HomeMy WebLinkAboutMFP18002371DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18002371
IVR Number: 18002371
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :05/02/2018Application Date:3123059041Parcel Number:4600 DAVIS AVE S
Permit Type:07/30/2018Issue Date:Franchise
Permit Work Class:07/30/2019Expiration Date:Minor Utility
Job Number:275106Franchise Type:Cable
Description:APPROVED WITH COMMENTS OR REDLINES.
PRE CONSTRUCTION MEETING REQUIRED
Overlashing new 48 ct 800' and overlash 144 ct 6200'. Pull new 48 ct through existing UG onto private property. Set
new node cabinet on private property. Restoration per City of Renton standards.
Conditions of Approval: 1. Any existing height violations would need to be resolved at the time of construction. New
aerial fiber must have a minimum vertical clearance of 15' 6". 2. Any abandoned or unused cable would need to be
removed at the time that construction is taking place. 3. The aerial fiber will be required to be installed underground in
the future when other utilities are undergrounded.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Scott Nall
SEFNCO Communications Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: BL.041108Construction Contractor: SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
MFP18002371Scott Warlick5/7/2018Justin Johnson5-16-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
RN22D NEW NODE RN59
SEFNCO Communications, Inc.
CODY SHACKETT 253 235-7406
410 Valley Ave NW, Ste 12, Bldg C, Puyallup, WA 98371
owen_shackett@comcast.com
4600 DAVIS AVE S
9:00 am to 3:00 pm
5-21-2018
Reset FormPrint Form
MFP18002371
Justin Johnson
5-16-2018
8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
S 48TH ST TALBOT RD STALBOT RD SS 48TH STEOPEOPEOPEOPEOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLEOPEOPEOPEOP
EOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLS 46TH PLTALBOT RD SBE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
COMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
LIMIT
SPEED R2-1
25
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
SITE SPECIFIC TRAFFIC CONTROL PLAN
BROADWAY [ PROPOSED WORK UNDER GROUND ]
CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS)
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA275106TCP-11 54/20/2018TCP PERMITMNJWMFP18002371
S 192ND ST
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLFLFLFLF
L
FL FLEOP EOP EOP EOP EOP EOP EOP EOP
EOPEO
P EOPFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLFLFLFLFL FLFLEOP EOP EOP EOP EOP EOP EOP EOP
EOP
EOPEOPEOPEOPEOPEOPEOP98TH AVE SS 192ND ST 267'
156'171'176'
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
R
O
A
D
W
O
R
K
A
H
E
A
D
B
E
P
R
E
P
A
R
E
D
T
O
S
T
O
P
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
COMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
LIMIT
SPEED R2-1
25
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
SITE SPECIFIC TRAFFIC CONTROL PLAN
BROADWAY [ PROPOSED WORK UNDER GROUND ]
CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS)
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA275106TCP-12 54/20/2018TCP PERMITMNJWMFP18002371
FLFLFLFLFLFLFLFLFLFLFL
FL
FL
FL
FL
FLEOPEOPEOPEOPE
O
P
E
O
P
EO
P
EOP
EOPFLFLFLFLFLFLFLFLFLFLFL
FL
FL
FL
FL
FL
FL
FL FL FLEOPEOPEOPEOPEOPE
O
P
E
O
P
EOP
EOP
EOPEOP EOP EOP EOP EOP EOP
EOP
EOP
EOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFL FLFLFLFLFLFLFLFLFLFLFLFLFLFL
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
FL
EOP
FLEOPEOP104TH PL SES 192ND STEOP
EOPEOPEOP92'150'145'185'200'164'
143
'
25
5
'
250'
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD 108TH AVE SES 192ND ST
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
COMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
LIMIT
SPEED R2-1
25
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
SITE SPECIFIC TRAFFIC CONTROL PLAN
BROADWAY [ PROPOSED WORK UNDER GROUND ]
CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS)
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA275106TCP-13 54/20/2018TCP PERMITMNJWMFP18002371
FL FL FLEOP
FL FL FL
EOP
FL FL FL FL FL FL FL FL FL
EOP EOP EOP EOP
FL FL FL FL FL FL FL FL
EOP EOP EOP EOP
EOP
FLFLFLFLFLFLFLEOPEOPFL
FL
FL
FL
FL
FL
FL
EOP
EOP
EOP
FL FL FL FLEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOP
EOPEOP108TH AVE SES 192ND ST
107TH AVE SES 192ND ST
106TH AVE SES 192ND STEOPEOP
EOPEOPEOP101'
117'107'86'102'186'134'103'
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
POLICE
OFFICER
FASCOMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
LIMIT
SPEED R2-1
25
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
SITE SPECIFIC TRAFFIC CONTROL PLAN
BROADWAY [ PROPOSED WORK UNDER GROUND ]
CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS)
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA275106TCP-14 54/20/2018TCP PERMITMNJWMFP18002371
Kent ROW
116TH AVE SES 192ND ST
EOP EOP EOP EOPEOP
EOP
EOPEOPEOPEOPEOP EOPEOPEOP215'46'94'
FL
FL
FL FL
FL FL FL FL FL FL FLFLFLFLFLFLFLFLFLFLFLFL FL FL FL FL FL FL FL FL FL FL FL
EOP EOP EOP
EOPEOPFLFLFLFLFLFLBE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
POLICE
OFFICER
COMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
LIMIT
SPEED R2-1
25
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
SITE SPECIFIC TRAFFIC CONTROL PLAN
BROADWAY [ PROPOSED WORK UNDER GROUND ]
CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS)
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA275106TCP-15 54/20/2018TCP PERMITMNJWMFP18002371
Kent ROW
renton ROW
traffic signal is
maintained by the city
of kent
101'117'107'86'102'186'134'103'201'251'92'150'145'185'200'164'
143'
255'250'
200'
267'
156'171'176'273'81'240'238'108'134'263'229'165'250'127'188'215'46'94'
SCOPE OF WORK:
SHEET INDEX:
1 - COVER SHEET
2 - NOTES & LEGEND SHEET
3 TO 5 - DESIGN
BILL OF MATERIALS*:
CONTACTS:
RN22D NEW NODE RN59
THIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONS
PROJECT MAP:
COVER
5900'
PROJECT DESCRIPTION*
4600 DAVIS AVE S, RENTON, WA
SEFNCO:- JUSTIN WITHROW (253)457-2940
COMCAST: - JERRY STEELE
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT1 94/16/2018PERMITMNJWCOMCAST
COMCAST
JT#:275106
TOTAL FOOTAGE 5900'
=
=
=
OVERLASH NEW 48 CT APPROX 800', OVERLASH 144 CT APPROX 6200',
PULL NEW 48 CT THROUGH EXISTING UG ON PRIVATE PROPERTY, SET
NODE CABINET ON PRIVATE PROPERTY.
-OVERLASH
AERIAL OVERLASH
AREA OF WORK
MFP18002371
NOTES & LEGEND
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT2 94/16/2018PERMITMNJWCOMCAST
FIBER PLACEMENT NOTES:
GENERAL NOTES:
DISCLAIMER:
1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY
BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.
2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE
BEEN FIELD LOCATED.
3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION
AND IS COLLECTED IN THE AS-BUILT PHASE.
1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY
SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP
AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT
COMPLETION.
3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,
REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS
ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.
4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE
CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.
5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
PRODUCTS.
6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.
7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE
LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.
8.ALL RISERS WILL BE CAPPED AT ALL TIMES.
9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND
BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.
1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.
3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
SPECIFIED OTHERWISE.
4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,
AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.
5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
SPECIFICATIONS.
7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
WITH BUILDING MANAGEMENT.
8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).
9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING
PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
REWORK AT HIS OWN COST.
10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
ALLOWED (9AM-3PM) BUSINESS HOURS.
12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
SHOULD BE ANTICIPATED. ADJUST AS NEEDED.
14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE
MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE
OR APPROVED EQUIVALENT.
15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,
NOT FIELD VERIFIED.
16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.
17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.
18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.
19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE
CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE
COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.
20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE
SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE
NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
CLOSURES.
STORM DRAIN
MANHOLE
COMMUNICATIONS
WATER
SEWER
POWER
GAS
6
ROW
R
PROPOSED VAULT
PROPOSED BORE PIT
STREET/SIGNAL/TRAFFIC LIGHT
CONSTRUCTION NOTE
CATCH BASIN
FIRE HYDRANT
EXISTING POLE W/ NEW RISER
BUILDING OUTLINE
TRAFFIC FLOW
LANDSCAPING/TREE
POTHOLE LOCATION
CHANNELIZATION
5+39 STATIONING
(xxx') OPEN TRENCH
PROPOSED DIRECTIONAL DRILL
EXISTING PULL THRU
PROPOSED BORE
PROPOSED OPEN TRENCH
(xxx') EXISTING PULL THRU
(xxx') BORE
(xxx') DIRECTIONAL DRILLRIGHT-OF-WAY
CENTERLINE
TRAFFIC LANE
FENCE
D
CB
S C
GAURD RAIL
AERIAL STRAND
LEGEND:
V
U U U U U U
S
W
P
C
G
D
EOP EDGE OF PAVEMENT
MFP18002371
S 48TH ST TALBOT RD SEOPEOPEOPEOPEOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLTALBOT RD S"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT3 94/16/2018PERMITMNJWCOMCAST
OVERLASH 48CT FIBER
MFP18002371
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLFLFLFLF
L
FL FLFLFLFLFLFLFLFLFLFLFLFL
F
L
EOP EOP EOP EOP EOP EOP
EOPE
O
P EOPEOPEOPEOPEOPFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLFLFLFLFL FLFLFLFLFLFLFLFLFLFLFLFLFL
F
L
EOP EOP EOP EOP EOP EOP
EOP
EOPEOPEOPEOPEOPEOPEOPEOP99TH PL SEOP98TH AVE SS 192ND ST
200'
267'
156'171'176'
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT4 94/16/2018PERMITMNJWCOMCAST
OVERLASH 144CT FIBER
MFP18002371
FLFLFLFLFLFLFL
FL
FL
FL
FL
FLEOPEOPEOPE
O
P
E
O
P
EO
P
EOP
EOPFLFLFLFLFLFLFL
F
L
FL
F
L
FL
FL
FL
FL FL FLEOPEOPEOPE
O
P
E
O
P
EO
P
EOP
EOPEOP EOP EOPFLFLFLFLFLFLFLFL FLFLFLFLFLFLFLFLFLFL FL
EOP EOP EOP EOP EOPEOP
EOPEOPEOP185'200'164'
143
'
25
5
'
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT5 94/16/2018PERMITMNJWCOMCAST
OVERHEAD WORK WILL BE AUBURN PERMIT
OVERLASH 144CT FIBER
MFP18002371
work in renton
EOP
EOP
EOP
EOP
FL FL FL FL FL FL FL FL FL
EOP EOP EOP
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
EOP
EOP
EOP
EOP
EOP
EOP
EOP
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
EOP
EOP
EOP
EOP
EOP
EOP104TH PL SES 192ND ST
103'201'
251'92'150'
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT6 94/16/2018PERMITMNJWCOMCAST
MFP18002371
FLFLFLFLFLFLFLEOPEOPFL
FL
FL
FL
FL
FL
EOP
EOP
EOP
FL FL FL FL FL FL FL FL FL FL FL FL
EOP EOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOP
EOP EOP EOP EOP108TH AVE SES 192ND ST
101'
117'107'86'
127'188'
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT7 94/16/2018PERMITMNJWCOMCAST
OVERLASH 144CT FIBER
MFP18002371
FL FL FL FL FL FL FL FL FL FL
FL FL FL FL FL FL FL FL FL FL FL
EOP EOP EOP EOP EOP
EOP EOP EOP EOP
SE 192ND STS 192ND ST
EOP
EOP EOP EOP EOP EOPEOPEOP EOP
EOP EOP EOP EOP
EOPEOPEOP EOP
EOP EOP
108'134'263'229'165'
FL FL FL FL FL FL FL FL FL FL FL FL
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FL FL FL
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT8 94/16/2018PERMITMNJWCOMCAST
OVERHEAD WORK WILL BE AUBURN PERMIT
OVERLASH 144CT FIBER
MFP18002371
116TH AVE SES 192ND ST
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOP EOP
EOP EOP EOP EOP EOP
EOP
EOP
EOPEOPEOPEOPEOP EOPEOPEOP273'81'240'
215'46'94'
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FL
FL FL
FL FL FL FL FL FL
FL FL FL FL FL FL FL FL FL FL FL FLFLFLFLFL FL FL FL FLFLFLFLFLFLFL
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT9 94/16/2018PERMITMNJWCOMCAST
OVERHEAD WORK WILL BE AUBURN PERMIT
OVERLASH 144CT FIBER
MFP18002371
MFP18002371
July 30, 2018
Cody Shackett
Comcast Cable Communications, LLC
410 Valley Ave NW
Puyallup, WA 98371
Via Email: owen_shackett@cable.comcast.com
SUBJECT: Request for Undergrounding Exemption (JT#275106, MFP18002371, 4600 Davis Ave S)
Dear Mr. Shackett:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have SEFNCO Communications perform the following:
1. Overlash approximately 460 lineal feet of 48-count aerial fiber to existing Puget Sound Energy
(PSE) poles beginning at a located on the west side of Talbot Road at the south side of the Copper
Ridge Apartments at the 400 block of Talbot Road S extending 460 feet south to an existing pole
on the northwest corner of S 48th Street and Talbot Road S.
2. Overlash approximately 3,780 lineal feet of 144-count aerial fiber to existing Puget Sound Energy
(PSE) poles beginning at the southwest corner of 108th Avenue SE and SE 192nd St and extending
west along the south side of SE 192nd for approximately 3,780 lineal feet ending at an existing
pole located approximately 80 feet east of the Talbot Road S and SE 192nd Street.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) i and ii.
Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under,
along, over, below, through and across the streets, avenues and alleys of City of Renton within the right-
of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the
wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a
utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise
Area are underground, Grantee shall place its Cable System’s distribution cables underground within that
area; provided that such underground locations are actually capable of accommodating Grantee’s cable
and other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles and attach to the existing Comcast aerial path. As minimum
vertical height clearance of 15’-6” would need to be provided for, and existing obsolete cable would need
to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an
exemption with conditions, per RMC 4-6-090(D)(1)(h) i and ii which allows for extensions of existing
Comcast Job JT#275106
Page 2 of 2
July 27, 2018
overhead communication facilities when there are continuing requirements for poles and it is not likely
that there will be undergrounding in the foreseeable future; and, when there are existing overhead
electrical or communication facilities that will not be removed and the facilities that would have been
required to be removed are parallel to the facilities that will not be removed.
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with exemption criteria of RMC 4-6-090(D)(1)(h) i and ii.
Conditions of Approval:
1. Any existing height violations would need to be resolved at the time of construction. New
aerial fiber must have a minimum vertical clearance of 15’-6”.
2. Any abandoned or unused cable would need to be removed at the time that construction is
taking place.
3. The traffic control plan requires separate approval.
4. The aerial fiber will be required to be installed underground in the future when other utilities
are undergrounded.
This decision to grant the exemption with conditions is subject to a fourteen (14) day appeal period from
the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the
City Clerk, along with the required appeal fee, by 5:00 pm, August 13, 2018.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Civil Engineer II
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Pat Miller, Construction Inspection Supervisor
Stefania Spencer, SEFNCO Communication Inc., sspencer@sefnco.com
Franchise Permits