Loading...
HomeMy WebLinkAboutNOA_Notice_of_Application_Eastside Int. 2_181128.pdfDEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: November 28, 2018 PROJECT NAME/NUMBER: PR18-000544 Eastside Interceptor Section 2 Rehabilitation / LUA18-000677, TUP PROJECT LOCATION: Along Logan Ave N from Lake Washington Blvd N to Burnett Ave N (APNs 0886600060 and 0886610020) APPLICANT/PROJECT CONTACT PERSON: Darlene Gaziano, King County, Department of Natural Resources & Parks / dgaziano@kingcounty.gov / 201 S Jackson St, Unit 505, Seattle, WA 98104 LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://bit.ly/2PXWp8o PERMITS/REVIEW REQUESTED: Tier II Temporary Use Permit PROJECT DESCRIPTION: The applicant is proposing a Tier II Temporary Use Permit to allow for the establishment of two staging areas to be used during the rehabilitation of the Eastside Interceptor Section 2, a 96-inch reinforced concrete pipe used for sewage flow running primarily within the Logan Ave N right-of-way (ROW) between Lake Washington Blvd N and Burnett Ave N. The two staging areas would be adjacent to Logan Ave N, with one located near the intersection of N 8th St and Logan Ave N on parcel #0886600060 (aka north staging area) and the other located on parcel #0886610020 near the intersection of Burnett Ave N and N 6th Ave (aka south staging area). Both staging areas would include equipment used for the temporary bypass pipe that will be installed to reroute flows during the rehabilitation of the main pipe. The bypass system in the north staging area would include as many as eight (8) primary and two (2) backup electric driven pumps to divert the sewage flow from the interceptor pipe into the temporary bypass pipe. Odor at the bypass site would be controlled via a tent structure over the open trench and an on-site modular, prefabricated air extraction and activated carbon odor control system. The north staging area would also be used for parking, material storage, and multiple job trailers. The south staging area located in the existing Boeing parking lot would also include equipment and materials to be used during the project. Both staging areas would be surrounded by security fencing and would include downward shielding lights that would be placed so as to minimize impacts to neighboring properties. According to the applicant, construction on the pipe would last approximately eight (8) months. DATE OF APPLICATION: November 14, 2018 NOTICE OF COMPLETE APPLICATION: November 28, 2018 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000544 Eastside Interceptor Section 2 Rehabilitation / LUA18-000677, TUP NAME: MAILING ADDRESS: CITY/STATE/ZIP: EMAIL: ___________________________________________________ TELEPHONE NO.: □ I prefer to receive project information and documents hard copy via US mail Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner, CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on December 12, 2018. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: AMorganroth@Rentonwa.gov