HomeMy WebLinkAboutMFP18000848DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18000848
IVR Number: 18000848
Permit Informa!on
Permit Name:Comcast Cable Franchise Permit
Address/Loca!on:02/13/2018Applica!on Date:1623059111Parcel Number:3209 NE 4TH ST
Permit Type :03/13/2018Issue Date:Franchise
Permit Work Class:03/13/2019Expira!on Date :Minor U#lity
Job Number:250159Franchise Type :Cable
Descrip!on:Bore 2 (2") conduit with cable 70' in the ROW across Monroe ave NE. Applicant is approved to
open trench across the roadway as well. Place 1 new vault. Pothole all utilities or open trench
across Monroe Ave NE. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communica#on Management &
Comcast Cable Holding
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communica#ons LLC
1701 J4 Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Sco7 Nall
SEFNCO Communica#ons Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: BL.041108Construc!on Contractor : SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
MFP18000848Contractor is required to pothole all existing utilities. traffic controlplan should cover each location the potholes will need to take place at.Bore 2 (2") conduit with cable 70' in the ROW across Monroe Ave NE.applicant is approved to open trench across the roadway as well.70'Scott Warlick2/28/2018Justin Johnson3-8-2018
MFP18000848Justin Johnson3-8-20188:00 am to 3:00 pmMonday through Friday
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWWORKVEHICLEWork ZoneWork ZoneW20-1W21-5W2
0
-
1W2
1
-
5
S
POTTERGeneral TCP for Bore2(2") conduit - 70'Monroe Ave NE
MINIMUM TAPER LENGTH IN FEET (L)(FEET)LANEWIDTHPOSTED SPEED (MPH)3025354045505560706515010105270205500450-550--16511115295225550495660605--18012125320245600540720660840780SCALE: 1"=50'025'50'"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE REVISION BY QC
3209 NE 4th St.
Renton, WA
250159
TCP152/8/2018 PERMIT PS AK
2/27/2018 Revision TCP PS AKBUFFER DATALONGITUDINAL BUFFER SPACE = B20030SPEED (MPH)LENGTH (FEET)251553053540250425360455057049555607307064565COMCAST
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWWORKVEHICLEPothole #1W20-1W2
0
-
1
W20-5RW4-2RMonroe Ave NE TCP for pothole #1MINIMUM TAPER LENGTH IN FEET (L)(FEET)LANEWIDTHPOSTED SPEED (MPH)3025354045505560706515010105270205500450-550--16511115295225550495660605--18012125320245600540720660840780SCALE: 1"=40'020'40'"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE REVISION BY QC
3209 NE 4th St.
Renton, WA
250159
TCP252/8/2018 PERMIT PS AK
2/27/2018 Revision TCP PS AKBUFFER DATALONGITUDINAL BUFFER SPACE = B20030SPEED (MPH)LENGTH (FEET)251553053540250425360455057049555607307064565COMCAST
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWWORKVEHICLEPothole #2W20-1W2
0
-
1
W20-5LW4-2LMonroe Ave NE TCP for pothole #2MINIMUM TAPER LENGTH IN FEET (L)(FEET)LANEWIDTHPOSTED SPEED (MPH)3025354045505560706515010105270205500450-550--16511115295225550495660605--18012125320245600540720660840780SCALE: 1"=40'020'40'"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE REVISION BY QC
3209 NE 4th St.
Renton, WA
250159
TCP352/8/2018 PERMIT PS AK
2/27/2018 Revision TCP PS AKBUFFER DATALONGITUDINAL BUFFER SPACE = B20030SPEED (MPH)LENGTH (FEET)251553053540250425360455057049555607307064565COMCAST
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWWORKVEHICLEPothole #3W4
-
2
L
W20-1Monroe Ave NE W20-5L
W2
0
-
1TCP for pothole #3MINIMUM TAPER LENGTH IN FEET (L)(FEET)LANEWIDTHPOSTED SPEED (MPH)3025354045505560706515010105270205500450-550--16511115295225550495660605--18012125320245600540720660840780SCALE: 1"=40'020'40'"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE REVISION BY QC
3209 NE 4th St.
Renton, WA
250159
TCP452/8/2018 PERMIT PS AK
2/27/2018 Revision TCP PS AKBUFFER DATALONGITUDINAL BUFFER SPACE = B20030SPEED (MPH)LENGTH (FEET)251553053540250425360455057049555607307064565COMCAST
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWWORKVEHICLEPothole #4W4
-
2
R
W20-1Monroe Ave NE W20-5
R
W2
0
-
1TCP for pothole #4MINIMUM TAPER LENGTH IN FEET (L)(FEET)LANEWIDTHPOSTED SPEED (MPH)3025354045505560706515010105270205500450-550--16511115295225550495660605--18012125320245600540720660840780SCALE: 1"=40'020'40'"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE REVISION BY QC
3209 NE 4th St.
Renton, WA
250159
TCP552/8/2018 PERMIT PS AK
2/27/2018 Revision TCP PS PSBUFFER DATALONGITUDINAL BUFFER SPACE = B20030SPEED (MPH)LENGTH (FEET)251553053540250425360455057049555607307064565COMCAST
SCOPE OF WORK:SHEET INDEX:1/3- COVER SHEET2/3- NOTES & LEGEND SHEET3/3 - PERMITBILL OF MATERIALS*:CONTACTS:McDonalds - Managed Broadband ProjectTHIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONSPROJECT MAP-Bore 2(2") conduit with cable.-Place 1 new vault. TOTAL FOOTAGE 70FT. 70FT.PROJECT DESCRIPTION*3209 NE 4th St.Renton, WASEFNCOJoe Wachowski 253-318-8897COMCASTKyle Kinney*ALL FOOTAGES AND MATERIALS ARE ESTIMATED"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE REVISION BY QC
3209 NE 4th St.
Renton, WA
250159
PERMIT132/8/2018 PERMIT PS AK
2/27/2018 Revision PERMIT PS AK JT#250159-70' 2(2") conduit with cable.-1 new vaults.DIG AND INTERCEPT (AND TIE IN TO) EXISTING COMCASTIN ROW AND PLACE 17"X30" VAULT. BORE 2(2") CONDUITWITH CABLE ACROSS MONROE AVE NE.COMCASTCOMCASTCONSTRUCTION ZONE ==COVER
6
ROW
R
PROPOSED VAULT
PROPOSED BORE PIT
STREET/SIGNAL/TRAFFIC LIGHT
CONSTRUCTION NOTE
CATCH BASIN
FIRE HYDRANT
EXISTING POLE W/ NEW RISER
BUILDING OUTLINE
TRAFFIC FLOW
LANDSCAPING/TREE
POTHOLE LOCATION
CHANNELIZATION
5+39 STATIONING
(xxx') OPEN TRENCH
PROPOSED DIRECTIONAL DRILL
EXISTING PULL THRU
PROPOSED BORE
PROPOSED OPEN TRENCH
(xxx') EXISTING PULL THRU
(xxx') BORE
(xxx') DIRECTIONAL DRILLRIGHT-OF-WAY
CENTERLINE
TRAFFIC LANE
FENCE
STORM DRAIN
MANHOLE
COMMUNICATIONS
WATER
SEWER
POWER
GAS
D
CB
S C
GUARD RAIL AERIAL STRAND
FIBER PLACEMENT NOTES:
GENERAL NOTES:
DISCLAIMER:
1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY
BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.
2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE
BEEN FIELD LOCATED.
3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION
AND IS COLLECTED IN THE AS-BUILT PHASE.
1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY
SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP
AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT
COMPLETION.
3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,
REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS
ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.
4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE
CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.
5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
PRODUCTS.
6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.
7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE
LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.
8.ALL RISERS WILL BE CAPPED AT ALL TIMES.
9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND
BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.
1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.
3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
SPECIFIED OTHERWISE.
4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,
AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.
5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
SPECIFICATIONS.
7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
WITH BUILDING MANAGEMENT.
8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).
9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING
PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
REWORK AT HIS OWN COST.
10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
ALLOWED (9AM-3PM) BUSINESS HOURS.
12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
SHOULD BE ANTICIPATED. ADJUST AS NEEDED.
14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE
MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE
OR APPROVED EQUIVALENT.
15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,
NOT FIELD VERIFIED.
16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.
17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.
18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.
19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE
CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE
COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.
20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE
SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE
NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
CLOSURES.
LEGEND:
V
U U U U U U U U U U
S
W
P
C
G
D
COMCAST
NOTES &
LEGEND
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEREVISIONBYQC3209 NE 4th St.Renton, WA250159PERMIT2 32/8/2018PERMITPSAK2/27/2018Revision PERMITPSAK
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW70'COMCASTCONSTRUCTION NOTES1Dig & intercept(and tie into) existingcomcast in ROW and place 17"x30"vault.2Bore 2(2") conduit with cable acrossMonroe Ave NE.SCALE: 1"=50'025'50'"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE REVISION BY QC
3209 NE 4th St.
Renton, WA
250159
PERMIT332/8/2018 PERMIT PS AK
2/27/2018 Revision Permit PS AK