HomeMy WebLinkAboutT-399112z
W
W
>
O
rr
n
2
z
O
U
LJJ
rr
LJJ
z
0
z
Q
J
Q
z
U
H
LL
Q
rr
0
Q
O
rr
O
In
Q
rr
W
z
W
U
J
Q
U_
0
LJJ
LJJ
J
J
Q
>
Q
Z
J
24 SMFO
CARR & BENSON (EB)
1-12
13-18
19-24
TRAFFIC SIGNAL PLAN —INTERCONNECT SCHEDULE co
0
LO
FOR o
UW MEDICINE —VALLEY MEDICAL CENTER
T
TALBOT ROAD TRAFFIC SIGNAL AND INTERSECTION IMR.POVEMENTS V
INTERCONNECT GENERAL NOTES
1
1 10
S 177TH ST
NEW S 177TH ST / TALBOT RD S CONTROLLER
FIBER OPTIC SPLICE SCHEMATIC
24 SMFO
CARR & TALBOT (WB)
1-12
13-18
19-24, 1
25 100
0 50 150
SCALE IN FEET
IPTENW
Transportation Engineering Northwest
Transportation Planning I Design I Traffic Impact & Operations
PO Box 65254, Seattle, WA 98155 1 Office (206) 361-7333
Project Contact: Chris Bicket, P.E.
Phone: 425-250-5002
24 SMFO
98TH & CARR
1-6
7-12
OLD 13-18 NEON
19-24
�pRNER••T: B
o:14
6'1STE9�P�
ONAL•�
07/18/2=
NEW
24 SMFO
I 177TH & TALBOT I
1-6
7-12
13-18
19-24
-_� 2
ST N ST
S 1'
EX 98TH AVE S / SE CARR ST CONTROLLER
\l91
SPLICE FIBER IN EXISTING
SPLICE BOX PER FIBER OPTIC
SPLICE SCHEMATIC, THIS SHEET.
REVISION
IN
SURVEYED:
DESIGNED:
JLS
DRAWN:
JLS
CHECKED:
GMD
BY DATE APPR APPROVED:
CTB
1. THIS PROJECT SHALL BE CONSTRUCTED PER 2016 ((WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL
EACHT OFCTHES,E CDOCUMENT SNSHALL BE DCONSIDERED PART OFT THIS
CONTRACD WSDOT STANDARD DETAILS (CURRENT EDITION).
T.
2. JUNCTION BOXES SHALL BE PLACED OUTSIDE OF PAVEMENT SURFACE AND WHEELCHAIR RAMPS UNLESS OTHERWISE
INSTRUCTED BY THE ENGINEER. ALL JUNCTION BOXES WITHIN THE PAR/SIDEWALK SHALL USE NON-SKID COVERS PER WSDOT
GSP8.20.2(9-29.2(1)A).OPT 1. GR8.
3. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS AND THE CURRENT EDITION OF THE CITY OF RENTON STANDARD
SPECIFICATIONS AND DETAILS. THE CURRENT EDITION OF THE CITY OF RENTON STANDARD SPECIFICATIONS AND DETAILS
SHALL BE CONSIDERED PART OF THIS CONTRACT.
4. THE LOCATIONS OF FEATURES SHOWN ARE APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR AS
NECESSARY.
5. THE CONTRACTOR SHALL SUBMIT A REQUEST TO THE INSPECTOR FOR MATERIALS APPROVAL THREE WEEKS PRIOR TO
REQUESTED APPROVAL DATE.
6. ALL WORK SHALL BE CONSISTENT WITH UTILITY AGENCY REQUIREMENTS. THE CONTRACTOR SHALL CONTACT ALL PERTINENT
UTILITY AGENCIES 48 HOURS BEFORE COMMENCING WORK, AND SHALL COORDINATE WITH AFFECTED UTILITY AGENCIES
THROUGHOUT THE PROJECT.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING UTILITIES. THE CONTRACTOR SHALL NOTIFY THE
AFFECTED UTILITY COMPANY AND THE CITY OF RENTON IMMEDIATELY UPON DAMAGE.
8. EXISTING FEATURES TO REMAIN UNLESS OTHERWISE NOTED.
9. ALL CONDUCTORS FOR SIGNAL HEADS, LOOPS, PEDESTRIAN HEADS, PUSHBUTTONS, INTERCONNECT AND STREET LIGHTS SHALL
BE LABELED IN EACH JUNCTION BOX.
10. ALL SIGNALIZED CROSSWALKS SHALL BE OPERATIONAL AT ALL TIMES UNLESS FLAGGERS/POLICE ARE PRESENT TO ASSIST
PEDESTRIANS.
11. CONTRACTOR SHALL PROVIDE TENW WITH REDLINE MARKUPS SHOWING ANY AND ALL CHANGES FROM THESE APPROVED PLANS
FOLLOWING CONSTRUCTION.
12. CONTRACTOR SHALL CONFIRM PREFERRED TRENCHING/BORING METHOD WITH CITY OF RENTON PRIOR TO BEGINNING
CONSTRUCTION.
13. TRAFFIC SIGNAL, ILLUMINATION AND INTERCONNECT CONDUIT SHALL BE PLACED SUCH THAT IT WILL NOT CONFLICT WITH
FUTURE STREET TREE OR STRUCTURE INSTALLATIONS. VERIFY CONDUIT PLACEMENT WITH ENGINEER PRIOR TO BEGINNING
CONSTRUCTION.
14. CONTRACTOR SHALL BE RESPONSIBLE TO RESTORE ALL SURFACE FEATURES TO EXISTING CONDITIONS FOLLOWING
INTERCONNECT INSTALLATION.
15. ALL JUNCTION BOXES OUTSIDE OF SIDEWALK MUST HAVE CONCRETE PAD PER CITY OF RENTON STANDARD PLAN 125.
INTERCONNECT CONSTRUCTION NOTES (THIS SHEET ONLY):
OINSTALL NEW CONDUIT AND 1-48CT FIBER INTERCONNECT, FROM NEW SIGNAL CONTROLLER AT S 177TH ST/ TALBOT RD S TO EXISTING SIGNAL
CONTROLLER AT THE INTERSECTION OF SE CARR ROAD AND 98TH AVENUE S. ROUTING OF INTERCONNECT SHOWN ON THIS PLAN IS SCHEMATIC
ONLY. CONTRACTOR SHALL SCHEDULE A FIELD MEETING WITH THE CITY INSPECTOR AND TENW TO CONFIRM INTERCONNECT PLACEMENT PRIOR TO
BEGINNING CONSTRUCTION. INTERCONNECT SHALL BE INSTALLED WITHIN CITY OF RENTON RIGHT-OF-WAY ONLY. JUNCTION BOX LOCATIONS SHOULD
BE FIELD LOCATED WITH THE CITY INSPECTOR PRIOR TO INSTALLATION.
20 INSTALL TYPE II JUNCTION BOX AT MAXIMUM 500-FT INTERVALS.
ra
SCALE:
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
SIGNAL WIRING SCHEDULE
zRACEWAY
CONDUIT
SIZE
1-48CT
FIBER
PULL
WIRE
CONDUIT
FILL
ALLOW.
FILL
NEW
NO.
2" SCH40 PVC
1
0.20
0.890
10
2" SCH40 PVC SPARE*
1
---
0.890
2" SCH80 PVC
1
0.20
0.890
20
2" SCH80 PVC SPARE*
1
---
0.890
21
EXISTING**
1
---
0.890
*VALLEY MEDICAL CENTER INTER CONNECT MY USE PROPOSED SPARE
FOR THEIR FIBER.
**OTHER CONDUIT AND CONDUCTORS MAY BE PRESENT.
�j
4 D AT U MI)
C TY OF
' RENTON
NUIV
Planning/Building/Public Works Dept.
T-399112
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
TRANSPORTATION OPERATION
cbarnes 09/19/2018_�
DATE:
TRAFFIC SIGNAL PLAN - INTERCONNECT SCHEDULE 7/18/18
UW MEDICINE - VALLEY MEDICAL CENTER FIELDBOOK:
PAGE:
TALBOT ROAD INTERSECTION UPGRADES DRAWING NO:
400 SOUTH 43RD STREET TS3.01
RENTON, WA 98055 SHEET. 12 OF:17
00
M
O
O
Cfl
T
Q
J
N
O
L0
O
O
T
y
7
z
Lu
2
Lu
O
C�
G
z
O
U
W
Lu
z
0
z
Q
Q
z
0
U_
LL
LL
Q
rr
0
Q
O
rr
O
m
J
Q
LJJ
z
LJJ
U
J
Q
U_
0
L L1
G
J
Q
>