Franchise Permit: MFP18002027
IVR Number: 18002027
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :04/17/2018Application Date:2423049048Parcel Number:1302 SW 16TH ST
Permit Type:07/30/2018Issue Date:Franchise
Permit Work Class:07/30/2019Expiration Date:Minor Utility
Job Number:279301Franchise Type:Cable
Description:APPROVED WITH COMMENTS OR REDLINES
Overlash fiber over existing comcast system. Proof and pull fiber in existing conduit onto private property. Restoration
per City of Renton standards.
Conditions of Approval: 1. Any existing height violations would need to be resolved at the time of construction. New
aerial fiber must have a minimum vertical clearance of 15' 6". 2. Any abandoned or unused cable would need to be
removed at the time that construction is taking place. 3. The aerial fiber will be required to be installed underground in
the future when other utilities are undergrounded.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
MFP18002027Scott Warlick4/18/2018Justin Johnson4-26-2018
MFP180020278:00 am to 3:00 pmMonday through FridayJustin Johnson4-26-2018
MFP18002027
MFP18002027
MFP18002027
MFP18002027
MFP18002027
MFP18002027
MFP18002027
MFP18002027
MFP18002027
MFP18002027
CANNON CONSTRUCTION,
406 PORTER WAY
MILTON WA, 98354
4/12/2018
To whom it may concern:
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JT# 279301
To whom it may concern,
Cannon Construction has been contracted to design and engineer this project on behalf of Comcast
Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities.
Comcast proposed to overlash approximately 284’ of aerial fiber along the right of way of SW 16th St.
between Oakesdale Ave SW and Seneca Ave SW. Please see maps and drawings for more details.
Comcast is requesting that the City of Renton approve this variance request based on the fact that the
requirements for undergrounding this proposed overlash will not cause substantial adverse impacts to
other persons or entities in the immediate area and will cause undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction roughly
15-25 times the amount of an aerial overlash on the existing Comcast strand.
2. Potential damage to underground facilities will be increased.
3. Over lash will not cause substantial adverse impact to other persons or entities in the
immediate area. Overlashing the cable will be accomplished in a few days, and the residents
will not notice any impact. Comcast will clean up the over lashed spans as necessary and
identify and remove and existing dead cables along this route.
4. The variance is necessary to prevent any undue hardship due to the increased construction
costs if forced to install the proposed extension underground.
5. The granting of the variance will not be materially detrimental to the public welfare because
Comcast does agree to underground the cable system, but they are waiving the obligation
into the future when all other utilities are underground to prevent an undue hardship
against Comcast currently.
Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your
requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere
to all provisions and requirements set forth by the City of Renton to insure safe installation and
maintenance of the proposed facilities.
If you have any further questions regarding this project, please contact Danny Cooley at (253)686-7592.
Thank you for your consideration in this matter.
MFP18002027
Danny Cooley
Construction Coordinator
Attachments:
1. Application for ROW permit
2. 11” x 17” Site plan
3. 11” x 17” Design plan
4. Traffic Control Plan
July 30, 2018
Rhonda Resnik
Comcast Cable Communications, LLC
410 Valley Ave NW
Puyallup, WA 98371
Via Email: Rhonda_Resnik@cable.comcast.com
SUBJECT: Request for Undergrounding Exemption (JT#279301, MFP18002027, 1302 SW 16th St)
Dear Ms. Resnik:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have Cannon Construction overlash approximately 284 lineal feet of 96-count aerial
fiber to existing Puget Sound Energy (PSE) poles beginning at a located on the south side of SW 16th Street
approximately 375 feet east of Oakesdale Avenue SW extending 284 feet west along the south side of SW
16th Street to another existing pole.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) i and ii.
Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under,
along, over, below, through and across the streets, avenues and alleys of City of Renton within the right-
of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the
wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a
utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise
Area are underground, Grantee shall place its Cable System’s distribution cables underground within that
area; provided that such underground locations are actually capable of accommodating Grantee’s cable
and other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles and attach to the existing Comcast aerial path. As minimum
vertical height clearance of 15’-6” would need to be provided for, and existing obsolete cable would need
to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an
exemption with conditions, per RMC 4-6-090(D)(1)(h) i and ii which allows for extensions of existing
overhead communication facilities when there are continuing requirements for poles and it is not likely
that there will be undergrounding in the foreseeable future; and, when there are existing overhead
electrical or communication facilities that will not be removed and the facilities that would have been
required to be removed are parallel to the facilities that will not be removed.
Comcast Job JT#279301
Page 2 of 2
July 30, 2018
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with exemption criteria of RMC 4-6-090(D)(1)(h) i and ii.
Conditions of Approval:
1. Any existing height violations would need to be resolved at the time of construction. New
aerial fiber must have a minimum vertical clearance of 15’-6”.
2. Any abandoned or unused cable would need to be removed at the time that construction is
taking place.
3. The traffic control plan requires separate approval.
4. The aerial fiber will be required to be installed underground in the future when other utilities
are undergrounded.
This decision to grant the exemption with conditions is subject to a fourteen (14) day appeal period from
the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the
City Clerk, along with the required appeal fee, by 5:00 pm, August 13, 2018.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Civil Engineer II
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Pat Miller, Construction Inspection Supervisor
Danny Cooley, Comcast danny_cooley@comcast.net