OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) –
Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: November 28, 2018
PROJECT NAME/NUMBER: PR18-000544 Eastside Interceptor Section 2 Rehabilitation / LUA18-000677, TUP
PROJECT LOCATION: Along Logan Ave N from Lake Washington Blvd N to
Burnett Ave N (APNs 0886600060 and 0886610020)
APPLICANT/PROJECT CONTACT
PERSON:
Darlene Gaziano, King County, Department of Natural
Resources & Parks / dgaziano@kingcounty.gov / 201 S
Jackson St, Unit 505, Seattle, WA 98104
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also https://bit.ly/2PXWp8o
PERMITS/REVIEW REQUESTED: Tier II Temporary Use Permit
PROJECT DESCRIPTION: The applicant is proposing a Tier II Temporary Use Permit to allow for the
establishment of two staging areas to be used during the rehabilitation of the Eastside Interceptor Section 2, a 96-inch
reinforced concrete pipe used for sewage flow running primarily within the Logan Ave N right-of-way (ROW) between
Lake Washington Blvd N and Burnett Ave N. The two staging areas would be adjacent to Logan Ave N, with one located
near the intersection of N 8th St and Logan Ave N on parcel #0886600060 (aka north staging area) and the other located
on parcel #0886610020 near the intersection of Burnett Ave N and N 6th Ave (aka south staging area). Both staging areas
would include equipment used for the temporary bypass pipe that will be installed to reroute flows during the
rehabilitation of the main pipe. The bypass system in the north staging area would include as many as eight (8) primary
and two (2) backup electric driven pumps to divert the sewage flow from the interceptor pipe into the temporary bypass
pipe. Odor at the bypass site would be controlled via a tent structure over the open trench and an on-site modular,
prefabricated air extraction and activated carbon odor control system. The north staging area would also be used for
parking, material storage, and multiple job trailers. The south staging area located in the existing Boeing parking lot
would also include equipment and materials to be used during the project. Both staging areas would be surrounded by
security fencing and would include downward shielding lights that would be placed so as to minimize impacts to
neighboring properties. According to the applicant, construction on the pipe would last approximately eight (8) months.
DATE OF APPLICATION: November 14, 2018
NOTICE OF COMPLETE APPLICATION: November 28, 2018
NOTICE
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR18-000544 Eastside Interceptor Section 2 Rehabilitation / LUA18-000677, TUP
NAME:
MAILING ADDRESS: CITY/STATE/ZIP:
EMAIL: ___________________________________________________ TELEPHONE NO.:
□ I prefer to receive project information and documents hard copy via US mail
Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner, CED –
Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on December 12, 2018. If you have questions
about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project
Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any
decision on this project.
CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: AMorganroth@Rentonwa.gov