winter, shading would extend north to the adjacent gas station and to the Rite Aid drugstore on NE 12th and NE Sunset Blvd. While shading and view obstruction impacts would be nominal, the overall bulk and scale of the 75 and 85 foot structures will be unique as no other buildings in the neighborhood are near those heights. In an effort to mitigate the impacts the height increase would cause related to bulk and scale of the two (2) mixed use buildings, staff recommends as a condition of approval, the applicant provides modulation (both vertical and horizontal) on Mixed Use Building A and B beyond what is required by Design District D regulations. The exterior cladding and articulation shall be a diverse mix of high quality materials that is commensurate to the overall size and scale of the building. The buildings shall incorporate upper story setbacks, roof extension features, extended feature elements on the buildings corners abutting NE 11th St and NE Sunset Blvd, or other articulation beyond what is already required in the Urban Design District ‘D’ Regulations. These modulation and articulation features shall be shown on colored elevation sheets and represented on three-dimensional renderings to be submitted with their respective Administrative Site Plan Review applications to be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. Compliant if condition of approval is met d. Compatibility: The proposed use shall be compatible with the scale and character of the neighborhood. Staff Comment: The applicant contends the proposed use and height of the mixed use buildings and weighting of the density of the site makes the proposed project more compatible with the various scales of surrounding properties particularly to the North and West. It also makes the proposed project overall more compatible with the scale and the character of the forward vision for NE Sunset Boulevard. Staff concurs, based on the recommended condition, that the proposed use and increase would be compatible with the scale and character of the neighborhood. The neighborhood along NE Sunset Blvd consists generally of commercial uses setback from the street by surface parking lots. As parcels along this arterial redevelop they will be required to construct the buildings closer to the street and provide structured parking. To accommodate on-street parking for the ground floor retail of the mixed use buildings, the applicant would relocate the planter strip west of the sidewalk to create a frontage road separated from the principal arterial, see FOF 27 Modification. The additional frontage dedication to facilitate this street treatment and other design considerations would result in the building being located directly behind the sidewalk instead of being setback between 15 and 20 feet as is typically required in the CV zone. In an effort to reduce the impacts of the increased heights of the mixed use buildings on City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 52 of 60 SR_HEX_Solera_Master_Plan_181127 the abutting pedestrian realm along NE Sunset Blvd staff recommends as a condition of approval, the applicant provides one of the following treatments to Mixed Use Buildings A and B along NE Sunset Blvd: (1) the floor to finished ceiling height shall be a minimum of 18-feet; or (2) the floor to finished ceiling height shall be a minimum of 15-feet and the residential portion of the buildings (wood construction) on top of the concrete podium be setback a minimum of 15-feet. The ground level details shall be shown on the Administrative Site Plan Review application to be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. Mixed Use Building ‘A’ is encroaching into the secondary front yard setback along Jefferson Ave NE and adjacent to the transitioning three (3) story townhome unit lot subdivision portion of the development. To reduce the bulk and scale and increased height impacts of the building on the unit lot townhome subdivision, staff recommends as a condition of approval the applicant submit elevations with the Administrative Site Plan Review application that provides a minimum setback of 15-feet for the portion of Building ‘A’ above the ground floor townhome units along the Jefferson Ave NE elevation. The elevations shall be reviewed and approved by the Current Planning Project Manager prior to site plan issuance.  e. Parking: Adequate parking is, or will be made, available. Staff Comment: The applicant contends that adequate parking will be available for the residential units. Staff concurs that adequate parking will be provided by the applicant. The height increase would have no effect on the amount of parking that is required for the uses within the buildings. Mixed Use Building ‘A’ would provide 378 parking spaces in a structured parking garage for 296 dwelling units and approximately 9,800 square feet of commercial gross floor area. The parking area provide the code required parking minimum for the residents and the commercial parking would be verified for compliance when a tenant is secured. Mixed Use Building ‘B’ would provide 284 parking spaces in a structured parking garage for 225 senior housing units and approximately 17,600 square feet of commercial gross floor area. Similar to Building ‘A’ the garage provides code compliant parking for the residents and ground floor commercial tenant. See also FOF 21 Zoning and Development Compliance: Parking.  f. Traffic: The use shall ensure safe movement for vehicles and pedestrians and shall mitigate potential effects on the surrounding area. Staff Comment: The applicant contends the proposed units are within the allowable density for the site and therefore will not increase the potential intensity of the use of the site. All vehicular entrances and exits to individual buildings are made internal to the site on public or private streets which connect to the existing neighborhood street network and pattern to minimize the impact of vehicular movement on and off of existing roads. Staff concurs the use will ensure safe movement for vehicles and pedestrians. The height increase would have no effect on the movement of vehicles and pedestrians. Regardless of the height increase the applicant is required to construct new public streets within the master plan development and frontage improvements along the site’s perimeter meeting the current City standards or as modified.  g. Noise, Light and Glare: Potential noise, light and glare impacts from the proposed use shall be evaluated and mitigated. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 53 of 60 SR_HEX_Solera_Master_Plan_181127 Staff Comment: The applicant contends the proposed use will not have a negative impact on potential noise, light or glare, and weights the activity within the site towards the more commercial frontage. Staff concurs the requested height increase would not cause noise, light, or glare impacts. Any potential impacts cause by noise, light, or glare would be adequately mitigated via existing code limitations.  h. Landscaping: Landscaping shall be provided in all areas not occupied by buildings, paving, or critical areas. Additional landscaping may be required to buffer adjacent properties from potentially adverse effects of the proposed use. Staff Comment: Landscaping will the provided in all areas that area not occupied by a building or pedestrian or vehicular path. See submitted landscape plan for full site landscaping proposed. Staff concurs that adequate landscaping would be provided on the Master Site Plan property. The mixed use buildings would have frontage landscaping along NE 11th St and other pervious areas within the site. Landscaping would also be provided in the eight (8) foot wide planter strips located in the abutting streets. 27. Modification Analysis: The applicant is requesting a modification from RMC 4-6-060F.2 Minimum Design Standards for Public Streets and Alleys for the following modifications to streets within the master site plan and along its frontage: (1) Jefferson Ave/Lane NE and NE 11th St – a Residential Access Street which requires a 53-foot right-of-way (ROW) with 26-foot paved roadway width, including two (2) 10-foot travel lanes and one (1) 6-foot parking lane, 0.5-foot curb and gutter, 8-foot planter strip, and 5-foot sidewalk. The applicant is proposing to reduce the paved roadway width for sections of these roadways as shown on Exhibit 4 from the standard 26 feet to a reduced 20 feet thereby eliminating the 6-foot parking lane; and (2) NE Sunset Blvd, a principal arterial, the applicant is proposing to provide on-street, parallel parking, separated from the vehicular traffic of NE Sunset Blvd by an 8-ft planter strip and 10-ft drive aisle in order to support the retail and commercial uses of the proposed mixed-use buildings along NE Sunset Blvd. The proposal is compliant with the following modification criteria, pursuant to RMC 4-9- 250.D.2, if all conditions of approval are met. Therefore, staff is recommending approval of the requested modifications, subject to conditions as noted below: Compliance Modification Criteria and Analysis  a. Substantially implements the policy direction of the policies and objectives of the Comprehensive Plan Land Use Element and the Community Design Element and the proposed modification is the minimum adjustment necessary to implement these policies and objectives. Staff Comment: The applicant contends that the Jefferson Ave NE and NE 11th modification request works in cooperation with the Sunset Boulevard modification to support the City’s goal for an activated and successful street frontage on Sunset Boulevard by making space for the applicant to dedicate additional ROW on Sunset Boulevard for a buffered parallel parking lane. The Sunset Blvd modification allows for on-street parking to support the viability of the ground floor commercial tenants of the mixed use buildings along a principal arterial that would not typically contain an on- street parking element. Staff concurs the requested modification substantially implements the Comprehensive Plan and is the minimum necessary. The modification does not inhibit the ability to provide complete streets arranged as an interconnecting network or grid and to locate City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 54 of 60 SR_HEX_Solera_Master_Plan_181127 planter strips between the curb and the sidewalk in order to provide separation between cars and pedestrians (Policy L-57). The modification also maintains the goal of ensuring that new development is designed to be functional and attractive (Goal L-BB). The intent of the policies are to promote new development with walkable places that support grid and flexible grid street and pathway patterns, and are visually attractive, safe, and healthy environments. The requested street modification is consistent with these policy guidelines. See also FOF 20, Comprehensive Plan Analysis. Compliant if condition of approval is met b. Will meet the objectives and safety, function, appearance, environmental protection and maintainability intended by the Code requirements, based upon sound engineering judgment. Staff Comment: The applicant contends the Jefferson Ave/NE 11th modification while reducing the ROW width, adequate fire access will be maintained throughout the site. The Sunset Blvd modification would address safety concerns resulting from the current, city established, Sunset Boulevard street section. The buffered parking and drive aisle is intended to create a safer condition for parallel parking. Staff concurs the proposed modification would meet the objectives of function and maintainability intended by the code requirements. The City’s Transportation Division and Planning Division have reviewed Jefferson Ave NE and NE 11th and the surrounding area and have determined that the proposed modified street section would mimic the street section on the recently improved Sunset Lane capital project that surrounds the adjacent Sunset Neighborhood Park. To maintain consistency with those improvements staff recommends as a condition of approval the applicant submit revised utility plans with the civil construction permit that provides a concrete tabled intersection at Jefferson Ave NE and NE 11th St. The revised utility plan shall be reviewed and approved by the Current Planning Project Manager prior to civil construction permit issuance. The City’s Transportation Division and Planning Division have reviewed NE Sunset Blvd and the surrounding area and have determined that the modified principal arterial section proposed is able to conform to design criteria adopted by the City. The modified street section maintains the existing travel lanes along NE Sunset Blvd which are consistent with the surrounding neighborhood and provides a frontage road, creating a safe pedestrian and vehicle route in and around the existing and proposed commercialized areas. The proposed frontage road provides parallel parking separated from the traditional traveled roadway and will operate at a speed substantially less than that of the adjacent NE Sunset Blvd. The proposed frontage road offers a safe vehicular exit from NE Sunset Blvd in order to parallel park without obstruction to the existing travel lanes and provides sufficient space to allow occupants to safely exit vehicles and reach a pedestrian access route detached from the existing travel lanes of NE Sunset Blvd.  c. Will not be injurious to other property(ies) in the vicinity. Staff Comment: The applicant contends that no other properties in the vicinity would be effected by the proposed modification. Staff concurs the modification would not impact other properties in the vicinity. The modification would be limited in scope to the subject property and it’s NE Sunset Blvd frontage. The modification would mimic a street section already in place abutting the Sunset Neighborhood Park and the NE Sunset Blvd would result in an opportunity to safely parallel park along a principal arterial. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 55 of 60 SR_HEX_Solera_Master_Plan_181127  d. Conforms to the intent and purpose of the Code. Staff Comment: The applicant contends the modification allows for parallel parking and safe separation from travel lanes along Sunset Blvd Staff concurs the intent and purpose of the Code would be maintained with the requested modification. The modification would not alter the lane widths needed for fire access or impact pedestrian amenities. Parking that would not be provided along the narrow sections of Jefferson Ave NE and NE 11th St would be now be allocated to NE Sunset Blvd.  e. Can be shown to be justified and required for the use and situation intended; and Staff Comment: The applicant contends the modification is intended to achieve City objectives to provide safe street sections and support the ground floor commercial tenants Staff concurs that modification can be shown to be justified for the use and situation intended. The new internal street section mimics the Sunset Neighborhood Park loop and provides an extension of this unique streetscape into the subject property. The modified planter strip and frontage road provides the needed parallel parking to sustain the economic viability of the ground floor retail of the mixed use buildings. See also comments under criterion ‘b’.  f. Will not create adverse impacts to other property(ies) in the vicinity. Staff Comment: The applicant contends no other properties would be impacted by the requested modification. Staff concurs the requested modification would not adversely impact other properties in the vicinity. See comments under criterion ‘c’. 28. Availability and Impact on Public Services: Compliance Availability and Impact on Public Services Analysis  Police and Fire: The proposed project would result in an estimated 594 police calls for service within a calendar year. Police and Fire Prevention staff indicates that sufficient resources exist to furnish services to the proposed development; subject to the condition that the applicant provides Code required improvements and fees. A Fire Impact Fee would be required for the future dwellings and commercial space. The current Fire Impact Fee is $964.53 per multi-family dwelling. Fire Impact Fees for retail is $1.25 per square foot and for restaurants it is $5.92 per square foot. The fee in effect at the time of building permit application is applicable to this project and is payable at the time of building permit issuance.  Schools: It is anticipated that the Renton School District can accommodate any additional students generated by this proposal at the following schools: Kennydale Elementary, McKnight Middle School, and Hazen High School. Elementary and High School students from the proposed development would be bussed to their schools. The stop is located at NE 12th St and Harrington Ave NE which is also the location of McKnight Middle School. Middle School students would walk to school. The proposed project includes the installation of new public streets within the development and frontage improvements along the site’s periphery. All street improvements would include sidewalks. Students would have a walking route to the bus stop with existing City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 56 of 60 SR_HEX_Solera_Master_Plan_181127 sidewalk improvements or installed as part of the development. Students would connect to the abutting NE 12th St from Jefferson Ave NE or NE 11th St/Harrington Place NE and walk west to Harrington Ave NE or they would walk south from Jefferson Ave NE connecting to NE 10th St continue west to Harrington Ave NE and walk north to NE 12th St. A School Impact Fee would be required for the future dwellings. The current Renton School District Impact Fee is $1,448 per multifamily dwelling unit. The fee in effect at the time of building permit application is applicable to this project and is payable at the time of building permit issuance.  Parks: A Park Impact Fee would be required for the future dwellings. The current Park Impact Fee is $1,858.95. The fee in effect at the time of building permit application is applicable to this project and is payable at the time of building permit issuance.  Storm Water: An adequate drainage system shall be provided for the proper drainage of all surface water. Staff Comment: A Preliminary Drainage Plan and Technical Information Report (TIR), dated October 2018, prepared by KPFF Consulting Engineers (Exhibit 15) was submitted with the land use application. Based on the City of Renton’s flow control map, the site falls within the Peak Rate Flow Control Standard area matching Existing Site Conditions and is within the East Lake Washington Drainage Basin. The development is subject to Full Drainage Review in accordance with the 2017 Renton Surface Water Design Manual (RSWDM). All nine core requirements and the six special requirements have been discussed in the Technical Information Report. The project is exempt from flow control as the proposed project meets the exception criteria outlined in RSWDM Section 1.2.3.1.A. The project results in less than a 0.15-cfs increase in the existing site conditions 100-year peak flow. The development is required to provide enhanced water quality treatment prior to discharge. The proposed water quality treatment consists of conveyance to a series of bioretention facilities prior to connection to the proposed new public conveyance system that would connect to the existing public conveyance system.  Water: The proposed water main improvements are shown on the Utility Plan (Exhibit 17). The proposed 10-inch water main extension into the development provides a 10- inch looped main around each mixed use building, and connects to the existing 8-inch water main located in NE 12th St, the existing 12-inch water main located in NE 10th Street, the existing 8-inch water main located in Harrington Place NE, the existing 10- inch water main located in Kirkland Ave NE, and the existing 12-inch water main located in NE Sunset Blvd. A connection shall also be made to the existing 12-inch water main stub in the public water easement located in the parking lot of the abutting Sunset Court Apartments. The existing water main in Sunset Lane NE shall be abandoned and replaced with a new 12-inch water main along the west side of the development. Water main extensions to Alleys D, E, F, and G from the proposed 10-inch water main in Alley B will be required to provide water services and meters to each townhome unit. Adequate horizontal and vertical separation between the new water main and other utilities (storm sewer pipes and vaults, sanitary sewer, power, gas, electrical) shall be provided for the operation and maintenance of the water main and shall be located within an easement.  Sanitary Sewer: The proposed sewer main improvements are shown on the Utility Plan (Exhibit 17). A new 8-inch sewer main within the future public ROW is required to City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 57 of 60 SR_HEX_Solera_Master_Plan_181127 provide sanitary sewer service to each building. New side sewers shall be installed to serve each individual property. I. CONCLUSIONS: 1. The subject site is located in the Commercial & Mixed Use (CMU) Comprehensive Plan designation and complies with the goals and policies established with this designation, see FOF 20. 2. The subject site is located in the Center Village (CV) zoning designation and complies with the zoning and development standards established with this designation provided the applicant complies with City Code and conditions of approval, see FOF 21. 3. The proposed Mixed Use Buildings A and B in the master site plan complies with Design District ‘D’ overlay standards and guidelines provided the applicant complies with City Code and conditions of approval. Further analysis of District ‘D’ standards would occur at each Administrative Site Plan Review application, see FOF 22. 4. The proposed Townhome Unit Lot Subdivision complies with the Residential Design and Open Space Standards provided the applicant complies with City Code and conditions of approval, see FOF 23. 5. The proposed master plan complies with Site Plan Review approval criteria provided the applicant complies with City Code and conditions of approval, see FOF 24. 6. The proposed preliminary plat and Unit Lot Subdivision complies with the subdivision regulations as established by City Code and state law provided all advisory notes and conditions are met, see FOF 25. 7. The proposed master plan complies with Conditional Use Permit approval criteria provided the applicant complies with City Code and conditions of approval, see FOF 26. 8. The requested street modification pursuant to RMC 4-9-250 complies with all six (6) modification criteria as identified in FOF 27. 9. The proposed Unit Lot Subdivision complies with the street standards as modified in FOF 27, and/or as established by City Code, provided the project complies with all advisory notes and conditions of approval contained herein, see FOF 24. 10. There are safe walking routes to the school bus stop, see FOF 28. 11. There are adequate public services and facilities to accommodate the proposed preliminary plat and master plan, see FOF 28. 12. Key features, which are integral to this project include a master plan development that ensures the mixed use buildings and infrastructure are constructed in the initial phases of the project with the townhomes providing a supporting and subordinate role in the plan. The mixed use buildings would be constructed with high quality exterior cladding materials that includes articulation and modulation to commensurate with their overall scale and relationship to pedestrians on the street. The structured parking garages are wrapped with commercial and residential amenities or landscape screening a minimum of 14-feet in width. The townhomes provide a transition from the higher density along NE Sunset Blvd to the lower density neighborhoods further removed from the principal arterial, from a scale of seven (7) stories to three (3) stories respectively. Townhomes with reduced setbacks are designed with stoops elevated from the public streets. Pedestrian and vehicle conflicts are minimized with very few curb cuts, alley loads, and an innovative frontage road with parallel parking along NE Sunset Blvd. The internal street system provides connections to the existing street system and follows a similar design pattern as the recently completed Sunset Lane Loop road capital improvement project directly abutting south of the master plan site. City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 58 of 60 SR_HEX_Solera_Master_Plan_181127 J. RECOMMENDATION: Staff recommends approval of the Solera Master Plan application, File No. LUA18-000490, SA-M, PP, CU-H, MOD, as depicted in the Site Plan (Exhibit 4) and Preliminary Plat Plan (Exhibit 5), subject to the following conditions: 1. The applicant shall submit revised plans with the administrative site plan review application for Block B that ensures any proposed amenity space is temporary in nature and not credited to the open space requirement under Urban Design Regulations District D. The applicant shall construct the space to commercial standards identified in FOF 26 Conditional Use Analysis. The revised plans shall be reviewed and approved by the Current Planning Project Manager prior to Administrative Site Plan issuance. 2. The applicant shall record a covenant on the underlying properties within the plat requiring that any future division of the lots or increases to density must be consistent with the maximum density requirements as measured within the master site plan as a whole. The applicant shall submit a draft of the covenant with the final plat application for review and approval by the Current Planning Project Manager prior to recording with the King County Recorder’s Office. 3. The applicant shall submit a revised master site plan for parent site R1 that contains a minimum lot size of 25,000 square feet. The revised parent site plans shall be reviewed and approved by the Current Planning Project Manager prior to Administrative Site Plan issuance or construction permit issuance, whichever occurs first. 4. The applicant shall raise the ground floor of the townhome units on Mixed Use Building ‘A’ a minimum of three (3) feet above the grade of the Jefferson Ave NE sidewalk and provide an elevated stoop entrance for each unit. These ground level features shall be shown on the elevation plans submitted with the Administrative Site Plan Review application to be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. 5. The applicant shall raise the ground floor of the units in the three (3) townhome unit cluster buildings in Block R3 a minimum of three (3) feet above the grade of the NE 11th St and Harrington Pl NE sidewalk and provide an elevated stoop entrance for each unit. Additionally, the applicant shall provide articulation, materials, and glazing, beyond what is required by the R-10 and R-14 Residential Design and Open Space Standards, along the side elevations of the townhomes facing the street that is similar to a front elevation. These ground level features and additional exterior side wall articulation shall be shown on the elevation plans submitted with the Administrative Site Plan Review application for Block 3 to be reviewed and approved by the Current Planning Project Manager. 6. The applicant shall submit building coverage calculations with an exhibit graphic that identifies compliance with the 75-percent lot coverage limitation for each parent site and mixed use lot with each Administrative Site Plan Review application. The building coverage calculations shall be reviewed and approved by the Current Planning Project Manager prior to Administrative Site Plan issuance. 7. The applicant shall submit a revised arborist report and tree retention plan with the civil construction permit application that considers the retention of trees 856-859 and 862-863. The arborist report shall identify best practices for working in and around drip lines of the retained trees. The revised arborist report and tree retention plan shall be reviewed and approved by the Current Planning Project Manager prior the permit issuance. 8. The applicant shall submit a refuse and recycling plan with the Administrative Site Plan applications for each unit lot subdivision block that identifies the required refuse and recycling space for each townhome unit and the exterior space allocated for pick-up day. Additionally, the applicant shall provide written approval from the City’s refuse and recycling contracted collector that adequate space for truck City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 59 of 60 SR_HEX_Solera_Master_Plan_181127 maneuvering is provided. The refuse and recycling plans and refuse/recycling written approvals shall be reviewed and approved by the Current Planning Manager prior site plan issuance. 9. The applicant shall submit revised floor plans with the Administrative Site Plan Review application for Building ‘B’ that limits residential entries to the NE 11th St frontage. The revised floor plans shall be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. 10. The applicant shall submit a cohesive sign package for the master plan site with the initial administrative site plan review application. The sign package shall be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. 11. The applicant shall submit a revised master plan prior to the first Administrative Site Plan Review application or construction permit application, whichever occurs first, that clearly indicates the amount of common open space meeting the standards of RMC 4-2.115E.2 and RMC 4-3-100E.4 or where applicable RMC 4-1-240B.3, if approved. A fee-in-lieu shall be paid prior to the issuance of the civil construction permit. The revised master plan shall be reviewed and approved by the Current Planning Project Manager prior to the first Administrative Site Plan or construction permit issuance. 12. The applicant shall submit an exhibit for each townhome unit with their respective Administrative Site Plan Review application that clearly identifies that each unit lot contains a minimum of 250 square feet of private yard space with no dimension less than 8-feet in width. The exhibits shall be reviewed and approved by the Current Planning Project Manager prior to each individual Administrative Site Plan issuance for Blocks R1-R4. 13. The applicant shall submit a revised master site plan to identify that Lots 7-12, 46, 54, 57, 66, 69, 116, and 125 comply with primary entry requirements of RMC 4-2-115E.2 and 3. The revised master site plan shall be reviewed and approved by the Current Planning Project Manager prior to Administrative Site Plan issuance or construction permit issuance, whichever occurs first. 14. The applicant shall provide implementation procedures for each of the mitigation measures identified in Attachment B of the Sunset Area Planned Action Ordinance #5813 or provide a written narrative of how the particular measure is not applicable to the project. The Planned Action mitigation implementation procedures shall be submitted with each Administrative Site Plan Review application for review and approval by the Current Planning Project Manager prior to site plan issuance. 15. The applicant shall submit a minor modification application to remove the Piha site from the Renton Sunset Terrace Redevelopment Master Plan (LUA14-001475). The minor modification application shall be submitted and decision issued prior to the applicant submitting the Administrative Site Plan Review application for this respective phase of the master plan. The minor modification application shall be reviewed and approved by the Current Planning Project Manager prior to issuance. 16. The applicant shall submit revised site plans for the unit lot townhomes with each Administrative Site Plan Review application that aligns pedestrian connections across vehicle alleys and provides delineated pedestrian crossings with paving that contrasts with the asphalt paving of the alley. The revised site plans shall be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. 17. The applicant shall coordinate with King County Metro Transit for RapidRide improvements at bus stop #45145 on NE Sunset Blvd. Those improvements include, but are not limited to, shelter footings at the bus stop and conduit to support RapidRide signage and lighting. Coordination of those improvements with King County Metro Transit shall be shown on the civil construction permit application to be reviewed and approved by the Current Planning Project Manager prior to permit issuance. 18. The applicant shall follow the Phasing Plan as provided in Exhibit 12. Construction activities on the townhome components of the Master Plan that follow a mixed use building phase shall not be permitted until the mixed use building concrete podium is completed and passed inspection. Any requested modifications of the phasing plan shall be reviewed and approved by the Current Planning Project City of Renton Department of Community & Economic Development Solera Master Plan Staff Report to the Hearing Examiner LUA18-000490, SA-M, PP, CU-H, MOD Report of November 27, 2018 Page 60 of 60 SR_HEX_Solera_Master_Plan_181127 Manager and shall continue to result in the initial phase of construction to include one of the two mixed use buildings and public infrastructure improvements identified in orange on the phasing plan. 19. The applicant shall submit a street modification request to modify the Unit Lot Drive standards and provide the private alley sections as shown on the townhome unit lot subdivision. The street modification decision shall be reviewed and approved by the Current Planning Project Manager and shall be issued prior to the submittal of the construction permit application. 20. The applicant shall ensure irrevocable access to Alley Tract C for Mixed Use Building B. The irrevocable access shall be noted on the final plat documents and recorded as an access easement with the King County Recorder’s Office. The irrevocable access language shall be reviewed and approved by the Current Planning Project Manager prior to final plat recording. The access easement shall be recorded with the King County Recorder’s office with the final plat. 21. The applicant shall prepare an irrevocable access and parking agreement with Mixed Use Building ‘A’ and the US Bank building. The access and parking agreement shall be reviewed and approved by the Current Planning Project Manager prior to final plat recording. The access and parking agreement shall be recorded with the King County Recorder’s Office with the final plat. 22. The applicant shall receive preliminary approval of the necessary street vacation(s) from City Council prior to issuance of the civil construction permit. Final approval of the street vacation(s) shall be completed prior to plat recording. 23. The applicant shall provide modulations (both vertical and horizontal) on Mixed Use Buildings A and B beyond what is required by Design District D regulations. The exterior cladding and articulation on each building shall be a diverse mix of high quality materials that is commensurate to the overall size and scale of the building. The buildings shall incorporate upper story setbacks, roof extension features, extended feature elements on the buildings corners abutting NE 11th St and NE Sunset Blvd, or other articulation beyond what is already required in the Urban Design District ‘D’ Regulations. These modulation and articulation features shall be shown on colored elevation sheets and represented on three-dimensional renderings to be submitted with their respective Administrative Site Plan Review applications to be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. 24. The applicant shall provide one (1) of the following ground level treatments to Mixed Use Buildings A and B along NE Sunset Blvd: (1) the floor to finished ceiling height shall be a minimum of 18 -feet; or (2) the floor to finished ceiling height shall be a minimum of 15-feet and the residential portion of the buildings (wood construction) on top of the concrete podium be setback a minimum of 15-feet. The ground level details shall be shown on the Administrative Site Plan Review application to be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. 25. The applicant shall submit elevations with the Administrative Site Plan Review application that provides a minimum setback of 15-feet for the portion of Building ‘A’ above the ground floor townhome units along the Jefferson Ave NE elevation. The elevations shall be reviewed and approved by the Current Planning Project Manager prior to site plan issuance. 26. The applicant shall submit revised utility plans with the civil construction permit that provides a concrete tabled intersection at Jefferson Ave NE and NE 11th St. The revised utility plan shall be reviewed and approved by the Current Planning Project Manager prior to civil construction permit issuance. CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT STAFF REPORT TO THE HEARING EXAMINER EXHIBITS Project Name: Solera Master Plan Land Use File Number: LUA18-000490, SA-M, PP, CU-H, MOD Date of Hearing November 27, 2018 Staff Contact Matt Herrera Senior Planner Project Contact/Applicant Jeremy Febus, KPFF 1601 5th Ave, Suite 1600, Seattle, WA 98101 Project Location 2902 NE Sunset Blvd, Renton, WA 98056 The following exhibits are included with the Staff Report to the Hearing Examiner: Exhibits 1-24: As shown in the Environmental Review Committee (ERC) Memo Exhibit 25: Staff Report to the Hearing Examiner Exhibit 26: Neighborhood Meeting Materials Exhibit 27: Critical Areas Assessment Exhibit 28: Sunset Master Site Plan Exhibit 29: Sunset Area Planned Action Ordinance Exhibit 30: Sunset Area Planned Action EIS Exhibit 31: Ground Floor Building A Exhibit 32: Ground Floor Building B Exhibit 33: Subdivision Plan Exhibit 34: Architectural Site Plan Exhibit 35: Code Interpretation #134 Exhibit 36: Conceptual Landscape Plan (Black & White) Exhibit 37: Architectural Project Summary Sheet Exhibit 38: Floor Plans Building A Exhibit 39: Floor Plans Building B Exhibit 40: Unit Mix Summary Exhibit 41: Site Section Building A Exhibit 42: Site Section Building B February 8, 2018 Dear Neighbor: Please attend a presentation for the proposed Greater Renton Highlands development. At this meeting we will discuss project details and solicit comments on the proposal from the neighborhood. Date: February 20, 2018 Time: 5:00-6:00 pm Location: Renton Highlands Library – Meeting Room 2801 NE 10th Street Renton, WA 98056 The Greater Renton Highlands redevelopment plans to construct townhomes, apartments, senior housing, and limited retail totaling approximately 10 acres. The project location is currently divided into five parcels, located at: • 2806 NE Sunset Blvd • 2902 NE Sunset Blvd • 2806 Harrington Pl • 975 NE 12th St • 1171 Kirkland Ave NE See the enclosed conceptual design site plan for more information on the project. The intent of this meeting is to facilitate an informal discussion between the project developer and the neighbors regarding the project. While required by the City of Renton, this meeting is not conducted by the City of Renton and is in addition to any future public hearing or public comment opportunities available under City of Renton development review processes. If you have any questions regarding the proposed project, please contact Corey Watson, corey.watson@quadranthomes.com or (425) 646-4139. Sincerely, Kelly Lesoing KPFF Consulting Engineers 1700659 Greater Renton Highlands – Conceptual Design Site Plan 3122000160 Sonia Scott 1175 Harrington Pl NE #209 Renton, WA 98056 3122000170 Vlado Situm Sr 1175 Harrington Pl NE #210 Renton, WA 98056 3122000180 Julie Lewis 1175 Harrrington Pl NE #211 Renton, WA 98056 3122000190 Lucian Stan 1175 Harrington Pl NE Apt 212 Renton, WA 98056 3122000200 Leticia Aparicio 1175 Harrington Pl NE Apt 213 Renton, WA 98056 3122000210 Steven Vu & Amanda Hoang 1175 Harrington Pl NE Unit 214 Renton, WA 98056 3122000220 Sharon Moon & James Schruder 1175 Harrington Pl NE Apt 301 Renton, WA 98056 3122000230 Inara Alksnin 1175 Harrington Pl NE #302 Renton, WA 98056 3122000260 Susan Tokheim 1175 Harrington Pl NE #305 Renton, WA 98056 3122000270 Harrington Place Condominiu 716 W Meeker St Kent, WA 98032 3122000280 Travis Anderson 1175 Harrington Pl NE Apt 307 Renton, WA 98056 3122000290 Michelle Fredell 1175 Harrington Pl NE Renton, WA 98056 3122000300 Ricky Kimwah 5115 NE 11th Ct Renton, WA 98059 3122000310 Charlotte Hudson 1175 Harrington Pl NE $310 Renton, WA 98056 3122000320 June Peterson 1175 Harrington Pl NE #311 Renton, WA 98056 3122000330 Michael Teramoto 14634 SE 195th Pl Renton, WA 98058 3122000140 Mathew & Katie Nelson 3311 Garden Ct N Renton, WA 98056 3122000130 Frederick Melendrez Sr & Mai Melendrez 1175 Harrington Pl NE Unit 206 Renton, WA 98056 3122000120 Leroy Dunn 1175 Harrington Pl NE #205 Renton, WA 98056 3122000110 Walter Navarrete 1175 Harrington Pl NE Apt 204 Renton, WA 98056 3122000100 Christine Sylvia 16167 139th Pl SE Renton, WA 98058 3122000090 Kiana Davis 1175 Harrington Pl NE Unit 202 Renton, WA 98056 3122000080 Frank & Melinda Graves 1175 Harrington Pl NE #201 Renton, WA 98058 3122000070 Norma Victorio 1175 Harrington Pl NE Unit 113 Renton, WA 98056 3122000060 John Stiefel 1175 Harrington Pl NE #111 Renton, WA 98056 3122000050 Xiao & Yufei Luo 1175 Harrington Pl NE #109 Renton, WA 98056 3122000040 Jayme Evans & Ling Chia 1175 Harrington Pl NE Apt 107 Renton, WA 98056 3122000030 Daniel Benapfl 1175 Harrington Pl NE #105 Renton, WA 98056 3122000020 Warren Friel 1175 Harrington Pl NE #103 Renton, WA 98056 3122000010 Donghyeon Gim & Jonatho Lucas 1175 Harrington Pl NE Apt 101 Renton, WA 98056 0423059095 Fgr Expo 13 LLC 3300 Powell St #205 Emeryville, CA 94608 7227801065 Renton City Of 1055 S Grady Way Renton, WA 98057 7227801450 Renton City Of 1055 S Grady Way Renton, WA 98055 7227801651 Paul & Catherine Russo 1217 Jefferson Ave NE Renton, WA 98056 7227801655 Lennice Dalrymple 1209 Jefferson Ave NE Renton, WA 98056 7227801075 Colpitts Sunset LLC 2256 38th Pl E Seattle, WA 98112 7227801085 Renton City Of 1055 S Grady Way Renton, WA 98057 7227801201 Yadav & Gill LLC 2800 NE Sunset Blvd Renton, WA 98056 7227801275 Numata Robert A & Carol F Trust 4821 S Bowdish Rd Spokane Valley, WA 99206 7227801280 Mark St Peter 407 Lyons Ave NE Renton, WA 98056 7227801285 Gregory MacKenzie 1127 Harrington Ave NE Renton, WA 98056 7227801290 Renton Housing Authority PO Box 2316 Renton, WA 98056 7227801295 Renton City Of 1055 S Grady Way Renton, WA 98057 7227801300 Renton City Of 1055 S Grady Way Renton, WA 98057 7227801305 Renton Housing Auth PO Box 2316 Renton, WA 98056 7227801310 Renton Housing Auth PO Box 2316 Renton, WA 98056 7227801315 Renton Housing Authority PO Box 2316 Renton, WA 98056 7227801320 Christina Jarvis 1701 SE 8th St Renton, WA 98057 7227801400 Renton City Of 1055 S Grady Way Renton, WA 98057 7227801440 Pamela Curley 1225 Kirkland Ave NE Renton, WA 98056 3122000150 Annie Brown 1175 Harrington Pl NE Apt 208 Renton, WA 98056 3122000240 Karishma Sanghvi 1175 Harrington Pl NE Apt 303 Renton, WA 98056 3122000250 Donovan Boyd Jr & Roxanne Boyd 1175 Harrington Pl NE #304 Renton, WA 98056 3122000340 Sheila & Tennert Frericks 8899 E Red Mtn Ln Gold Canyon, AZ 85118 3122000350 Robert Holliday 1175 Harrington Pl NE #314 Renton, WA 98168 6377300180 Howard Banasky 600 Andover Pk E Seattle, WA 98188 6377300190 Oliver Spencer 1100 Harrington Ave NE Apt 301 Renton, WA 98056 6377300200 Henry Dunlap 1100 Harrington Ave NE #302 Renton, WA 98056 6377300210 Nathan Lam 7453 Newcastle Golf Club Rd Newcastle, WA 98059 6377300220 Barbara Underwood 1100 Harrington Ave NE #304 Renton, WA 98056 6377300230 Liu Yang & Beichuan Zhu 5102 NE 16th St Renton, WA 98059 6377300240 Donna Hill 1100 Harrington Av NE #306 Renton, WA 98056 6377300250 John Young 5508 S Cloverdale St Seattle, WA 98118 6377300260 Karen Drinkwine 1100 Harrington Av NE #308 Renton, WA 98056 6377300270 Larry Craven P O Box 251 Renton, WA 98057 6377300280 Sarah Regalado 1100 Harrington Ave NE #310 Renton, WA 98056 6377300290 K Schutz_coralee 1100 Harrington Ave NE #311 Renton, WA 98056 6377300300 Gebreyesus Aklilu 1100 Harrington Ave NE #312 Renton, WA 98056 7227801660 Renton Housing Authority PO Box 2316 Renton, WA 98056 7227801670 Annmarielinn LLC 19244 39th Ave S Seatac, WA 98188 7227801675 Ronald & Sharon Goodmansen 2916 91st Ave E Edgewood, WA 98371 7227801680 17 Derby Road Ltd & C/O Moen Ruth A 403 SW 41st St Renton, WA 98057 7227801685 Di Jiang 2812 NE 12th St Renton, WA 98056 7227801776 Mjs Heather LLC PO Box 489 Maple Valley, WA 98038 7227802040 Renton City Of 1055 S Grady Way Renton, WA 98055 7227900016 Highlands Property Investme 5368 NE 4th Ct Renton, WA 98059 7227900017 S Square LLC 6660 E Mercer Way Mercer Island, WA 98040 7227900019 Walgreen Co & Real Estate Property Tax PO Box 1159 Deerfield, IL 60015 7227900020 Walgreen Co & Real Estate Property Tax PO Box 1159 Deerfield, IL 60015 7227900090 2801 NE Sunset Blvd LLC & C/O Belmar Properties Inc 2001 Sixth Ave Ste 2300 Seattle, WA 98031 7227900091 Wong D & C 1 LLC 6311 Seward Park Ave S Seattle, WA 98118 7227900093 Ki-Woong Noh & Noh Hea 451 SW 175th Pl Normandy Park, WA 98166 7227900094 Alison Oakland LLC 185 NW Spanish River Blvd #100 Boca Raton, FL 33431 7227900095 Pacific Nut Company Inc 15732 Tustin Village Wy Tustin, CA 92780 7227900096 Wong D & C 1 LLC 6311 Seward Park Ave S Seattle, WA 98118 6377300170 Kerri Miles 4660 NE 3rd Ct Unit J4 Renton, WA 98059 6377300160 Rache Boston 5710 37th St SE Auburn, WA 98092 6377300150 Kerri Miles 4660 NE 3rd Ct #j-4 Renton, WA 98059 6377300140 Howard Banasky 600 Andover Pk E Seattle, WA 98188 6377300130 Arthur Dong 1100 Harrington Ave NE Apt 207 Renton, WA 98056 6377300120 Charles Belcher Jr 1100 Harrington Av NE Unit 206 Renton, WA 98056 6377300110 Ronald Muller 1100 Harrington Ave NE Unit 205 Renton, WA 98056 6377300100 Karl Banasky 1100 Harrington Av NE #204 Renton, WA 98056 6377300060 Howard Banasky 600 Andover Park E Tukwila, WA 98188 6377300050 Larry Dean 1100 Harrington Avenue NE #105 Renton, WA 98056 6377300040 Gary Walter 1100 Harrington Ave NE #104 Renton, WA 98056 6377300030 Francis & Margaret Webb PO Box 3011 Renton, WA 98056 6377300020 Howard Banasky 1100 Harrington Av NE #106 Renton, WA 98056 6377300010 Trang Tran 1100 Harrington Ave NE #101 Renton, WA 98056 0089000010 Wong D & C 1 LLC 6311 Seward Park Ave S Seattle, WA 98118 6377300070 Jaipal Singh 22302 NE 6th Ct Sammamish, WA 98074 6377300080 Howard Banasky 600 Andover Park E Seattle, WA 98188 6377300090 Deborah Boston 2856 Tanzanite Terr Kissimmee, FL 34758 7227800265 Greg & Sabra Fawcett P O Box 402 Fall City, WA 98024 7227800285 Usa Oil LLC 3002 NE Sunset Blvd Renton, WA 98056 7227801026 Safeway Inc Store #0366 2725 NE Sunset Blvd Renton, WA 98056 7227801055 Renton City Of 1055 S Grady Way Renton, WA 98057 7227802045 Renton Housing Authority PO Box 2316 Renton, WA 98056 7227900015 Walgreen Co & Real Estate Property Tax PO Box 1159 Deerfield, IL 60015 8143450010 Priya Vaidyanathan 12638 SE 27th St Bellevue, WA 98005 8143450020 Tran Hien & Dao Thu 1153 Harrington Ave NE Renton, WA 98056 8143450030 Luis Francum 1157 Harrington Av NE #3 Renton, WA 98056 8143450040 James Wiesen 1159 Harrington Av NE #4 Renton, WA 98056 This map/plat is being furnished as an aid in locating the herein described land in relation to adjoining streets, natural boundaries and other land, and is not a survey of the land depicted. Except to the extent a policy of title insurance is expressly modified by endorsement, if any, the company does not insure dimensions, distances, location of easements, acreage or other matters shown thereon. Page 1 of 1geoAdvantage: King County of Washington State (App4) 1/16/2018http://geo.sentrydynamics.net/WA_King/default.aspx Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN February 13, 2018RENTON, WA # 20170853 SOLERA SP.DCXXX 0 8 16 32 L.01SITE PLAN WEISMANDESIGNGROUP HARRINGTON PL.NE 10TH STREET4 SIDEWALK 1 2 3 4 3 PLAY AREA SUNSET BLVD.KIRKLAND AVE.NE 1 2 T H S T R E E TNE 11TH STREETSUNSET LANE WOONERF1 2 PASEO 2 4 HARRINGTON PLSUNSET BLVDNE 10th ST NE 12th STK I R K L A N D A V E 13'-6"31'-8"24'24'20'20' G1 + G2 LEVELS - 116 STALLSRESIDENTIAL20' RESIDENTIAL/ AMENITYTOTAL 20 UNITSTOTAL 12 UNITS G1 + G2 LEVELS - 140 STALLS TOTAL (12 COMMERCIAL)SUBTERRANEAN LEVEL : 130 STALLSCOMMERCIAL PARKING SPACES : 12 @ G1 LEVELLOBBY 2 BLOCK C1.58 ACRESBLOCK A2.18 ACRESRES. STORAGE9,349 SQ. FT.5,530 SQ. FT.5.84ACRESBLOCK B1.16 ACRES upRAMP DN18'16'38'-2"RAMPUPRESIDENTIAL UNITS@ G1 AND G2 LEVELSRESIDENTIAL UNITS @ G1 AND G2 LEVELS16'-4"26'SUNSET LN16' 13'-5" 70'35'-3"DAY CARE12,000 sf. TOTAL16'BANK5,400 sf.PASEO PLAZA38'28'ENTRY 1LOBBY27'20'24'-9"53'10'9'-9"PLAZA 20'15'24' 53'WOONERF (32ft wide)27'12'-6"13'-6" 53'SUBTERRANEAN LEVEL 110 STALLS COMMERCIALSPACE5,000 SFRESIDENTIAL/ AMENITY COMMERCIALSPACE4,800 SF RESIDENTIAL/ AMENITY RESIDENTIALLOBBYCOMMERCIAL PARKING : G1 LEVELRETAIL PARKING: 13 STALLS + DAYCARE STAFF : 25 = 38RAMPUPRAMPDN26'OPENSPACE16 FT ALLEY WAY16 FT ALLEY WAY31'-5" 24'-8"16' JEFFERSONP/LP/L P/ LP/LP/LP/LP/LP/L26'10'LOBBYLOBBY4,000 SF.PLAY AREA @2ND LEVELEXISTING2 DROP OFFS - DAYC.14 STALLSFOR BANK5'-6"7 FT. FLEX ZONE7 FT. FLEX ZONE7 FT. FLEX ZONEOPENSPACE7'20'16'16'24'-9"NE 11th ST SUNSET LN16'16'16'18'14'-9"19'-6"53'PASEOPASEO24'3 DROP OFFS- DAYC.2 0 ' 12'-6"15'-6"53'2'-10"12'2 DROP OFFS - DAYC.2 STALLS2 STALLS32'3'6'6'15'134'-5"323'-5"88'-5" 59' 122'-6" 32'70'6'32'73'-3"LOBBYLOBBY 2PODIUM 1RESIDENTIAL UNITS @ R1-R5 LEVELSAVG. 46 UNITS PER LEVEL32'RESIDENTIAL : 5 LEVELS OVER PODIUM (221)TOTAL UNITS : 4 + 221 = 22532'6'45'-9"RESIDENTIAL : 5 LEVELS OVER PODIUM (245)TOTAL UNITS : 35 + 245 = 280132'-11" 231'-5"309'-5"50'66'28'45'-9"70'28'4,000 SF.PLAY AREA @2ND LEVEL2,500 SF.DAYCARE @2ND LEVEL73'-3"69'-7"50' 50'Architecture + Planning888.456.5849ktgy.comCONCEPTUAL DESIGNFebruary 8, 2018RENTON, WA # 20170853RENTON HIGHLANDS TOWNHOMESSP.1SITE PLAN 0408020PODIUM BUILDING - BLOCK B2 LEVELS OF TYPE IA5 LEVELS OF TYPE III-A OVER PODIUMCOMMERCIAL AREA PROPOSED : 5,000 SF.TOTAL RESIDENTIAL UNITS ESTIMATED : 225 UNITS(820 SF. AVG. SIZE)SITE AREA: 1.16 ACRESDENSITY: 193 DU/ACPODIUM BUILDING - BLOCK A2 LEVELS OF TYPE I-A ABOVE GRADE5 LEVELS OF TYPE III-A OVER PODIUMCOMMERCIAL AREA PROPOSED : 5,000 SF.TOTAL RESIDENTIAL UNITS ESTIMATED : 280 UNITS(820 SF. AVG. SIZE)SITE AREA: 2.18 ACRESDENSITY:128 DU/ACPODIUM BUILDINGBLOCK APODIUM BUILDING -BLOCK BTOTAL UNITSFOR-SALE TOWNS: 150PODIUM MIXED-USE: 505TOTAL: 655SITE AREA : 7.0 ACRESDENSITY : 21.4 DU/AC 1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 kpff.com Neighborhood Meeting Notes – February 20, 2018 Renton Highlands Library Speakers Corey Watson – Quadrant Homes - Applicant Keith McCloskey – KTGY – Architect Jeremy Febus – KPFF – Civil Engineer Introduction  Corey Watson opened the presentation by introducing the speakers and giving a general overview of the project.  Jeremy Febus then gave a general walk-through of the project process and a potential timeline for project milestones.  Keith McCloskey followed by discussing the project in more detail, Specifying the intent of the layout, and the uses of the proposed site features. Questions/Comments The questions and comments that were received and addressed at the meeting are listed below:  What are the uses of each building?  How many people will this project bring to the area?  Clarification on parking locations and amount being provided.  Concern about crime rate going up – Asked if the project will be required to pay a safety impact fee.  General summary of size of each building proposed.  What will building façade from Sunset Blvd look like? Number of stories/general aesthetic.  When do the leases for the existing businesses end?  Request for Keith to provide more detail surrounding the thought behind the site layout.  Concern about the proposed senior housing being placed adjacent to sunset blvd (noise).  Are the roofs going to be pitched or flat?  Request for clarification about what on the project is set in stone.  How much traffic will the project bring? Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Page 1 2907 Harborview Drive, Suite D Gig Harbor, WA 98335 Technical Memorandum To: Corey Watson, Quadrant Homes File Number: 1298.0008 From: Jon Pickett, Soundview Consultants LLC Date: February 20, 2018 Re: Critical Areas Assessment; Renton Highlands – Northeast Sunset Blvd and Northeast 12th Street, Renton, Washington Dear Mr. Watson, Soundview Consultants LLC (SVC) conducted a critical areas assessment of an 11.07-acre property located near the intersection of Northeast Sunset Boulevard and Northeast 12th Street (King County Tax Parcel Numbers 7227801205, 7227801206, 7227801235, 7227801405, and 7227801406, and 7227801785) in the City of Renton, Washington. The subject property is situated in the Northwest ¼ of Section 9, Township 23 North, Range 5 East, W.M. SVC investigated the site to evaluate if any potentially-regulated aquatic features or fish and wildlife habitat are located on or near the subject property for proposed redevelopment of the site. This Technical Memorandum has been prepared to document the results of this assessment. Figure 1. Subject Property Location. Subject Property Location Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Page 2 Background Data Prior to the site investigation, SVC conducted background research using King County Geographic Information System (GIS) data, Washington Department of Fish and Wildlife (WDFW) Priority Habitat and Species (PHS) database, WDFW SalmonScape mapping tool, the U.S. Fish and Wildlife Service (USFWS) National Wetland Inventory (NWI), Natural Resources Conservation Service (NRCS) Soil Survey map, and Washington Department of Natural Resources (DNR) stream typing map. All determinations were made using observable vegetation, hydrology, and soils in conjunction with data from the U.S. Geographic Survey (USGS) topographic maps, NRCS, USFWS, National Oceanic and Atmospheric Administration (NOAA) precipitation data, and various orthophotographic resources. Background maps are provided in Attachment A. The King County topographic map shows that the subject property gently slopes down from northeast to the southwest. The NRCS Soil Survey map (Attachment A2) identifies three hydric soil series in the offsite project area: Arents, Alderwood material, 6 to 15 percent slopes (AmC), Ragnar-Indianola association, sloping (RdC), and Urban land (Ur). The USFWS NWI map (Attachment A3), City of Renton wetland map (Attachment A4), City of Renton streams map (Attachment A5), DNR stream typing map (Attachment A6), WDFW Salmonscape map (Attachment A7), and WDFW PHS map (Attachment A8) do not identify any potential critical areas on or near the subject property. Methods A formal site investigation was performed by SVC in the Fall of 2017. This investigation consisted of a walk-through survey of the subject property and any accessible areas within 300 feet of the subject property for potentially-regulated wetlands, waterbodies and fish and wildlife habitat per Renton Municipal Code (RMC) 4-3-050. Wetlands, streams, and select fish and wildlife habitats and species are regulated as critical areas under RMC 4-3-050 and subject to restricted uses/activities under the same title. Wetland presence/absence was determined in accordance with RMC 4-3-050G.9 and as outlined in the U.S. Army Corps of Engineers (USACE) Wetlands Delineation Manual (Environmental Laboratory, 1987), as modified according to the guidelines established in the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Western Mountains, Valleys, and Coast Region, Version 2.0 (USACE, 2010). The fish and wildlife habitat assessment was conducted during the same site visit by a qualified fish and wildlife biologist. The experienced biologist made visual observations using stationary and walking survey methods for both aquatic and upland habitats noting any special habitat features or signs of fish and wildlife activity. Results The subject property is a fully developed property consisting entirely of paved surfaces, commercial buildings and associated infrastructure and landscaping. Onsite vegetation consists of sparse planted ornamental and native trees and shrubs in landscaping strips and contained in planters and maintained lawn area. Two artificial rain gardens were observed approximately 80 to 120 feet southwest of the subject property across Northeast 10th Street, which appear to be constructed as part of the City of Renton’s Sunset Neighborhood park development (City of Renton et al, 2014). Google Earth aerial imagery indicates that these rain gardens were constructed following demolition of residential homes Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Page 3 between 2014 and 2015. Surrounding land use consist of single and multifamily-residential development and mix commercial development. No potentially-regulated wetlands or fish and wildlife habitat was observed on the subject property. Regulatory Considerations The offsite rain gardens are exempt from regulatory consideration per RMC 4-3-50.B.1: f. Wetlands created or restored as a part of a mitigation project are regulated wetlands. Regulated wetlands do not include those artificial wetlands intentionally created from non-wetland sites, including, but not limited to, irrigation and drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway. The offsite rain gardens were likely constructed as stormwater facilities between 2014 and 2015 as part of the City of Renton’s Sunset Neighborhood park development (City of Renton et al, 2014) and are not regulated features. Conclusions The site investigation did not identify any critical areas on or within 300 feet of the subject property, and therefore, redevelopment at the subject property should not impact wetlands, waterbodies or fish and wildlife habitat. If you have any further questions, please contact me at your earliest convenience. Sincerely, ____________________________ February 20, 2018 Jon Pickett Date Senior Environmental Planner Soundview Consultants LLC 2907 Harborview Drive, Suite D Gig Harbor, WA 98335 (253) 514-8952 Office (253) 514-8954 Fax Jon@soundviewconsultants.com Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Page 4 References Brinson, M. M. 1993. A hydrogeomorphic classification for wetlands, Technical Report WRP-DE-4, U.S. Army Engineer Waterways Experiment Station, Vicksburg, MS. Cooke, S.S. 1997. Wetland Plants of Western Washington. Seattle Audubon Society. Seattle, Washington. City of Renton, HBB Landscape Architecture, and CH2MHill. 2014. “Sunset Neighborhood Park Final Master Plan.” November 3, 2014. Cowardin, L.M., V. Carter, F. Golet, and E.T. LaRoe. 1979. Classification of Wetlands and Deepwater Habitats of the United States. U.S. Fish & Wildlife Service. Washington D.C. Environmental Laboratory. 1987. Corps of Engineers Wetlands Delineation Manual. Technical Report Y- 87-1, US Army Engineer Waterways Experiment Station, Vicksburg, Mississippi. Hruby, T. 2014. Washington State Wetland Rating System for Western Washington: 2014 Update. Washington State Department of Ecology Publication # 14-06-029. Lichvar, R.W., D.L. Banks, W.N. Kirchner, and N.C. Melvin. 2016. The National Wetland Plant List: 2016 wetland ratings. Phytoneuron 2016-30: 1-17. Published 28 April 2016. ISSN 2153 733X. Munsell Color. 2000. Munsell Soil Color Charts. New Windsor, New York. Natural Resources Conservation Service. 2001. Hydric Soils List: King County, Washington. U.S. Department of Agriculture. Washington D.C. Renton Municipal Code. 2017. 4-3-050 Critical Areas Regulations. December 11, 2017. Snyder, D.E., Gale, P.S., Pringle, R.F. 1973. Soil Survey of King County Area, Washington. United States Department of Agriculture, Soil Conservation Service in cooperation with Washington State Department of Natural Resources, and Washington State University, Agriculture Research Center. Washington, D.C. U.S. Army Corps of Engineers. 2010. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Western Mountains, Valleys, and Coast Region (Version 2.0), ed. J. S. Wakeley, R. W. Lichvar, and C. V. Noble. ERDC/EL TR-10-13. Vicksburg, MS: U.S. Army Engineer Research and Development Center. United States Department of Agriculture, Natural Resources Conservation Service. 2017. Field Indictors of Hydric Soils in the United States, Version 8.1. L.M. Vasialas, G.W. Hurt, and C.V. Noble (eds.). USDA, NRCS, in cooperation with the National Technical Committee for Hydric Soils. Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Attachment A – Background Information This attachment includes a USGS Topographic Map (A1), NRCS Soil Survey Map (A2), USFWS NWI Map (A3), City of Renton Wetlands Map (A4), City of Renton Streams Map (A5), DNR Stream Typing Map (A6), WDFW SalmonScape Map (A7), and WDFW PHS Map (A8). Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Attachment A1 – King County Topographic Map Subject Property Location Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Attachment A2 – NRCS Soil Survey Map Subject Property Location Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Attachment A3 – USFWS NWI Map Subject Property Location Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Attachment A4 – City of Renton Wetlands Map Subject Property Location Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Attachment A5 – City of Renton Streams Map Subject Property Location Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Attachment A6 – DNR Stream Typing Map Subject Property Location Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Attachment A7 – WDFW SalmonScape Map Subject Property Location Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Attachment A8 – WDFW PHS Map Subject Property Location Soundview Consultants LLC February 20, 2018 1298.0008 Renton Highlands – Critical Areas Assessment Attachment B – Site Photographs Onsite street trees Onsite landscaping KEY RESIDENTIAL MIXED-USE COMMUNITY ——SITEAREA 0’100’200’400’ Sunset Terrace Master Site Plan RENTON SUNSET AREA MSP EXHIBIT 9 DEPARTMENTOFCOMMUNITYANDECONOMICDEVELOPMENT—RentonADMINISTRATIVESITEDEVELOPMENTPLANREPORT&DECISIONREPORTDATE:June20,2016ProjectName:RentonSunsetTerraceRedevelopment(2016Modification)Owner/Applicant:CityofRenton;RentonHousingAuthority;SunsetTerraceDevelopmentLLCFileNumber:LUA14-001475,MODProjectManager:RocaleTimmons,SeniorPlannerProjectSummary:TheapplicantisrequestingaMinorSitePlanModificationforamendmentstotheapprovedSunsetPlannedActionAreaandRentonSunsetTerraceRedevelopmentMasterSitePlan(LUA1O-052andLUA14-001475)inordertoincludeanadditionalfiveparcelsandtoswapresidentialunitsbetweentwomasterplannedsites.Noadditionalresidentialunitsarebeingproposed.TherevisedproposalrequiresaNEPAReevaluation,pursuanttoSection58.47ofUSDepartmentofHousingandUrbanDevelopment’s(HUD’s)NEPAregulations,demonstratingthattheoriginalconclusionsoftheFEISremainvalid.SEPAalsoprovidesaprocess,usinganAddendumtothepriorFEISwherenewinformationoranalysisdoesnotsubstantiallychangepriorconclusionsaboutimpacts(WAC197-11-706).Proposedresidentiallandincludesapartmentsandattachedtownhomesthataregenerallybetweentwoandfourstoriesinheight,extendingtofiveandsixstoriesalongSR900.Proposedcommercialspacewouldequalbetween19,500-59,000squarefeet.ProjectLocation:LocatedinnortheastRenton,theSunsetTerracecommunityisgenerallyboundedbySunsetBlvdNEonthesouththatformsa“U-shaped”border,GlenwoodAvenueNEandNE10thStreetonthenorth;HarringtonAvenueNEbisectsthearea.SiteArea:15.28acresProjectLocationMap CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeSitePlanReport&DecisionSUNSETTERRACEREDEVELOPMENTMASTERPLANMINORMODIFICATIONLUA1O-052&LUA14-001475,MODReportofJune20,2016Page2of8A.EXHIBITS:Exhibit1:ERCReport,datedJune13,2016Exhibit2:RentonSunsetAreaReevaluationandAddendum,datedMay2016Exhibit3:DraftNEPA/SEPAEISExhibit4:FinalEIS(2011)Exhibit5:RecordofDecision(2014)Exhibit6:PlannedActionOrdinance(2014)Exhibit7:RevisedMitigationMeasures(2014)Exhibit8:TrafficAnalysis—SunsetMasterPlan(2014)Exhibit9:MasterSitePlan(2016)Exhibit10:MasterSitePlan(2014)Exhibit11:CulturalResourceAssessment(2016)Exhibit12:TrafficAnalysis—SunsetCourt(2016)Exhibit13:HEXDecision—RentonSunsetTerraceRedevelopmentMasterSitePlan—January14,2015Exhibit14:AdministrativeSitePlanReport&Decision—June20,2016B.GENERALINFORMATION:CityofRenton1.Owner(s)ofRecord:RentonHousingAuthoritySunsetTerraceDevelopmentLLC2.ComprehensivePlanLandUseDesignation:CenterVillage(CV)3.ZoningClassification:CenterVillage(CV)andResidential-14(R-14)4.ExistingSiteUse:Multi-FamilyResidential,PublicLibrary,Vacant5.NeighborhoodCharacteristics:a.North:Multi-FamilyResidential(R-14andCVzone)b.East:Multi-FamilyResidentialandCommercial(CVzone)c.South:SunsetBlvdNE/SR900d.West:Multi-FamilyResidential(R-10andCVzone)6.SiteArea:16.88acresC.HISTORICAL/BACKGROUND:ActionLandUseFileNo.OrdinanceNo.DateComprehensivePlanN/A509911/01/2004ZoningN/A510011/01/2004AnnexationN/A179109/09/1959SunsetLaneStreetVacationVAC13-001569309/09/2013LLALUA3-001114N/A10/10/2013SunsetAreaPlannedActionLUA1O-052N/A06/06/2011EISHighlandsLibraryLUA13-001720N/A03/04/2014SitePlanReport CityofRentonDepartmentofCommunity&EconomicDevelopmentSUNSETTERRACEREDEVELOPMENTMASTERPLANMINORMODIFICATIONReportofJune20,2016SunsetLLALUA6-000132N/A04/28/2016SunsetCourtLUA16-000068N/ATBDD.PUBLICSERVICES:1.ExistingUtilitiesa.Water:WaterservicewouldbeprovidedbytheCityofRenton.b.Sewer:SewerservicewouldbeprovidedbytheCityofRenton.c.Surface/StormWater:TherearestormdrainageimprovementsinNE10thSt,SunsetLaneNEandHarringtonAveNE.2.Streets:Therearepartialstreetimprovementsalongthefrontagesofthesite.3.FireProtection:CityofRentonFireDepartmentE.APPLICABLESECTIONSOFTHERENTONMUNICIPALCODE:1.Chapter2LandUseDistrictsa.Section4-2-020:PurposeandIntentofZoningDistrictsb.Section4-2-070:ZoningUseTablec.Section4-2-11OA:ResidentialDevelopmentStandardsd.Section4-2-120A:CommercialDevelopmentStandards2.Chapter3EnvironmentalRegulationsa.Section4-3-100:UrbanDesignRegulations3.Chapter4PropertyDevelopmentStandards4.Chapter6StreetsandUtilityStandards5.Chapter9ProceduresandReviewCriteriaa.Section4-9-200:SitePlanReview6.Chapter11DefinitionsF.ADMINSTRATIVESITEPLANREVIEWFINDINGSOFFACT:1.TheCityofRenton,alongwiththeRentonHousingAuthority(RHA),KingCountyLibrarySystem,andColpittsDevelopment,andcommunitypartners,isredevelopingtheSunsetTerracepublichousingcommunity,anapproximately16-acresitewithinthelargerSunsetAreaCommunityNeighborhoodinnortheastRenton.2.Intotal,722dwellingunitswereapprovedonsitesAthrough0andX.Approximately675oftheseunitswereapprovedonMasterPlansitesCthrough0(Exhibit13).Additionally,therewasarangeofcommercialspaceapprovedwithalowendof19,500squarefeetandanupperrangeof59,000squarefeet.AdministrativeSitePlanReport&DecisionLUA1O-052&LUA14-001475,MODPage3of8SitePlanReport 3.TheRentonSunsetTerraceRedevelopmenttofourconditionsofapproval(Exhibit12):2)AllphasesincludedintheMasterSiteClassificationMap,(StaffReportExhibitsubmittedatthetimeofSitePlanReviewCurrentPlanningProjectManagerandPlanCityandColpittspriortowhichintendstoutilizePlanshallcomplywiththeSunsetAreaStreet12).ConceptualfrontageimprovementsshallbeforeachphaseandaresubjecttoapprovalbytheReviewer.3)Priortobeginningconstruction,eachindividualprojectphaseorimprovementshallprovideinformationtosurroundingpropertyownersabouttimelines,extentofconstruction,andcontactinformation.4)ThisdecisioniseffectiveuntilJanuary14,2025.4.TherequestedmodificationtotheapprovedSunsetTerraceRedevelopmentMasterSitePlanincludesthefollowingchanges:•ShiftsevenunitsfromtheSunsetTerraceApartments(SiteD)totheSunsetParkEast(Piha)Townhomes&Apts(a.k.a.Suncrest)property(SiteG);and•DevelopreplacementhousingfortheRHASunsetTerraceRedevelopmentonfiveparcelslocatedoutsidebutabuttingthe2014MasterPlanarea.ThreeparcelswouldbeaddedtotheCityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeSitePlanRepart&DecisionSUNSETTERRACEREDEVELOPMENTMASTERPLANMINORMODIFICATIONLUAO-052&LUA14-001475,MODReportofJune20,2016Page4of8TotalUnitsProp-ReviewedSiteNameStatusAcresosedinUnitsReevaluationAGlennwoodTownhomesConstructedRHA0.6588BKirklandAvenueTownhomesConstructedRHA0.771818CEdmondsApartmentsMasterSitePlan1.799112DSunsetTerraceApartmentsMasterSitePlan0.514154ESunsetParkWestTownhomesMasterSitePlan0.551010FSunsetCourtTownhomesMasterSitePlan0.881515SunsetParkEast(Piha)GMasterSitePlan1.095657Townhomes&AptsHSunsetTerraceDev.BuildingAMasterSitePlan0.56111117ISunsetTerraceDev.BuildingBMasterSitePlan1.18188196JSunsetTerraceDev.BuildingCMasterSitePlan0.74104110KRentonHighlandsLibraryMasterSitePlan0.43LRegionalStormwaterFacilityMasterSitePlanSeeMMSunsetParkMasterSitePlan3.2NSunsetLaneLoopImprovementsMasterSitePlan1.41NE10thStreetExtension0MasterSitePlan0.2ImprovementsXLibrarySite(2013)FutureDevelopment1.412525Totals15.28675722MasterSitePlanwasapprovedonJanuary14,2015subject1)ADevelopment/DensityTransferAgreementshallbeexecutedbythedetailedSitePlanReviewapprovalforanyphaseofdevelopmentunusedresidentialdensityfromtheproposedparkacreage.SitePlanReport CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeSitePlanReport&DecisionSUNSETTERRACEREDEVELOPMENTMASTERPLANMINORMODIFICATIONLUA1O-052&LUA14-001475,MODReportofJune20,2016PageSof8SunsetCourtParksite(SiteF)anddevelopedwith50apartmentsandtownhomes(LUA16-000068),andtwoparcelswouldbeaddedtopropertiesnorthofthe“looproad”intheSunsetParkWestTownhomes(a.k.a.HarringtonPark)developmentresultingin19townhomes(SiteE).TotalUnitsTotalUnits.Acres:ReviewedinReviewedinSiteNameStatusAcres:20162014Reevaluation:Reevaluation:20142016AGlennwoodTownhomesConstructedRHA0.6580.658BKirklandAvenueIownhomesConstructedRHA0.77180.7718CEdmondsApartmentsPartofMasterSitePlan1.701121.7068DSunsetTerraceApartmentsPartofMasterSitePlan0.51540.5147ESunsetParkWestTownhomes2014/HarringtonPark2016PartofMasterSitePlan,Amended0.55101.0619FSunsetCourtTownhomes2014/SunsetCourtApartments2016PartofMasterSitePlan,Amended0.88151.95500SunsetParkEast(Piha)Townhomes&Apts2014/SuncrestHomes2016PartofMasterSitePlan1.09571.0964HSunsetTerraceDcv.BuildingAPartofMasterSitePlan0.091170.99117ISunsetTerraceDcv.BuildingBPartofMasterSitePlan1.181961.18196JSunsetTerraceDec.BuildingCPartofMasterSitePlan0.741100.74110KRentonHighlandsLibraryPartofMasterSitePlanSeeHSeeHCRegionalStormwaterFacilityPartofMasterSitePlanSeeMSeeMMSunsetParkPartofMasterSitePlan3.203.2NSunsetLaneLoopimprovementsPartofMasterSitePlan1.411.410NE10thStreetEutensionImprovementsPartofMasterSitePlan0.200.20XLibrurySite(2013)FutureDevelopment1.41251.4125TotalMasterPlanSites12.4467114.04671Total-AllSites15.287221B.88722=MasterPlanProperties5.TheCityhaspreparedanEnvironmentalImpactStatement(EIS)fortheSunsetArea(Exhibit4),supplementedbyaddenda,thataddressestheprobablesignificantenvironmentalimpactsassociatedwiththelocation,type,andamountofdevelopmentanticipatedinthePlannedActionarea.6.TheCityadoptedaPlannedActionOrdinance5610onJune13,2011,andsubsequentlyreplaceditwithOrdinance5740onDecember8,2014(Exhibit6)toreflectpreparationofaMasterPlanfortheRentonSunsetTerraceRedevelopmentareawithinthelargerPlannedActionAreaandtoreflectintegrationofaSEPAReevaluationAlternativein2014(Exhibit10).7.WiththecurrentlyproposedrevisionstotheMasterPlanandadditionoftheabuttingparcels,therewouldbenonetincreaseinthetotalnumberofhousingunitsintheMasterPlanareaorintheSunsetAreaneighborhood.However,consistentwiththeflexibilityallowedbytheadoptedMasterPlan,someunitswouldberedistributed.8.ThepropertyislocatedwithintheCenterVillage(CV)landusedesignationandtheCenterVillage(CV)andResidential-14du/aczoningclassifications.9.ThesiteislocatedwithinZone2oftheAquiferprotectionArea.Therearenoothercriticalareaslocatedonsite.10.ThePlanningDivisionoftheCityofRentonacceptedtheabovemasterapplicationforreviewonJanuary29,2016,determineditcompleteonFebruary19,2016andcommencedatwoweekpubliccommentperiod.11.Duringstaff’sreviewitwasdeterminedadditionalinformationwasneededinordertoproceedfurther.TheprojectwasplacedonholdonMarch20,2016.TheCityreceivedslightrevisionstotheapplication,theprojectwastakenoffholdonMay27,2016,andasecondcourtesytwo-weekpubliccommentperiodcommencedandwasheldopenuntilJune10,2016.12.Theprojectcomplieswiththe120-dayreviewperiod.13.Noagencyorpubliccommentswerereceived.SitePlanReport CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeSitePlanReport&DecisionSUNSETTERRACEREDEVELOPMENTMASTERPLANMINORMODIFICATIONLUA1O-052&LUA14-001475,MODReportofJune20,2016Page6of814.Representativesfromvariouscitydepartmentshavereviewedtheapplicationmaterialstoidentifyandaddressissuesraisedbytheproposeddevelopment.Thesecommentsarecontainedintheofficialfile,andtheessenceofthecommentshavebeenincorporatedintotheappropriatesectionsofthisreportandtheDepartmentalRecommendationattheendofthisreport.15.MinorModification:TheproposalrequiresaMinorModificationtotheapprovedMasterSitePlanapprovedonJanuary14,2015(Exhibit13).ThefollowingtablecontainsprojectelementsintendedtocomplywiththeminormodificationtoapprovedSitePlanscriteria,asoutlinedinRMC4-9-200H.2:TableA:MINORMODIFICATIONTOANAPPROVEDMASTERPLANORSITEPLANMinormodificationsmaybepermittedbyadministrativedetermination.Tobeconsideredaminormodification,theamendmentmustnot:Involvemorethanatenpercent(10%)increaseinareaorscaleofthedevelopmentintheapprovedplan.StaffComment:Withthe2016/currentlyproposedrevisionstotheMasterSitePlanandadditionoftheabuttingparcels,therewouldbenonetincreaseinthetotalnumberof‘housingunitsintheMasterPlanareaorintheSunsetAreaneighborhood.However,consistentwiththeflexibilityallowedbytheadoptedMasterPlan,someunitswouldberedistributed.TheproposeddevelopmentswouldmeetCitystandardsfordensity,height,setbacks,transportationlevelsofservice,connectiontoutilities,andwouldbesubjecttoCityparkingcodes,includingproceduresformodifyingapplicablestandards.Haveasignificantlygreaterimpactontheenvironmentand/orpublicfacilitiesthantheapprovedplan.StaffComment:Mostoftheoriginalcomponentsofthe2014MasterSitePlan(Exhibit10)remainthesameandcontinuetocomplywithSitePlanReviewdecisioncriteria,asoutlinedinRMC4-9-200.E.Theproposedmodificationwouldberequiredtocontinuetodemonstratecompliancewiththoseconditionsissuedaspartoftheoriginalapproval(seeabove,FindingofFact2).Aswiththechangespreviouslyevaluatedin2014,therevisionsproposedtotheMasterSitePlanatthistimerequireaNEPAReevaluationandSEPAAddendum.AReevaluation,consistentwithapplicableNationalEnvironmentalPolicyAct(NEPA)regulations,combinedwithaSEPAAddendum,waspreparedtoevaluatetheproposedchangesinCompliantiftheMasterSitePlan.TheReevaluation/Addendum,datedMay,2016,concludedthatconditionoftherewerenonewordifferentimpactsandthattheconclusionsoftheEISarestillvalidapprovalis(Exhibit2).metOnJune6,2016,theCity’sEnvironmentalReviewCommitteedeterminedthatthe2016SunsetTerraceRedevelopmentMasterSitePlanModificationwasconsistentwithboththerangeofplanalternativesthatwereevaluatedintheFSEIS(Exhibit4)andwiththedevelopmentlevelsorparametersasspecifiedintherevised2014PlannedActionOridinance(Exhibit6).However,the2016Re-evaluationandAddendumwouldnecessitateminorrevisionstotheRecordofDecisionandPlannedActionOrdinancetoreflecttherevised(2016)MasterSitePlanpriortoconstruction.Thereforestaffrecommendsaconditionofapprovalrequiringallnecessarychanges,reflectingthe2016MasterSitePlanRevisions,bemadetotheRecordofDecisionandPlannedActionOrdinancepriortothecommencementofconstructiononSitesD,EFandG(SunsetTerraceApartments,SunsetParkWestTownhomes,SunsetCourtPark,andSunsetParkEastTownhomes&SitePlanReport CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeSitePlanReport&DecisionSUNSETTERRACEREDEVELOPMENTMASTERPLANMINORMODIFICATIONLUA1O-052&LUA14-001475,MODReportofJune20,2016Page8of8TRANSMITTEDthisthis20thdayofJune2016totheContact/Applicant/Owner:Owners:RentonHousingAuthorityCityofRentonColpittsDevelopmentTRANSMITTEDthisthis20thdayofJune2016tothePartiesofRecord:CoraleeSchutzSharonBarkerHarringtonPlaceCondoManager1100HarringtonAveNE#31115718SEi43dSt716W.MeekerSt#101Renton,WA98056Renton,WA98059Kent.WA98032SandraBowersAlD’AlessandroMatt&CindyGano1135HarringtonAveNEKingCounty1145HarringtonAveNERenton,WA980564015thAye,Ste#500Renton,WA98056Seattle,WA98104TRANSMITTEDthisthis20thdayofJune2016tothefollowing:CE.“Chip”Vincent,CEDAdministratorBrianneBannwarth,DevelopmentEngineeringManagerVanessaDolbee,CurrentPlanningManagerFireMarshalLandUseActionAppeals,RequestforReconsideration,&ExpirationThereviewdecisionswillbecomefinalifthedecisionsarenotappealedwithin14daysofthedecisiondate.MinorModificationtoApprovedSitePlanApprovalAppeal:AppealsoftheadministrativemodificationtoapprovedsiteplanmustbefiledinwritingtotheHearingExamineronorbefore5:00p.m.onJuly5,2016.APPEALS:Anappealofthedecision(s)mustbefiledwithinthe14-dayappealperiod(RCW43.21.C.075(3);WAC197-11-680).RentonMunicipalCodeSection4-8-110governsappealstotheHearingExaminer.Appealsmustbefiledinwritingtogetherwiththe$250.00applicationfeetoHearingExaminer,CityofRenton,1055SouthGradyWay,Renton,WA98057.AdditionalinformationregardingtheappealprocessmaybeobtainedfromtheCityClerk’sOffice,RentonCityHall-7thFloor,(425)430-6510.RECONSIDERATION:Within14daysofthedecisiondate,anypartymayrequestthatadecisionbereopenedbytheAdministrator(Decision-maker).TheAdministrator(Decision-maker)maymodifyhisdecisionifmaterialevidencenotreadilydiscoverablepriortotheoriginaldecisionisfoundorifhefindstherewasmisrepresentationoffact.Afterreviewofthereconsiderationrequest,iftheAdministrator(Decision-maker)findssufficientevidencetoamendtheoriginaldecision,therewillbenofurtherextensionoftheappealperiod.Anypersonwishingtotakefurtheractionmustfileaformalappealwithinthe14-dayappealtimeframe.EXPIRATIONPERIOD:TheAdministrativeSiteDevelopmentPlanReviewdecisionwillexpiretwo(2)yearsfromthedateofdecisionortheexpirationoftheMasterSitePlanwhichevercomesfirst.THEAPPEARANCEOFFAIRNESSDOCTRINE:providesthatnoexparte(privateone-on-one)communicationsmayoccurconcerningthelandusedecision.TheDoctrineappliesnotonlytotheinitialdecision,buttoAppealstotheHearingExamineraswell.Allcommunicationsafterthedecision/approvaldatemustbemadeinwritingthroughtheHearingExaminer.Allcommunicationsarepublicrecordandthispermitsallinterestedpartiestoknowthecontentsofthecommunicationandwouldallowthemtoopenlyrebuttheevidenceinwriting.AnyviolationofthisdoctrinecouldresultintheinvalidationoftheappealbytheCourt.SitePlanReport CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeSitePlanReport&DecisionSUNSETTERRACEREDEVELOPMENTMASTERPLANMINORMODIFICATIONLUA1O-052&LUA14-001475,MODReportofJune20,2016Page7of8Apartmentsrespectively).ItshouldbenotedstaffiscurrentlyprocessingamendmentstotheSunsetAreaPlannedActionOrdinance,pursuanttoSEPA.TheCityheldacommunitymeeting,asrequired,onJune6,2016forproposedamendmentstothePlannedActionOrdinance.TheCityCouncilwillholdapublichearingonJuly11,2016regardingnewamendmentstothePlannedActioninordertointegratethe2016ReevaluationAlternative,outlinedintheNEPAReevaluationandSEPAAddendum(Exhibit2).ItisanticipatedtherevisedPlannedActionOrdinance,andRecordofDecision,willbeeffectiveand/orinplaceinAugustof2016.Themodificationdoesnotchangetheboundariesoftheoriginallyapprovedplan.StaffComment:All2016MasterPlannedsites(Exhibit9)wereevaluatedinthe2011EISfortheSunsetAreaCommunityPlannedActionArea(Exhibit4).ThreeadditionalparcelsvabuttingSunsetCourtPark(Site“F”,a2011‘swapsite”)areaddedtotheMasterPlan,andtwoadditionalparcelsareaddedtotheRedevelopmentarea(Site“E”).MostoftheMasterPlanSitesbeingreviewedinthisdocumentwerepreviouslyconsideredinthePotentialSunsetRedevelopmentStudyAreaorwereconsidered“swapsites”(wherehousingreplacementcouldoccur).G.CONCLUSIONS:1.TheSunsetTerraceRedevelopmentSitePlanMinorModificationisconsistentwiththeMinorModificationcriteriatoanapprovedSitePlan,ifallconditionsofapprovalaremet.2.Theproposaliscompliantandconsistentwiththeplans,policies,regulationsandapprovalstowhichitisvestedifallconditionsofapprovalaremet.3.Staffdoesnotanticipateanyadverseimpactsonsurroundingpropertiesandusesaslongastheconditionsofapprovalarecompliedwith.4.TheproposeduseisanticipatedtobecompatiblewithexistingandfuturesurroundingusesaspermittedintheCVandR-14zoningclassifications.5.Thereareadequatepublicservicesandfacilitiestoaccommodatetheproposeduse.H.DECISION:TheproposedSunsetTerraceRedevelopmentSitePlanMinorModification,FileNo.LUA14-001475andLUA1O-052,MODisapproved.Theproposalissubjecttothefollowingconditions:1.TheapplicantshalldemonstratecompliancewithallconditionsofapprovalissuedaspartoftheSunsetTerraceRedevelopmentMasterSitePlanDecision,datedJanuary14,2015(Exhibit13).2.Allnecessarychanges,reflectingthe2016MasterSitePlanRevisions,shallbemadetotheRecordofDecisionandPlannedActionOrdinancepriortothecommencementofconstructiononSitesD,E,FandG(SunsetTerraceApartments,SunsetParkWestTownhomes,SunsetCourtPark,andSunsetParkEastTownhomes&Apartmentsrespectively).JenniferHenning,PlanningDirectorDateSitePlanReport CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeSitePlanReport&DecisionSUNSETTERRACEREDEVELOPMENTMASTERPLANMINORMODIFICATIONLUA1O-052&LUA14-001475,MODReportofJune20,2016Page8of8TRANSM1?TEDthisthis20thdayofJune2016totheContact/Applicant/Owner:Owners:RentonHousingAuthorityCityofRentonColpittsDevelopmentTRANSMuTEDthisthis20thdayofJune2016tothePartiesofRecord:CoraleeSchutzSharonBarkerHarringtonPlaceCondoManager1100HarringtonAveNE#31115718SE;43rdSt716W.MeekerSt#101Renton,WA98056Renton,WA98059Kent,WA98032SandraBowersAlD’AlessandroMatt&CindyGano1135HarringtonAveNEKingCounty1145HarringtonAveNERenton,WA98056401SthAve,Ste#500Renton,WA98056Seattle,WA98104TRANSMIJTEDthisthis20thdayofJune2016tothefollowing:C.E.“Chip”Vincent,CEDAdministratorBrianneBonnworth,DevelopmentEngineeringManagerVanessaDolbee,CurrentPlanningManagerFireMarshalLandUseActionAppeals,RequestforReconsideration,&ExpirationThereviewdecisionswillbecomefinalifthedecisionsarenotappealedwithin14daysofthedecisiondate.MinorModificationtoApprovedSitePlanApprovalAppeal:AppealsoftheadministrativemodificationtoapprovedsiteplanmustbefiledinwritingtotheHearingExamineronorbefore5:00p.m.onJuly5,2016.APPEALS:Anappealofthedecision(s)mustbefiledwithinthe14-dayappealperiod(RCW43.21.C.075(3);WAC197-11-680).RentonMunicipalCodeSection4-8-110governsappealstotheHearingExaminer.Appealsmustbefiledinwritingtogetherwiththe$250.00applicationfeetoHearingExaminer,CityofRenton,1055SouthGradyWay,Renton,WA98057.AdditionalinformationregardingtheappealprocessmaybeobtainedfromtheCityClerk’sOffice,RentonCityHall-7thFloor,(425)430-6510.RECONSIDERATION:Within14daysofthedecisiondate,anypattymayrequestthatadecisionbereopenedbytheAdministrator(Decision-maker).TheAdministrator(Decision-maker)maymodifyhisdecisionifmaterialevidencenotreadilydiscoverablepriortotheoriginaldecisionisfoundorifhefindstherewasmisrepresentationoffact.Afterreviewofthereconsiderationrequest,iftheAdministrator(Decision-maker)findssufficientevidencetoamendtheoriginaldecision,therewillbenofurtherextensionoftheappealperiod.Anypersonwishingtotakefurtheractionmustfileaformalappealwithinthe14-dayappealtimeframe.EXPIRATIONPERIOD:TheAdministrativeSiteDevelopmentPlanReviewdecisionwillexpiretwo(2)yearsfromthedateofdecisionortheexpirationoftheMasterSitePlanwhichevercomesfirst.THEAPPEARANCEOFFAIRNESSDOCTRINE:providesthatnoexparte(privateone-on-one)communicationsmayoccurconcerningthelandusedecision.TheDoctrineappliesnotonlytotheinitialdecision,buttoAppealstotheHearingExamineraswell.Allcommunicationsafterthedecision/approvaldatemustbemadeinwritingthroughtheHearingExaminer.Allcommunicationsarepublicrecordandthispermitsallinterestedpartiestoknowthecontentsofthecommunicationandwouldallowthemtoopenlyrebuttheevidenceinwriting.AnyviolationofthisdoctrinecouldresultintheinvalidationoftheappealbytheCourt.SitePlanReport EntireDocumentAvailabteUponRequestEXHIBIT3 FULLDOCUMENTAVAILABLEUPONREQUEST)/p.r1i)j-ftyof__enton•Commun;&EconomicDevelopmentEXHIBIT4 FULLDOCUMENTAVAILABLEUPONREQUESTRecordofDecision(Revised)SunsetAreaCommunityPlannedActionEISIntroduction1Background1SummaryofAlternativesConsideredinReachingDecision2PublicInvolvement10CoordinationwithOtherAgencies11FinalElSComments13ClarificationsandCorrections13Attachments13IntroductionTheCouncilonEnvironmentalQuality(CEQ)directstheimplementationoftheNationalEnvironmentalPolicyAct(NEPA).CEQrulesrequireagenciestoprepareaRecordofDecision(ROD)afterpreparinganenvironmentalimpactstatement(FIS)(Title40oftheCodeoftheFederalRegisterpart1505.2).ThepurposeofaRODistoexplainwhytheagencyhastakenaparticularcourseofaction.ARODmustincludethefollowingelements:•Anexplanationofdecisiononaproposedaction;•Factorsconsideredinmakingadecision;•Alternativesconsideredandtheenvironmentallypreferredalternative;•Adoptedmitigationmeasuresorreasonswhymitigationmeasureswerenotadopted;and•Amonitoringandenforcementprogramforadoptedmitigationmeasures.ThisRODaddressestheredevelopmentoftheSunsetTerracepublichousingcommunityanditsrelationshiptoneighborhoodgrowthandrevitalization.GrowthinthebroaderplanningstudyareaisnotpartoftheproposaladdressedintheROD,andcouldoccurindependentoftheSunsetTerraceproposal.BackgroundTheCityofRenton(City)istheResponsibleEntity(RE)andleadagencyforNEPApurposes.InaccordancewithspecificstatutoryauthorityandtheU.S.DepartmentofKousingandUrbanDevelopment’s(HUD’s)regulationsat24CodeofFederalRegulations(CFR)part58,theCityisauthorizedtoassumeresponsibilityforenvironmentalreview,decision-making,andactionthatwouldotherwiseapplytoHUDunderNEPA.Additionally,theCityistheproponentofthebroaderPlannedActionfortheSunsetareawhichhashadenvironmentalreviewunderWashingtonStateEnvironmentalPolicyAct(SEPA)(RevisedCodeofWashington[RCWJ43.21C).RecordofDecisionEXHIBIT5May2011;RevisedNovember2014 FULLDOCUMENTAVAILABLEUPONREQUESTCITYOFRENTON,WASHINGTONORDINANCENO.5740ANORDINANCEOFTHECITYOFRENTON,WASHINGTON,ESTABLISHINGAPLANNEDACTIONFORTHESUNSETAREAPURSUANTTOTHESTATEENVIRONMENTALPOLICYACT.THECITYCOUNCILOFTHECITYOFRENTON,WASHINGTON,DOESORDAINASFOLLOWS:SECTIONI.Findings.TheCouncilfindsasfollows:A.TheCityissubjecttotherequirementsoftheGrowthManagementAct,RCW36.70A(“GMA”)andislocatedwithinanUrbanGrowthArea;B.TheCityhasadoptedaComprehensivePlancomplyingwiththeGMA,andhasamendedtheComprehensivePlantoaddresstransportationimprovementsandcapitalfacilitiesspecifictotheSunsetArea;C.TheCityhasadoptedaCommunityInvestmentStrategy,developmentregulations,anddesignguidelinesspecifictotheSunsetAreawhichwillguidegrowthandrevitalizationofthearea,includingtheSunsetTerracepublichousingproject;D.TheCityhaspreparedanEnvironmentalImpactStatement(EIS)fortheSunsetArea,supplementedbyanaddendum,thataddressestheprobablesignificantenvironmentalimpactsassociatedwiththelocation,type,andamountofdevelopmentanticipatedinthePlannedActionarea;E.ThemitigationmeasuresidentifiedinthePlannedActionEIS,andattachedtothisordinanceasAttachmentB,togetherwithadoptedCitydevelopmentregulations,willEXHIBIT6I FULLDOCUMENTAVAILABLEUPONREQUESTAttachmentB:SunsetAreaCommunityI’IanneuMcIUflEISMitigationMeasuresTableofContentsIntroductionandPurpose3SEPATerms3GeneralInterpretation3SummaryofProposal,Alternatives,andLandCapacity4ProposalandAlternatives4LandCapacity5Location6MitigationDocument71.Earth82.AirQuality103.WaterResources164.PlantsandAnimals195.Energy216.Noise237.EnvironmentalHealth258.LandUse289.Socloeconomics3010.Housing3211.EnvironmentalJustice3412.Aesthetics3613.Historic/Cultural3914.Transportation4215.ParksandRecreation4616.PublicServices4917.Utilities54AdvisoryNotes59Attachment1:DraftEIS,CulturalResourcesAppendixi,PlanandProceduresforDealingwiththeUnanticipatedDiscovery60Attachment2:Figure3.17-1PotentialSubareaUtilityImprovementsandPhasing62Water63Overview63Edmonds-GlenwoodPhase163NewLibrary63NewMixed-UseBuildingAdjacenttoNewLibrary64RHA’sPihaSite64__EXHIBIT7______________PlannedActionOrdinanceAttachmentB:MitigationDocument CH2MH1LLSL.EntireDocumentAvailableUponRequestSunsetAreaCommunityPlannedActiTrafficAnalysisResults-May2014RedevelopmentMasterSitePlanAlternativeINTRODUCTIONThismemorandumprovidestrafficanalysisresultsfortheMay2014RedevelopmentMasterSitePlanAlternative,orReevaluationAlternative,oftheSunsetAreaCommunityPlannedAction,andcomparestheseresultswithoperationsforAlternative3andthePreferredAlternativeasdocumentedintheFinalNEPA/SEPAFIS.ComparedtoAlternative3,theReevaluationAlternativeincludesamaximumof90additionalunitsinthePotentialSunsetTerraceRedevelopmentSubarea.These90additionalunitsareshiftedoutoftheNorth,South,andSunsetMixedUseareasofthePlannedActionstudyarea.ThisanalysisfocusesontheintersectionoperationsexpectedasaresultofthisshiftTRIPGENERATIoNANDDISTRIBUTIONTripsgeneratedbyAlternative3andthePreferredAlternativeinthePlannedActionstudyareawereestimatedusingtheCity’sversionofthePSRCregionaltravelforecastingmodelwithappliedfuture-yearproposedlanduses.TheAlternative3trafficvolumes,asanalyzedintheFinalNEPA/SEPAEIS,wereusedasabasetodeveloptheReevaluationAlternativevolumes.Tripsgeneratedbythe90additionalunitswereremovedfromtheNorth,South,andSunsetMixedUseareas,andre-routedtothePotentialSunsetTerraceRedevelopment.Assumingthe90shiftedhousingunitsconsistofmediumtohighdensitylow-riseapartmentdwellings,approximately61trips7wouldbegeneratedduringtheweekdayPMpeakhour.(Source:InstituteofTransportationEngineers,TripGenerationManual,9thEdition,InstituteofTransportationEngineers.)Approximatelyhalfoftheunits(47units)wouldbeshiftedfromtheNorthsubarea,37percent(33units)wouldbeshiftedfromtheSouthsubarea,andtheremaining11percent(10units)wouldcomefromthenortheastendoftheSunsetMixedUsesubarea.TRAFFICANALYSISRESULTSTrafficanalysisresultswerecalculatedforthePMpeakhourfortheyears2015and2030.Ingeneral,futuretrafficpatternsintheReevaluationAlternativewoulddifferslightlyfromboththePreferredAlternativeandAlternative3.ThesewouldbenewtripstothePotentialSunsetTerraceRedevelopmentarea,butshiftedfromotherareasofthePlannedActionneighborhood.1EXHIBIT8 Cu0a)IU)Cu-J—w—<zzw1-1I-.’a)0Cu0L..U)—I’‘3dw1—-I--aa)CoU)K—0=I—zC,.)w a)U)a)U)G)0Cuci)ci)U)CU)0‘.41—mI-IzzzUEXHIBIT30U)wI—wC’,zDU)z0Ui>.QøI FULLDOCUMENTAvUPONREQUESTCulturalResourceConsultants,Inc.TECHNICALMEMO1507F-2DATE:September11,2015TO:KevinGiffordBerkConsultingFROM:GlennHartmann,PrincipalInvestigatorRE:CulturalResourcesAssessmentfortheSunsetCourtApartmentsProject,Renton,WATheattachedshortreportformconstitutesourfinalreportfortheabovereferencedproject.Assessmentdidnotidentifyarchaeologicalresourcesthatcouldbeaffectedbythisproject.Fourstructuresbuiltover50yearsagoarelocatedonthesubjectparcels;however,thesedonotmeetminimumcriteriaforeligibilityforstateornationalhistoricregistereligibility.Historicinventoryformsforthestructuresandaninadvertentdiscoveryplanareattached.Pleasecontactthisofficeshouldyouhaveanyquestionsaboutourfindingsandlorrecommendations.197PARFIUWAYSW,SuITE100P0Box10668,BAINBRIDGEISLAND,WA98110PHONE206855-9020-inlo@crcwa.com FULLDOCUMENTAVAILABLEUPONREQUESTPerteet5055thAvenue5,Suite300Seattle,WA981041.800.615.9900/206.436.0515AllyCommunityDevelopment,LLCTrafficImpactAnalysisSunsetCourtSeptember10,2015/1tJlEXHIBIT12 FULLDOCUMENTAVAILABLEUPONREQUEST12345678BEFORETHEHEARINGEXAMINERFORTHECITYOFRENTON9)RE:RentonSunsetTerrace)10.)FINALDECISIONRedevelopmentMasterSitePlan11)SitePlan,ConditionalUsePermit)12)LUA14-00001475,SA-M,CUP)13_____________________________________________1415SUMMARY16TheCityhasrequestedMasterSitePlanreviewandaConditionalUsePermittomodifytheSunset17TerraceRedevelopmentAreabyadding90additionalresidentialunits,increasinatheheightlimitandlotcoveragerequirementsandreducingsetbacks.TheCityhasalsorequesteãachangeintheisvestingtimeline.TheMasterSitePlanReviewandConditionalUsePermitareapprovedwithconditions.The10yearexpirationrequestisgranted.1920TESTIMONY21RocaleTiinmons,seniorplanner,describedthehistoryoftheprojectandtheprogresstodate.Shedescribedthesitecharacteristicsandtherevisionsbeingrequestedforthisprocess.Ms.Timrnons22statedsince2011,therehavebeensomeentitlementsoflanduses.TheCityanditspartnershave23reevaluatedtheoriginalMasterSitePlansincethe2011approvalsofthePlannedActionOrdinanceandissuanceoftheFEIS.ThepreferredalternativewasAlternative3fromtheFEIS.TheCityandits24partnersarerequestingseveralchangestothepreferredalternativeincludingtheadditionof90moreresidentialunits,increasedbuildingheights,reducedsetbacks,increasedlotcoveragesand25reclassificationoflocalstreets.Inreturn,theCitywillbeabletoexpandtheproposedpublicparkto263.2acres.EXHIBIT13SITEPLAN,CRITICALAREASEXEMPTION,STREETMODWICATION,ANDLOTLINEADJUSTMENT-1 NE 12TH ST NE 7 T H S TEDMONDS AVE NEHARRINGTON AVE NENE SUNSET BLVDMONROE AVE NEBLAINE AVE NENE 16 T H S T ABERDEEN AVE NEOLYMPIA AVE NESUNSET BLVD NENE PAR K D R NE 10TH ST NE 6TH P L NE 10TH PL DAYTON AVE NENE 9TH STLYNNWOOD AVE NEINDEX AVE NEJEFFERSON AVE NENE 8T H P L NE 11TH ST NE 17TH PL KIRKLAND AVE NENE 8TH S T NE 9TH PL NE 7TH PL NE 11TH PL SUNSET LN NENE 15TH ST NE 13TH PL NE 21ST ST INDEX PL NENE 20TH ST GLENWOOD AVE NENE 19TH ST INDEX CT NENE 17TH STKIRKLAND PL NENE 18TH ST CAMAS AVE NENE 13 T H S T NE 6TH C I R FERNDALE CIR NENE 15TH PL NE 14TH ST MONROE AVE NEDAYTON AVE NENE 18TH ST GLENWOOD AVE NENE 9TH ST NE 20TH ST INDEX AVE NEABERDEEN AVE NENE 21ST STNE 21ST ST NE 13TH ST NE 14TH ST NE 21ST ST NE 8TH PL KIRKLAND AVE NESUNSET LN NENE 7TH STNE 8T H S T N E 1 0 T H S TDAYTON AVE NEINDEX AVE NENE 10TH STKIRKLAND AVE NENE 8TH ST NE 10TH PLDAYTON AVE NELYNNWOOD AVE NENE 20 T H S T CAMAS AVE NEAttachment A Planned Action Study Area Sunset Area Community Planned Action Final NEPA/SEPA EIS Source: City of Renton; King County 00593.10/GIS - Revised: 10/12/2010City Limits Planned Action Study Area Subarea Central North South Sunset Mixed Use Potential Sunset Terrace Redevelopment 0 500 1,000 Feet CITY OF RENTON, WASHINGTON ORDINANCE NO. 5813 AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING ORDINANCE NOS. 5610 AND 5740, ADDING FIVE PARCELS AND REDISTRIBUTING, BUT NOT INCREASING, THE TOTAL NUMBER OF HOUSING UNITS IN THE SUNSET TERRACE REDEVELOPMENT AREA, AND REVISING A PLANNED ACTION DESIGNATED FOR THE SUNSET AREA PURSUANT TO THE STATE ENVIRONMENTAL POLICY ACT(SEPA). THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES ORDAIN AS FOLLOWS: SECTION I. Findin s. The Council finds as follows: A. The City is subject to the requirements of the Growth Management Act, RCW 36.70A ("GMA") and is located within an Urban Growth Area; B. The City has adopted a Comprehensive Plan complying with the GMA, and has amended the Comprehensive Plan to address transportation improvements and capital facilities specific to the Sunset Area; C. The City has adopted a Community Investment Strategy, development regulations, and design guidelines specific to the Sunset Area, as designated in Attachment A, which will guide growth and revitalization of the area, including the Sunset Terrace public housing redevelopment area identified in Attachment C; D. The City has prepared an Environmental Impact Statement (EIS) for the Sunset Area, supplemented by addenda, that addresses the probable significant environmental impacts associated with the location, type, and amount of development anticipated in the Planned Action area; 1 ORDINANCE N0. 5813 E.The mitigation measures identified in the Planned Action EIS, and attached to this ordinance as Attachment B, together with adopted City development regulations, will adequately mitigate the probable significant environmental impacts from development within the Planned Action area; F.Future development projects in and around the Planned Action Area will protect the environment, benefit the public and enhance economic development; G. The public has meaningfully participated in the proposed Planned Action, during comment periods, community meetings, and hearings, during and after the preparation of the EIS, and the City has modified the proposal or mitigation measures in response to some of the suggestions; H. The Sunset Area Planned Action is not an essential public facility as defined by RCW 36.70A.200(1); I.The Planned Action Area applies to a defined subarea of the City boundaries illustrated in Attachment A; J.Public services and facilities are adequate to serve the proposed Planned Action area; K. The City adopted a Planned Action Ordinance 5610 on June 13, 2011, and subsequently replaced it with Ordinance 5740 on December 8, 2014 to reflect preparation of a Master Plan for the Renton Sunset Terrace redevelopment area within the larger Planned Action Area and to reflect integration of a Reevaluation Alternative in 2014; L.A revised master plan for the Sunset Terrace redevelopment area was submitted to the City on May 27, 2016, which amends the 2014 Reevaluation Alternative by shifting the 2 ORDINANCE N0. 5813 location of planned dwellings and master plan territory to include five additional parcels, and redistributing but not altering the total number of dwellings studied or boundaries of the designated Planned Action Area in Attachment A; M. A NEPA Reevaluation, dated June 2016, pursuant to the National Environmental Policy Act (NEPA), as authorized by U.S. Department of Housing and Urban Development regulations, and an EIS addendum pursuant to SEPA were prepared to consider the environmental effects of the revised Sunset Terrace master plan; N. The City held a community meeting consistent with RCW 43.21C.440 on June 6, 2016; and 0. The City Council held a public hearing on July 11, 2016 regarding new amendments to the Planned Action applicable to the Sunset Area in order to integrate the Reevaluation Alternative, outlined in the NEPA Reevaluation and SEPA Addendum. SECTION II. Procedures and Criteria for Evaluatin and Determinin Proiects as Planned Actions. A. Planned Action Area. The Planned Action designation shall apply to the area shown in Attachment A. B.Environmental Document. A Planned Action determination for a site-specific implementing project application shall be based on the environmental analysis contained in the Draft EIS issued by the City on December 17, 2010, and the Final EIS published on April 1, 2011, the NEPA reevaluation/SEPA addendum published on December 12, 2014, and the 2016 NEPA reevaluation/SEPA addendum published on June 10, 2016. The Planned Action EIS shall consist of the Draft EIS, Final EIS, and the 2016 NEPA reevaluation/SEPA addendum. The mitigation 3 ORDINANCE N0. 5813 measures contained in Attachment B are based upon the findings of the above-mentioned environmental documents and shall, along with adopted City regulations, provide the framework for the City's imposition of appropriate conditions on qualifying Planned Action projects. C.Planned Action Designated. Land uses and activities described in the Planned Action EIS, subject to the thresholds described in subsection II.D below and the mitigation measures contained in Attachment B, are designated Planned Actions or Planned Action Projects pursuant to RCW 43.21C.031. A development application for a site-specific Planned Action project located within the Sunset Area shall be designated a Planned Action if it meets the criteria set forth in subsection II.D of this ordinance and applicable laws, codes, development regulations and standards of the City. D. Planned Action Qualifications. The following thresholds shall be used to determine if a site-specific development proposed within the Sunset Area is contemplated by the Planned Action and has had its environmental impacts evaluated in the Planned Action EIS: 1) Land Use. a) The following general categories/types of land uses are considered Planned Actions: single family and multi-family residential; schools; parks; community and public facilities; office and conference; retail; entertainment and recreation; services; utilities; and mixed-use development incorporating more than one use category where permitted. b) Individual land uses considered as Planned Actions shall include those uses specifically listed in RMC 4-2-060, Zoning Use Table — Uses Allowed in Zoning 4 ORDINANCE N0. 5813 Designations, as permitted or conditionally permitted in the zoning classifications applied to properties within the Planned Action area provided they are consistent with the general categories/types of land uses in (1)(a). 2) Development Thresholds. a) The following amount of various new land uses are anticipated by the Planned Action: Land Use Development Amount Alternative 3/ FEIS Preferred Alt Reevaluation Alternative Residential I 2,506 units 2,339 units I Schools I 57,010 gross square feet 57,010 gross square feet I I Parks 0.25 -3.2 acres 3 acres I I Office/Service 776,805 gross square feet I 745,810 gross square feet I Retail 476,299 gross square feet I 457,119 gross square feet b) The following infrastructure and utilities are considered planned actions: roadways, water, wastewater, and stormwater facilities identified and studied in the EIS. c) Shifting development amounts between categories of uses may be permitted so long as the total build-out does not exceed the aggregate amount of development and trip generation reviewed in the EIS, and so long as the impacts of that development have been identified in the Planned Action EIS and are mitigated consistent with Attachment B. d) The Renton Sunset Area Master Site Plan is included in Attachment C and is to be used as a conceptual guide to redevelopment in that portion of the 5 ORDINANCE N0. 5813 Planned Action area, together with the land use studied in the NEPA reevaluation/SEPA addendum published on June 10, 2016, and the use allowances of the Renton Municipal Code. e) If future development proposals in the Planned Action area exceed the development thresholds specified in this ordinance, further environmental review may be required pursuant to WAC 197-11-172, Planned actions—Project review. Further, if proposed development would alter the assumptions and analysis in the Planned Action EIS, further environmental review may be required. 3) Transportation -Trip Ran es and Thresholds. Inserted below are the new PM Peak Hour Trips anticipated in the Planned Action area: I Alternative/Period PM Peak Hour Trips* I I 2006 2,082 trips 2030 Alternative 3/ Reevaluation 5,555 trips Alternative I 2030 Preferred Alt 5,386 trips Net increase from 2006-> 2030 Alternative 3,473 trips 3 / Reevaluation Alternative Net increase from 2006-> 2030 Preferred 3,304 trips Alternative all PM peak hour trips with at least one end (origin, destination, or both) in TAZs containing the study area Uses or activities that would exceed the range of maximum trip levels will require additional SEPA review. 4) Chan ed Conditions. Should environmental conditions change significantly from those analyzed in the Planned Action EIS, the City's SEPA Responsible Official may determine that the Planned Action designation is no longer applicable until supplemental environmental review is conducted. 6 ORDINANCE N0. 5813 E.Planned Action Review Criteria. 1) The City's Environmental Review Committee may designate as "planned actions", pursuant to RCW 43.21C.030, Guidelines for stare agencies, local governments -- Statements -- Reports -- Advice — Information, applications that meet all of the following conditions: a) The proposal is located within the Planned Action area identified in Attachment A of this ordinance; b) The proposed uses and activities are consistent with those described in the Planned Action EIS and subsection II.D of this ordinance; c) The proposal is within the Planned Action thresholds and other criteria of subsection II.D of this ordinance; d) The proposal is consistent with the City of Renton Comprehensive Plan and applicable zoning regulations; e) The proposal's probable significant adverse environmental impacts have been identified in the Planned Action EIS; f) The proposal's probable significant adverse environmental impacts have been mitigated by application of the measures identified in Attachment B, and other applicable City regulations, together with any modifications or variances or special permits that may be required; g) The proposal complies with all applicable local, state and/or federal laws and regulations, and the Environmental Review Committee determines that these constitute adequate mitigation; and 7 ORDINANCE N0. 5813 h) The proposal is not an essential public facility as defined by RCW 36.70A.200(1j. 2) The City shall base its decision on review of a SEPA checklist, or an alternative form approved by the Department of Ecology, and review of the application and supporting documentation. 3) A proposal that meets the criteria of this section shall be considered to qualify and be designated as a planned action, consistent with the requirements of RCW 43.21C.030, Guidelines for state agencies, local governments--Statements -- Reports --Advice– Information, WAC 197-11-164, Planned actions—Definition and criteria, and this ordinance. F. Effect of Planned Action. 1) Designation as a planned action project means that a qualifying proposal has been reviewed in accordance with this ordinance and found to be consistent with its development parameters and thresholds, and with the Planned Action EIS's environmental analysis. 2) Upon determination by the City's Environmental Review Committee that the proposal meets the criteria of subsection II.D and qualifies as a Planned Action, the proposal shall not require a SEPA threshold determination, preparation of an EIS, or be subject to further review pursuant to SEPA. G. Planned Action Permit Process. Applications for planned actions shall be reviewed pursuant to the following process: 1) If the project is determined to qualify as a Planned Action, it shall proceed in accordance with the applicable permit review procedures specified in RMC 4-8- 8 ORDINANCE N0. 5813 080.G and 4-9, except that no SEPA threshold determination, EIS or additional SEPA review shall be required. The decision of the Environmental Review Committee regarding qualification as a Planned Action shall be final. 2) Public notice and review for projects that qualify as Planned Actions shall be tied to the underlying permit. The review process for the underlying permit shall be as provided in RMC 4-8-080.G, Land Use Permit Procedures, and RMC 4-9 as modified by RCW 43.21C.440(3)(b). If notice, in addition to the requirements of RCW 43.21C.440(3)(b), is otherwise required for the underlying permit, the notice shall state that the project has qualified as a Planned Action. If notice is not otherwise required for the underlying permit, no special notice is required by this ordinance. 3) If a project is determined to not qualify as a Planned Action, the Environmental Review Committee shall so notify the applicant and require a SEPA review procedure consistent with the City's SEPA regulations and the requirements of state law. The notice shall describe the elements of the application that result in failure to qualify as a Planned Action. 4) Projects that fail to qualify as Planned Actions may incorporate or otherwise use relevant elements of the Planned Action EIS, as well as other relevant SEPA documents, to meet their SEPA requirements. The Environmental Review Committee may limit the scope of SEPA review for the non-qualifying project to those issues and environmental impacts not previously addressed in the Planned Action EIS. SECTION III. Monitorin and Review. 9 ORDINANCE N0. 5813 A. The City shall monitor the progress of development in the designated Planned Action area to ensure that it is consistent with the assumptions of this ordinance and the Planned Action EIS regarding the type and amount of development and associated impacts, and with the mitigation measures and improvements planned for the Sunset Area. B. This Planned Action ordinance shall be reviewed no later than five (5) years from its effective date by the Environmental Review Committee to determine the continuing relevance of its assumptions and findings with respect to environmental conditions in the Planned Action area, the impacts of development, and required mitigation measures. Based upon this review, the City may propose amendments to this ordinance and/or may supplement or revise the Planned Action EIS. C. At the following time periods, the City shall evaluate the overall sustainability of the Sunset Area Planned Action area, defined in Attachment A, consistent with Final EIS Appendix A review of Goals and Objectives and LEED-ND qualitative evaluation, or an equivalent approach: 1) At the time of the five (5)-year review in subsection IV.B above. 2) At the time of a NEPA re-evaluation pursuant to 24 CFR Part 58.53, for the Sunset Community Planned Action Area. D. The City shall conduct a Greenroads evaluation or its equivalent at the time the NE Sunset Boulevard design is at the thirty percent (30%) design level and at the sixty percent 60%) design level. E. The City shall review the Potential Sunset Terrace Redevelopment Subarea at the time of the five (5)-year review in subsection III.B in relation to the following evaluation criteria: 10 ORDINANCE N0. 5813 1) Contribution of final conceptual designs to 2030 Regional Vehicle Miles Travelled (VMT) consistent with Final EIS Table 3.2-4, Sunset Terrace Redevelopment Subarea Contribution to Forecast 2030 Regional VMT. 2) Changes in land use and population growth and resulting greenhouse gas emissions of final conceptual designs compared to Tables 3.2-5 and 3.2-6 of the Final EIS, titled respectively Assumed Land Use and Population Growth for Greenhouse Gas Emission Calculations—Potential Sunset Terrace Redevelopment Subarea and Comparison of Greenhouse Gas Emissions—Potential Sunset Terrace Redevelopment Subarea. 3) Change in effective impervious area for Sunset Terrace Redevelopment Subarea compared with Final EIS Preferred Alternative and Alternative 3 which resulted in a decrease of approximately 0.51 acre (11%) to 1.07 acres (23%) compared to existing conditions as provided in Table 7 of the Planned Action ordinance Attachment B. SECTION IV. Conflict. In the event of a conflict between this ordinance or any imposed mitigation measure, and any City ordinance or regulation, the provisions of this ordinance shall control except that the provision of any Uniform Code shall supersede. SECTION V. Severabilitv. Should any section, subsection, paragraph, sentence, clause or phrase of this ordinance or its application be declared to be unconstitutional or invalid by a court of competent jurisdiction, such decision shall not affect the constitutionality or validity of the remaining portions of this ordinance or its application to any other person or situation. SECTION VI. Effective Date. This ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum, and shall take effect five (5j 11 ORDINANCE N0. 5813 days after its passage, approval and after publication of a summary of this ordinance in the City's official newspaper. The summary shall consist of this ordnance's title. PASSED BY THE CITY COUNGL this 8th day of August 2016. t,1 ' / ; Jaso A. Seth,{y Clerk APPROVED BY THE MAYOR this 8th day of August 2016. Denis Law, Mayor Approved as to form: t'—_ 1``',::,,:"" s,;;; fr t;,r orU ; Lawrence J. Warren, City Attorney y '` v, p u Date of Publication: 8/12/2016 (summary) c,;. ' ORD.1926:6/13/16:scr 12 ORDINANCE N0. 5813 ATTACH M ENT A s E j ` rt 4 City Limits ti: i Ui dMI.ir ' ..` i . '".i'5,N 21 S*T.T"" I ' 4 °..F"tNE215TST. ,' -, bi Planned Action Study Area u r1» ,, Ubdfea a.s '"' w NE215T ST'S o ZCentral NE 20TH,ST• 1" a l t SOUth i",` `= i Q a.w .... f Y NE;19TH ST*', Sunset Mixed Use y r t 2 g s'i.k" °'? a: Z,. :, t,--- Potential Sunset a. x t. °'•. NE 18TH ST. a ' " Terrace Redevelopment u N fi ' t 6 "'T ',' m N r .."'. , m,; $ l 1,9 . A Ir ' 'a.,: 5 r.., _ ' T ,Pa NE16 ..'^"~ w•.. , Y N Hs ti` ' a hf 15TH"ST w ', l -,g o soo t,00a s_ r w' q . ,+, ,., ! ..:, eet NE STH+PL X c, . r y z .C" s» Q;f X f z W , : l',:.f G c .,x e^ W 1 o Z wu..-. x" o NE 14 TH 5TyR3t NE'14T ST wyt - , r''NEI3THPl "-, "l; a ' wa c.'j _ w w t.5- N 1,, N,Swe;a., - ae 0"j s , e 1.' `NE 13THs5T A4,,,,; a g` ;Z :l ".13 s m- o"+> e " . " NE 12TH 5 Y T s: k ` Q vi W M . ' - Q„r„ . 2 _ ` I '+;,,, 4, tl ... Y, # s ' a. U" "t p r. QgW PPRKpR " y, 3 ( a O Q O i NE. r'Pi, -N •o 3 q,' ;, Q y'z . - 3 ZE "' **'',' xw w ' t, A` ; +"NE 11TH ST ' co. h J p t..r ae '¢. a „r,Y _ } J y' Z i" m i; w., i e ' ,NE y1,0TH.P.L*'c Je' ryQ, ' _ ..4`•jzy Q"+wt'.` '`i we "'IIMSr ral w.r. y r F s t i,- .awl4+t ,.sR W ro s .. y iz, p Ill ."+m' 1r w p•N s'^'NE 1OTH PL, "' i 10' Q i; 4,5~` ' a q, . 'Q J T q r 7.{ NE$0 5 , o x' W M " z 0 s r, ` c ,.+ IzM, 1"' =0 v,'"°'S1 •' x p "'_ waii w w j F.!° `''j j'Q . ,_ NE.9TH PL i.o Z w z NE•lOTH ST Z - , a a i I iM . a _w W ','"` 8 +m a rJ "ar krt a ;t 5 ; t w Fc p,rt ll fAil,'Ymdf r`^ _ t k@ '.•aii, u a d a a,F,_r a i..:..i- F - en,.„fr m. i y, 4. . 'k i`,' e' O x O -*p"` NE 9TH ST ,haa; NE 9TH ST 1 Q o a ilf;0 ,;g! fi rr ' a,,T t.+l 1 w. S:^;iG`a*no-.' yL, 'a q,rc,, r z 3 .*, r. rt ,e ;z 3 z j+.—s_ y ..::s +;:zRF `c 'WLF. W ''W.Y , T iR.r % ' Z ' ' NE 8TH:PL ,c Q"'4.r w ,. 'b,:, € a ra . srr: € r` wi lE`:s *3 t +L +-j '' "` 7"f a d r 4'a , NE '`R Y 'O Zx 'y3t' e ^ t ,ry 6e , s ad S e.... a r ,'Q :il! Z k#1 -Np .' j +,,"' r"'+ .ro=c' w" NE STH ST.gy N S N`1 iu W xi'iw . r. g t . y g' gF.. aII Y P}Lf 3Y`i j''':'' s'' Z {Z b iy.'•-,t.,* Y j ' .. fRd,'j sau,. 0.r.rz.. g s> +F + 'tw' a " r""` S'( ,' .,. i NE6 ,y v. -r Q x , aZ,H ""'v i+'S, iTHp rFt'g`+ .-ir4.N 7 Z k '' ,'" 1 ._: v Fr NE H 571, E 6TN CIR t 'a l:,L'.a'Tysl Z "'' s.3r'. `: :. t ,' fia'-'. `w zd r Z `" ,, ,, ` ,, r aa a .,y i _ O ,' , m , , . Ar =r' Source CityofRe nton,King ounty L` *""''' . ' ' ., p rr1 '* ` q": 4 y n I * S/ g a `,,. -g'' `. ;k: m," ai NE•TH P"=`' ;a;"S'' Attachment A Planned Action Study Area TEe,AnorfA Sunset Area Community Planned Action Final NEPA/SEPA EIS ORDINANCE N0. 5813 ATTACHMENT B Attachment B: Sunset Area Community Planned Action EIS Mitigation Measures Table of Contents Introductionand Purpose ......................................................................................................................3 SEPATerms.............................................................................................................................................3 GeneralInterpretation...........................................................................................................................4 Summary of Proposal,Alternatives, and Land Capacity........................................................................4 Proposaland Alternatives................................................................................................................4 LandCapacity...................................................................................................................................5 Location..................................................................................................................................................6 MitigationDocument.............................................................................................................................9 1. Earth..................................................................................................................................10 2. AirQuality.........................................................................................................................12 3. Water Resources...............................................................................................................18 4. Plants and Animals............................................................................................................20 5. Energy...............................................................................................................................22 6.Noise.................................................................................................................................25 7. Environmental Health.......................................................................................................27 8. Land Use............................................................................................................................30 9. Socioeconomics................................................................................................................32 10. Housing.............................................................................................................................34 11. Environmentallustice.......................................................................................................36 12. Aesthetics..........................................................................................................................38 13. Historic/Cultural................................................................................................................41 14. Transportation..................................................................................................................44 15. Parks and Recreation........................................................................................................48 16. Public Services...................................................................................................................51 17. Utilities..............................................................................................................................56 AdvisoryNotes .....................................................................................................................................61 Attachment 1: Draft EIS, Cultural Resources Appendix J, Plan and Procedures for Dealing with the Unanticipated Discovery........................................................................................................62 Attachment 2: Figure 3.17-1 Potential Subarea Utility Improvements and Phasing........................64 Wate r....................................................................................................................................................65 Overview........................................................................................................................................65 Edmonds-Glenwood Phase 1.........................................................................................................65 NewLibrary....................................................................................................................................65 New Mixed-Use Building Adjacent to New Library..............................................................................66 RHA's Piha Site...............................................................................................................................66 Pldnned ACtiOn OfdindnCe 1 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B SunsetTerrace Redevelopment.....................................................................................................67 Edmonds-Glenwood Phase 2.........................................................................................................67 WaterMain Costs..........................................................................................................................68 WastewaterCollection.........................................................................................................................68 Overview........................................................................................................................................68 DetailedDiscussion........................................................................................................................68 List of Tables Table 1. Summary of Land Capacity-Planned Action Alternatives...................................................6 Table2. Earth Significant Impacts....................................................................................................................10 Table 3. Earth Mitigation Measures.................................................................................................................11 Table 4. Air Quality Significant Impacts.........................................................................................................12 Table 5. Air Quality Mitigation Measures......................................................................................................14 Table 6. Potential Greenhouse Gas Reduction Measures........................................................................16 Table 7. Water Resources Significant Impacts............................................................................................18 Table 8. Plants and Animals Significant Impacts........................................................................................20 Table9. Energy Significant Impacts................................................................................................................22 Table10.Energy Mitigation Measures..............................................................................................................24 Table 11.Noise Significant Impacts...................................................................................................................25 Table 12.Noise Mitigation Measures.................................................................................................................26 Table 13.Environmental Health Impacts........................................................................................................27 Table 14.Environmental Health Mitigation Measures...............................................................................28 Table15.Land Use Impacts...................................................................................................................................30 Table 16.Land Use Mitigation Measures.........................................................................................................31 Table 17.Socioeconomics Impacts.....................................................................................................................32 Table 18.Socioeconomics Mitigation Measures...........................................................................................34 Table19.Housing Impacts.....................................................................................................................................34 Table 20.Housing Mitigation Measures...........................................................................................................36 Table 21.Environmental Justice Impacts........................................................................................................36 Table 22.Environmental Justice Mitigation Measures...............................................................................38 Table23.Aesthetic Impacts...................................................................................................................................38 Table 24.Aesthetic Mitigation Measures.........................................................................................................41 Table 25.Historic/Cultural Impacts..................................................................................................................41 Table 26.Historic/Cultural Mitigation Measures.........................................................................................42 Table27.Transportation Impacts......................................................................................................................44 Table 28.Transportation Mitigation Measures.............................................................................................46 Table 29.Parks and Recreation Impacts..........................................................................................................48 Table 30.Parks and Recreation Mitigation Measures................................................................................49 Table31.Public Services Impacts.......................................................................................................................51 Table 32.Public Services Mitigation Measures.............................................................................................54 Table33.Utilities Impacts......................................................................................................................................56 Table 34.Utilities Mitigation Measures............................................................................................................59 Planned Action Ordinance z Attachment B:nnitigation Document ORDINANCE N0. 5813 ATTACHMENT B Introduction and Purpose The State Environmental Policy Act(SEPA) requires environmental review for project and non- project proposals that are likely to have adverse impacts upon the environment. In order to meet National Environmental Policy Act(NEPA) and SEPA requirements,the City of Renton issued the Draft Environmental/mpactStatement(DEIS)for the Ciry of Renton SunsetArea Community Planned Action on December 17,2010 and the Final EnvironmentallmpactStatement(FEIS)for the Ciry of Renton SunsetArea Community Planned Action on April 1,2011. The Draft together with the Final EIS is referenced herein as the"EIS".The EIS has identified significant beneficial and adverse impacts that are anticipated to occur with the future development of the Sunset Planned Action area, together with a number of possible measures to mitigate those significant adverse impacts.A NEPA Reevaluation/SEPA Addendum was prepared in September 2014 and issued in December 2014 to evaluate any potential changes in EIS conclusions associated with modifications to the conceptual master plan for Sunset Terrace,which comprises a portion of the Planned Action area. Similarly,a NEPA Reevaluation/SEPA Addendum was prepared in May 2016 and issued in June 2016,based on a revised master plan for Sunset Terrace and associated housing replacement sites. No new or significantly different impacts were identified from this reevaluation. The purpose of this Mitigation Document is to establish specific mitigation measures,based upon significant adverse impacts identified in the EIS and minor changes identified in the Reevaluation/Addendum. The mitigation measures shall apply to future development proposals which are consistent with the Planned Action scenarios reviewed in the EIS,and which are located within the Renton Sunset Area Community Planned Action Study Area(see Exhibit A). This document will be used primarily to facilitate review of future projects proposed as planned actions. SEPA Terms As used in this document,the words action,planned action,or proposal are defined as described below. Action"means projects or programs financed,licensed,regulated,conducted or approved by a governmental Agency."Project actions"involve decisions on a specific project such as a construction or management activity for a defined geographic area. "Non-project"actions involve decisions about policies,plans or programs. (see WAC 197-11-704) Planned Action"refers to types of project actions that are designated by ordinance for a specific geographic area and addressed in an EIS,in conjunction with a comprehensive plan or subarea plan,a fully contained community,a master planned resort,a master planned development or phased project. (see WAC 197-11-164) Proposal"means a proposed action that may be an action and regulatory decision of an agency, or any action proposed by applicants. (see WAC 197-11-784) Pldnned ACtiOn OfdinanC2 3 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B General Interpretation Where a mitigation measure includes the words"shall"or"will,"inclusion of that measure in project plans is mandatory in order to qualify a project as a Planned Action. Where"should"or"would" appear,the mitigation measure may be considered by the project applicant as a source of additional mitigation,as feasible or necessary,to ensure that a project qualifies as a Planned Action. Unless stated specifically otherwise,the mitigation measures that require preparation of plans, conduct of studies,construction of improvements,conduct of maintenance activities,etc.,are the responsibility of the applicant or designee to fund and/or perform. Summary of Proposal, Alternatives, and land Capacity Proposal and Alternatives The proposal is to redevelop the Sunset Terrace public housing community and promote associated neighborhood growth and revitalization as part of a Planned Action.Redevelopment of the public housing community and adoption of a Planned Action Ordinance would encourage redevelopment in the Planned Action Study Area through land use transformation and growth,public service and infrastructure improvements,and a streamlined environmental review process.The Renton Housing Authority(RHA) is the proponent of the proposal's primary development action, redevelopment of the existing Sunset Terrace public housing community;however,RHA wou(d likely redevelop the property in partnership with other public and private non-profit and for-profit developers and agencies.The City of Renton(City) is responsible for public service and infrastructure improvements for Sunset Terrace and the broader Sunset Area Community neighborhood,is the agency responsible for streamlining local permitting and environmental review through this Planned Action,and is the agency that would regulate private neighborhood redevelopment in accordance with its Comprehensive Plan and development regulations. The City analyzed three alternatives(Alternatives 1,2,and 3) as part of the Draft EIS to determine its Preferred Alternative.The Preferred Alternative is evaluated in the Final EIS.A Reevaluation Alternative was developed through a NEPA Reevaluation and SEPA Addendum process in 2014. Similarly,a 2016 Reevaluation Alternative was evaluated through a NEPA Reevaluation and SEPA Addendum in 2016.All six alternatives are described below. Alternative 1 (No Action). RHA would develop affordable housing on two vacant properties,but it would not redevelop the Sunset Terrace pub ic housing property.Very limited public investment would be implemented by the City,resulting in lesser redevelopment across the Planned Action Study Area.A Planned Action would not be designated.The No Action Alternative is required to be studied under NEPA and SEPA. Alternative 2.This alternative represents a moderate level of growth in the Planned Action Study Area based on investment in mixed-income housing and mixed uses in the Potential Sunset Terrace Redevelopment Subarea,targeted infrastructure and public services throughout the Planned Action Study Area,and adoption of a Planned Action Ordinance. Alternative 3.This alternative represents the highest level of growth in the Planned Action Study Area,based on investment in the Potential Sunset Terrace Redevelopment Subarea with a greater Planned Action Ordinance 4 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B number dwellings developed in a mixed-income,mixed-use sryle,major public investment in study area infrastructure and services,and adoption of a Planned Action Ordinance. Preferred Alternative. This alternative represents neighborhood growth similar to and slightly less than Alternative 3 in the Planned Action Study Area,based on investment in the Potential Sunset Terrace Redevelopment Subarea with a moderate number dwellings developed in a mixed-income, mixed-use style oriented around a larger park space and loop road,major public investment in study area infrastructure and services,and adoption of a Planned Action Ordinance. 2014 Reevaluation Alternative.This alternative proposes neighborhood growth the same as Alternative 3,with slightly more units(approximately 90) redirected to the Sunset Terrace subarea. Sunset Terrace would have a mixed-income,mixed-use development similar to Alternative 3 and the Preferred Alternative,with a larger park and with dwellings focused more along SR 900. Greenstreets,library uses,and other investments would be similar to those proposed for Alternative 3 and the Preferred Alternative. 2016 Reevaluation Alternative.An amended master plan was developed in 2016 addressing RHA revised proposals to develop replacement housing for the Sunset Terrace redevelopment on five parcels located outside but abutting the 2014 Master Plan area-three parcels would be added to the Sunset Court Park site and developed with 50 apartments and townhomes,and two parcels would be added to properties north of the"loop road"in the Harrington Park development providing 19 townhomes.Within the 2014 Master Plan boundaries there would also be unit transfers from one site to another.With the 2016 revisions to the Master Plan and addition of the abutting parcels,there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. However,consistent with the flexibility allowed by the adopted Master Plan,some units would be redistributed. Land Capacity To determine future growth scenarios for the next 20 years,a land capacity analysis was prepared. The alternatives produce different future growth estimates. Each would affect different amounts of property. Alternative 1 assumes that about 16%(35 acres) of the 213 net acres of Planned Action Study Area parcels would infill or redevelop. Alternative 2 assumes that about 32%(68 acres) of the Planned Action Study Area parcels would infill or redevelop. Alternative 3 assumes that approximately 40%(84 acres] of the Planned Action Study Area parcels would infill or redevelop. The Preferred Alternative assumes that approximately 40%(84 acres) of the Planned Action Study Area parcels would infill or redevelop. The Reevaluation Alternatives 2014 and 2016 assume the same Planned Action Study Area growth levels as Alternative 3,with slight differences in distribution towards the Sunset Terrace subarea. The latter three alternatives-Alternative 3,the Preferred Alternative,and the Reevaluation Alternatives in 2014 and 2016 which are similar-represent the higher growth levels studied in the EIS and differ,when compared at the Planned Action area as a whole,by about 7%;these three Planned Action Ordinance 5 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B alternatives are considered for the purposes of this mitigation document to be the"Planned Action Alternatives." This mitigation document is based on the range of growth considered in the Planned Action Alternatives.More details on the components of the alternatives can be found in Final EIS Chapter 2 and the Reevaluation subsections below(as well as Attachment I of the NEPA Record of Decision). Table 1. Summary of Land Capacity— Planned Action Alternatives INet New Growth Alternative 3/Reevaluation Dwelling Units/Jobs Alternative Preferred Alternative Dwelling units 2,506 2,339 Population 5,789 5,403 Employment SF 1,310,113 1,247,444-1,259,944 Jobs 3,330 3,154-3,192 Reevaluation Alternative: 2014 In November 2014,the City conducted a NEPA Reevaluation pursuant to Section 58.47 of US Department of Housing and Urban Development's(HUD's) NEPA regulations.SEPA also provides a process using an Addendum to the prior FEIS where information or analysis does not substantially change prior conclusions about impacts(WAC 197-11-706). Based on updated master planning in 2014, some changes in units were considered(90 more units than Alternative 3).See Tables 2 and 3. Table 2. Reevaluation-Total Units Under Review Total Units Reviewed in Site Name EIS Study Area Status Acres Reevaluation A Glennwood Townhomes Sunset Terrace Redevelopment Constructed RHA 0.65 8 B Kirkland Avenue Townhomes Swap Site, North Study Area Under Construction RHA 0.77 18 C Edmonds Apartments Sunset Terrace Redevelopment Future Development RHA 1.70 112 D Sunset Terrace Apartments Sunset Terrace Redevelopment Part of Master Site Plan 0.51 54 E Sunset Park West Townhomes Sunset Terrace Redevelopment Part of Master Site Plan 0.55 20 F Sunset Court Townhomes Swap Site,Central Study Area Future Development RHA 0.88 15 6 Sunset Park East(Piha)Townhomes&Apts Sunset Terrace Redevelopment Part of Master Site Plan 1.09 57 H Sunset Terrace Dev.Building A Sunset Terrace Redevelopment Part of Master Site Plan 0.99 117 I Sunset Terrace Oev.Building B Sunset Terrace Redevelopment Part of Master Site Plan 1.18 196 1 Sunset Terrace Dev.Suilding C Sunset Terrace Redevetopment Part of Master Site Ptan 0.74 110 K Renton Highlands Library Sunset Terrace Redevelopment Part of Master Site Plan See H L Regional Stormwater Facility Sunset Terrace Redevelopment Part of Master Site Plan See M M Sunset Fark Sunset Terrace Redevelopment Part of Master Site Plan 3.2 N Sunset Lane loop tmprovements Sunset Terrace Redevelopment Part of Master Site Plan 1.41 0 NE 10th Street Extension Improvements Sunset Terrace Redevelopment Part of Master Site Plan 0.20 X _Library Site(2013) Swap Site,Central Study Area Future Development 1.41 25 Totals 15.28 722 Note:Units may be redistributed among sites provided the Reevaluation conclusions are maintained. Total Units:Difference Master Plan Proposals with EIS Preferred Alternative 209 Total Units:Difference with EIS Alternative 3 90 Sources:Veer,Schemata,Colpitts,City of Renton,Renton Housing Authority,Mlthun,BERK 2014 Planned Action Ordinance 6 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Notes: Shaded sites=Master Plan Sites. Table 3. Comparison of Net Growth in Sunset Terrace and Neighborhood Alternatives Net New Growth I Alternative 3 I Preferred Alternative I Reevaluation Alternative Dwelling Neighbor- St nset Neighbor- Sunset Neighbor- Sunset Units/Jobs hood Terrace hood 1'errace hood - Tei i ace Dwelling units 2,506 79 2,339 2b6a . 2,506 554 Population 5,789 I,106 5,403 - : t 14 : 5,789 2,279 : EmploymentSF 1,310,113 <.:9,p(t0" . 1,247,444- 38 1Qf} 1,310,113 19,50F}-_ 1,259,944 4,{pQ Jobs 3,330 1$Z 3,154- - llfi - " 3,330 6p-.$2 3,192 a Does not include approximately 90-100 units to be developed on land swap/housing replacement sites. b Similar to the FEIS,the Sunset Terrace study area Master Plan sites D,E,G to J and L to 0,plus sites A and C. Source: FEIS 2011,BERK 2014 The City also proposed a larger park than was considered under either of the selected alternatives, and accordingly some buildings increased in height or numbers of units.Some streets were proposed for reclassification to achieve the circulation proposals and"green streets"in the Final EIS. Setbacks of buildings from the future SR 900 improvement boundaries are less than for the Preferred Alternative. As the analysis in the Reevaluation shows,no substantive changes in conclusions or required mitigation are needed as a result of the revised alternative,termed the"2014 Reevaluation Alternative." Reevaluation Alternative: 2016 The proposed developments would meet City standards for density,height,setbacks,transportation levels of service,connection to utilities,and would be subject to City parking codes,including procedures for modifying applicable standards.The new developments would be incorporated into an amended Master Plan pursuant to RMC Title IV.Also,the SEPA Planned Action Ordinance could be amended to include the revised Master Plan concept. In total,722 dwelling units are being proposed in the study area,which is to the same as the number of units considered in the 2014 Reevaluation.See Table 4. Table 4.Summary of Total Units Proposed for Study in Reevaluation land Area Total and Area Total Commerci Location acres): Dwelling ( acres : Dwelling al Square 2014 Units: 2016) Units: Feet:2014 2014 2016 and 2016 Master Plan Sites I Sunset Terrace and Replacement Sites:C through 1 I 7.63 I 671 9.23 671 4,500- 39,500 Pldnned ACtiOn OrdinanCE Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B land Area Total and Area Total Commerci Dwelling Dwelling al5quareLocationacres): acres : 2014 Units: 2016) Units: Feet:2014 2014 2016 and 2016 Library(Site K)I 15,000 Sunset Park and Regional Stormwater Facility(Sites L I 3 2 I 3.20 and M)I I NE lOth and Sunset Lane Loop(Site N and 0) I 1.61 1.61 I Total Master Plan Sites I 12.44 671 14.04 I 671 I 19,500- 54,500 Other Sunset Terrace Study Area Sites:Glenwood I 0.65 8 I 0.65 8 ISiteA)-Developed Swap Sites:Kirkland Avenue(B)-Developed,Library I 2.18 43 I 2.18 43 ISiteforFutureSurplus(X) Other Employment potential in Sunset Terrace and I I 4,500 Replacement Sites I Total All Sites 15.28 7Z2 I 16.88 f 722 I 19,500- 59,000 Source:King County Assessor;ICF Jones&Stokes et al.2011;BERK Consulting 2016 A comparison of the Reevaluation Alternatives and the Final EIS Alternatives is provided in Table 5. The mitigation documents contained in the ROD and Planned Action Ordinance were based on the range of growth of the two Selected Sunset Area Alternatives. The mitigation measures continue to apply to the Reevaluation Alternatives in 2014 and 2016. Table 5.Comparison of Net Growth in Sunset Terrace and Neighborhood Alternatives Net New Growth Final EIS Alternative I Final EIS Preferred Reevaluation I Reevaluation 3 Alternative Alternative: 2014 Alternative: 2016 Dwelling Neighbo a tinset Neighbo $uttset Neighbor- `Stutset Neighbor- Stttiset Units/Jobs r-hood Teri`aCe. r-hood fieri'ace hood :TerraCe hood TErrace Dwelling units 2,506 •:.?9;=.. 2,339 266'.: 2,506 ' :554: 2,506 519 Population 5,789 -,5{6 5,403 bl+ 5,789 :::.,27.5,789 1,93 Employment 1,310,11 59,t Qp_ 1,247,44 3$,1p(} 1,310,113 1},SUO- 1,310,113 29,5t 0- SF 3 4- 5.9,t}QCI 59,{Wk0 1,259,94 4 Jobs 3,330 i -.1$2' 3,154- 217 3,330 6i?-182_ 3,330 '{s{1-$2 . " 3,192 a Does not include approximately 90-100 units to be developed on land swap/housing replacement sites. b Similar to the Final EIS,includes the Potential Sunset Terrace Redevelopment subarea and housing replacement sites abutting the subarea and included in the Master Plan. Does not include several housing replacement sites in the neighborhood. Source:Final EIS 2011,BERK 2014 Per the approved 2014 Master Plan,dwelling units may be redistributed among sites provided the Reevaluation conclusions are maintained. Planned Action Ordinance 8 Attachment B:Mit gation Document ORDINANCE N0. 5813 ATTACHMENT B While the net units in Sunset Terrace are lower in 2016 than in 2014 per Table 5,this is a reflection of the boundaries of the 2011 Potential Sunset Terrace Redevelopment Area that did not include several replacement housing sites which were part of the neighborhood growth studied in the EIS. Some of the housing replacement sites are part of the am,ended Master Plan for Sunset Terrace. Some potential dwelling units are proposed to be transferred among three individual Master Plan sites.However,the total number of units that could be developed in the Master Plan area would remain the same.Similarly,the overall neighborhood development and growth would be the same as in 2011 and 2014. See the revised master plan reflecting the 2016 Reevaluation Alternative in the 2016 Reevaluation and Addendum. location The Sunset Terrace public housing community is generally bounded by Sunset Lane NE and Glenwood Avenue NE on the north,NE 10th Street on the east,NE Sunset Boulevard(State Route SR] 900) on the south,and Edmonds Avenue NE on the west.See Exhibit A of the Planned Action Ordinance. The Sunset Terrace public housing community is part of the Sunset Area Community neighborhood. This broader neighborhood is the Planned Action Study Area considered in the EIS;it is generally bounded by NE 21st Street on the north,Monroe Avenue NE on the east,NE 7th Street on the south, and Edmonds Avenue NE.See Exhibit A of the Planned Action Ordinance. Mitigation Document Based on the EIS and Reevaluation/Addendum(2014 and 2016)this Mitigation Document identifies significant adverse environmental impacts that are anticipated to occur as a result of development of planned action projects. Mitigation measures identified in the EIS are reiterated here for inclusion in proposed projects to mitigate related impacts and to qualify as Planned Action projects. Consistency review under the Planned Action,development plan review,and other permit approvals will be required for specific development actions under the Proposed Action pursuant to WAC 197- 11-172.Additional project conditions may be imposed on planned action projects based upon the analysis of the proposal in relationship to independent requirements of the City,state or federal requirements or review criteria. Any applicant for a project within the Planned Action area may propose alternative mitigation measures,if appropriate and/or as a result of changed circumstances,in order to allow equivalent substitute mitigation for identified impacts. Such modifications shall be evaluated by the City's SEPA Responsible Official prior to any project approvals by the City. In combination,regulations applicable to each element of the environment and mitigation measures identified in the EIS and documented in this Mitigation Document that are applied to any planned action proposal will adequately mitigate all significant environmental impacts associated with planned action proposals,except for those impacts that are identified as"significant unavoidable adverse impacts." Planned Action Ordinance 9 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Provided below for each element of the environment analyzed in the EIS for the proposed action are: a) summary of significant environmental impacts (construction,operation,indirect and cumulative); b)a summary of unavoidable adverse impacts; c) mitigation measures established by this mitigation document for both the Planned Action Study Area as a whole as well as the Potential Sunset Terrace Redevelopment Subarea; and d) a list of City policies/regulations on which mitigation measures are based. Advisory notes are included at the end of the document to list the federal,state,and local laws that act as mitigation measures. 1. Earth Significant Impacts Table 2. Earth Significant Impacts Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Construction Erosion could increase as a result of soil Same as Planned Action Study Area disturbance;however,much of the existing soils are glacial outwash materials with low erosion potential. Codified best management practices minimize the potential for both erosion and erosion transport to waterways. Construction could require import and Similar to Planned Action Study Area. export of earth materials;however,The underlying glacial outwash soils with minimal planning and protection, have the highest potential for reuse the outwash soils in most of the study within the Planned Action Study Area area could be reused as backfill, and consequently the subarea. minimizing import and export. There is an increased risk of landsliding There are no mapped geologic hazards, due to soil disturbance,changing and thus a low potential for impacts. drainage,or temporarily oversteepening slopes.However,a relatively small proportion of the study area is considered either steep slope or erosion hazard.Both the glacial outwash and till soils are generally strong and of low concern regarding slope instability. Operations Active seismicity in the Planned Action Same as Planned Action Study Area Study Area would require that inhabited structures,including buildings,bridges,and water tanks,be designed to withstand seismic loading. ndirect The major steep slope,erosion,and There are no mapped geologic hazards, Planned A[tion OfdinanCe 10 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea landslide hazard areas within the and thus a low potential for impacts. Planned Action Study Area extend beyond the study area boundaries. Development on the slope above inside)the study area boundary could increase the risk of erosion and landsliding downslope(outside)ofthe study area. Cumulative Same as indirect impacts above; There are no mapped geologic hazards, intensive development around this and thus a low potential for impacts. hazard area outside of the Planned Action Study Area by other projects is not currently anticipated,but could increase the risk of erosion and landsliding. Unavoidable Adverse Impacts There are no significant unavoidable adverse earth impacts. Mitigation Measures Table 3. Earth Mitigation Measures Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea The following mitigation measures shall apply to Mitigation measures shall be the same as the development throughout the Planned Action Planned Action Study Area,except that there are Study Area. no geologic hazard areas to avoid. Apply erosion-control best management practices(BMPs),as described in Appendix D of the Ciry of Renton Amendments to the King CountySurface WaterDesign Manuall. Limit development in geologic hazard areas and their buffers,or require rigorous engineered design to reduce the hazard,as currently codified. Planned Action applicants shall identify in their applications the source of earth material to be used in construction and shall consider earth material reuse and provide information to the City regarding why earth material reuse is not feasible if it is not proposed. The City may condition the planned action application to provide for earth material reuse where feasible. 1 City of Renton.2010.City ofRenton Amendments to the King CountySurface Water Design Manual. February. Appendix D,Erosion and Sedimentation Control Standards. Planned ACtion OrdinanCe 11 Attachment B:Mitigation Dotument ORDINANCE N0. 5813 ATTACHMENT B Nexus City of Renton Comprehensive Plan RMC 4-3-050 Critical Areas Regulations RMC 4-4-030 Development Guidelines and Regulations—General RMC 4-4-060 Grading,Excavation and Mining Regulations RMC 4-5-050 International Building Code RMC 4-6-030 Drainage(Surface Water) Standards 2. Air Quality Significant Impacts Table 4. Air Quality Significant Impacts Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Construction Dust from excavation and grading Same as Planned Action Study could cause temporary,localized Area increases in the ambient concentrations of fugitive dust and suspended particulate matter. Construction activities would likely Same as Planned Action Study require the use of diesel-powered, Area heavy trucks and smaller equipment such as generators and compressors.These engines would emit air pollutants that could slightly degrade local air quality in the immediate vicinity of the activity. Some construction activities could Same as Planned Action Study cause odors detectible to some Area people in the vicinity of the activity, especially during paving operations using tar and asphalt.Such odors would be short-term and localized. Construction equipment and Same as Planned Action Study material hauling could temporarily Area increase traffic flow on city streets adjacent to a construction area.If construction delays traffic enough to significantty reduce travel speeds in the area,general traffic-related emissions would increase. Operations Emissions from Stationary equipment,mechanical Same as Planned Action Study Commerciat Operations equipment,and trucks at loading Area Pldnn2d ACtion OrdinanCe 12 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea docks at office and retail buildings could cause air pollution issues at adjacent residential property. However,new commercial facilities would be required to register their pollutant-emitting equipment and to use best available control technology to minimize emissions. Emissions From Vehicle Tailpipe emissions from vehicles The forecasted VMT from the Travel would be the major source of air subarea is only a small fraction of pollutant emissions associated with the Puget Sound regional totals. growth.The net increases in vehicle Future emissions from increased miles travelled(VMT)forecast as a population and motor vehicles in result of Planned Action the subarea would not cause alternatives are inconsequentially significant regional air quality small compared to the Puget Sound impacts. regional VMT and its implied impact on regional emissions and photochemical smog.This would not alter Puget Sound Regional Council's conclusion that future regional emissions will be less than the allowable emissions budgets of air quality maintenance plans. Air Quality Attainment Land use density and population Same as Planned Action Study Status would increase in the Planned Area. Action Study Area;however,these increases represent only a small fraction of the Puget Sound regional totals.Furthermore,this alternative would not result in land use changes that include unusual industrial developments.Therefore, development in the Planned Action Study Area would not cause a substantial increase in air quality concentrations that would result in a change in air quality attainment status. Greenhouse Gas Emissions: Planned Action alternatives are Planned Action Alternatives Study Area and Subarea estimated to result in this would result in an estimated alternative would result in an 3,760 to 6,612 metric tons/year estimated 43,050 to 45,766 metric of GHG emissions. tons/year of greenhouse gas(GHG) emissions for the Planned Action Study Area. Outdoor Air Toxics The Planned Action Study Area is in Impacts on outdoor air toxics a mixed-use residential and would be similar to those commercial zone that does not described for the Planned Action include unusual sources of toxic air Study Area. pollutants.The major arteriat street Planned ACtiOn OfdinanCe 13 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea through the Planned Action Study Area(NE Sunset Boulevard)does not carry an unusually high percentage of heavy-duty truck traffic.Thus,the Planned Action Alternatives would not expose existing or future residents to disproportionately high concentrations of toxic air pollutants generated by local emission sources. Indoor Air Toxics See Potential Sunset Terrace RHA development would be Redevelopment Subarea constructed according to local building codes that require adequate insulation and ventilation.Regardless,studies have shown that residents at lower-income developments often suffer higher rates of respiratory ailments than the general public.Therefore,the City and RHA will explore measures to improve indoor air quality beyond what is normally achieved by simply complying with building codes. lndirectand Cumulative Greenhouse Gas Emissions: With the highest level of transit- With the highest level of transit- Subarea,Study Area,and oriented development in the study oriented development in the Region area of the studied alternatives,subarea of the alternatives Planned Action Alternatives would studied,Planned Action provide the greatest regional GHG Alternatives would provide the emission reductions,a net greatest reduction in regional reduction of 3,907-4,164 metric GHG emissions,a net reduction of tons/year,compared with the No 150-467 metric tons/year, Action Alternative studied in the compared with the No Action EIS.Alternative studied in the EIS. Unavoidable Adverse Impacts No significant unavoidable adverse impacts on regional or local air quality are anticipated. Temporary,localized dust and odor impacts could occur during the construction activities.The regulations and mitigation measures described below are adequate to mitigate any adverse impacts anticipated to occur as a result of study area growth increases. Mitigation Measures Table 5. Air Quality Mitigation Measures Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea Planned Action Ordinance 14 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea Construction Emission Control In addition to the mitigation measures for air The City shall require all construction contractors quality described under the Planned Action Study to implement air quality control plans for Area,the following mitigation measures apply: construction activities in the study area.The air . Should the phases of the Potential Sunset quality control plans shall include BMPs to Terrace Redevelopment Subarea occur control fugitive dust and odors emitted by diesel concurrently rather than in a phased and construction equipment. sequential manner,the City and RHA wiil The following BMPs shall be used to control consider adding the Northeast Diesel fugitive dust. Collaborative Diesel Emission Controls in Construction Projects-Model Contract Use water sprays or other non-toxic dust Specifications or an equivalent approachz as control methods on unpaved roadways. additional mitigation measures. Minimize vehicle speed while traveling on . The City and RHA and other public or private unpaved surfaces. applicants within the subarea should explore Prevent trackout of mud onto public streets. measures to improve indoor air quality beyond what is normally achieved by simply complying Cover soil piles when practical. with building codes.For example,grant Minimize work during periods of high winds Programs such as the Breath Easy Homes when practical. program could provide funding to foster construction methods that reduce dust,mold,The following mitigation measures shall be used and air toxics concentrations in the homes,such to minimize air quality and odor issues caused by as the following:tailpipe emissions. o use of low-VOC [volatile organic compounds] Maintain the engines of construction building materials and coatings, equipment according to manufacturers' o enhanced building ventilation and room air specifications. filtration,and Minimize idling of equipment while the o installation of dust-free floor materials and equipment is not in use. low-pile carpeting to reduce dust buildup. Where feasible,Applicants shall schedule haul • Planned Action applicants for residential traffic during off-peak times(e.g.,between 9:00 developments shall provide information a.m.and 4:00 p.m.)to have the least effect on regarding the feasibility and appticability of traffic and to minimize indirect increases in traffic ndoor air quality measures.The City may related emissions. This shall be determined as condition Planned Action applications to part of traffic control plans required in Section 14 ncorporate feasible indoor air quality of this mitigation document. measures. Burning of slash or demolition debris shall not be permitted without express approval from Puget Sound Clean Air Agency(PSCAA).No slash burning is anticipated for any construction projects in the Planned Action Study Area. Greenhouse Gas Reduction Measures Please see text and Table 6 below. Greenhouse Gas Reduction Measures The City shall require development applicants to consider the reduction measures shown in Table 6 for their projects,and as part of their application explain what reduction measures are included and z Northeast Diesel Collaborative.December 2010.Diesel Emission Controls in Construction Projects,Model Contract Specification.Available:<http://www.northeastdiesel.org/pdf/NEDC-Construction-Contract-Spec.pdf.> Accessed:March 14,2011. Planned Action Ordinance 15 Attathment B:Mitiga[ion Dotument ORDINANCE N0. 5813 ATTACHMENT B why other measures found in the table are not included or are not applicable.The City may condition Planned Action applications to incorporate feasible GHG reduction measures. Table 6. Potential Greenhouse Gas Reduction Measures Reduction Measures Comments Site Design Plant trees and vegetation near structures to shade Reduces on-site fuel combustion emissions and buildings. purchased electricity,and enhances carbon sinks. Minimize building footprint. Reduces on-site fuel combustion emissions and purchased electricity consumption,materials used,maintenance,tand disturbance,and direct construction emissions. Design water efficient landscaping. Minimizes water consumption,purchased energy,and upstream emissions from water management. Minimize energy use through building orientation. Reduces on-site fuel combustion emissions and purchased electricity consumption. Building Design and Operations Construct buildings according to City of Seattle The City of Seattle code is more stringent than energy code. the current City of Renton building code. Apply Leadership in Energy and Environmental Reduces on-site fuel combustion emissions and Design(LEED)standards(or equivalent)for design off-site/indirect purchased electricity,water and operations. use,waste disposal. Purchase Energy Star equipment and appliances for Reduces on-site fuel combustion emissions and public agency use. purchased electricity consumption. Incorporate on-site renewable energy production, Reduces on-site fuel combustion emissions and including installation of photovoltaic cells or other purchased electricity consumption. solar options. Design street lights to use energy-efficient bulbs Reduces purchased electricity. and fixtures. Construct"green roofs"and use high-albedo Reduces on-site fuel combustion emissions and roofing materials. purchased electricity consumption. Install high-efficiency heating,ventilation,and air- Minimizes fuel combustion and purchased conditioning(HVAC)systems. electricity consumption. Eliminate or reduce use of refrigerants in HVAC Reduces fugitive emissions.Compare systems. refrigerant usage before/after to determine GHG reduction. Maximize interior day tighting through floor plates, Increases natural/day lighting initiatives and increased building perimeter and use of skylights, reduces purchased electrical energy celestories,and light wells.consumption. Incorporate energy efficiency technology such as Reduces fuel combustion and purchased super insulation motion sensors for lighting and electricity consumption. climate-contro(-efficient,directed exterior lighting. Use water-conserving fixtures that surpass building Reduces water consumption. code requirements. Reuse gray water and/or collect and reuse Reduces water consumption with its indirect rainwater. upstream electricity requirements. Planned Action Ordinance 16 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Reduction Measures Comments Use recycted building materials and products. Reduces extraction of purchased materials, possibly reduces transportation of materials, encourages recycling and reduction of so(id waste disposal. Use building materials that are extracted and/or Reduces transportation of purchased materials. manufactured within the region. Use rapidly renewable building materials. Reduces emissions from extraction of purchased materials. Conduct third-party building commissioning to Reduces fuel combustion and purchased ensure energy performance. electricity consumption. Track energy performance of building and develop Reduces fuel combustion and purchased strategy to maintain efficiency. electricity consumption. Transportation Size parking capacity to not exceed local parking Reduced parking discourages auto-dependent requirements and,where possible,seek reductions travel,encouraging alternative modes such as in parking supply through special permits or transit,walking,and biking.Reduces direct and waivers. indirect VMT. Develop and implement a marketing/information Reduces direct and indirect VMT. program that includes posting and distribution of ridesharing/transit information. Subsidize transit passes.Reduce employee trips Reduces employee VMT. during peak periods through alternative work schedules,telecommuting,and/or flex time. Provide a guaranteed-ride-home program. Provide bicycle storage and showers/changing Reduces employee VMT. rooms. Use traffic signalization and coordination to Reduces transportation emissions and VMT. improve traffic flow and support pedestrian and bicycle safety. Apply advanced technology systems and Reduces emissions from transportation by management strategies to improve operational minimizing idling and maximizing efficiency of local streets. transportation routes/systems for fuel efficiency. Develop shuttle systems around business district Reduces idling fuel emissions and direct and parking ga-ages to reduce congestion and create indirect VMT. shorter commutes. Source:Washington State Department of Ecology 2008b VMT=vehicle miles travelled. Nexus City of Renton Comprehensive Plan RMC 4-4-030 Development Guidelines and Regulations—General RMC 4-4-060 Grading,Excavation and Mining Regulations Planned ACtiOn OrdinanCe 1 Attachment B:Mitigation Document ORDINANCE N. 5813 ATFACHMENT B 3. Water Resources Significant lmpacts Table 7. Water Resaurces 5ignificant Impacts Potential Sunset Terrace Type af Impact Planned Action Study Area Redevetopment Subarea Construction Canstruction impacts on water Same as Planned Action Study Area resources wouid be addressed through compliance with Core Requirement#5 for Erosion and Sediment Control in the Renton Stormwater Manual and compliance with Ecalogy's NPDES Canstruction Stormwater General Permit,if the project results in 1 acre or more of land-disturbing activity.Also see Section 1, Earth,above. Operatians Water Qualiry and Land Implementation of the green All untreated pollution-generating Cover connections and the NE Sunset imperviaus surfaces within the Boulevard reconstruction subarea wfluld be eliminated, project is estimated to result in resulting in a reduction of 1.83 acres a net reduction of nf untreated potlution-generating appraximatety 14.7-15.7 acres surface from the Jahns Creek Basin. of untreated poilution- The estimated change in effective generating impervious area and impervious area would result in a approximately 3.1-6.6 acres of decrease of appraximately 0.51 acre effective impervious area. 11%)to 1.07 acres(23%)compared Exclusive of the Sunset Terrace to existing conditions. Redevelopment Subarea the net The Reevatuation Alternative is in the change in pallutant generating range of the priar analysis of the surfaces is approximately 40-42 Preferred Alternative and Alternative acres reductian.Exclusive of the 3 as documented in the Sunset Terrace Redevelopment Reevaluation/Addendum. Subarea,the net change in effective impervious area would be an increase of approximately 1.3 acres(0.8%to 4.24(2.6%) from existing cqnditions. Considering the reduction in the Potentia]Sunset Terrace Redevelopment Subarea as weit as the overall Planned Action Study Area,the net change in effective imperviaus area would be smaller at 0.75-3.17. lndirect and Cumulative The operations analysis above Same as the Planned Action Study presents cumulative impacts in area. 3n particular,the City proposes terms of total impervious to construct a regionai stormwater Ptanned Action Qrdinance 18 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea surfaces and potential water facility that would be designed to quantity and quality impacts,as maintain active and open recreation well as indirect impacts on space allowing water to be treated receiving water bodies outside within a series of distributed yet of the study area. The Planned integrated small rain gardens along Action Alternatives would the edge of the proposed Sunset implement a drainage master Terrace Park and connecting the plan and mitigation would be subsurface to an underground provided in advance through infiltration bed beneath the open the self-mitigating public space. This will mitigate impacts in stormwater infrastructure the subarea as well as portions of the features including a larger Planned Action Study Area. combination of green connections,regional stormwater flow control,and possible public-private partnership opportunities for retrofits. Unavoidable Adverse Impacts None of the alternatives would have significant unavoidable adverse impacts on water resources, because the redevelopment would likely result in an improvement of runoff and recharge water quality.In addition,the net change in effective impervious area can be adequately mitigated through the self-mitigating features(e.g.,green connections,drainage master plan,etc.) of the Planned Action alternatives and through implementation of the stormwater code,as described below. Mitigation Measures All of the alternatives would involve redevelopment and reduction of existing pollution-generating impervious surfaces in the Planned Action Study Area.In addition,per the requirements of the stormwater code,the redeveloped properties would be required to provide water quality treatment for all remaining pollution-generating impervious surfaces.The net reduction in untreated pollution-generating impervious surfaces throughout the study area is,therefore,considered to result in a net benefit to surface water quality.Each of the alternatives would result in a slight increase in the effective impervious area of the Planned Action Study Area. Self mitigating features of the Planned Action Alternatives are listed below: Under Alternative 3,mitigation would be provided in advance or incrementally through the public stormwater infrastructure features including a combination of green connections, regional stormwater flow control,and possible public-private partnership opportunities for retrofits.Conceptual design and planning of the public stormwater infrastructure would be developed under a drainage master plan for the Study Area.It could be developed in advance of likely through grants or city funds) or incrementally as development occurs depending on opportunity costs of constructing the improvements.The extent and form of the public infrastructure projects would be refined through the drainage master plan development and further design.The goal under Alternative 3 would be to provide sufficient advance public infrastructure improvements to balance the anticipated increase in effective impervious area. Planned Action Ordinance 19 Attachment B:Mitigation Document ORDINANCE NtJ. 5813 ATTACHMENT B This strategy would only require that future developments implement flow-control BMPs,but could eliminate on-site flow control through a development fee or similar funding structure ta compensate for the off-site mitigation provided by the public infrastructure investment, The Preferred Alternative mitigation would be similar ta Alternative 3.Harringtan Avenue NE, including partions of NE 16th and NE 9th streets,has been identified as a high priority Green Connection project.This corridor would be enhanced by narrowing through-traffic lanes to calm traffic,create wide planter areas to accommodate large trees and rain gardens to mitigate stormwater runaff,and create wider sidewalks.This project would be implemented as a public infrastructure retrofit project pending available funds.The remaining green connections projects would likely be implemented as revised roadway standards to require incremental redevelopment of the frontage as redevelopment occurs (constructed either by future developers or the City,depending on availability of funds).In addition to the Green Connections projects,the City will implement regional detention/retention irnpravements to provide advance mitigation for future increases in impervious area that could result from redevelopment.I,ocations of the regionai facilities would include the western margin of the newly created park at Sunset Terrace and/or the northern corner of Highlands Park(beyond the outfield of the existing baseball Jsoftball field),A drainage master plan will be developed far the Preferred Alternative. The Reevaluation Alternative is similar to and in the range of impervious results for the Preferred Alternative and Alternative 3 and will be subject to the Sunset Area Surface Water Master Plan,and associated strect frontage improvements,and will be consistent with the City stormwater regulations. Ptanned Actions shall implement the City's adopted Sunset Area Surface Water Master Plan,and assaciated street frontage improvements,and be consistent with the City stormwater regulations in effect at the time of application.Planned Actian applicants shall also demonstrate compliance with RMC 4-1-184 Charges far Equitable Share of Public Works Facilities. Nexus Ciry of Renton Comprehensive Plan RMC 4-3-05Q Critical Areas Regulations RMC 4-4-030 Development Guidelines and Regulations-General RMC 4-6-030 Drainage (Surface Water)Standards RMC 4-6-060 Street Standards 4. Piants and Animals Significant Impacts Tabie 8. Piants and Animais Significant impacts Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Construction Individual redevelopment Same as Planned Action Study Area Pianned Action Ordinance 20 Attachmenk B Mitigation Documeni ORQIPUANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea projects would result in short- term loss of vegetation caver, along with noise and activity levels that would result in little ar no use of the constructian areas by wildlife during the period af construction. Redevetopment actions would be required to comply,during construction,with City regulations requiring temporary erosion and sedimentation controls to prevent water quality impacts from work site starmwater runoff. Q erations Itedeveloprnent activities that Same as Planned Action Study Area would be facilitated under the planned action ordinance would have a limited effect on plant or wildlife habitat in the Planned Actian Study Area.New development being designed as Low Impact Development{LID is likely to result in a measurable decline in total vegetated area,accompanied by a measurable improvement in piant diversity and quality of the remaining habitat. Green connections and urban forestry plans affset to some degree by greater redevelapment,the net result is likely to be a reduction in habitat connectivity and a decline in total vegetated area, albeit with some improvement in plant diversity and quality of the remaining habitat. Largeiy due ta the absence of irnpacts on special-status species,effects on wildlife would be less than significant. ndirect Planned Action Alternatives Same as Planned Action Study Area would result in an indirect impact on plants and wildlife by contributing to a substantial increase in the human population within the area.This can be expected ta result in effects such as increased wildlife martality due to road Pldnned ACtion OrdinanGB 21 Attachment B:Mit3gation Document ORDINANCE NC}. 5$13 ATfACNMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea kill and predation by pets,and reduced wildlife diversity due ta increases in opportunistic species such as starlings,crows, and rats.These indirect impacts can be expected to result in reduced numbers,vigor,and diversity of plant and wildli e species. The stormwater commitments incarporated in Planned Action Alternatives would be sufficient ta avoid substantial impacts on aquatic habitats and fish. Cumulative No impact No impact Unavoidable Adverse Impacts No significant unavoidable adverse impacts would occur for plants and animals under any alternative. Mitigation Measures With implementation of propased stormwater features or standards,no mitigatian is required. Nexus City of Renton Comprehensive Plan RMC 4-6-030 Drainage(Surface Water) Standards RMC 4-3-050 Critical Areas Regulations RMC 4-4-030 Develapment Guidelines and Regulations-General RMC 4-4-130 Tree Retention and Land Clearing Regulations 5. Energy Significant Impacts Table 9. Energy Significant Impacts Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Construction During construction,energy Same as Planned Action Study Area would be consumed by dernolition and reconstruction activities.These activities would include the manufacture of construction materials,transport Platlned ActiOn Ordifldn[Q 2z Attachment B:Mitigation Document CJRDINANCE N4. 5813 ATTACHMENT B Patential Sunset Terrace Type of Impact Planned Action Study Area Redevelapment Subarea of construction materials to and from the construction site,and operation af machinery during demolitian and construction. Operations Energy tJsage:Study Area The annuai energy usage is The annual energy usage is and Subarea estimated at 255,845 ta 275,529 estimated at 22,33$to 43,654 million British thermal units rnillion British thermal units(Btu). Btu). Indirect and Cumulative Energy Usage:Subarea,With high levels of transit- With high levels of transit-oriented Study Area,and Region oriented and high-density and high-density development the develapment the Planned Actian Planned Actian Alternatives would Alternatives wauld provide the pravide the greatest estimated greatest estimated regional regianal energy usage reduction for energy usage reduction for the the subarea compared to the Na study area compared to the No Action Alternative: 1,145 to 3,624 Action Alternative:26,3$3 to million Btu, 29,194 millian Btu. Unavoidabfe Adverse Impacts Additional energy would be consumed and would contribute to increases in demand associated with the growth and development af the region.As described in the Utilities Element of the City Comprehensive Plan,it is anticipated that existing and planned infrastructure of affected energy utilities could accommodate growth,Energy canservation features would be incorporated into building design as required by the current City building codes. For the Potentiat Sunset Terrace Redeveiopment Subarea,HUD encourages public housing authorities such as RHA to use Energy Star,renewable energy,and green construction practices in public hausing.As such,no significant unavoidable adverse impacts an energy use are anticipated, Planned Action(7rdinancE 23 Attacfiment e:Mitigation Document ORDINANCE NtJ. 5813 ATTACHMENT B Mitigation Measur s Table 10. Energy Mitigation Measures Planned Action Study Area Potentia]Sunset Terrace Redevelapment Subarea Although the grawth and development wauid In addition to the mitigation measures described far result in increased energy demand in the the Planned Action Study Area,according to the King Planned Action Study Area under all of the County proposed GHG reduction regulation,energy alternatives,expanding the beneficial transit- reductions can be provided with the implementation ariented development and high-density of the foilowing basic requirements of the American hausing development within the study area Society of Heatin,g,Refri,gerating and Air-anditianing would reduce regianal energy usage. Engzneers Advanced&uildin,gs Core Performance Guide Therefare,all alternatives would provide a for residential and non-residential building in the net benefit rather than adverse impact with subarea: regards to energy usage.Hawever,to further 3pola energy reduction for residential dwelling reduce energy consumptian,the City shall that are 50p/o of average size;and 15%energy encourage future developers ta implement reduction for residential dwelling that are 75%of additional trip-reduction measures and average size;and energy conservation measures.For example, energy and GHG reductions can be achieved . 12%energy reduction for office,school,retail, through implementation of the following and public assembly buildings that are smaller energy canservatian techniques or equivaient than 100,004 square feet in floor area. approaches. An energy reduction of 12Q/o can be achieved by implementing sufficient strategies established by the Northwest Energy Star Homes program for multifamily residential buildings.The Northwest ENERGY STAR I-Iomes pragram(U.S.Enviranmental Pratection Agency 2010)is designed to help buiiders construct energy-ef cient homes in Washington,Oregon,Idaha,and Montana to meet energy-efficiency guidelines set forth by the EPA. An energy reduction of 10%would comply with Seattle Energy Cade for non- residentia]buildings. See also Air Quality mitigation measures.The City shall require developmem applicants to consider trip-reduction measures and energy conservation,and as part of their application explain what reductian measures are included and which ones are not ineluded(based an that are part of Table 6 ar Tabie 10).The City may condition Planned Action applications ta incorporate feasible trip reduction and energy conservatian measures. Nexus City of Renton Comprehensive Plan Planned Action Ordinance 24 Attachment B:Mftigation Document oRai van c vo. s1 ATTACHMENT B RMC 4-5-051 Washington State Energy Code Adopted 6. Noise Significant Impacts Tabie 11. Noise Significant Impacts Fatentia]Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Construction Development in the study area Same as Planned Action Study would require demolitian and Area canstruction activity,which would temporarily increase noise levels at residences close to the develapment site.This type of activity could cause annayance and speech interference at outdoor tocations adjacent to the construction sites,and could cause discernible noise. Operatians Noise from New Uniess properly controiled, Same as Pianned Action Study Commercial Operations rnechanical equiprnent(e.g.,Area rooftop air conditioning units) and trucks at loading docks af affice and retail buildings in the study area could cause ambient noise levels at nearby residential housing units to exceed the City naise ordinance timits. lndirectand Cumulative Noise from Increased For most residents adjacent to Development wauld result in Traffic:Praposat with roadways in the study area, noise increase from vehicles Future Traffic Levels increased traffic wauEd result in traveling on NE Sunset the greatest increase in ambient Boulevard and locat streets The noise]evels,caused by moving estimated day-night naise levels traf c and vehicles idling at from NE Sunset Boulevard at intersections.Development the adjacent buildings indicates would result in noise increase they wauld be exposed to from vehicies traveling an NE "normaliy unacceptable"noise Sunset Boulevard and local levels exceeding U.S. streets.Department of Housing and Urban Develaprnent's(HUD's) outdoor day-night noise criterion of b5 dBA.The naise levels at these first raw residential dwellings currently exceed the HUD noise criterion and wauld continue to exceed Planned Action Ordinance 25 Attathment B:Mitfgation Qocument ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea the criterion under Planned Action Atternatives. Unavoidable Adverse Impacts No significant unavoidable adverse constructian or operational traffic noise impacts are anticipated in the Planned Action Study Area with the implementation of mitigation measures noted below.No significant unavoidable adverse traffic ndise impacts are anticipated at residences alang NE Sunset Boulevard in the Planned Action Study Area per WSDOT criteria,because the noise increase caused by NE Sunset Boulevard traffic is less than the WSDOT"substantial increase"impact threshald, Partians af the Potential Sunset Terrace Redevelapment Subarea,even under existing conditions and the Na Actian Alternative,would be deemed narmally unacceptable under the HUD noise criteria withoat implementation of noise attenuation mitigation,due to traffic noise from the adjacent street(NE Sunset Boulevard).Na significant unavoidable adverse noise impacts are anticipated in this subarea,if the noise control measures noted below are implemented ta reduce anticipated future traffic noise to levels suitable for residential uses under the HUD criteria. Mitigation Measures Table 12. Noise Mitigatian Measures Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea Constructian Naise Mitigation measures described in the Planned To reduce constructian noise at nearby Action Study Area wouid aiso apply to this receivers,the failowing mitigatian measures subarea. shall be incorporated by Planned Action Site design approaches shall be incorporated to applicants inta construction plans and reduce potential noise impacts including the contractor specifications. following. Locate stationary equipment away from Concentrating park and apen space uses away receiving properties. from NE Sunset Boulevard. Erect portable noise barriers around loud • Where park and open space uses must be stationary equipment lacated near sensitive located near NE Sunset Boulevard,avoiding receivers. activities that require easily understood conversation(e.g.,instructianal classes),or Limit construction activities to between 7:OQ flther uses where quiet canditions are a.m.and 10:00 p.m.to avoid sensitive required for the primary function of the nighttime hours. activi t3'• Turn off idling canstruction equipment. Allowing for balconies on exterior facing units Require contractors to rigorously maintain only if they do not open to a bedroam. all equipment. According to HUD noise guideboak,noise Train construction crews ta avoid attenuation fiom various building materials are unnecessarily loud actions(e.g.,dropping calcuiated using saund transmission class(STC) bundles of rebar onto the ground or ating.Although the standard canstruction dragging steel plates across pavement)near PPraaches can normally achieve the STC rating of noise-sensitive areas. more than 24 dBA as demonstrated in Final EIS Appendix E,the City shall reGuire a 5TC rating of New Commerciat Operation Noise 30 dBA reduction for these first row residential The City shall require all prospective future Pianned Action Ordinance 26 Attachment 8:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B P anned Action Study Area Potential Sunset Terrace Redevelopment Subarea developers to use low-noise mechanical dwellings because the HUD noise guidebook shows equipment adequate to ensure compliance with that the sound reduction achieved by different the City's daytime and nighttime noise ordinance techniques may be a little optimistic3. limits where commercial uses are abutting residential uses and where there is a potential to exceed noise ordinance limits.Depending on the nature of the proposed development,the City may require the developer to conduct a noise impact study to forecast future noise levels and to specify appropriate noise control measures. Compliance with the noise ordinance would ensure this potential impact would not be significant. Traffic Noise Mitigation Although traffic noise is exempt from City noise ordinance,based on site-specific considerations, the City may at its discretion require the new development to install double-pane glass windows or other building insulation measures using its authority under the Washington State Energy Code(RMC 4-5-040). Nexus City of Renton Comprehensive Plan RMC 4-4-030 Development Guidelines and Regulations—General RMC 4-4-060 Grading,Excavation and Mining Regulations RMC Title 8 Chapter 7 Noise Level Regulations 7. Environmental Health Significant Impacts Table 13. Environmental Health Impacts Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Construction Potential construction impacts Existing subsurface indude releasing existing contaminations have not been contaminants to the environment identified on the redevelopable by ground-disturbing or properties and,therefore,are not dewatering activities, expected to be encountered encountering underground during construction.Hazardous storage tanks(USTs)or leaking building materials such as lead- USTs,generating hazardous based paint and asbestos- building materials that require containing materials(ACMs) 3 HUD noise guidebook,Chapter 4,page 33"...use the STC ratings with a bit of caution and remain aware of the possible 2-3 d6 overstating that you may get with the STC rating system." Planned ACtiOn OrdinanCe z Attachment B:Mitigation Document ORDINANCE NO. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea special disposal,and accidentally could be generated from releasing hazardous substances. demolition of the existing Sunset Terrace buildings.If there are lead-based paints or ACMs at the complex,appropriate permits and precautions would be required. Accidental release of hazardous substances during construction could still occur as in all construction projects. Operations If development occurs on No impact contaminated sites,where appropriate clean-up measures were not completed or residual contaminations were present, then there is a potential risk to public health for people using the site. lndirect No impact No impact Cumulative No impact No impact Unavoidable Adverse Impacts No significant unavoidable adverse impacts are identified at the programmatic level throughout the Planned Study Area or for the Sunset Terrace Redevelopment Subarea for any of the studied alternatives.Contaminated sites would be avoided during project design when possible; implementing the mitigation approaches described below would minimize or eliminate adverse effects on human health and the environment. Mitigation Measures Table 14. Environmental Health Mitigation Measures Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea Since encountering unreported spills or The construction and operation mitigation unreported underground fuel tanks is a risk measures identified for the Planned Action Study when performing construction,contractors Area are applicable to the subarea. shall be required to provide hazardous materials awareness training to all grading and excavation crews on how to identify any suspected contaminated soil or groundwater,and how to alert supervisors in the event of suspected contaminated material.Signs of potential contaminated soil include stained soil,odors,oily sheen, or the presence of debris. Contractors shall be required to implement a contingency plan to identify,segregate, and dispose of hazardous waste in full Pldnned ACtiOn OfdlnanCe Z$ Attachment B:Mitigation Document RDINANCE NC}. 5813 ATTACHMENT B Planned Action Study Area Potential Sunset Terrace Redevelapment Subarea accordance with the Model Toxics Cantral Act(MTCA)(WAC 173-340)and the Dangerous Waste(WAC 173-303) regulat'sans. Contractors shall be required to develop and implement the Stormwater Pollution Preventian Plan,BMPs,and ather permit canditians to minimize the potential for a release of hazardous materials to soil, groundwater,or surface water during construction. Contractors shall be required to follow careful construction practices to protect against hazardous materiais spil)s from routine equipment operatian during construction;prepare and maintain a current spill prevention,cantrol,and countermeasure plan,and have an individual on site designated as an emergency coardinator;and understand and use proper hazardous materials starage and handling procedures and emergency procedures,including proper spill natification and response requirements. All asbestos-containing materials(ACM) and lead-based paint wili be identiFed in structures priar to demolition activities in accordance with 24 CFR Part 35.lf ACM or lead-based paint is identified,appropriately trained and licensed personnel will contain, remove,and properly dispose of the ACM and/or lead-based paint materiat according to federal and state regulatians prior to demolition af the affected area. If warranted,contractors shall conduct additional studies to]ocate undacumented underground starage tank(USTs)and fuel lines before construction of specific development projects(areas af concern include current and forrner commercial and residentia]structures)and will permanently decommission and properly remove USTs from project sites before commencing general construction activities. Priar to acquisition of known or potentially contaminated property,the City shalt require apprapriate due diligence be performed ta identify the presence and extent of soil or groundwater Planned Action Ordinance 29 Attachmenk 8:Mitigation pocument QRDINANCE N0. 5813 ATTACHMENT B Planned Action Study Area Potential Sunset Terrace Redevelapment Subarea contamination.This can help to prevent or manage liabilities for any long-term clean- up activities that might be angoing during project aperations.If contaminatian is discovered,the project proponent will cornply with all state and federal regulations far contaminated sites. Nexus City of Rentan Comprehensive Plan RMC 4-4-030 Development Guidetines and Regulations-General RMC Title 4 Chapter 5 Building and Fire Prevention Standards 8. Land Use Significant Impacts Tabte 15, Land Use Impacts Potential Sunset Terrace Type of Impact Ptanned Action Study Area Redevelopment Subarea Construction The incremental nature of Same as Planned Action Study develapment over the planning Area period would minimize the number af nearby residents exposed to temporary construction impacts including dust emissions,noise, construction traffic,and sporadic interference with access to adjacent residences and businesses. Operations Land Use Patterns Planned Action Alternatives Planned Action Alternatives would provide more than 2,300 to would provide about 266-554 2,500 dwelling units and 1.2 to mare dwelling units than existing 1.3 million square feet of conditions in a mixed-use cornmercial space compared ta development that integrates existing conditions. comrnercial and civic spaces. Redevelopment would pravide mare cornmercial development than residential development. This aiternative would also pravide more than two times as many residential dwellings as currently exist in the study area. Plans and Policies Planned Actian Alternatives Planned Action Alternatives pravide the greatest degree of provide the greatest degree of P(dllned ACtion OrdilldnC@ 30 Attathment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea consistency among the consistency with the City's land alternatives with the City use element goals and policies of Comprehensive Plan goals, all alternatives by promoting the objectives,and policies by redevelopment of the Sunset implementing the development Terrace public housing types envisioned in the City's land community.It also does more use and zoning designations than other alternatives to develop within the study area.Anticipated the Center Village.Development growth would help the City meet in the subarea under this its 2031 housing and employment alternative has a similar targets. consistency as the study area for Public investments would need to other City goals and policies, be accounted for in amendments providing a greater degree of to the City's Transportation and consistency with those goals and Capital Facilities elements. policies than other alternatives. ndirect and Cumulative No indirect or cumulative land Redevelopment of the subarea use impacts are anticipated under this alternative would outside the study area.The City serve as an incentive for other applies its policies and redevelopment opportunities development regulations to create near the study area. a planned land use pattern. Density is most intense at the center of the study area and least along its boundaries with single- family residential land use patterns;it is unlikely to alter patterns or plans along the edges of the study area.The City will,as part of its regular comprehensive plan review and amendment updates,control the monitoring, evaluation,and amendment process. Unavoidable Adverse Impacts Although intensification of land uses in the Planned Action Study Area,including the Potential Sunset Terrace Redevelopment Subarea,would occur and density would increase,this change would be consistent with applicable plans,zoning,and land use character. Plan consistency can be addressed by Comprehensive Plan amendments using the City's legislative process.Therefore,there would be no significant adverse impacts. Mitigation Measures Table 16. Land Use Mitigation Measures Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea Under all alternatives,the City shall require Construction mitigation would be the same as planned action applicants to implement described under the Planned Action Study Area. appropriate construction mitigation measures, The City and RHA should coordinate on future including but not limited to dust control and Pldnned ACtiOn OfdindnCe 31 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea construction traffic management. Sunset Terrace redevelopment and Planned The City shouid make efforts to minimize Action Study Area streetscape improvements to property acquisition that affects buildings as part ensure that property acquisition that affects of its refinement of study area streetscape designs buildings is minimized. while balancing Complete Streets principles. The City shall require construction plans to: As part of the Planned Action Ordinance adoption Locate the majority of the most intensiveprocess,the City should amend its Comprehensive non-residential development along or nearPlan's Transportation and Capital Facilities NE Sunset Boulevard,where possible. elements to ensure that planned public investments and their funding sources are Implement proposed open space and accounted for and programmed. landscape features to offset the proposed intensification of land uses on the site. Provide new opportunities for public open space area. As part of site design,emphasize transitions in density,with less intense densities where abutting lower-intensity zones. Nexus City of Renton Comprehensive Plan RMC Title 4 Chapter 2 Zoning Districts—Uses and Standards 9. Socioeconomics Significant Impacts Table 17. Socioeconomics Impacts Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Construction Construction activities could The demolition of the Sunset temporarily increase congestion Terrace complex to allow for the and reduce parking,local access subarea redevelopment would for businesses and residents,and require the relocation of the access near the construction tenants. activities,which could negatively Moreover,the relocation of the affect businesses;however, tenants could affect some local businesses located close to businesses during construction,if construction activities could the tenants are relocated outside experience an increase in revenue of the immediate area; however, from spending by construction since the total number of workers. relocations represents a small portion of the overall population any impact would likely be small in scale. Operations The higher number of dwelling The Planned Action Alternatives units and jobs would result in would increase dwelling units and greater intensities in development jobs by 266-554 net dwelling Planned ACtion OfdindnCe 32 Attachment B:Mitigation Document ORDINANCE NO. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea and economic benefits.units and 79- 117 jobs. The Improvements in the streetscape subarea would be developed with along NE Sunset Boulevard and new park,street,and civic the other civic and infrastructure improvements that would improvements would make the promote a healthy and walkable study area more desirable to neighborhood. investment,which could lead to additional opportunities for employment as more businesses are attracted to the study area. The facilities that would be added under Alternative 3 include a family village and a wider reconstruction of NE Sunset Boulevard.The family village would include housing,education, recreation,and supportive services that would be designed to promote a healthy and walkable neighborhood. lndirect Construction spending would Increased spending is anticipated result in positive indirect effects with the mixture of affordable and on the economic elements of market-rate units,which would employment and income in the result in positive impacts on the study area and the regional businesses in the area as well as economy as businesses that local tax revenues. support the construction effort would likely see increased spending. The additional public and private investment and associated economic benefits would be greater due to the increased spending. Cumulative Cumulative effects would be As the area changes and new positive with the addition of new housing is provided,no existing development that would continue public units would be lost and to enhance the area and continue improvements in the to improve the neighborhood neighborhood would likely vitality. continue as new developments are constructed. Unavoidable Adverse Impacts No long-term significant unavoidable adverse impacts are anticipated. Planned Action alternatives would encourage new development in the both the Planned Action Study Area and the Potential Sunset Terrace Redevelopment Subarea that would result in beneficial changes to the socioeconomic conditions. Under Planned Action Alternatives,relocation of the tenants of the Sunset Terrace complex would result in short-term impacts;however,these impacts would be mitigated.The creation of new jobs Planned ACtion Ordindnce 33 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B and spending in the subarea during construction of new developments would result in short-term benefits. Mitigation Measures Table 18. Socioeconomics Mitigation Measures Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea Mitigation measures to minimize dust,noise, In addition to mitigation measures described for aesthetics,and transportation impacts during the Planned Action Study Area,the following construction are identified in Sections 2,6, 12, mitigation measures apply: and 14,respectively,of this Mitigation Document. . Public housing tenants shall be provided These measures would address many of the relocation assistance under the Uniform construction-related impacts that could Relocation Act. negatively affect the study area businesses. RHA should consider phased demolition and In addition,with the reconstruction of NE Sunset reconstruction to minimize the need to relocate Boulevard,or with any new development,if all the residents at the same time,or the new access to businesses is affected,the following affordable housing development could be measures should be addressed by the City or constructed prior to demolition to provide WSDOT: opportunities to relocate tenants within the Provide detour,open for business,and other subarea. signage,as appropriate. Provide business cleaning services on a case- by-case basis,as needed. Establish promotions or marketing measures to help affected businesses maintain their customer base during construction. Maintain access,as much as possible,to each business and,if access needs to be limited, coordinate with the affected businesses. Mitigation measures to address indirect impacts on housing affordability are addressed in Section 10 of this Mitigation Document. Nexus City of Renton Comprehensive Plan 10. Housing Significant Impacts Table 19. Housing Impacts Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Construction Construction of commercial, Construction of residential and residential,and civic uses in the civic uses would create temporary study area would create noise,dust,and construction temporary noise,dust,and traffic,which would affect Plann2d ACtion OfdindnCe 34 Attachment B:Mitigation Document ORDINANCE NO. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea construction traffic,which would adjacent residents to the subject affect current residents. properties. Operations The Planned Action Alternatives In this subarea,110 public assume 40%of the study area housing and duplex dwellings acreage would infilt or redevelop. would be eliminated.There would This would result in the greatest be a 1:1 replacement of public number of dwellings replaced at housing units on site and in the 299. Planned Action Study Area. The Planned Action Alternatives The number of units added would would add up to approximately be 266-554 above existing 2,339 to 2,507 new dwellings.dwellings,for a total of 376-664 In the study area there is a units.About three quarters of the potential for additional market units would be affordable or public, rate dwellings as well as and another approximate quarter affordable and public dwellings. Would be market-rate dwelling Most new units would be units. multifamily. lndirect Increased housing could increase The potential for residents to help local resident spending at support local businesses as well businesses in the study area,and as to create a demand for services could also create an increased is similar to the Planned Action demand for parks and recreation, Study Area. public services,and utilities. Cumulative Growth in the study area would The support of the new dwellings be consistent with the City's to assist the City in meeting Comprehensive Plan and would growth targets is similar to the contribute to meeting growth Planned Action Study Area. targets for the City's next Comprehensive Plan Update for the year 2031. Unavoidable Adverse Impacts Housing in the Planned Action Study Area would likely redevelop to some degree to take advantage of adopted plans and zoning.However,the alternatives would allow for the construction of new dwelling units to replace those that are eliminated.Lower-cost housing could be replaced with more costly housing. Implementation of City regulatory incentives and use of federal,state,and local housing funds and programs could reduce potential affordability impacts.Through its regular Comprehensive Plan review cycles,the City could monitor housing trends in the neighborhood and adapt measures to promote affordability. During construction and in the short-term,residents would be subject to construction activities and the tenants of the Sunset Terrace complex would be required to relocate during demolition and construction. However,relocation assistance mitigation measures for RHA units would mitigate impacts. Planned ACtion OrdinanCe 35 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATfACHMENT 8 Mitigation Measures Table 20. Housing Mi#igation Measures Patentiai Sunset Terrace Redevetapmer t Planned Action Study Area Subarea Renton Municipai Cade(RMC)4-4-Q30(C) Construction mitigation would be as described identifies construction hnurs intended to address for the Planned Action Study Area. noise in sensitive time periods.See Section 6, RHA has cammitted to replacement hausing for Noise,of this Mitigation Document regarding other the Sunset Terrace public housing units at a 1:1 noise mitigatian measures for constructian ratio,consistent with the existing proportion of periods. units by number af bedrooms.Such replacement When federal funds are being used for a praposal, hausing could occur on site and jar off site. displaced tenants shall be offered relocation During the time replacement hausing is under assistance in compliance with the Uniform construction,Section 8 vouchers,or equivalent Relocation Assistance and Real Property measures,shall be used to relocate tenants. Acquisitions Policies Act of 1970,as amended. The Ciry and RHA should apply for federa3,state, and local funding programs described in Draft EIS Section 3.2Q,Hausing,ta promote new housing appartunities for low and very low-income housing. RHA shauld establish a local preference far rental assistance.For example,RHA could establish a priority list far Sectian 8 vouchers for displaced low-income tenants in the Planned Action Study Area(in addition to the relocation assistance to he provided by RHA to the Sunset Terrace residents). llnit replacement and relocation assistance for the family village would be the same as described for the Patential Sunset Terrace Redevelapment Subarea. Nexus City of Renton Comprehensive Plan RMC Title 4 Chapter 2 Zoning Districts-Uses and Standards RMC 4-4-030 Development Guidelines and Regulations-General 11. Environmentallusfiice Significant Impacts Table 21. Environmentallustice Impacts Potentia]Sunset Terrace Type of Impact Planned Action Study Area Redevetopment Subarea Constructian Residents near constructian The demolition of the Sunset activities would likely be affected Terrace camplex and construction by temporary noise,dust,and of the proposed conceptual plans visual impacts due to wauld require the relocatian of Planned Action Ordinance 36 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea construction;these impacts would the tenants of the Sunset Terrace be short-term in nature.The complex likely through Section 8 poputation of the study area is vouchers.Because the tenants are predominately non-minority and low-income and predominately non-low-income and any negative minority,this would constitute a impacts would likely occur on greater impact on these these populations to a greater populations than other degree than the minority and low- populations. income populations. Operations Residential,commercial,and Planned Action Alternatives recreational development and would have a number of beneficial civic and infrastructure effects on minority and low- improvements under Planned income populations in the Action Alternatives would subarea,including the improve the overall redevelopment of the existing neighborhood,making it a more dwelling units,construction of cohesive and desirable place to additional units,transportation live for all populations in the improvements,and the addition community,including minority of other community facilities(i.e., and low-income populations. senior day health,library,parks). The family village would be These changes would result in beneficial for all populations in improvements to public health the Planned Action Study Area, and to the aesthetics of the area. but these benefits could accrue to These would all improve a greater degree for minority and community cohesion for subarea low-income populations due to residents. the close proximity,especially for those without access to a vehicle. lndirect The introduction of new retail and Housing types and affordability commercial space within the would be more varied.New retail study area would increase and commercial space wand employment opportunities.These provide new employment opportunities would benefit all opportunities could be seen as study area populations,but could more beneficial to subarea benefit minority and low-income residents who may be populations to a greater degree. unemployed or not have a their The Planned Action Alternatives own vehicle and would,therefore, would increase the variety of benefit more from the proximity. residential unit types and affordability levels would reduce the concentration of low-income households in the subarea,and thereby reduce or eliminate some of the social consequences of such concentrations. Cumulative Cumulative impacts would Adverse impacts are not primarily be beneficial.As the anticipated.New dwelling units area continues to redevelop with would be affordable,public,and new investments,public and market-rate units.The beneficial private,it would become more cumulative impacts identified desirable for the residents and under the Planned Action Study Planned ACtiOn OrdinanCe 3 Attachment B:Mitigation Document RDINANCE Nt}. 5813 AITACHMENT B Pc tential Sunset Terrace Type of Impact Planned Action 5tudy Area Redevelopment Subarea would continue to create new Area would be similar. jobs.The new development and additian of more market-rate units could cause the study area to become less affordable to lower-income papulations,which could result in these populations needing to relocate outside of the study area. Unavoidabie Adverse impacts There are no long-term significant unavoidable adverse impacts related to environmental justice. The Planned Actian alternatives would result in primarily beneficial impacts associated with new dwelling units,new civic facilities and parks,improvements in nonmotorized transpartation,and new employment opportunities in the surrounding area. During construction and in the shart-term residents would be subject to construction activities and the tenants af the Sunset Terrace complex would be required to relocate during demolition anc! constructian.However,construction mitigation and relocatian assistance mitigation measures(for the RHA units)would minimize irnpacts. Mitigation Measures Table 22. Enviranmental Justice Mitigatian Measures Planned Actian Study Area Patential Sunset Terrace Redevelapment Subarea There are no specific mitigation measures related Mitigation measures during constructian include ta environmental justice during constructian or the need far replacement housing far the aperation.During construction,mitigation residents of Sunset Terrace.It is likely that the measures related to noise,dust,traffic congestion, tenants would be relocated under a potential and visual quality shall be applicable to all Sectian 8 vaucher strategy during construction. populations.These measures are described in See Section 9,Socioecanornics,of this Mitigation Sections 2,6,12,and 14,respectivety,of this Document. Mitigation Document. Nexus City of Renton Comprehensive Plan RMC 4-4-Q30 Development Guidelines and Regulations—Genera] 12. aestnet cs Significant Impacts Table 23. Aesthetic Impacts Potentiai Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Pldnned ActiOn OfdillBnG2 38 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Construction The demolition of existing Same as Planned Action Study structures and construction of Area new buildings would expose nearby residents to visual impacts,including dust,the presence of construction equipment,stockpiles of construction materials,localized increases in vehicular traffic,and on-site construction activities.For each alternative,these activities would occur sporadically at various locations throughout the Planned Action Study Area,would be localized to the construction site,and would be temporary in nature. Operations Visual Character The extensive public investment The visual character of the under the Planned Action Potential Sunset Terrace Alternatives would result in Redevelopment Subarea would widespread changes to the visual change from its current state to a character of the Planned Action pedestrian-oriented community Study Area affecting about 40%of with a mix of residential,ground- parcel acres.Private development floor commercial,and community would take full advantage of the uses linked by public spaces and current development regulations, landscaped pedestrian pathways. resulting in a transition to a The Preferred Alternative concept mixed-use,pedestrian-oriented would focus less residential neighborhood. development in the subarea than The application of adopted design Alternative 3,making room for a standards as new construction larger neighborhood park. gradually replaces older buildings would result in an overall improvement of the visual environment in the Planned Action Study Area. Height and Bulk The subarea would experience Building height and bulk within moderate increases in height and the Potential Sunset Terrace bulk over existing conditions. Redevelopment Subarea would Heights would range from two to range from one to six stories. four stories,and buildings would The Preferred Alternative, generally be located closer to the however,would provide much street than under current more park space than Alternative conditions.The tallest building 3,and the Reevaluation heights under the Preferred Alternative more park space than Alternative would occur on these alternatives providing a property zoned Center Village. sense of openness to the Sunset Terrace site.In addition,buildings on the site would be arranged to place 2-story townhomes adjacent Pldnned ActiOn OrdinanCe 39 Attachment B:Mitigation Document ORDINANCE NO. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea to the park on the north and taller multifamily residential buildings along NE Sunset Boulevard and Sunset Lane NE to the south. Shade and Shadow Because heights in the Planned Taller buildings along NE Sunset Action Study Area would Boulevard would cast longer generally increase,shading effects shadows on the interior of the would also become more subarea to the north,potentially pronounced,though only to a shading sidewalks along Sunset moderate degree.Increased Lane NE.Dependent on final building heights within the design,building may potentially Planned Action Study Area could shade sidewalks along Sunset result in increased shading of Lane NE and Glenwood pedestrian areas and public Avenue NE at various times of the spaces,particularly along day. NE Sunset Boulevard,which is With the Reevaluation Alternative likely to see some of the most or Preferred Alternative,the intense commercial and mixed- increased size of the central park, use development. as well as the placement of 2- story townhomes adjacent to the park,reduces the potential for adverse shading effects compared to Alternative 3. Indirect/Cumulative While redevelopment of the Redevelopment of the Sunset public facilities discussed under Terrace housing facility would be the various alternatives would be a localized action,but additional a coherent effort,private private development is development throughout the anticipated to occur in response study area would occur to this public investment,and piecemeal.Individual private each private development project developments are likely to be of would contribute to the overall higher density,greater height,and transformation of the area's a different architectural style than aesthetic character. existing development,and have the potential to create temporary aesthetic conflicts where they are located adjacent to older structures.Over time,as more properties redevelop,the temporary conflicts would be less frequent and less noticeable. Unavoidable Adverse Impacts With the application of adopted development regulations and recommended mitigation measures, no significant unavoidable adverse aesthetic impacts are anticipated. Planned ACtion OfdindflCe 40 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Mitigation Measures Table 24. Aesthetic Mitigation Measures Potential Sunset Terrace Redevelopment Planned Action Study Area Subarea In both the Planned Action Study Area and Potential See Planned Action Study Area. Sunset Terrace Redevelopment Subarea,mitigation Current city design standards address building measures will be necessary to minimize impacts modulation and roofline variation and are associated with increased height,bulk,and shading. recommended for application in the Future development occurring under any of the Reevaluation/Addendum. alternatives shall conform to the Renton Municipal Code design standards,including but not limited to the following: Urban design standards contained in RMC 4-3- 100, Residential Design and Open Space Standards contained in RMC 4-2-115,and Lighting Standards contained in RMC 4-4-075. As described in RMC 4-3-100B3,portions of the Planned Action Study Area do not currently lie within an established Urban Design District,most notably those properties north of NE 16th Street and west of Kirkland Avenue NE,where the family village proposed under the Planned Action A ternatives would be located.To ensure that future redevelopment exhibits quality urban design,the City should consider either including this area in Design District D or creating a new design district for this purpose.Prior to the enactment of new design standards,the City may condition development north of NE 16th Street to meet appropriate standards of Design District D in RMC 4- 3-100. Nexus City of Renton Comprehensive Plan RMC Title 4 Chapter 2 Zoning Districts-Uses and Standards RMC 4-3-100 Urban Design Regulations RMC 4-4-075 Lighting,Exterior On-Site 13. Historic/Cultural Significant Impacts Table 25. Historic/Cultural tmpacts Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Planned ACtiOn OrdinanCe 41 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Construction Typical project impacts that could No significant cultural resources disrupt or adversely affect are known to exist in the Potential cultural resources in the Planned Sunset Terrace Redevelopment Action Study Area include Subarea. demolition,removal,or substantial alteration without consideration of historic and archaeological sites and/or features. Operations,lndirect,and Development could occur on or Future development in the Cumulative lmpacts near parcels in the Planned Action subarea would have no impact Study Area that contain any known National Register of previously identified or unknown Historic Places(NRHP)-eligible cultural resources.This archaeological or historic development would likely involve resources,and the likelihood of ground disturbance and impacts on unknown cultural modifications to buildings and resources is considered low. structures,which could result in a potentially significant impact on cultural resources.Because of the potential to impact unknown cultural resources,a detailed review of potential impacts on cultural resources would be required on a project-specific basis. Unavoidable Adverse Impacts The impacts on cultural resources caused by new development associated with any alterative could be significant and unavoidable,depending on the nature and proximity of the proposed development project.Implementation of mitigation measures set forth in Draft EIS Section 4.13.2 as amended in the Final EIS would identify potential impacts on cultural resources,at which point measures to reduce them to less than significant could be taken. Mitigation Measures Table 26. Historic/Cultural Mitigation Measures Potential Sunset Terrace Redevelopment Planned Action Study Area Subarea In the event that a proposed development site Since no native"A"horizon was identified at the within the study area contains a building at Edmonds-Glenwood site and throughout the least 50-years of age that is not listed in or Sunset Terrace public housing complex,no determined eligible for listing in the National further archaeological investigations are Register of Historic Places(NRHP)or recommended for these areas.Although a Washington Heritage Register(WHR),the buried,native"A"horizon was identified on project shall be required to undergo review to RHA's Piha site(east of Harrington Avenue NE), determine if the property is considered eligible the potential for an archaeological discovery is for listing. very low.The project should proceed with no further archaeolo ical investigations.If Planned Action Ordinance 42 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Redevelopment Planned Action Study Area Subarea It is recommended that the City adopt a archaeological materials are discovered during historic preservation ordinance that considers ground disturbing excavations,the contractor the identification and treatment of historic shall halt excavations in the vicinity of the find resources listed in or determined eligible for and contact DAHP. listing in the NRHP or WHR,or locally If human skeletal remains are discovered,or if designated.Until such time an ordinance is during excavation archaeological materials are adopted,the City must enter into consultation uncovered,the proponent will immediately stop with DAHP regarding potential impacts on work and notify agencies as outlined in the historic resources in the study area that are Unanticipated Discovery Plan provided in Draft listed in or determined eligible for listing in the EIS Appendix J and as amended by Final EIS NRHP or WHR. Chapter 4(and provided as Attachment 1 of this Exhibit B).If the project would disturb an For future projects that involve significant archaeological resource,the City shall impose excavation in the study area the City must any and all measures to avoid or substantially enter into consultation with Washington State lessen the impact.If avoidance of the Department of Archaeology and Historic archaeological resource is not possible,an Preservation(DAHP)to determine the appropriate research design must be developed likelihood of and recommendations for and implemented with full data recovery of the addressing potential archaeological resources. archaeological resource prior to the It may be necessary to complete archaeological development project.The avoidance of testing prior to significant excavation in the archaeological resources through selection of study area,such as digging for footings or project alternatives and changes in design of utilities.Archaeological project monitoring project features in the specific area of the may be recommended for subsurface affected resource(s)would eliminate the need excavation and construction in high for measuring or mitigating impacts. probability areas. In the event that a future development project in the study area is proposed on or immediately surrounding a site containing an archaeological resource,the potential impacts on the archaeological resource must be considered and,if needed,a study conducted by a qualified archaeologist to determine whether the project would materially impact the archaeological resource.If the project would disturb an archaeological resource,the City shall impose any and all measures to avoid or substantially lessen the impact.If avoidance of the archaeological resource is not possible, an appropriate research design must be developed and implemented with full data recovery of the archaeological resource prior to the development project.The avoidance of archaeological resources through selection of project alternatives and changes in design of project features in the specific area of the affected resource(s)would eliminate the need for measuring or mitigating impacts. Non-site-specific mitigation could include developing an educational program,interpretive displays,and design guidelines that focus on compatible materials,and professional Pldnned ACtiOn OfdindnCe 43 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Redevelopment Planned Action Study Area Subarea publications. Nexus City of Renton Comprehensive Plan 14. Transportation Significant Impacts Table 27. Transportation Impacts Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea Construction Potential impacts that could result Same as Planned Action Study from construction activities Area include increased traffic volumes, increased delays,detour routes, and road closures. Lane closures in both directions of NE Sunset Boulevard could be required during construction roadway improvements associated with the Planned Action Alternatives.This reduction in capacity would likely increase travel times,and may force reroutes through local streets. Operations Traffic Operations At Edmonds Avenue NE and NE Delay times in the subarea could 12th Street LOS F conditions are worsen slightly due to the predicted in both 2015 and 2030. increase in trips generated,but At Harrington Avenue NE and NE intersections would likely operate 12th Street LOS F conditions are better than the LOS D threshold. expected in 2030. Transit At both Edmonds Avenue NE and Same as Planned Action Study at NE 10th Street,expanded bus Area zones in both directions of travel would provide larger waiting areas for transit users and would be conveniently located near residential or retail land uses.Bus zones and existing bus stops could include shelters with adequate lighting and street furniture. Nonmotorized Planned Action Alternatives Same as Planned Action Study include improved nonmotorized Area facilities such as bicycle lanes, sidewalks,and marked Planned ACtion OfdinanCe 44 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT 6 Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea crosswalks.Design elements such as bike route signage,bike storage lockers,and bicycle detection at signalized intersections are included to promote bike ridership and safety. The Preferred Alternative includes a 5-foot-wide eastbound bicycle lane,rather than bicycle lanes in both directions(as in Alternative 3). Sidewalk connections from NE Sunset Boulevard to side streets would be improved, strengthening the connectivity between the residential areas and NE Sunset Boulevard.To improve safety for pedestrians crossing the roadways,the Preferred Alternative includes special paving at crosswalks and intersections. Sustainability The Planned Action Alternatives Same as Planned Action Study score a minimum of 33 with a Area maximum of up to 99 out of 118 points in the Greenroads metric; therefore,the alternatives meet the minimum Greenroads certification level and could achieve the highest level of certification. The Planned Action Alternatives score most strongly in the"Access and Equity"section of the Greenroads evaluation,as improving access for pedestrians, bicyclists,and transit users are important elements of this alternative. The Planned Action Alternatives typically include higher leve(s of improvements or higher quality of improvements such as wider sidewalks,wider planting areas, and special paving. Indirect and Cumulative Growth would increase in Same as Planned Action Study comparison to Comprehensive Area Plan land use estimates;however, the Planned Action Alternatives' operational analysis is based on a model that addresses growth Planned Action Ordinance 45 Attathment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea cumulatively on the City's current and planned roadway system and any operational deficiencies can be mitigated to meet City of Renton thresholds. Unavoidable Adverse Impacts The alternatives are expected to contribute to a cumulative increase in traffic volumes within the study area,which could degrade some roadway operations.The increase in traffic volumes due to activities in the study area is considered unavoidable,but the roadway operation and LOS can be mitigated to meet applicable LOS standards. Mitigation Measures Table 28. Transportation Mitigation Measures Potential Sunset Terrace Redevelopment Planned Action Study Area Subarea Operational Mitigation No permanent mitigation measures are Planned Action applicants shall pay a Transportation recommended within Potential Sunset Terrace Impact Fee as determined by the Renton Municipal Redevelopment Subarea.The intersection Code at the time of payment,payable to the City as operations under action alternatives are specified in the Renton Municipal Code. expected to be within the LOS D threshold. Planned Action applicants shall provide a traffic During construction,mitigation measures are analysis estimating trips generated by their those described for the Planned Action Study proposed development and demonstrate Area.Flaggers,advance warning signage to conformance with the Planned Action Ordinance trip alert motorists of detours or closures,and ranges and thresholds in Section 3(d) (4)as well as reduced speed zones would likely benefit demonstrate conformance with the City's traffic operations. concurrency requirements in RMC 4-6-070. When demonstrated by an applicant's analysis that operational LOS standards reviewed in the EIS are exceeded at the following locations,intersection improvements shall be made by planned action applicants as appropriate to meet LOS D and in conformance with the City's street standards in RMC 4-6-060: Edmonds Avenue NE and NE 12th Street:an additional southbound left-turn pocket and westbound right-turn pocket would improve operations to LOS E,while added pedestrian-and bicycle-oriented paths or multi-use trails to encourage mode shifts would likely improve operations to LOS D. At the Harrington Avenue NE and NE 12th Street intersection:the eastbound and westbound approaches could be restriped to increase the number of tanes and,therefore,the capacity of the intersection.With implementation,this Planned Action Ordinance 46 Attachment B Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Redevelopment Planned Action Study Area Subarea intersection would improve to LOS D. Construction Mitigation Temporary mitigation during construction may be necessary to ensure safe travel and manage traffic delays.The following mitigation measures shall be implemented prior to or during construction within the Planned Action Study Area. Prior to construction: o Assess pavement and subsurface condition of roadways being proposed for transport of construction materials and equipment. Ensure pavement can support loads. Adequate pavement quality would likely reduce the occurrence of potholes and would help maintain travel speeds. o Alert landowners and residents of potential construction.Motorists may be able to adjust schedules and routes to avoid construction areas and minimize disruptions. o Develop traffic control plans for a11 affected roadways.Outline procedures for maintenance of traffic,develop detour plans, and identify potential reroutes. o Place advance warning signage on roadways surrounding construction locations to minimize traffic disturbances. During construction: o Place advance warning signage on NE Sunset Boulevard and adjacent arterials to warn motorists of potential vehicles entering and exiting the roadway.Signage could include"Equipment on Road,""Truck Access,"or"Slow Vehicles Crossing." o Use pilot cars as dictated by the Washington State Department of Transportation WSDOT). o Encourage carpooling among construction workers to reduce traffic volume to and fi-om the construction site. o Employ flaggers,as necessary,to direct traffic when vehicles or large equipment are entering or exiting the public road system to minimize risk of conflicts between trucks and passenger vehicles. o Maintain at least one travel lane at all times, if possible.Use flaggers to manage Pldnned Action OrdinanC2 47 Attachment B:M tigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Redevelopment Planned Action Study Area Subarea alternating directions of traffic.If lane closures must occur,adequate signage for potential detours or possible delays should be posted. o Revisit traffic control plans as construction occurs.Revise traffic control plans to improve mobility or address safety issues if necessary. Nexus Renton Comprehensive Plan RMC 4-6-060 Street Standards 15. Parks and Recreation Significant Impacts Table 29. Parks and Recreation Impacts Potential Sunset Terrace f Type of Impact Planned Action Study Area Redevelopment Subarea Construction Construction could temporarily No parks and recreation facilities disrupt pedestrian access to exist in this subarea and no existing park properties.Active construction impacts are construction sites also represent anticipated. opportunities for creative play and attractive adventure for young people in the community. Operations Although there is an increase in With Alternative 3,portions of community park acreage there Harrington Avenue NE right-of- would continue to be a deficiency way within the subarea would be in neighborhood and community converted to 0.25 acres of passive park acreage in the Planned open space. Action Study Area.Deficiencies Under the Preferred Alternative, are less than for the Preferred Sunset Court Park woutd be Alternative than Alternative 3 relocated to the Sunset Terrace which has a similar population Subarea.Additionally,this park but less proposed park facilities. would be expanded from 0.5 acres Ballfield and sport court LOS to 2.65 acres and would have a standards are applied citywide; vacation of Harrington Avenue NE thus a lack of such facilities within similar to Alternative 3. This the Planned Action Study Area or increases the acreage in the Potential Sunset Terrace neighborhood park land for this Redevelopment Subarea does not subarea and the Planned Action indicate an LOS deficiency. Study Area. NE Sunset Boulevard would be improved to include bike lanes, The Reevaluation Alternative also intersection improvements,and relocates Sunset Court Park and Pldnned ACtiOn OfdinanC2 48 Attachment B:Mitigation Document QRDINANCE N0. 5813 ATfACNMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea sidewalks,providing a more would vacate a portion of walkabte corridar and more Harrington Avenue similar to the direct access between residential above alternatives.The size ofthe areas and park land park is the greatest considered at about 3.2 acres. Additionally,a library would be constructed in the subarea. ndirect Indirect impacts are expected to Facility deficiencies in this mostly fall on the City's regional subarea would atso tikely lead to and communitywide parks and spillover demand for aetive recreatian facilities.Far example, piayfields far team sports in ather as the population increases in the parts of Renton as well as in Planned Action Study Area,there surrounding cornmunities. will be a growing deficiency of Neighborhoad and Community Parks.Due to praximity,those demands wauld likely be displaced to nearby regional facilities such as Gene Coulon Park as well as in surrounding communities. Cumulative Increased demands for park and Same as Planned Action Study recreation facilities and services Area generated by the forecast population growth under each of the alternatives would add to thase created by general population growth throughout the Renton community. Unavoidabie Adverse Impacts Under studied alternatives for the Planned Action Study Area and Potential Sunset Terrace Redevelopment 5ubarea,there wauld be an increased demand for parks and recreation facilities. With the application of mitigation measures,no significant unavoidable impacts are anticipated. Mitigation Measures Table 30. Parks and Recreation Mitigation Measures Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea During construction,impacts adjacent to or in With the prevalence of public facilities in the parks within the Planned Action Study Area,such Planned Action Study Area as a whole,and the as an increase in noise,dust,and access addition of a centrai park and a library in the timitations,shall be mitigated as per a Potential Sunset Terrace Redevelopment construction mitigation plan developed by Subarea,there is opportunity to manage the Planned Action applicants and approved by the current facilities in a manner that maximizes ty, their beneficial parks and recreation uses for Planned Action Applicants shall pay a Parks and future population growth.The mitigation Recreation Impact fee as deterrnined by the measures proposed far the Flanned Action Study Area shall a pty to the Patential Sunset Terrace Pldnned ACtion OrdindnCe 49 A#tachment B:Mitigatioo Document ORDINANCE N0. 5813 ATTACHMENT B Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea Renton Municipal Code at the time of payment, Redevelopment Subarea. payable to the City as specified by t he Renton Municipal Code. The following four mitigation measures would help improve the availability or access to parks and recreation facilities in the Planned Action Study Area. The City is initiating a parks,recreation,open space and natural resources plan for completion in 2011.That plan could identify alternative LOS standards and parks and recreation opportunities inside or outside of the Planned Action Study Area that could serve the local population. The City is considering amendments to its development codes that would provide for payment of a fee-in-lieu for required common open space.As proposed,the fee-in-lieu option could be executed when development sites are located within 0.25 mile of a public park and when that park can be safely accessed by pedestrians.The City's package of amendments also includes park impact fees. The City and Renton School District could develop a joint-use agreement for public use of school grounds for parks and recreation purposes during non-school hours.Joint-use agreements between the City and Renton School District could also be used to,at least partially,address the LOS deficiencies in existing recreation facilities. The City could add parks and recreation facilities such as: o The City could convert current public properties no longer needed for their current uses to parks and recreation uses, such as the Highlands Library that is intending to move and expand off site. Draft EIS Figure 4.15-2 shows properties in public use. o The City could purchase private property for parks and recreation use.An efficient means would be to consider properties in the vicinity of existing parks and recreation facilities or where additional population growth would be greatest. Draft EIS Figure 4.15-2 shows locations where future demand could be greater and where the City could focus acquisition efforts. Planned Action Ordinance 50 Attachment B:Mitigation Document 4RDINANCE N0. 5813 ATfACHMENT B Nexus Renton Camprehensive Plan Parks,Recreation,Open Space and Natural Resources Plan 16. Public Services Significant Impacts Table 31. Public Services Impacts Potential Sunset Terrace Type of tmpact Planned Action Study Area Redevelopment Subarea* Construction Police The Renton Police Department Same as Planned Action Study cauld experience an increase in Area calls for service related to construction site theft,vandalism, or trespassing relating to construction. Pire and Emergency Medical Construction impacts on fire Sarne as Planned Action Study Services protection and emergency Area medical services could include increased calls far service related to inspection of construction sites and patential construction-related injuries. Education The McKnight Middle Schaol No impact expansion wauid accur similar to other alternatives.In addition, changes would occur at the Hillcrest F.arly Childhoad Center and the reconfigured Hillcrest Early Childhaad Center would be part of a family village cancept that would include recreation and housing.The expansion of McKnight Middle School is not expected to disrupt student attendance at the campus. Health Care There may be temporary changes Same as Planned Action Study to nonmotorized and motorized Area access to health care services during infrastructure construction(e.g.,NE Sunset Baulevard),but alternative routes wauld be established. Social Services There may be temparary changes Redevelapment of the Sunset to nonmotorized and motorized Terrace housing develapment access to social services during would displace the existing on- infrastructure construction(e.g., site community meeting space Planned Action Ordinance 51 Attachment B:Mit9gation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea* NE Sunset Boulevard),but that is currently used for on-site alternative routes would be social service programs.However, established. the space would be replaced Construction at the Hillcrest Early onsite or nearby with a larger and Childhood Center as part of the more modern facility,and with family village redevelopment,appropriate phasing of would require relocation of the development,disruption to on- Friendly Kitchen weekly meal site social service programs can program that meets at that site. be minimized or avoided. The Friendly Kitchen program would either be relocated permanently as a part of the redevelopment or may be accommodated as part of the range of social services provided at the family village. Solid Waste Planned Action Alternatives Same as Planned Action Study would result in construction- Area related waste generation. Library When the library is relocated,Same as Planned Action Study library services may be Area temporarily unavailable in the study area,but services would be available at other branches. Operations Police Applying the Renton Police Applying the Renton Police Department staffing per Department standard to the population standard to the anticipated population increase anticipated population increase would account for 1.0 to1.8 of the would result in a need for an approximately 8.6 to 9.3 estimated 8.6 to 9.3 additional additional police officers to police officers to address increase address population growth study in service calls related to growth. area. Fire and Emergency Medical Applying the fire service's staffing Applying the fire service's staffing Services ratio to growth in the study area ratio to growth in the study area would result in the need for an to the population growth of in this additiona11.2 to1.3 firefighter full- subarea would result in the need time equivalents(FTEs) for less than 0.14 to 0.2 of the 1.2 compared to existing conditions to1.3 firefighter FTEs needed in to maintain the City's existing the overall Planned Action Study staffing ratio. Area to maintain the City's existing staffing ratio. Education Population growth would result in Population growth would result in an increase in approximately 526 approximately 60 to 107 to 567 students in the Renton additional students compared to School District compared to existing conditions.It is existing conditions.The district's anticipated that this additional planned opening of Honey Dew increment of students would be Elementary,as well as accommodated by the district's construction of additions to planned capital improvements, McKnight Middle School and including openin Honey Dew Plann2d ACtion OfdinanCe 52 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea* Hazen High School,would Elementary,expansion of accommodate this increase in McKnight Middle School,and student population. redeveloping the Hillcrest Early New students within the study Childhood Center which would area would include a higher than provide additional student average number of students capacity in addition to early speaking English as a second education programs that language,increasing demands on currently exist on the site. the district's English Language Learners Program. Health Care Increase in study area population Based VMC's existing ratio of would increase the need for hospital beds to district hospital beds in the Valley population,the anticipated Medical Center(VMC)service population increase would result area by approximately 4.1 to 4.4 in a small increase of beds,based on the current ratio of approximately 0.5 to 0.8 hospital hospital beds to district service beds of the total assumed for the area population.Additional entire study area. population growth may aiso result in increased demand at VMC's nearby primary care and urgent care clinics. Social Services Planned Action Alternatives The subarea's new affordable include major public investments, housing development for seniors which could expand upon or would include enriched senior enhance social services in the services on site,including elder study area.Among the key day-health for off-site patients in components outside of Potential a 12,500-square-foot space on the Sunset Terrace Redevelopment northeastern vacant RHA parcel. Subarea is development of a The increased population of family village in the North affordable housing and,in Subarea. particular,affordable senior housing would increase the demand for social services, including senior services accessible to the subarea. Additional community space at the family village,would be located outside but nearby the subarea. Solid Waste Solid waste generation is Solid waste generation from the expected to increase by around subarea would increase by about 129,689 to 139,000 pounds per 14,750 to 9,300 pounds per week week compared to existing compared to existing conditions. conditions.A portion of this waste A percentage of this waste would stream would be diverted to be diverted to recycling. recyclables. Library Services Anticipated growth would create Anticipated growth in the subarea a demand for an additional 1,940 would account for approximately to 2,079 square feet of library 221-397 square feet of library space compared to existing facilities to meet the growth in Planned ACtlon OfdinanCe 53 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea* conditions. demand. Indirect and Cumulative All alternatives increase growth Same as Planned Action Study above existing conditions and Area would add to a citywide increase in demand for public services; however,the alternatives are accommodating an increment of growth already anticipated in the Comprehensive Plan at a citywide level,and planned growth to the year 2035 has been addressed in the City's 2015 Comprehensive Plan update. The overall conclusions of the FEIS is expected to be similar for the Reevaluation Alternatives in 2014 and 2016,except that patterns of growth and demand may slight shift to have slightly greater need in the Potential Sunset Terrace Redevelopment Area and slightly less in the overall neighborhood. Unavoidable Adverse Impacts Demand for public services will continue to increase in conjunction with population growth.With advanced planning and implementation of mitigation measures,no significant unavoidable adverse impacts related to police,fire/emergency medical,education,health care,social services,solid waste,or library services are anticipated. Mitigation Measures Table 32. Public Services Mitigation Measures Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea Police Police During construction,security measures shall be Mitigation measures described for the Planned implemented by developers to reduce potential Action Study Area also apply to this Subarea. crimina activity,including on-site security Fire and Emergency Medical Services surveillance,lighting,and fencing to prevent Mitigation measures described for the Planned public access. Such measures shall be detailed in Action Study Area also apply to this Subarea. a construction mitigation plan prepared by Education Planned Action Applicants and approved by the No mitigation measures are necessary orCity. proposed. Planned Action applicants shall design street Health Carelayouts,open space,and recreation areas to promote visibility for residents and police.Street No mitigation measures are necessary or and sidewalk lighting would discourage theft and Proposed. vandalism,and enhance security. Social Services Fire and Emergency Medical Services RHA's provision of community space that could Developers will construct all new buildings in be used for social services or community meeting compliance with the International Fire Code and space for community organizations would serve Renton Development Regulations(RMC Title 4), as mitigation.See the discussion under the including provision of emergency egress routes P anned Action Study Area. and installation of fire extinguishing and smoke RHA should maintain a community meeting space Planned Action Ordinance 54 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT 6 Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea detection systems.All new buildings will comply within or near the subarea during construction with accessibility standard for people with phase of Sunset Terrace redevelopment that disabilities,per the requirements of the allows for on-site social service programs to Americans with Disabilities Act. continue to meet within the subarea. Ptanned Action applicants shall pay a Fire Impact Solid Waste Fee as determined by the Renton Municipal Code Mitigation measures described for the Planned at the time of payment,payable to the City as Action Study Area also apply to this Subarea. specified in the Renton Municipal Code.Public Library Education The King County Library System should continue During renovation of the Hillcrest Early Childhood to monitor growth within its geographic clusters, Center,the Renton School District shall provide and adjust plans for facility sizing and spacing temporary transportation or take other according to shifting trends in population growth. equivalent measures to ensure accessibility of the early education program to area children who attend the program. Since the school district typically plans for a shorter-term horizon than the 20 years envisioned for the Planned Action,the district will continue to monitor student generation rates into the future and adjust its facility planning accordingly.The district will continue to implement existing plans to expand permanent student capacity at area schools.In addition,the district may utilize portable classrooms or shift attendance boundaries to address student capacity issues that arise on a shorter term basis. The district will also continue monitoring growth in the number of English Language Learner students in the district,and plan additional capacity in that program to meet growing demands for that service,particularly in schools with high percentages of English Language Learners,such as Highlands Elementary. The school district imposes a school impact fee for new residential construction.This funding source can be used to help provide expanded school facilities needed to serve the growth anticipated under all alternatives(RMC 4-1-160). Health Care There are no mitigation measures needed or proposed for health care due to the negligible change in the number of beds. Social Services The City's planned improvements to the streetscape and transit facilities that make walking,bicycling,and taking transit more viable modes of transportation would improve accessibility of social services located outside the Planned Action Study Area to area residents. RHA,Renton School District,and the City should work together to relocate the Friendly Kitchen community feeding program when the Hillcrest Planned ACtiOn OfdinanCe 55 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea Early Childhood Center campus,the current site of this program,is redeveloped as part of a family village.Relocation should occur at an accessible location nearby to maintain service to the existing community that relies upon the Friendly Kitchen services.If possible,Renton School District and RHA should incorporate space for the continuation of the Friendly Kitchen Program within the family village. RHA and the City should consider developing a community center facility as part of Sunset Terrace redevelopment or the family village development or at another location in the Planned Action Study Area.The center would provide an accessible on-site space for a comprehensive range of social services for residents in the Planned Action Study Area,focused on alleviating poverty,and addressing the needs of some of the more predominant demographic groups found within the Planned Action Study Area—seniors, individuals living with disabilities,those speaking English as a Second Language,and youth. Solid Waste The City shall require development applicants to consider recycling and reuse of building materials when redeveloping sites,and as part of their application explain what measures are included. The City may condition Planned Action applications to incorporate feasible recycling and reuse measures. Public Gibrary The King County Library System should continue to monitor growth within its geographic clusters, and adjust plans for facility sizing and spacing according to shifting trends in population growth. Nexus Renton Comprehensive Pian RMC Title IV Chapter 1 Administration and Enforcement RMC Title IV Chapter 5 Building and Fire Prevention Standards 17. Utilities Significant Impacts Table 33. Utilities Impacts Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea* Planned ACtiOn OfdindnCe 56 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea* Construction Where new construction occurs, Same as Planned Action Study it is anticipated that existing Area telecommunication lines would be removed,replaced,or abandoned in place. Redevelopment would require coordination with service providers regarding the location of proposed structures,utilities, and site grading. To accommodate the required demand and capacity for water and sewer services for new development and redevelopment in the study area,existing water and sanitary sewer lines would be abandoned in place or removed and replaced with new and larger lines.New and larger water and sewer mains would be installed in existing and/or future dedicated public rights-of-way or within dedicated utility easements to the City,and would connect with the existing distribution network.Existing utility lines would continue to service the site during construction,or temporary bypass service would be implemented until the distribution or collection system is complete and operational. Operations Telecommunications Increased capacity requirements Same as Planned Action Study with increased levels of Area population and commercial activity in each of the alternatives could require new fiber within the Planned Action Study Area and coordination with telecommunication providers as development occurs should be performed so that appropriate facilities can be planned. Water The increase in the average daily The increase in ADD for this Planned ACtion OrdindnCe 57 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Potential Sunset Terrace Type of Impact Planned Action Study Area Redevelopment Subarea* demand(ADD)is projected to be subarea is 0.05 to 0.09 mitlion 0.56 to 0.59 million gallons per gallons per day.The increase in day within the Planned Action the peak daily demand (PDD)for Study Area. this subarea is 0.09 to 0.16 The growth projected would million gallons per day. increase the storage The primary significant impact of requirements for the Highlands subarea development on the 435 and 565 pressure zones and water distribution system would further increase the existing be related increased fire-flow storage deficit in the Highlands requirements.These increased 435 pressure zone.In addition, fire flow requirements are the development that is projected substantial and cannot be met by for the Planned Action Study Area the existing distribution system would increase the fire-flow serving the subarea. Water requirements with more system pressure provided by the multifamily development and 435 pressure zone within the commercial development.The subarea is not adequate for capacity of the existing water multistory development and/or distribution system to meet these for development with fire higher fire flows is inadequate if sprinkler systems. New water system improvements are not mains extended from the higher- constructed. pressure 565 pressure zone system to service the subarea would need to be phased to accommodate growth. Wastewater The increase in wastewater load The increase in wastewater flow for the Planned Action Study Area in this subarea is 0.05 to 0.10 is 0.59 to 0.63 million gallons per million gallons per day.Similar to day. the Planned Action Study Area, This increase in wastewater load no impacts on the interceptors is not expected to affect the that provide conveyance from the wastewater interceptors that subarea are expected,but the provide canveyance of increased sewer load could wastewater from the Planned impact local sewers within the Action Study Area but it could subarea. increase surcharging that is currently experienced and observed within the Planned Action Study Area. Indirect and Cumulative Demands on utilities would Same as Planned Action Study increase as a result of cumulative Area development.No significant cumulative impacts are anticipated as long as the replacement of water and sewer infrastructure is properly planned,designed,and constructed,and funding strategies are identified and approved by City Council. Planned ACtiOn OfdinanCe 58 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B The overall conclusions of the FEIS is expected to be similar for the Reevaluation Alternatives in 2014 and 2016,except that patterns of growth and demand may slight shift to have slightly greater need in the Potential Sun set Terrace Redevelopment Area and slightly less in the overall neighborhood. Unavoidable Adverse Impacts All studied alternatives are anticipated to increase demand for water,wastewater,and telecommunication services.Increased growth in the Planned Action Study Area has the potential to exacerbate existing water and wastewater system deficiencies. However,with application of mitigation measures,no significant unavoidable adverse impacts are anticipated. Mitigation Measures Table 34. Utilities Mitigation Measures Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea Water Water To mitigate the current and projected water The mitigation measures that are required in the storage deficit in the pressure zones that serve Potential Sunset Terrace Redevelopment Subarea the study area,the City completed the are similar to those noted for the Planned Action construction of the 4.2-million-gallon Hazen Study Area.The water storage deficit would be met Reservoir in the Highlands 565 pressure zone with an increase in storage at the existing Highlands in March 2009.The City also completed a water Reservoirs site,and fire-flow requirements would distribution storage feasibility study to develop require the new 12-inch-diameter pipe loop conceptual options and planning level cost throughout this subarea and realignment of the estimates for expanding the storage capacity at Highlands 435 and Highlands 565 pressure zones. two existing City-owned sites:the Highlands As noted previously,the City has recently installed a Reservoirs site and the Mt.Olivet Tank site new 12-inch-diameter main for development HDR,Inc.2009).Financial strategies for the adjacent to this subarea,and as development occurs planning,design,and construction of the in the subarea,the pipe network would need to be storage-capacity expansion have not been extended to serve the development.A more detailed determined at this time. discussion of needed system improvements is To mitigate the fire-flow requirements for the provided in Attachment 2. proposed level of development and redevelopment within the Planned Action Study The NEPA Reevaluation/SEPA Addendum(October Area,larger diameter(12-inch)piping is Z014)provides a description of water system required throughout the Planned Action Study requirements for fire flow that are similar to the Area to convey the higher fire-flow FEIS conclusions and that benefit from more requirements.The new water mains will be specific master planning review. looped for reliability and redundancy of service, as required by City policies and water design ,yastewater Collection standards.The larger mains will be installed The sewers within the Potential Sunset Terracewithinthededicatedright-of-way in a north-to- Redevelopment Subarea are also identified for south and east-to-west grid-style water system. replacement based on age and condition in theAdditionalmainswithinthedevelopmentsites City's Long Range Wastewater Management Plan.will also be required to provide water to gased on the increased wastewater load within thehydrantsandwatermeters,and should be potential Sunset Terrace Redevelopment Subarea,looped within the development site around the local sewers may need to be replaced withbuitdings.To provide the water pressure requirements for multistory buildings and to upsized pipe to manage the increased wastewater support the pressure requirements for fire load from the subarea.A more detailed discussion of sprinkler systems,the new water mains will be needed sewer system improvements is provided connected to the higher-pressure Highlands Attachment 2. The NEPA Reevaluation/SEPA Addendum(October Planned Action Ordinance 59 Attachment 6:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT 6 Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea 565 pressure zone.The options to address fire 2014)provides a description of sewer main flow within the Planned Action Study Area are considerations that are similar to the FEIS further described below. conclusions and that benefit from more specific The Highlands 565 pressure zone typically has master planning review. enough pressure to meet the pressure needs for fire-flow requirements for the proposed development and redevelopment in the Planned Action Study Area,but is limited in providing the fire-flow rate due to the size of the existing water mains that are generally smaller than 12 inches in diameter.The Highlands 435 pressure zone operates at lower pressures and has smaller-diameter pipes in this area of the pressure zone and,therefore, cannot meet both the pressure reyuirements and the fire-flow capacity(flow)requirements. The options developed to remedy fire-flow and pressure inadequacies are shown in Draft EIS Section 4.17,Figure 4.17-1 and summarized below. A 12-inch-diameter pipeline loop shown in Draft EIS Section 4.17,Figure 4.17-1 was developed to extend the Highlands 565 pressure zone into the existing Highlands 435 pressure zone.This 12-inch-diameter loop was also extended north of NE 12th Street in the existing Highlands 565 pressure zone to improve the conveyance capacity throughout the Planned Action Study Area.This 12-inch- diameter loop improvement builds on the City's recent extension of the Highlands 565 pressure zone into the Highlands 435 pressure zone to support fire-flow requirements for the Harrington Square Development. In addition to the 12-inch-diameter pipe loop shown in Draft EIS Section 4.17,Figure 4.17-1, additional piping improvements for each development served from the 12-inch-diameter loop are expected to be reGuired to provide sufficient fire flow and pressure throughout each development.The sizing and layout of this additional piping will depend on the development layout,but will require that the development piping be looped around buildings and be sufficient in size to maintain the fire- flow requirements of the development. Planned Action Applicants shall implement improvements required for water service and fire flow consistent with City standards in RMC Title 4 Chapter 6 and RMC 4-5-070 International Fire Code and Fire Prevention Regulations.Planned Action applicants shall also demonstrate compliance with RMC 4-1- Planned Action Ordinance 60 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Planned Action Study Area Potential Sunset Terrace Redevelopment Subarea 180 Charges for Equitable Share of Public Works Facilities. Wastewater Collection The local wastewater collection system n the Planned Action Study Area is scheduled for replacement based on age and condition as noted in the City of Renton Long Range Wastewater Management Plan (City of Renton 2009b).The local sewers have reached the end of their useful life and have been identified as high priority replacements due to leaks and current surcharging.However,the increased wastewater load with the development in the Planned Action Study Area could require that the local sewers be replaced with larger diameter pipe to provide sufficient capacity to the wastewater interceptors that serve the Planned Action Study Area.The locations where lines would be improved are identified in Draft EIS Section 4.17. Pursuant to RMC 4-6-040.B,any facility improvements identified by the current adopted long-range wastewater management plan(comprehensive sewer system plan)that are not installed or in the process of being installed must be constructed by the property owner(s)or developer(s)desiring service. Planned Action applicants shall also demonstrate compliance with RMC 4-1-180 Charges for Equitable Share of Public Works Facilities. Nexus Renton Comprehensive Plan RMC Title IV Chapter 1 Administration and Enforcement RMC Title IV Chapter 6 Street and Utility Standards Advisory Notes The EIS identified potentially applicable federal,state,and local laws and rules that apply to Planned Actions and that can serve to mitigate adverse environmental impacts. It is assumed that all applicable federal,state,and local regulations would be applied.The primary set of applicable local regulations is the Renton Municipal Code. A list of specific requirements included in Chapter 3 of the Draft EIS. Pldnned ACtiOn OfdindnCe 61 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Attachment 1: Draft EIS, Cultural Resources Appendix J, Plan and Procedures for Dealing with the Unanticipated Discovery Plan and Procedures for Dealing with the Unanticipated Discovery of Human Skeletal Remains or Cultural Resources during Redevelopment of the Edmonds- Glenwood Lot, Harrington Lot, and Sunset Terrace Public Housing Complex in Renton, Washington Any human skeletal remains that are discovered during this project will be treated with dignity and respect. A. If any City of Renton employee or any of the contractors or subcontractors believes that he or she has made an unanticipated discovery of human skeletal remains or cultural resources,all work adjacent to the discovery shall cease.The area of work stoppage will be adequate to provide for the security,protection,and integrity of the human skeletal remains,in accordance with Washington State Law.The City of Renton project manager will be contacted. B. The City of Renton project manager or the City of Renton representative will be responsible for taking appropriate steps to protect the discovery.At a minimum,the immediate area will be secured to a distance of thirty(30)feet from the discovery.Vehicles,equipment,and unauthorized personnel will not be permitted to traverse the discovery site. C. If skeletal remains are discovered,the City of Renton will immediately call the King County Sheriffs office,the King County Coroner,and a cultural resource specialist or consultant qualified to identify human skeletal remains.The county coroner will determine if the remains are forensic or non-forensic(whether related to a criminal investigation).The remains should be protected in place until this has been determined. D. If the human skeletal remains are determined to be non-forensic,the King County Coroner will notify the Washington State Department of Archaeology and Historic Preservation.DAHP will take jurisdiction over the remains.The State Physical Anthropologist will make a determination of whether the remains are Native American or Non-Native American.DAHP will handle all consultation with the Muckleshoot Indian Tribe as to the treatment of the remains. E. If cultural resources are uncovered,such as stone tools or flakes,fire-cracked rocks from a hearth feature,butchered animal bones,or historic-era objects(e.g.,patent medicine bottles, milk tins,clay pipes,building foundations),the City of Renton will arrange for a qualified professional archaeologist to evaluate the find.Again,the cultural resources will be protected in place until the archaeologist has examined the find. F. If the cultural resources find is determined to be significant,the City of Renton cultural resource specialist/archaeologist or consulting archaeologist will immediately contact the Washington State Department of Archaeology and Historic Preservation and the Muckleshoot Indian Tribes Planned Action Ordinance 62 Attathment B:Mitigation Dotument ORDINANCE N0. 5813 ATTACHMENT B to seek consultation regarding the eligibility of any further discovery for inclusion in the National Register of Historic Places. CONTACT INFORMATION Rocale Timmons,Senior Planner City of Renton Department of Community and Economic Development Renton City Hall 1055 South Grady Way Renton,WA 98057 Phone: (425) 430-6578 Stephanie Kramer Assistant State Archaeologist Department of Archaeology and Historic Preservation PO Box 48343 1063 Capitol Way South Olympia,WA 98504-8343 Phone: (360) 586-3083 King County Sheriffs Office Headquarters 516 Third Avenue,Room W-150 Seattle,WA 98104-2312 Phone: (206) 296-4155 (non-emergency) Laura Murphy Muckleshoot Tribe Cultural Resources 39015 172nd Avenue SE Auburn,WA 98092 Phone: (253) 876-3272 Planned Action Ordinance 63 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Attachment 2: Figure 3.17-1 Potential Subarea Utility Improvements and Phasing Planned Action Ordinance 64 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B Water The mitigation measures that are required in the Potential Sunset Terrace Redevelopment Subarea are similar to those noted for the Planned Action Study Area.The water storage deficit would be met with an increase in storage at the existing Highlands Reservoirs site,and fire-flow requirements would require the new 12-inch-diameter pipe loop throughout this subarea and realignment of the Highlands 435 and Highlands 565 pressure zones.As noted previously,the City has recently installed a new 12-inch-diameter main for development adjacent to this subarea,and as development occurs in the subarea,the pipe network would need to be extended to serve the development.A more detailed discussion of needed system improvements is provided below. See NEPA Reevaluation/SEPA Addendum(October 2014) for more recent considerations on location of pipes and fire flow requirements. Overview Renton fire and building codes mandate minimum fire flows,durations,and pressure prior to occupancy of new structures. In the case of the Potential Sunset Terrace Redevelopment Subarea these mandated flows dictate substantial upgrades to the water distribution system. When the fire flow required for a new development exceeds 2,500 gallons per minute(gpm),the City also requires that the mains providing that fire flow be looped. Looped water mains provide more reliability and higher pressures under fire-flow conditions. City regulations also require installation of fire hydrants along all arterials such as NE Sunset Boulevard. Taken together these code requirements would lead to a series of new water mains connected to the 565 pressure zone and extended to the various redevelopment projects within the subarea. It is not possible to predict the precise timing and sequencing of these redevelopment projects. The following paragraphs illustrate one scenario of water main sequencing that could meet fire-flow requirements. Edmonds-Glenwood Phase 1 Phase 1 of the Edmonds-Glenwood redevelopment project consists of townhomes along Glenwood Avenue NE. Fire-flow requirements for this project are expected to be in the range of 2,500 gpm. The existing water system in Glenwood Avenue NE cannot provide that amount of fire flow. A new 12-inch-diameter water main would be required to be extended from Harrington Avenue NE and NE 12th Street in the 565 pressure zone,south along Harrington Avenue NE,and continuing along Glenwood Avenue NE past and through the project site,about 800 feet of new pipe(Segment A on Figure 3.17-1). New Library A new library is proposed in the northeast quadrant of NE Sunset Boulevard and Harrington Avenue NE. If the fire-flow requirements for the new library are about 2,500 gpm or less,then the existing 12-inch-diameter main in NE Sunset Boulevard could meet that requirement. Pldnned ACtiOn OfdinanC2 65 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B New Mixed-Use Building Adjacent to New Library A new mixed-use community service/retail/residential structure is proposed adjacent to the new library between NE Sunset Boulevard,NE 10th Street,and Sunset Lane NE. It is reasonable to expect that the combination of additional structure size and exposure(to the library)would mandate fire flows for this building in excess of 2,500 gpm. In that case,a looped system of mains from the 565 pressure zone would be required. This could be achieved by extending new mains from the existing 12-inch-diameter main in NE Sunset Boulevard northwesterly on both Harrington Avenue NE and NE 10th Street to Sunset Lane NE. The loop could then be connected by installing a new 12-inch- diameter main in Sunset Lane NE from Harrington Avenue NE to NE 10th Street.The existing water main in Sunset Lane NE could then be abandoned in place. This new loop would be about 700 feet in total length(Segment B on Figure 3.17-1). RHA's Piha Site (aka Suncrest Homes) Fire flows required for the Piha site development have not been established. If the flow requirement is 2,500 gpm or less,then it could be met by extending a new 12 inch main in NE 10 h Street past the site to Harrington Avenue NE. The extension could either be from NE Sunset Boulevard(if the project precedes the mixed use development adjacent to the library). Or it could be from Sunset Lane NE,if the project occurs after the mixed use development adjacent to the library. The length of pipe required from Sunset Boulevard would be about 500 feet;from Sunset Lane NE it would be about 350 feet. (Segment C on Figure 3.17-1) It is possible that required fire flows for the Piha site would exceed 2,500 gpm. In that situation a looped main system would be necessary. There are multiple scenarios to meet the looping requirements. Those fire flow looping scenarios depend largely on the timing and sequencing of the PISA site project;i.e.does it precede or follow other redevelopment projects contemplated for the project area. Under one scenario,if the Piha site development precedes construction of Phase II and III of the Sunset Terrace redevelopment looping could be achieved by extending another main(in addition to Segment C,discussed above) north on Harrington Avenue NE to Glenwood Avenue NE (Segment H on Figure 3.17-1). If Piha site development follows Phases II and III of Sunset Terrace,looping could be achieved by simply connecting the Piha main extension in NE 10th Street(Segment C)with Segment E at the intersection of Harrington Avenue NE and NE lOth Street. Under another scenario,the Piha site development could proceed before all other projects. In that case the cost of looping would not be shared with other projects as described in the preceding paragraphs and the Piha site project would need to install either a"long-term"or a"temporary" 12 inch diameter"stand alone"water main loop. The"long-term"alignment would be to extend a 12-inch main in Harrington Avenue NE connecting to the existing high-pressure water line in NE Sunset Blvd. This option would result in the installation of a new water main in the section of Harrington Avenue NE that is proposed to be vacated to help create the Sunset Terrace Redevelopment Neighborhood Park. The new 12-inch water main would be looped around the west and north side of the new Piha site building and extended southerly in Sunset Lane NE to NE lOth Street,then southeasterly in NE 10th Street to connect back to the existing 12-inch line in Sunset Boulevard NE. (Segment P1 on Figure 3.17-1) This new looped water main would be able to deliver about 5,000 gpm. Planned ACtiOn Ordinance 66 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B A temporary route(which is not the preferred option)to provide 5,000 gpm to the same site would be to extend two paralle112-inch water lines in NE lOth Street from the existing 12-inch line in Sunset Boulevard NE,along with a looped water main around the west and north side of the building,and a 12-inch line in Sunset Lane NE connecting back to the second new 12-inch main in NE 10 h Street. (Segment P2 on Figure 3.17-1) Sunset Terrace Redevelopment It is reasonable to assume that the fire flows required for the Sunset Terrace redevelopment would exceed 2,500 gpm,mandating installation of a looped system. In addition,Sunset Terrace abuts NE Sunset Boulevard,triggering the requirement to install hydrants every 400 feet along that arterial. It may be possible to phase the Sunset Terrace redevelopment in a manner that would allow early elements of the redevelopment to be constructed without looping the water mains(see Edmonds- Glenwood Phase 1,above). In any case,all mains serving the redevelopment would be extended from the 565 pressure zone. Initially,a new water main would be installed in Sunset Lane NE from Harrington Avenue NE to Glenwood Avenue NE(about 750 feet). This presumes that the new main in Harrington Avenue NE discussed in the Mixed-Use Building section,above,has been installed. The existing water main in Sunset Lane NE could be abandoned in place(Segment D on Figure 3.17-1). Looping the system could be achieved by extending the main from the intersection of Sunset Lane NE and Glenwood Avenue NE along the newly aligned NE 10th Street to Harrington Avenue NE about 250 feet) (Segment E on Figure 3.17-1).This presumes that the water main extension in NE lOth Street to serve RHA's Piha site has already be installed. There are two ways to install the required fire hydrants along NE Sunset Boulevard. One option would be to extend the 12-inch-diameter main in NE Sunset Boulevard from Harrington Avenue NE along the Sunset Terrace frontage(about 800 feet). This would be the most expensive option. Another option would be to extend fire hydrant leads southwesterly through the Sunset Terrace project from Sunset Lane NE to NE Sunset Boulevard at the appropriate intervals(Segments F on Figure 3.17-1).This would be the least expensive option for two reasons. First,the pipes would not be installed in a street avoiding significant restoration costs. Second,the pipes could be smaller because they would be single purpose and not part of the City's transmission/distribution system. Edmonds-Glenwood Phase 2 Fire-flow requirements for the Edmonds-Glenwood Phase 2 project are expected to be about 4,000 gpm,triggering the requirement to loop the water system. There are two options to meet this looping requirement:north or south. The north option would involve extending the 12-inch-diameter main from Phase 1 westerly through the site to Edmonds Avenue NE. From there,the main would be extended north in Edmonds Avenue NE to NE 12th Street,then east in NE 12th Street to Harrington Avenue NE,a distance of more than 1,500 feet(Segment G on Figure 3.17-1). The south option would begin in the same manner by extending the Phase 1 main through the project site. Looping would be achieved by installing two new mains. One would extend from Sunset Lane NE north in Glenwood Avenue NE to the Phase 1 pipe. The other would extend Planned Action Ordinance 67 attachment s:nnitigation oocument ORDINANCE N0. 5813 ATTACHMENT B northwesterly in easements adjacent to NE Sunset Boulevard and Edmonds Avenue NE from the northern-most fire hydrant lead installed for the Sunset Terrace project through the Phase 2 site. (A more expensive option would be to install this same section of pipe in the rights-of-way of NE Sunset Boulevard and Edmonds Avenue NE.) These loops would also comprise more than 1,500 feet of new pipe (Segment H on Figure 3.17-1). Water Main Costs The cost of installation for new water mains is driven by a number of factors. Water mains installed in roads are more expensive than water mains installed within project or open space areas,because of the cost savings of avoiding conflicting utilities and restoring the road surface. New water main costs are also affected by whether they are stand-alone or part of a suite of infrastructure improvements. If the project is only installing a new water main,then all of the excavation,bedding,installation,and other costs are borne by that project. If the project involves installation of the other underground utilities such as sewers or storm sewers,the costs common to the project can be spread across each utility facility being installed. The cost of water mains is also affected by the project sponsor. If the project is being constructed by a private developer,new water mains are less expensive. If the project is sponsored by a government agency,numerous statutes make new water main projects more expensive. The City's recent experience with stand-alone water main projects in a major arterial indicate costs per foot of about$200 to$250. Applying these costs to the water main improvement described above would indicate costs in the range of$1 to 1.2 mil(ion.The improvements would be implemented with City and developer funding. Wastewater Collection Overview The sewers within the Potential Sunset Terrace Redevelopment Subarea are also identified for replacement based on age and condition in the City's Long Range Wastewater Management Plan. Based on the increased wastewater load within the Potential Sunset Terrace Redevelopment Subarea,the local sewers may need to be replaced with upsized pipe to manage the increased wastewater load from the subarea.A more detailed discussion of needed sewer system improvements is provided below. See NEPA Reevaluation/SEPA Addendum(October 2014)for more recent considerations on location of sewer mains and the potential for reuse of existing lines or rerouting requirements. Detailed Discussion Mitigation issues related to wastewater fall into three broad categories: upsizing,rehabilitation,and relocation. Wastewater flows(forecast for the Planned Action Study Area,including the Potential Sunset Terrace Redevelopment Subarea) indicate that some existing sewer pipes must be replaced with larger pipes. One of those pipes is in Harrington Avenue NE. This sewer pipe would be replaced by Planned Action Ordinance 68 Attachment B:Mitigation Document ORDINANCE N0. 5813 ATTACHMENT B the Ciry as part of the overall Sunset Terrace redevelopment to accommodate forecast flows. Manholes along the Harrington alignment would be carefully designed and located to avoid interference with the planned park. The collection sewers in Sunset Lane NE are at or near the end of their design life. The condition of these sewers would be assessed to determine if they can be rehabilitated in place or if new pipes would need to be installed. The redevelopment concept proposes narrowing and shifting the alignment of Sunset Lane NE. If this action leaves the existing sewers too close to new structures,then the City would require that a new sewer main be installed within the new right-of-way of Sunset Lane NE. Planned ACtion Ordinance 69 Attachment B:Mitigation Dotument ORDINANCE N0. 5813 ATTACHMENT B r t2w st y f f r Private Rd t f_ oR- i utz A a sK, a z a 0 D a w r S. oa,a 5 NE 1Q[h St w NE 9th pt Z NE 9th pf Afy " m Ferndale Cir NE Flrelbw Phase A E BJlding P1 e F 0 100 200 300 400 t e saeet: P2 re et llio i MM E aingwatttPlpes Figure 3.17-1 Fireflow Phasing—Potential Sunset Terrace Redevelopment Subarea Sunset Area Community Planned Action Final NEPA/SEPA EIS Planned Action Ordinance Attachment B:Mitigation Document Sunset Terrace Master Site Plan I „ T, , f_ _--- 1 1.... ir- -.+.++ t. tt i' . y \ i j -: a I _ n. v/ ,' e' - s t i ,,_, j' f;; JI J 3 r' o I ! i _._._. D J jf f 4 D D ry 11 2 n a, sn ` m zo s s Gy W rv i . y 617 P p // f i ' i V ` floo a 1J a , 1 ' re KEY RESIDENTIAL 1 ' MIXED- USE I COMMUNITY i ____ 1-. 1 °' 1 .; SITE AREA t'• o• on aao ra 1:, RENTON SUNSET AREA MSP EXHIgIT 9 SUNSET AREA COMMUNITY PLANNED ACTION FINAL NEPA/SEPA ENVIRONMENTAL IMPACT STATEMENT • VOLUME 1 • APRIL 2011 Issued by: City of Renton NEPA Responsible Entity and SEPA Lead Agency Prepared in partnership with: Renton Housing AuthorityRenton Housing Authority Urbal Architecture 206.257.0972 urbalarchitecture.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 16BLOCK A - LEVEL 2 1/1 TH768GSF 1/1 TH768GSF 1/1 TH768GSF 1/1 TH768GSF 1/1 TH768GSF 1/1 TH768GSF 1/1 TH768GSF 1/1 TH768GSF 1/1 TH768GSF 1/1 TH768GSF 1/1 TH768GSF 1/1 TH768GSF 1/1 TH768GSF 2/2 TH1280GSF NE SUNSET LN.NE 11th ST.PARKING LANE LOBBYBELOW OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF 1/1 DEN864GSF GSF 1/1 DEN864 RESIDENTIAL PARKING 41 SPACES UTILITY/STORAGERAMP DN COMMERCIAL PARKING 49 SPACES RETAIL9800 GSF PARKINGENTRY TRASH UTILITY SECURITYGATE PROPOSED BANKEXISTING TOWNHOMES RENTON, WA PROJECT # 17-020 FLOOR PLAN: LEVEL 2 SCALE: NTS SOLERA BLOCK A 05-16-18NE 10th ST20'-0"20'-0"16'-0"13'-6"BANK20'-0"53'-0"29'-6"16'-0"JEFFERSON P/L P/LP/LP/L P/LP/L P/L P/L 15'EXISTING6'-0"20'-0"16'-0" 16'-0" 2 1 ' - 0 "53'-0"15'-0"16'-0" 26'-0" 16'-0" 26'-0"26'-0" 34'-5"28'-8"16'-0" 26'-0" 35'-0"49'-9" BLOCK B MIXED USE10'-0"11'-0"15'-8"KIRKLAND AVEHARRINGTON PL NE 1 2 t h S T SUNSET BLVDNE 11th ST37'-3"5'-0"16'-0" 26'-0" 19'-6" 18'-0" 15'-0" 15'-0"15'-0"13'-6"15'-0" 40'-4" 35'-0" 26'-0" 40'-9" 26'-5" 18'-0" 15'-0" 15'-0" 17'-0" 18'-0"18'-6" 15 ' - 0 "29'-6"18'-9"35'-1"3 2 ' - 8 " 15 ' - 7 " 28'-6"29'-6"36'-6"3 4 ' - 6 " 28'-9"3'-9"11'-8"25'-3"19'-10"33'-8"1 6 ' - 0 "33'32'-4"8'-0"21'-6"12'-6"23'-0"2'-0"2'-0"6'-0" 6'-0" BLOCK A MIXED USE 54'-0"30'-3"16'-4"16'-0"2'-0"47'-0"13'-6"28'-6" 5 3 ' - 0 " 1 5 ' - 0 " 1 5 ' - 0 " 2 0 ' 2 8 ' - 3 " 1 5 ' 1 5 '12'-8"15'-0"13'-6"16'-0"15'-0"20'-0"25'-6"25'-6" 53'-0" 53'-0" GARAGE ENTRY ELEV 349 GARAGE ENTRY ELEV 355 DAYCARE DROP-OFF ENTRANCE ELEV 349 DAYCARE OUTDOOR PLAY AREA ELEV 349 LOBBY ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM SUNSET BLVD PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM JEFFERSON COVERED BREEZEWAY / ACCESS TO BANK FROM PARKING 10'-3" LOBBY ENTRY ELEV 355 GARAGE ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 6 6 6 6 6 6 5 3 4 4 54 5 6 4 5 5 5 8 6 3 8 6666 5 8 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 40 8020 A-101SITE PLAN SHEET INFORMATION OPEN TO RESIDENTIAL LOBBY BELOW COMMERCIAL & GUEST JOINT PARKING SPACES BLOCK A DN RESIDENTIAL UNITS ELEV 364 RESIDENTIAL UNITS ELEV 364 PLAZA COMMERCIAL / RESD AMENITIES 8,986 SF ELEV. 361 GARAGE ENTRY BELOW ELEV 342 228'32'32'42'294'RES. CORRIDOR38 SPACES ELEV 364 39 SPACES ELEV. LOBBY ELEV 364 RAMP RESIDENTIAL STORAGE 140 STORAGE LOCKERS ELEV 364 ELEV 356 AT GRADE ELEV 361 ELEV 361 ELEV 356 DNOPEN TOBELOWAT GRADE ELEV 358 221' (75% OF 294' = 220'-6") LEASING ELEV 364 RES. CORRIDOR 9'18'24'COMMERCIAL REFUSE & RECYCLING 141 SQFT REQ. 200 SQFT PROV.10'Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN MARCH 2, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 A-A202BLOCK A LEVEL 2 SHEET INFORMATION FLOOR PLAN NOTES 1. Fire sprinkler and fire alarm systems will be provided throughout mixed use building. Dry stand pipes will be provided in all stairwells. Direct outside access will be provided to the fire sprinkler riser room. 2. Elevator cars will be sized to allow a mininum of a 40-inch by 84-inch stretcher Architecture + Planning 888.456.5849 ktgy.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 25BLOCK B - LEVEL 224' COMMERCIAL / RESD AMENITIES SPACE 6435 SQ. FT. LOBBY UP44'40'LEVEL 2 ELEV 360 123'-6"368'-6"GARAGE ENTRY ELEV 355 ELEV 355ELEV 360 LEASING 123'-6"40' ELEV 360 PEDESTRIAN CONNECTION ELEV 360 ELEV 360 ELEV 360 ELEV 360 ELEV 360 ACCESS TO DAYCARE ELEV 360 BLOCK B 21'-6"COMMERCIAL / RESIDENTIAL AMENITIES 5263 SQ. FT. 55 SPACES 77' 5,900 SQ.FT. PROPOSED CHILD CARE ELEV 36018'9' 445'-6" (75% OF 452'-6" = 340'-0")53'-6"ELEV 355 MAIL ROOM ELEV 355144 BICYCLE PARKING COMMERCIAL REFUSE & RECYCLING 323 SQFT REQ. 500 SQFT PROV.COMMERCIAL / DAYCARE PARKING SPACES MECH MECH ELEV 361FIRE ACCESS TO DAY CARE FROM SUNSET BLVD 37' LOBBY ELEV 355 PEDESTRIAN CONNECTION ELEV 360 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 B-A202BLOCK B LEVEL 2 FLOOR PLAN NOTES 1. Fire sprinkler and fire alarm systems will be provided throughout mixed use building. Dry stand pipes will be provided in all stairwells. Direct outside access will be provided to the fire sprinkler riser room. 2. Elevator cars will be sized to allow a mininum of a 40-inch by 84-inch stretcherNE 10th ST20'-0"20'-0"16'-0"13'-6"BANK20'-0"53'-0"29'-6"16'-0"JEFFERSON P/L P/LP/LP/L P/LP/L P/L P/L 15'EXISTING6'-0"20'-0"16'-0" 16'-0" 2 1 ' - 0 "53'-0"15'-0"16'-0" 26'-0" 16'-0" 26'-0"26'-0" 34'-5"28'-8"16'-0" 26'-0" 35'-0"49'-9" BLOCK B MIXED USE10'-0"11'-0"15'-8"KIRKLAND AVEHARRINGTON PL NE 1 2 t h S T SUNSET BLVDNE 11th ST37'-3"5'-0"16'-0" 26'-0" 19'-6" 18'-0" 15'-0" 15'-0"15'-0"13'-6"15'-0" 40'-4" 35'-0" 26'-0" 40'-9" 26'-5" 18'-0" 15'-0" 15'-0" 17'-0" 18'-0"18'-6" 15 ' - 0 "29'-6"18'-9"35'-1"3 2 ' - 8 " 15 ' - 7 " 28'-6"29'-6"36'-6"3 4 ' - 6 " 28'-9"3'-9"11'-8"25'-3"19'-10"33'-8"1 6 ' - 0 "33'32'-4"8'-0"21'-6"12'-6"23'-0"2'-0"2'-0"6'-0" 6'-0" BLOCK A MIXED USE 54'-0"30'-3"16'-4"16'-0"2'-0"47'-0"13'-6"28'-6" 5 3 ' - 0 " 1 5 ' - 0 " 1 5 ' - 0 " 2 0 ' 2 8 ' - 3 " 1 5 ' 1 5 '12'-8"15'-0"13'-6"16'-0"15'-0"20'-0"25'-6"25'-6" 53'-0" 53'-0" GARAGE ENTRY ELEV 349 GARAGE ENTRY ELEV 355 DAYCARE DROP-OFF ENTRANCE ELEV 349 DAYCARE OUTDOOR PLAY AREA ELEV 349 LOBBY ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM SUNSET BLVD PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM JEFFERSON COVERED BREEZEWAY / ACCESS TO BANK FROM PARKING 10'-3" LOBBY ENTRY ELEV 355 GARAGE ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 6 6 6 6 6 6 5 3 4 4 54 5 6 4 5 5 5 8 6 3 8 6666 5 8 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 40 8020 A-101SITE PLAN SHEET INFORMATION OPEN TO RESIDENTIAL LOBBY BELOW COMMERCIAL & GUEST JOINT PARKING SPACES BLOCK A DN RESIDENTIAL UNITS ELEV 364 RESIDENTIAL UNITS ELEV 364 PLAZA COMMERCIAL / RESD AMENITIES 8,986 SF ELEV. 361 GARAGE ENTRY BELOW ELEV 342 228'32'32'42'294'RES. CORRIDOR38 SPACES ELEV 364 39 SPACES ELEV. LOBBY ELEV 364 RAMP RESIDENTIAL STORAGE 140 STORAGE LOCKERS ELEV 364 ELEV 356 AT GRADE ELEV 361 ELEV 361 ELEV 356 DNOPEN TOBELOWAT GRADE ELEV 358 221' (75% OF 294' = 220'-6") LEASING ELEV 364 RES. CORRIDOR 9'18'24'COMMERCIAL REFUSE & RECYCLING 141 SQFT REQ. 200 SQFT PROV.10'Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN MARCH 2, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 A-A202BLOCK A LEVEL 2 SHEET INFORMATION 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. Architecture + Planning 888.456.5849 ktgy.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 2 SITE PLANNE 10th ST20'-0"20'-0"16'-0"13'-6"BANK20'-0"53'-0"29'-6"16'-0"JEFFERSON P/L P/LP/LP/L P/LP/L P/L P/L 15'EXISTING6'-0"20'-0"16'-0" 16'-0" 2 1 ' - 0 "53'-0"15'-0"16'-0" 26'-0" 16'-0" 26'-0"26'-0" 34'-5"28'-8"16'-0" 26'-0" 35'-0"49'-9" BLOCK B MIXED USE10'-0"11'-0"15'-8"KIRKLAND AVEHARRINGTON PL NE 1 2 t h S T SUNSET BLVDNE 11th ST37'-3"5'-0"16'-0" 26'-0" 19'-6" 18'-0" 15'-0" 15'-0"15'-0"13'-6"15'-0" 40'-4" 35'-0" 26'-0" 40'-9" 26'-5" 18'-0" 15'-0" 15'-0" 17'-0" 18'-0"18'-6" 15 ' - 0 "29'-6"18'-9"35'-1"3 2 ' - 8 " 15 ' - 7 " 28'-6"29'-6"36'-6"3 4 ' - 6 " 28'-9"3'-9"11'-8"25'-3"19'-10"33'-8"1 6 ' - 0 "33'32'-4"8'-0"21'-6"12'-6"23'-0"2'-0"2'-0"6'-0" 6'-0" BLOCK A MIXED USE 54'-0"30'-3"16'-4"16'-0"2'-0"47'-0"13'-6"28'-6" 5 3 ' - 0 " 1 5 ' - 0 " 1 5 ' - 0 " 2 0 ' 2 8 ' - 3 " 1 5 ' 1 5 '12'-8"15'-0"13'-6"16'-0"15'-0"20'-0"25'-6"25'-6" 53'-0" 53'-0" GARAGE ENTRY ELEV 349 GARAGE ENTRY ELEV 355 DAYCARE DROP-OFF ENTRANCE ELEV 349 DAYCARE OUTDOOR PLAY AREA ELEV 349 LOBBY ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM SUNSET BLVD PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM JEFFERSON COVERED BREEZEWAY / ACCESS TO BANK FROM PARKING 10'-3" LOBBY ENTRY ELEV 355 GARAGE ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 6 6 6 6 6 6 5 3 4 4 54 5 6 4 5 5 5 8 6 3 8 6666 5 8 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 40 8020 A-101SITE PLAN SHEET INFORMATION BLOCK A - PODIUM MIXED USE BLOCK B - PODIUM MIXED USE TOWNHOMES EXISTING BANK PROJECT TOTALS 2 LEVELS OF TYPE I-A ABOVE GRADE 2 LEVELS OF TYPE I-A ABOVE GRADE 3 STORIES INCLUDING 2-CAR GARAGE EXISTING ONE STORY 5 LEVELS OF TYPE III-A OVER PODIUM 5 LEVELS OF TYPE III-A OVER PODIUM MARKET RATE APARTMENTS 296 UNITS SENIOR APARTMENTS 225 UNITS FOR SALE HOMES 152 UNITS TOTAL UNITS 673 UNITS COMMERCIAL 9,800 SF COMMERCIAL 11,698 SF COMMERCIAL 5,479 SF TOTAL COMMERCIAL 26,977 SF DAY CARE 11,800 SF TOTAL DAYCARE 11,800 SF GROSS RESIDENTIAL AREA 251,998 SF GROSS RESIDENTIAL AREA 189,475 SF GROSS RESIDENTIAL AREA 372,404 SF GROSS TOTAL RESIDENTIAL AREA 813,877 SF GROSS TOTAL BUILDING AREA 377,425 SF GROSS TOTAL BUILDING AREA 323,430 SF GROSS TOTAL BUILDING AREA 372,404 SF GROSS TOTAL BUILDING AREA 5,479 SF GROSS TOTAL BUILDING AREA 1,078,738 SF (includes residential balconies)NE 10th ST20'-0"20'-0"16'-0"13'-6"20'-0"53'-0"29'-6"P/LP/L P/LP/L6'-0"20'-0"16'-0" 16'-0"53'-0"15'-0"16'-0" 26'-0" 16'-0" 26'-0"26'-0" 34'-5"28'-8"16'-0" 26'-0" 35'-0"49'-9" BLOCK B MIXED USE10'-0"11'-0"15'-8" SUNSET BLVDNE 11th ST37'-3""16'-0" 26'-0" 19'-6" 18'-0" 15'-0" 15'-0"15'-0"13'-6"15'-0" 40'-4" 26'-0" 40'-9" 26'-5" 18'-0" 15'-0" 15'-0" 17'-0" 18'-0"18'-6"29'-6"28'-6"29'-6"36'-6"28'-9" 1 6 ' - 0 "32'-4"12'-6"2'-0"6'-0" 6'-0" BLOCK A MIXED USE30'-3"16'-4"16'-0"2'-0"47'-0"13'-6"28'-6"12'-8"15'-0"13'-6"16'-0"15'-0"20'-0"25'-6"25'-6" 53'-0" 53'-0" GARAGE ENTRY ELEV 349 GARAGE ENTRY ELEV 355 DAYCARE DROP-OFF ENTRANCE ELEV 349 DAYCARE OUTDOOR PLAY AREA ELEV 349 LOBBY ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM SUNSET BLVD PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM JEFFERSON 10'-3" LOBBY ENTRY ELEV 355 GARAGE ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 6 6 6 6 6 6 5 54 5 6 4 5 8 6 3 8 6666 5 8 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 40 8020 PEDESTRIAN ENTRANCE / EXIT VEHICULAR ENTRANCE / EXIT CITYOF—----—-RentoncDepartmentofCommunityandEconomicDevelopmentPlanningDivisionADMINISTRATIVEPOLICY/CODEINTERPRETATIONADMINISTRATIVEPOUCY/CODEINTERPRETATION#:Cl-134MUNICIPAl.CODESECTIONS:4-7-090,UnitLotSubdivisionsREFERENCE:OrdNo5818/CI-125SUBJECT:UnitCotSubdivisionsintheCVZone#2BACKGROUND:Ordinance#5818establishedprocessandstandardsforunitlotsubdivisionsthatwouldaccommodatefeesimpletownhomedevelopmentprojects.TheordinanceidentifiedtheR-10,R-14,andRMFzonesfortheiruse,butCl-125clarifiedthataunitlotsubdivisionisalsopermittedinareasoftheCVzonethatallowstandalonetownhomedevelopment.Thisfollowupinterpretationisintendedtoclarifyunitlotsubdivisionsarereviewedconsistentlywithinallfourzoningdistrictstheyarepermitted.TheRMFzonecontainsanUrbanDesignDistrictBoverlaythatrequiresproposalstocomplywithRMC4-3-100,UrbanDesignRegulations.However,forunitlotsubdivisionprojects,theproposalsareexemptfromtheUrbanDesignRegulationsandinsteadaresubjecttoRMC4-2-115,ResidentialDesignandOpenSpaceStandards,asappliedtoR-10andR14zones.UnitlotsubdivisionsintheCVzonewerealsointendedtobeexemptfromtheUrbanDesignRegulations.Additionally,theResidentialDesignandOpenSpaceStandardsconflictwiththeCVzone’sBuildingOrientationStandards(RMC4-2-120A)thatrequirethefrontentryofresidentialonlyusesbeorientedtoapublicorprivatestreet,whereastheResidentialDesignandOpenSpaceStandardsallowadditionalentryoptionssuchasfromapark,commongreen,pocketpark,pedestrianeasement,oropenspace.Lastly,theunitlotsubdivisionparkingregulationsrefertotheR-10,R-14,andRMFzonesandexcludeanymentionoftheCVzone.H:\CED\Planning\TitleIV\Docket\AdministrativePolicyCodelnterpretation\CI-134\CodeInterpretation.docx OnehousekeepingitemisaddedtotheinterpretationthatremovesreferencetononexistentprivatestreetstandardsandredundantlanguageregardingpublicstreetstandardsDECISION:ClarifythatunitlotsubdivisionregulationsapplyconsistentlytotheR-10,R-14,RMF,andCVzones.JUSTIFICATION:Applyingthesamestandardstoallunitlotsubdivisions,regardlessoftheirrespectivezone,providesaclarifiedandconsistentreviewprocessandcontinuestegoalsobjectivesandpurposeofOrdinance5818.ADMINISTRATOR-APPROVAL:____________________________C.E.“Chip”VincentEFFECTIVEDATE:March1,2018APPEALPROCESS:Toappealthisdetermination,awrittenappeal--accompaniedbytherequiredfilingfee--mustbefiledwiththeCitysHearingExaminer(1055SouthGradyWay,Renton,WA98057,425-430-6515)nomorethan14daysfromthedateofthisdecision.Yoursubmittalshouldexplainthebasisfortheappeal.Section4-8-110oftheRentonMunicipalCodeprovidesfurtherinformationontheappealprocess.DISCLAIMER:ExcerptsfromtheRentonMunicipalCodeshownbelowmaynotcontainthemostrecentlycodifiedtext.Insuchinstances,codeamendmentsimplementedthroughthisAdministrativeCodeInterpretationshallbeconstruedtoaffectthecurrentcodeandpast/futureAdministrativeCodeInterpretationsnotyetcodifiedinthesamemannerasshownbelow.ShouldanyconflictsresulttheAdministratorshalldeterminetheeffectivecode.CODEAMENDMENTSNEEDEDTOIMPLEMENTDETERMINATIONS:4-2-120ADEVELOPMENTSTANDARDSFORCOMMERCIALZONINGDESIGNATIONS(CN,CV,CA,&UC)CNCVCAUCBUILDINGLIMITATIONSBuildingAllcommercialSeeurbandesignregulationsinSeeurbandesignOrientationusesshallhaveRMC4-3-100.regulationsinRMC4-3-theirprimaryCommercialandcivicusesshall100.entranceandprovideentryfeaturesonallshopdisplaysidesofabuildingfacingapublicwindoworientedright-of-wayorparkinglot.towardthestreetExceptforunitlotsubdivisions,frontage.thefrontentryofresidentialcI-134Page2of3 CNCVCAUConlyusesshallbeorientedtoapublicorprivatestreetdevelopedtothcrequiredstandardsinRMC46060.4-7-090UNITLOTSUBDIVISIONS:E.EXCEPTIONS:3.Parking:ThenumberofparkingspacesrequiredforattacheddwellingsintheR10,R14,andRMFzonespursuanttoRMC4-4-O8OFlOd,ParkingSpacesRequiredBasedonLandUse,maybeaveragedanddispersedamongunitlotsorwithintheparentsite;however,atleastoneparkingspaceshallbeprovidedwithineachunitlot.F.UNITLOTSUBDIVISIONREQUIREMENTS:5.DesignandOpenSpaceStandards:RMC4-2-115,ResidentialDesignandOpenSpaceStandards,asappliedtotheR-10andR-14zonesshallapplytounitlotsubdivisionswithintheRMFandCVzones.UnitlotsubdivisionswithintheRMFandCVzonesshallbeexemptfromRMC4-3-100,UrbanDesignRegulations.STAFFCONTACT:MattHerrera,SeniorPlannerX6593CI-134Page3of3 Architecture + Planning 888.456.5849 ktgy.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 3PROJECT SUMMARY Site Lot Area (SF)514,032 SF Lot Area (acres)11.8 Lot Area (SF) minus dedications and public easements 414,030 SF Lot Area (acres) minus dedications and public easements 9.5 Building Height 50', or 60' if ground floor is commercial use Proposed Max. Building Height For Mixed Use Buildings 85' above grade plan with requested CUP Allowable Density 20-80 du/ac Proposed Density 70.81 du/ac Max Lot Coverage 65% Lot coverage 54.75% Uses Block A Mixed Use Block B Mixed Use Townhomes Residential 251,998 SF 189,475 SF 372,404 SF Commercial 9,800 SF 11,698 SF Day Care 11,800 SF Garage / Mech 115,627 SF 110,457 SF Gross Building Area 377,425 SF 323,430 SF 372,404 SF Units Block A Mixed Use 296 UNITS Block B Mixed Use 225 UNITS Townhomes 152 UNITS Total Units 673 UNITS Vehicle Parking - Block A MINIMUM MAXIMUM PROVIDED Resident 296 Guest 33 Total Residential 296 518 329 Commercial 25 @ 2.5/1,000 25 @ 2.5/1,000 49 w/ add. for eat/drink Block A Parking 321 543 378 Vehicle Parking - Block B Resident 229 Guest 0 Total Residential 225 394 229 Commercial 29 @ 2.5/1,000 29 @ 2.5/1,000 30 Required Day Care 25 25 25 Block B Parking 279 448 284 Vehicle Parking - Townhomes Townhome Parking 152 266 244 Vehicle Parking Project Totals Total Average Vehicle Parking 752 1,256 906 Bicyle Parking MINIMUM PROVIDED Bicycle Parking - Block A 148 153 Bicycle Parking - Block B 113 144 Bicycle Parking - Townhomes 76 152 Total Average Bicycle Parking 337 449 170853 Quadrant - Renton Highlands Renton, WA Site Information Assesor Parcel Number 722780-1235, -1405, -1406, -1206, -1785, and -1205 Lot Area (SF)514,000 SF Lot Area (acres)11.8 Lot Area (SF) minus dedications and public easements 422,090 SF Lot Area (acres) minus dedications and public easements 9.7 Existing Zoning CV - Center Village, District D Comprehensive Plan Land Use CMU - Commercial mixed Use Community Planning Area Highlands (Sunset Area) Use - Existing Shopping Center Use - Proposed Mixed-use residential, senior, and commercial DEVELOPMENT STANDARDS FOR COMMERCIAL ZONING Section 4-2-120A Minimum Lot Size 25,000sf Lot Coverage 65%, or 75% if parking provided within building Density 20-80 du/ac Setbacks Front Yard 15' min to 20' max Secondary Front Yard 15' min to 20' max Rear Yard none, except 15' if lot abuts lot zoned residential Side Yard none, except 15' if lot abuts or is adjacent to lot zoned residential Clear Vision Area 20' triangle Max Gross Floor Area none Building Height 50', or 60' if ground floor is commercial use URBAN DESIGN REGULATIONS Section 4-3-100 Natural light and sun exposure shall be considered. Buildings shall be oriented to the street with connections to sidewalk. Front entry shall be oriented to the street or landscaped pedestrian-only courtyard. Residential uses shall be setback 10' from sidewalk or raised above street level. Street-facing facades shall be prominent and include weather protection proportional to the distance above ground. Transition to surrounding used by using upper-level step-backs, building breaks, or roof design to reduce apparent bulk. Service elements shall be located to minimize impacts to pedestrian environment and abutting uses. Service / trash collection areas shall be enclosed on all sides or adjacent to 3' min planter. No surface parking shall be located between building and front or side PL. Parking structures shall accommodate ground floor commercial uses along street frontages at 75% min frontage width. Public-facing façade of oparking structures shall be pedestrian-oriented and setback 6' from sidewalk (10' for arterial). Access to parking shall be from alleys or side streets. 50 sf/unit Minimum common open space and/or recreation area (excludes private o.s.). For projects with over 100 DU, LID facilities may count towards no more than 50% of required open space. All buildings shall include modulations or articulation every 40', at a minimum of 2' deep, 16' high, and 8' wide. Buildings over 160' in length shall provide a variety of modulations. PARKING REGULATIONS Section 4-4-080 Fire Lane width 20' Parking Stall Dimensions-surface/private garage/carport standard 9' x 20' parallel 9' x 23' compact 8'-6" x 16' structure parking - standard 8'-4" x 16' structure parking - compact 7'-6" x 13' maximum compact 50% structured, 30% otherwise vehicle overhang 2' parallel parking aisle width 10', one way, 18' two way 90 degree parking aisle width 24' Parking spaces required detached dwellings 2 spaces per unit attached dwellings 1 space minimum - 1.75 spaces maximum per unit retail 2.5 spaces per 1,000 sf of net floor area restaurant min. and max of 10 per 1,000 SF of dining area day care center min. and max of 1 per employee and 2 drop-off spaces within 100 ft of the main entrace for every 25 clients of the program Bicycle parking required bicycle parking, attached dwellings 0.5 space per unit bicycle parking, other uses 10% of off-street vehicle parking requirement bicycle space dimensions 2' x 6' + 5' aisle SOLERA - ZONING SUMMARY SOLERA - PROJECT SUMMARY Urbal Architecture 206.257.0972 urbalarchitecture.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 17BLOCK A - LEVEL 3-6 FLOOR PLAN NOTES 1. Fire sprinkler and fire alarm systems will be provided throughout mixed use building. Dry stand pipes will be provided in all stairwells. Direct outside access will be provided to the fire sprinkler riser room. 2. Elevator cars will be sized to allow a mininum of a 40-inch by 84-inch stretcher OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 576GSF 1/1OPEN 576GSF 1/1OPEN 576GSF 1/1 OPEN 576GSF 1/1 OPEN 576GSF 1/1 OPEN 576GSF 1/1OPEN 576GSF 1/1 OPEN 576GSF 1/1 OPEN 544GSF 1/1 OPEN 1/1544GSF 2/2960GSF 2/2960GSF 2/2960GSF 2/2960GSF 2/2960GSF 2/2960GSF OPEN 1/1624GSF OPEN 1/1624GSF OPEN 1/1624GSF OPEN 1/1624GSF 1/1720GSF 1/1720GSF 1/1720GSF 1/1720GSF DEN+1/1816GSF DEN 1/1816GSF 1/1672GSF 1/1672GSF 2/21032GSF 2/21032GSF DEN+1/1816GSF DEN+1/1816GSF 2/21008GSF 2/21008GSFUTILITYUTILITY2/21032GSF 2/21032GSF 2/21032GSF 2/21032GSF 2/21032GSF 2/21032GSF 1/1672GSF 1/1672GSF NE SUNSET LN.NE 11th ST.NE SUNSET BLVD. OPEN 576GSF 1/1 OPEN 1/1576GSF OPEN 1/1544GSF OPEN 544GSF 1/1 RENTON, WA PROJECT # 17-020 FLOOR PLAN: LEVELS 3-6 SCALE: NTS SOLERA BLOCK A 05-16-18NE 10th ST20'-0"20'-0"16'-0"13'-6"BANK20'-0"53'-0"29'-6"16'-0"JEFFERSON P/L P/LP/LP/L P/LP/L P/L P/L 15'EXISTING6'-0"20'-0"16'-0" 16'-0" 2 1 ' - 0 "53'-0"15'-0"16'-0" 26'-0" 16'-0" 26'-0"26'-0" 34'-5"28'-8"16'-0" 26'-0" 35'-0"49'-9" BLOCK B MIXED USE10'-0"11'-0"15'-8"KIRKLAND AVEHARRINGTON PL NE 1 2 t h S T SUNSET BLVDNE 11th ST37'-3"5'-0"16'-0" 26'-0" 19'-6" 18'-0" 15'-0" 15'-0"15'-0"13'-6"15'-0" 40'-4" 35'-0" 26'-0" 40'-9" 26'-5" 18'-0" 15'-0" 15'-0" 17'-0" 18'-0"18'-6" 15 ' - 0 "29'-6"18'-9"35'-1"3 2 ' - 8 " 15 ' - 7 " 28'-6"29'-6"36'-6"3 4 ' - 6 " 28'-9"3'-9"11'-8"25'-3"19'-10"33'-8"1 6 ' - 0 "33'32'-4"8'-0"21'-6"12'-6"23'-0"2'-0"2'-0"6'-0" 6'-0" BLOCK A MIXED USE 54'-0"30'-3"16'-4"16'-0"2'-0"47'-0"13'-6"28'-6" 5 3 ' - 0 " 1 5 ' - 0 " 1 5 ' - 0 " 2 0 ' 2 8 ' - 3 " 1 5 ' 1 5 '12'-8"15'-0"13'-6"16'-0"15'-0"20'-0"25'-6"25'-6" 53'-0" 53'-0" GARAGE ENTRY ELEV 349 GARAGE ENTRY ELEV 355 DAYCARE DROP-OFF ENTRANCE ELEV 349 DAYCARE OUTDOOR PLAY AREA ELEV 349 LOBBY ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM SUNSET BLVD PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM JEFFERSON COVERED BREEZEWAY / ACCESS TO BANK FROM PARKING 10'-3" LOBBY ENTRY ELEV 355 GARAGE ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 6 6 6 6 6 6 5 3 4 4 54 5 6 4 5 5 5 8 6 3 8 6666 5 8 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 40 8020 A-101SITE PLAN SHEET INFORMATION OPEN TO RESIDENTIAL LOBBY BELOW COMMERCIAL & GUEST JOINT PARKING SPACES BLOCK A DN RESIDENTIAL UNITS ELEV 364 RESIDENTIAL UNITS ELEV 364 PLAZA COMMERCIAL / RESD AMENITIES 8,986 SF ELEV. 361 GARAGE ENTRY BELOW ELEV 342 228'32'32'42'294'RES. CORRIDOR38 SPACES ELEV 364 39 SPACES ELEV. LOBBY ELEV 364 RAMP RESIDENTIAL STORAGE 140 STORAGE LOCKERS ELEV 364 ELEV 356 AT GRADE ELEV 361 ELEV 361 ELEV 356 DNOPEN TOBELOWAT GRADE ELEV 358 221' (75% OF 294' = 220'-6") LEASING ELEV 364 RES. CORRIDOR 9'18'24'COMMERCIAL REFUSE & RECYCLING 141 SQFT REQ. 200 SQFT PROV.10'Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN MARCH 2, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 A-A202BLOCK A LEVEL 2 SHEET INFORMATION Urbal Architecture 206.257.0972 urbalarchitecture.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 18BLOCK A - LEVEL 7 FLOOR PLAN NOTES 1. Fire sprinkler and fire alarm systems will be provided throughout mixed use building. Dry stand pipes will be provided in all stairwells. Direct outside access will be provided to the fire sprinkler riser room. 2. Elevator cars will be sized to allow a mininum of a 40-inch by 84-inch stretcher OPEN 576GSF 1/1 OPEN 576GSF 1/1 OPEN 576GSF 1/1 OPEN 576GSF 1/1 OPEN 576GSF 1/1 OPEN 576GSF 1/1 OPEN 576GSF 1/1 OPEN 576GSF 1/1 OPEN 576GSF 1/1 OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1544GSF OPEN 1/1544GSF OPEN 544GSF 1/1 OPEN 544GSF 1/1DEN+1/1816GSF DEN+1/1816GSF 2/21008GSF 2/21008GSF 2/2960GSF 2/2960GSF 1/1720GSF 1/1720GSFOPEN 1/1624GSF OPEN 1/1624GSFUTILITY UTILITY2/2960GSF 2/2960GSF 2/2960GSF 2/2960GSF 1/1720GSF 1/1720GSF OPEN 1/1576GSF OPEN 1/1576GSF OPEN 1/1576GSF DEN 1/1816GSF DEN+1/1816GSF AMENITY1728GSF NE SUNSET LN.NE 11th ST.NE SUNSET BLVD. RENTON, WA PROJECT # 17-020 FLOOR PLAN: LEVEL 7 SCALE: NTS SOLERA BLOCK A 05-16-18NE 10th ST20'-0"20'-0"16'-0"13'-6"BANK20'-0"53'-0"29'-6"16'-0"JEFFERSON P/L P/LP/LP/L P/LP/L P/L P/L 15'EXISTING6'-0"20'-0"16'-0" 16'-0" 2 1 ' - 0 "53'-0"15'-0"16'-0" 26'-0" 16'-0" 26'-0"26'-0" 34'-5"28'-8"16'-0" 26'-0" 35'-0"49'-9" BLOCK B MIXED USE10'-0"11'-0"15'-8"KIRKLAND AVEHARRINGTON PL NE 1 2 t h S T SUNSET BLVDNE 11th ST37'-3"5'-0"16'-0" 26'-0" 19'-6" 18'-0" 15'-0" 15'-0"15'-0"13'-6"15'-0" 40'-4" 35'-0" 26'-0" 40'-9" 26'-5" 18'-0" 15'-0" 15'-0" 17'-0" 18'-0"18'-6" 15 ' - 0 "29'-6"18'-9"35'-1"3 2 ' - 8 " 15 ' - 7 " 28'-6"29'-6"36'-6"3 4 ' - 6 " 28'-9"3'-9"11'-8"25'-3"19'-10"33'-8"1 6 ' - 0 "33'32'-4"8'-0"21'-6"12'-6"23'-0"2'-0"2'-0"6'-0" 6'-0" BLOCK A MIXED USE 54'-0"30'-3"16'-4"16'-0"2'-0"47'-0"13'-6"28'-6" 5 3 ' - 0 " 1 5 ' - 0 " 1 5 ' - 0 " 2 0 ' 2 8 ' - 3 " 1 5 ' 1 5 '12'-8"15'-0"13'-6"16'-0"15'-0"20'-0"25'-6"25'-6" 53'-0" 53'-0" GARAGE ENTRY ELEV 349 GARAGE ENTRY ELEV 355 DAYCARE DROP-OFF ENTRANCE ELEV 349 DAYCARE OUTDOOR PLAY AREA ELEV 349 LOBBY ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM SUNSET BLVD PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM JEFFERSON COVERED BREEZEWAY / ACCESS TO BANK FROM PARKING 10'-3" LOBBY ENTRY ELEV 355 GARAGE ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 6 6 6 6 6 6 5 3 4 4 54 5 6 4 5 5 5 8 6 3 8 6666 5 8 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 40 8020 A-101SITE PLAN SHEET INFORMATION OPEN TO RESIDENTIAL LOBBY BELOW COMMERCIAL & GUEST JOINT PARKING SPACES BLOCK A DN RESIDENTIAL UNITS ELEV 364 RESIDENTIAL UNITS ELEV 364 PLAZA COMMERCIAL / RESD AMENITIES 8,986 SF ELEV. 361 GARAGE ENTRY BELOW ELEV 342 228'32'32'42'294'RES. CORRIDOR38 SPACES ELEV 364 39 SPACES ELEV. LOBBY ELEV 364 RAMP RESIDENTIAL STORAGE 140 STORAGE LOCKERS ELEV 364 ELEV 356 AT GRADE ELEV 361 ELEV 361 ELEV 356 DNOPEN TOBELOWAT GRADE ELEV 358 221' (75% OF 294' = 220'-6") LEASING ELEV 364 RES. CORRIDOR 9'18'24'COMMERCIAL REFUSE & RECYCLING 141 SQFT REQ. 200 SQFT PROV.10'Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN MARCH 2, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 A-A202BLOCK A LEVEL 2 SHEET INFORMATION Architecture + Planning 888.456.5849 ktgy.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 26BLOCK B - LEVEL 3 71'-0"71'-0" 32'-0" 73'-6"73'-6"71'-0"123'-6"32'-0"7'-0"32'-0"7'-0"32'-0"32'-0"32'-0"7'-0" Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 B-A203BLOCK B LEVEL 3 FLOOR PLAN NOTES 1. Fire sprinkler and fire alarm systems will be provided throughout mixed use building. Dry stand pipes will be provided in all stairwells. Direct outside access will be provided to the fire sprinkler riser room. 2. Elevator cars will be sized to allow a mininum of a 40-inch by 84-inch stretcherNE 10th ST20'-0"20'-0"16'-0"13'-6"BANK20'-0"53'-0"29'-6"16'-0"JEFFERSON P/L P/LP/LP/L P/LP/L P/L P/L 15'EXISTING6'-0"20'-0"16'-0" 16'-0" 2 1 ' - 0 "53'-0"15'-0"16'-0" 26'-0" 16'-0" 26'-0"26'-0" 34'-5"28'-8"16'-0" 26'-0" 35'-0"49'-9" BLOCK B MIXED USE10'-0"11'-0"15'-8"KIRKLAND AVEHARRINGTON PL NE 1 2 t h S T SUNSET BLVDNE 11th ST37'-3"5'-0"16'-0" 26'-0" 19'-6" 18'-0" 15'-0" 15'-0"15'-0"13'-6"15'-0" 40'-4" 35'-0" 26'-0" 40'-9" 26'-5" 18'-0" 15'-0" 15'-0" 17'-0" 18'-0"18'-6" 15 ' - 0 "29'-6"18'-9"35'-1"3 2 ' - 8 " 15 ' - 7 " 28'-6"29'-6"36'-6"3 4 ' - 6 " 28'-9"3'-9"11'-8"25'-3"19'-10"33'-8"1 6 ' - 0 "33'32'-4"8'-0"21'-6"12'-6"23'-0"2'-0"2'-0"6'-0" 6'-0" BLOCK A MIXED USE 54'-0"30'-3"16'-4"16'-0"2'-0"47'-0"13'-6"28'-6" 5 3 ' - 0 " 1 5 ' - 0 " 1 5 ' - 0 " 2 0 ' 2 8 ' - 3 " 1 5 ' 1 5 '12'-8"15'-0"13'-6"16'-0"15'-0"20'-0"25'-6"25'-6" 53'-0" 53'-0" GARAGE ENTRY ELEV 349 GARAGE ENTRY ELEV 355 DAYCARE DROP-OFF ENTRANCE ELEV 349 DAYCARE OUTDOOR PLAY AREA ELEV 349 LOBBY ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM SUNSET BLVD PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM JEFFERSON COVERED BREEZEWAY / ACCESS TO BANK FROM PARKING 10'-3" LOBBY ENTRY ELEV 355 GARAGE ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 6 6 6 6 6 6 5 3 4 4 54 5 6 4 5 5 5 8 6 3 8 6666 5 8 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 40 8020 A-101SITE PLAN SHEET INFORMATION OPEN TO RESIDENTIAL LOBBY BELOW COMMERCIAL & GUEST JOINT PARKING SPACES BLOCK A DN RESIDENTIAL UNITS ELEV 364 RESIDENTIAL UNITS ELEV 364 PLAZA COMMERCIAL / RESD AMENITIES 8,986 SF ELEV. 361 GARAGE ENTRY BELOW ELEV 342 228'32'32'42'294'RES. CORRIDOR38 SPACES ELEV 364 39 SPACES ELEV. LOBBY ELEV 364 RAMP RESIDENTIAL STORAGE 140 STORAGE LOCKERS ELEV 364 ELEV 356 AT GRADE ELEV 361 ELEV 361 ELEV 356 DNOPEN TOBELOWAT GRADE ELEV 358 221' (75% OF 294' = 220'-6") LEASING ELEV 364 RES. CORRIDOR 9'18'24'COMMERCIAL REFUSE & RECYCLING 141 SQFT REQ. 200 SQFT PROV.10'Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN MARCH 2, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 A-A202BLOCK A LEVEL 2 SHEET INFORMATION Architecture + Planning 888.456.5849 ktgy.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 27BLOCK B - LEVEL 4-6 71'-0"71'-0" 32'-0" 73'-6"73'-6"71'-0"123'-6"32'-0"7'-0"32'-0"7'-0"32'-0"32'-0"32'-0"7'-0" Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 B-A204BLOCK B LEVEL 4-5 FLOOR PLAN NOTES 1. Fire sprinkler and fire alarm systems will be provided throughout mixed use building. Dry stand pipes will be provided in all stairwells. Direct outside access will be provided to the fire sprinkler riser room. 2. Elevator cars will be sized to allow a mininum of a 40-inch by 84-inch stretcherNE 10th ST20'-0"20'-0"16'-0"13'-6"BANK20'-0"53'-0"29'-6"16'-0"JEFFERSON P/L P/LP/LP/L P/LP/L P/L P/L 15'EXISTING6'-0"20'-0"16'-0" 16'-0" 2 1 ' - 0 "53'-0"15'-0"16'-0" 26'-0" 16'-0" 26'-0"26'-0" 34'-5"28'-8"16'-0" 26'-0" 35'-0"49'-9" BLOCK B MIXED USE10'-0"11'-0"15'-8"KIRKLAND AVEHARRINGTON PL NE 1 2 t h S T SUNSET BLVDNE 11th ST37'-3"5'-0"16'-0" 26'-0" 19'-6" 18'-0" 15'-0" 15'-0"15'-0"13'-6"15'-0" 40'-4" 35'-0" 26'-0" 40'-9" 26'-5" 18'-0" 15'-0" 15'-0" 17'-0" 18'-0"18'-6" 15 ' - 0 "29'-6"18'-9"35'-1"3 2 ' - 8 " 15 ' - 7 " 28'-6"29'-6"36'-6"3 4 ' - 6 " 28'-9"3'-9"11'-8"25'-3"19'-10"33'-8"1 6 ' - 0 "33'32'-4"8'-0"21'-6"12'-6"23'-0"2'-0"2'-0"6'-0" 6'-0" BLOCK A MIXED USE 54'-0"30'-3"16'-4"16'-0"2'-0"47'-0"13'-6"28'-6" 5 3 ' - 0 " 1 5 ' - 0 " 1 5 ' - 0 " 2 0 ' 2 8 ' - 3 " 1 5 ' 1 5 '12'-8"15'-0"13'-6"16'-0"15'-0"20'-0"25'-6"25'-6" 53'-0" 53'-0" GARAGE ENTRY ELEV 349 GARAGE ENTRY ELEV 355 DAYCARE DROP-OFF ENTRANCE ELEV 349 DAYCARE OUTDOOR PLAY AREA ELEV 349 LOBBY ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM SUNSET BLVD PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM JEFFERSON COVERED BREEZEWAY / ACCESS TO BANK FROM PARKING 10'-3" LOBBY ENTRY ELEV 355 GARAGE ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 6 6 6 6 6 6 5 3 4 4 54 5 6 4 5 5 5 8 6 3 8 6666 5 8 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 40 8020 A-101SITE PLAN SHEET INFORMATION OPEN TO RESIDENTIAL LOBBY BELOW COMMERCIAL & GUEST JOINT PARKING SPACES BLOCK A DN RESIDENTIAL UNITS ELEV 364 RESIDENTIAL UNITS ELEV 364 PLAZA COMMERCIAL / RESD AMENITIES 8,986 SF ELEV. 361 GARAGE ENTRY BELOW ELEV 342 228'32'32'42'294'RES. CORRIDOR38 SPACES ELEV 364 39 SPACES ELEV. LOBBY ELEV 364 RAMP RESIDENTIAL STORAGE 140 STORAGE LOCKERS ELEV 364 ELEV 356 AT GRADE ELEV 361 ELEV 361 ELEV 356 DNOPEN TOBELOWAT GRADE ELEV 358 221' (75% OF 294' = 220'-6") LEASING ELEV 364 RES. CORRIDOR 9'18'24'COMMERCIAL REFUSE & RECYCLING 141 SQFT REQ. 200 SQFT PROV.10'Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN MARCH 2, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 A-A202BLOCK A LEVEL 2 SHEET INFORMATION Architecture + Planning 888.456.5849 ktgy.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 28BLOCK B - LEVEL 7 71'-0"71'-0" 32'-0" 73'-6"73'-6"71'-0"123'-6"32'-0"7'-0"32'-0"7'-0"32'-0"32'-0"32'-0"7'-0" ROOF DECK AMENITY ROOF DECK AMENITY Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 B-A207BLOCK B LEVEL 7 FLOOR PLAN NOTES 1. Fire sprinkler and fire alarm systems will be provided throughout mixed use building. Dry stand pipes will be provided in all stairwells. Direct outside access will be provided to the fire sprinkler riser room. 2. Elevator cars will be sized to allow a mininum of a 40-inch by 84-inch stretcherNE 10th ST20'-0"20'-0"16'-0"13'-6"BANK20'-0"53'-0"29'-6"16'-0"JEFFERSON P/L P/LP/LP/L P/LP/L P/L P/L 15'EXISTING6'-0"20'-0"16'-0" 16'-0" 2 1 ' - 0 "53'-0"15'-0"16'-0" 26'-0" 16'-0" 26'-0"26'-0" 34'-5"28'-8"16'-0" 26'-0" 35'-0"49'-9" BLOCK B MIXED USE10'-0"11'-0"15'-8"KIRKLAND AVEHARRINGTON PL NE 1 2 t h S T SUNSET BLVDNE 11th ST37'-3"5'-0"16'-0" 26'-0" 19'-6" 18'-0" 15'-0" 15'-0"15'-0"13'-6"15'-0" 40'-4" 35'-0" 26'-0" 40'-9" 26'-5" 18'-0" 15'-0" 15'-0" 17'-0" 18'-0"18'-6" 15 ' - 0 "29'-6"18'-9"35'-1"3 2 ' - 8 " 15 ' - 7 " 28'-6"29'-6"36'-6"3 4 ' - 6 " 28'-9"3'-9"11'-8"25'-3"19'-10"33'-8"1 6 ' - 0 "33'32'-4"8'-0"21'-6"12'-6"23'-0"2'-0"2'-0"6'-0" 6'-0" BLOCK A MIXED USE 54'-0"30'-3"16'-4"16'-0"2'-0"47'-0"13'-6"28'-6" 5 3 ' - 0 " 1 5 ' - 0 " 1 5 ' - 0 " 2 0 ' 2 8 ' - 3 " 1 5 ' 1 5 '12'-8"15'-0"13'-6"16'-0"15'-0"20'-0"25'-6"25'-6" 53'-0" 53'-0" GARAGE ENTRY ELEV 349 GARAGE ENTRY ELEV 355 DAYCARE DROP-OFF ENTRANCE ELEV 349 DAYCARE OUTDOOR PLAY AREA ELEV 349 LOBBY ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM SUNSET BLVD PEDESTRIAN CONNECTION ELEV 360 FIRE ACCESS TO DAY CARE FROM JEFFERSON COVERED BREEZEWAY / ACCESS TO BANK FROM PARKING 10'-3" LOBBY ENTRY ELEV 355 GARAGE ENTRY ELEV 355 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 PEDESTRIAN CONNECTION ELEV 365 6 6 6 6 6 6 5 3 4 4 54 5 6 4 5 5 5 8 6 3 8 6666 5 8 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 40 8020 A-101SITE PLAN SHEET INFORMATION OPEN TO RESIDENTIAL LOBBY BELOW COMMERCIAL & GUEST JOINT PARKING SPACES BLOCK A DN RESIDENTIAL UNITS ELEV 364 RESIDENTIAL UNITS ELEV 364 PLAZA COMMERCIAL / RESD AMENITIES 8,986 SF ELEV. 361 GARAGE ENTRY BELOW ELEV 342 228'32'32'42'294'RES. CORRIDOR38 SPACES ELEV 364 39 SPACES ELEV. LOBBY ELEV 364 RAMP RESIDENTIAL STORAGE 140 STORAGE LOCKERS ELEV 364 ELEV 356 AT GRADE ELEV 361 ELEV 361 ELEV 356 DNOPEN TOBELOWAT GRADE ELEV 358 221' (75% OF 294' = 220'-6") LEASING ELEV 364 RES. CORRIDOR 9'18'24'COMMERCIAL REFUSE & RECYCLING 141 SQFT REQ. 200 SQFT PROV.10'Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN MARCH 2, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 A-A202BLOCK A LEVEL 2 SHEET INFORMATION Architecture + Planning 888.456.5849 ktgy.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 4UNIT MIX SUMMARY SOLERA FEE-SIMPLE UNITS REVISED 06/07/ 2018 # OF 2A 2B 2C 2D 3A 3B 4A 4B BUILDINGS 1,261 SF 1,373 SF 1,520 SF 2,279 SF 1,643 SF 2,018 SF 2,018 SF 2,139 SF 471 SF 552 SF 300 SF 270 SF 283 SF 456 SF 456 SF 448 SF 82 SF 65 SF 102 SF 57 SF 65 SF 101 SF 101 SF 127 SF 1,814 SF 1,990 SF 1,922 SF 2,606 SF 1,991 SF 2,575 SF 2,575 SF 2,714 SF B3 - 3 HOUSE GROUP 2 0 2 0 0 0 2 0 2 6 UNITS B4 - 4 HOUSE GROUP 2 0 4 0 0 4 0 0 0 8 UNITS B5 - 5 HOUSE GROUP 6 0 12 0 0 0 12 0 6 30 UNITS B5-ALT - 5 HOUSE GROUP 1 2 0 0 0 1 1 1 0 5 UNITS B6 - 6 HOUSE GROUP 6 0 12 0 0 0 12 0 12 36 UNITS B6-ALT - 6 HOUSE GROUP 6 12 0 12 0 6 0 6 0 36 UNITS B7 - 7 HOUSE GROUP 1 0 1 0 1 0 0 1 4 7 UNITS B8 - 8 HOUSE GROUP 3 0 0 0 0 0 9 9 6 24 UNITS TOTAL 27 14 UNITS 31 UNITS 12 UNITS 1 UNITS 11 UNITS 36 UNITS 17 UNITS 30 UNITS 152 UNITS 17,654 SF 42,563 SF 18,240 SF 2,279 SF 18,073 SF 72,648 SF 34,306 SF 64,170 SF 269,933 SF 25,396 SF 61,690 SF 23,064 SF 2,606 SF 21,901 SF 92,700 SF 43,775 SF 81,420 SF 352,552 SF TOTAL UNIT AREA TOTAL GROSS AREA TOTAL UNITS 58 UNITS 47 UNITS 47 UNITS 38.16%30.92%30.92% FEE-SIMPLE UNIT TYPE UNIT AREA / UNIT GARAGE AREA/UNIT BALCONY AREA /UNIT UNIT GROSS AREA /UNIT REVISED 06/07/ 2018 Townhome 768 SF 20 UNITS 7%15,360 SF Studio -0 UNITS 0%0 SF Open 1/1 576 SF 146 UNITS 49%84,096 SF 1 br / 1ba 720 SF 36 UNITS 12%25,920 SF 1 br / 1ba Den 816 SF 22 UNITS 7%17,952 SF 2 br / 2ba 1,008 SF 72 UNITS 24%72,576 SF TOTAL UNITS 729 SF avg unit size 296 UNITS 100%215,904 SF Studio 500 SF 68 UNITS 30%34,000 SF 1 Bedroom 650 SF 135 UNITS 60%87,750 SF 2 Bedroom 950 SF 22 UNITS 10%20,900 SF TOTAL UNITS 634 SF avg unit size 225 UNITS 100%142,650 SF 1 Bedroom 675 SF 40 UNITS 25%27,000 SF 1 Bedroom 750 SF 30 UNITS 19%22,500 SF 1 Bedroom + 1.5 bath 825 SF 25 UNITS 16%20,625 SF 2 bedroom 950 SF 18 UNITS 11%17,100 SF 2 bedroom 1,050 SF 22 UNITS 14%23,100 SF 2 Bedroom 1,150 SF 25 UNITS 16%28,750 SF TOTAL UNITS 869 SF avg unit size 160 UNITS 100%139,075 SF BLOCK B - Unit Mix and sizes per Avenida preferred unit mix and count Unit Types Area / Unit Gross Rentable (SF)No. Units Unit Mix NRSF BLOCK B - Unit mix and sizes per Site Review Submittal Package Unit Types Area / Unit Gross Rentable (SF)No. Units Unit Mix NRSF BLOCK A - Unit mix and sizes per Site Review Submittal Package Unit Types Area / Unit Gross Rentable (SF)No. Units Unit Mix NRSF BLOCK A - UNIT MIX & UNIT SIZES REVISED 06/07/ 2018 Townhome 768 SF 20 UNITS 7%15,360 SF Studio -0 UNITS 0%0 SF Open 1/1 576 SF 146 UNITS 49%84,096 SF 1 br / 1ba 720 SF 36 UNITS 12%25,920 SF 1 br / 1ba Den 816 SF 22 UNITS 7%17,952 SF 2 br / 2ba 1,008 SF 72 UNITS 24%72,576 SF TOTAL UNITS 729 SF avg unit size 296 UNITS 100%215,904 SF Studio 500 SF 68 UNITS 30%34,000 SF 1 Bedroom 650 SF 135 UNITS 60%87,750 SF 2 Bedroom 950 SF 22 UNITS 10%20,900 SF TOTAL UNITS 634 SF avg unit size 225 UNITS 100%142,650 SF 1 Bedroom 675 SF 40 UNITS 25%27,000 SF 1 Bedroom 750 SF 30 UNITS 19%22,500 SF 1 Bedroom + 1.5 bath 825 SF 25 UNITS 16%20,625 SF 2 bedroom 950 SF 18 UNITS 11%17,100 SF 2 bedroom 1,050 SF 22 UNITS 14%23,100 SF 2 Bedroom 1,150 SF 25 UNITS 16%28,750 SF TOTAL UNITS 869 SF avg unit size 160 UNITS 100%139,075 SF BLOCK B - Unit Mix and sizes per Avenida preferred unit mix and count Unit Types Area / Unit Gross Rentable (SF)No. Units Unit Mix NRSF BLOCK B - Unit mix and sizes per Site Review Submittal Package Unit Types Area / Unit Gross Rentable (SF)No. Units Unit Mix NRSF BLOCK A - Unit mix and sizes per Site Review Submittal Package Unit Types Area / Unit Gross Rentable (SF)No. Units Unit Mix NRSF BLOCK B - UNIT MIX & UNIT SIZES TOWNHOMES - UNIT MIX & UNIT SIZES Urbal Architecture 206.257.0972 urbalarchitecture.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 21BLOCK A - SITE SECTIONS OPEN TO RESIDENTIAL LOBBY BELOW COMMERCIAL & GUEST JOINT PARKING SPACES BLOCK A DN RESIDENTIAL UNITS ELEV 364 RESIDENTIAL UNITS ELEV 364 PLAZA COMMERCIAL / RESD AMENITIES 8,986 SF ELEV. 361 GARAGE ENTRY BELOW ELEV 342 228'32'32'42'294'RES. CORRIDOR38 SPACES ELEV 364 39 SPACES ELEV. LOBBY ELEV 364 RAMP RESIDENTIAL STORAGE 140 STORAGE LOCKERS ELEV 364 ELEV 356 AT GRADE ELEV 361 ELEV 361 ELEV 356 DNOPEN TOBELOWAT GRADE ELEV 358 221' (75% OF 294' = 220'-6") LEASING ELEV 364 RES. CORRIDOR 9'18'24'COMMERCIAL REFUSE & RECYCLING 141 SQFT REQ. 200 SQFT PROV.10'Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN MARCH 2, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 A-A202BLOCK A LEVEL 2 SHEET INFORMATION9'-2"9'-2"9'-2"10'-0"12'-0"9'-2"8'-0"TYPE V-ACONSTRUCTIONTYPE I-ACONSTRUCTION60'-0"9'-0"75'-0"NE SUNSET LN COURTYARD RETAIL RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS RES. UNITS PARKING PARKING PARKING SUNSET BLVDGRADE PLANE RMC AVG EL. 361'-0" RMC HGT. LIMITEL. 421'-0" RMC HGT. LIMIT INCREASE PER CUPEL. 436-0" EL. 421'-8"T.O. PLATE EL. 413'-8"LEVEL 7 EL. 404'-6"LEVEL 6 EL. 395'-4"LEVEL 5 EL. 386'-2"LEVEL 4 EL. 377'-0"LEVEL 3 EL. 365'-0"LEVEL 2 EL. 346'-0"LEVEL P1 EL. 355'-0"LEVEL 1 RENTON, WA PROJECT # 17-020 BUILDING SECTION SCALE: NTS SOLERA BLOCK A 05-16-18 Architecture + Planning 888.456.5849 ktgy.com QUADRANT HOMES 15900 SE EASTGATE WAY SUITE 300 BELLEVUE, WA 98008 RENTON, WA # 2017-0853 SOLERA JULY 12, 2018 SITE PLAN REVIEW A - 31 COMMERCIAL ELEV. 360 COURTYARD ELEV. 375 COMMERCIAL ELEV. 360 DAY CARE ELEV. 360 LOBBY ELEV. 360 MAXIMUM CV ZONING HEIGHT - 60' REQUESTING MAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 LOBBY ELEV. 360 PARKING ELEV. 349DAY CARE ELEV. 349 GRADE PLANE ELEV. 353.25 MECH ELEV. 360 NE 11TH ST ELEV. 359 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 PARKING ELEV. 338 DAY CARE ELEV. 349 DAY CARE ELEV. 360DAY CARE ELEV. 360 PARKING ELEV. 338 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 COURTYARD ELEV. 375 COMMERCIAL ELEV. 360PARKING ELEV. 360 PARKING ELEV. 349JEFFERSON ACCESS ELEV. 345 MAXIMUM CV ZONING HEIGHT - 60' REQUESTING MAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 GRADE PLANE ELEV. 353.25 MAXIMUM CV ZONING HEIGHT - 60' REQUESTING MAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 GRADE PLANE ELEV. 353.25OUTDOOR PLAY AREA ELEV. 349 SUNSET BLVD ELEV. 353 JEFFERSON ACCESS ELEV. 355 SUNSET BLVD ELEV. 359 PARKING ELEV. 338 PARKING ELEV. 341 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 B-A401BLOCK B SITE SECTIONS SHEET INFORMATION 2. CROSS SECTION 3. LONG SECTION 1. CROSS SECTION 24' COMMERCIAL / RESD AMENITIES SPACE 6435 SQ. FT. LOBBY UP44'40'LEVEL 2 ELEV 360 123'-6"368'-6"GARAGE ENTRY ELEV 355 ELEV 355ELEV 360 LEASING 123'-6"40' ELEV 360 PEDESTRIAN CONNECTION ELEV 360 ELEV 360 ELEV 360 ELEV 360 ELEV 360 ACCESS TO DAYCARE ELEV 360 BLOCK B 21'-6"COMMERCIAL / RESIDENTIAL AMENITIES 5263 SQ. FT. 55 SPACES 77' 5,900 SQ.FT. PROPOSED CHILD CARE ELEV 36018'9' 445'-6"(75% OF 452'-6" = 340'-0")53'-6"ELEV 355 MAIL ROOM ELEV 355144 BICYCLE PARKING COMMERCIAL REFUSE & RECYCLING 323 SQFT REQ. 500 SQFT PROV.COMMERCIAL / DAYCARE PARKING SPACES MECH MECH ELEV 361FIRE ACCESS TO DAY CARE FROM SUNSET BLVD 37' LOBBY ELEV 355 PEDESTRIAN CONNECTION ELEV 360 Architecture + Planning888.456.5849ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 B-A202BLOCK B LEVEL 2 BLOCK B - SITE SECTIONS OPEN TO RESIDENTIAL LOBBY BELOW COMMERCIAL & GUEST JOINT PARKING SPACES BLOCK A DN RESIDENTIAL UNITS ELEV 364 RESIDENTIAL UNITS ELEV 364 PLAZA COMMERCIAL / RESD AMENITIES 8,986 SF ELEV. 361 GARAGE ENTRY BELOW ELEV 342 228'32'32'42'294'RES. CORRIDOR38 SPACES ELEV 364 39 SPACES ELEV. LOBBY ELEV 364 RAMP RESIDENTIAL STORAGE 140 STORAGE LOCKERS ELEV 364 ELEV 356 AT GRADE ELEV 361 ELEV 361 ELEV 356 DNOPEN TOBELOWAT GRADE ELEV 358 221' (75% OF 294' = 220'-6") LEASING ELEV 364 RES. CORRIDOR 9'18'24'COMMERCIAL REFUSE & RECYCLING 141 SQFT REQ. 200 SQFT PROV.10'Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN MARCH 2, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 A-A202BLOCK A LEVEL 2 SHEET INFORMATION 1 2 3 COMMERCIAL ELEV. 360 COURTYARD ELEV. 375 COMMERCIAL ELEV. 360 DAY CARE ELEV. 360 LOBBY ELEV. 360 MAXIMUM CV ZONING HEIGHT - 60' REQUESTING MAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 LOBBY ELEV. 360 PARKING ELEV. 349DAY CARE ELEV. 349 GRADE PLANE ELEV. 353.25 MECH ELEV. 360 NE 11TH ST ELEV. 359 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 PARKING ELEV. 338 DAY CARE ELEV. 349 DAY CARE ELEV. 360DAY CARE ELEV. 360 PARKING ELEV. 338 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 COURTYARD ELEV. 375 COMMERCIAL ELEV. 360PARKING ELEV. 360 PARKING ELEV. 349JEFFERSON ACCESS ELEV. 345 MAXIMUM CV ZONING HEIGHT - 60' REQUESTING MAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 GRADE PLANE ELEV. 353.25 MAXIMUM CV ZONING HEIGHT - 60' REQUESTING MAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 GRADE PLANE ELEV. 353.25OUTDOOR PLAY AREA ELEV. 349 SUNSET BLVD ELEV. 353 JEFFERSON ACCESS ELEV. 355 SUNSET BLVD ELEV. 359 PARKING ELEV. 338 PARKING ELEV. 341 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 B-A401BLOCK B SITE SECTIONS SHEET INFORMATION 2. CROSS SECTION 3. LONG SECTION 1. CROSS SECTION COMMERCIAL ELEV. 360 COURTYARD ELEV. 375 COMMERCIAL ELEV. 360 DAY CARE ELEV. 360 LOBBY ELEV. 360 MAXIMUM CV ZONING HEIGHT - 60' REQUESTING MAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 LOBBY ELEV. 360 PARKING ELEV. 349DAY CARE ELEV. 349 GRADE PLANE ELEV. 353.25 MECH ELEV. 360 NE 11TH ST ELEV. 359 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 PARKING ELEV. 338 DAY CARE ELEV. 349 DAY CARE ELEV. 360DAY CARE ELEV. 360 PARKING ELEV. 338 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 COURTYARD ELEV. 375 COMMERCIAL ELEV. 360PARKING ELEV. 360 PARKING ELEV. 349JEFFERSON ACCESS ELEV. 345 MAXIMUM CV ZONING HEIGHT - 60' REQUESTING MAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 GRADE PLANE ELEV. 353.25 MAXIMUM CV ZONING HEIGHT - 60' REQUESTING MAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 GRADE PLANE ELEV. 353.25OUTDOOR PLAY AREA ELEV. 349 SUNSET BLVD ELEV. 353 JEFFERSON ACCESS ELEV. 355 SUNSET BLVD ELEV. 359 PARKING ELEV. 338 PARKING ELEV. 341 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 B-A401BLOCK B SITE SECTIONS SHEET INFORMATION 2. CROSS SECTION 3. LONG SECTION 1. CROSS SECTION COMMERCIAL ELEV. 360 COURTYARD ELEV. 375 COMMERCIAL ELEV. 360 DAY CARE ELEV. 360 LOBBY ELEV. 360 MAXIMUM CV ZONING HEIGHT - 60' REQUESTING MAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 LOBBY ELEV. 360 PARKING ELEV. 349DAY CARE ELEV. 349 GRADE PLANE ELEV. 353.25 MECH ELEV. 360 NE 11TH ST ELEV. 359 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 PARKING ELEV. 338 DAY CARE ELEV. 349 DAY CARE ELEV. 360DAY CARE ELEV. 360 PARKING ELEV. 338 RESIDENTIAL ELEV. 375 RESIDENTIAL ELEV. 375 COURTYARD ELEV. 375 COMMERCIAL ELEV. 360PARKING ELEV. 360 PARKING ELEV. 349JEFFERSON ACCESS ELEV. 345 MAXIMUM CV ZONING HEIGHT - 60' REQUESTINGMAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 GRADE PLANE ELEV. 353.25 MAXIMUM CV ZONING HEIGHT - 60' REQUESTINGMAXIMUM BUILDING HEIGHT = 85'-0" VIA ADMINISTRATIVE CUP PER RMC 4-2-120C.16 GRADE PLANE ELEV. 353.25OUTDOOR PLAY AREA ELEV. 349 SUNSET BLVD ELEV. 353 JEFFERSON ACCESS ELEV. 355 SUNSET BLVD ELEV. 359 PARKING ELEV. 338 PARKING ELEV. 341 Architecture + Planning 888.456.5849 ktgy.com CONCEPTUAL DESIGN May 25, 2018RENTON, WA # 20170853 SOLERA 0 8 16 32 B-A401BLOCK B SITE SECTIONS SHEET INFORMATION 2. CROSS SECTION 3. LONG SECTION 1. CROSS SECTION