Loading...
HomeMy WebLinkAboutMFP18002371DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18002371 IVR Number: 18002371 Permit Informaon Permit Name:Comcast Cable Franchise Permit Address/Locaon :05/02/2018Application Date:3123059041Parcel Number:4600 DAVIS AVE S Permit Type:07/30/2018Issue Date:Franchise Permit Work Class:07/30/2019Expiration Date:Minor Utility Job Number:275106Franchise Type:Cable Description:APPROVED WITH COMMENTS OR REDLINES. PRE CONSTRUCTION MEETING REQUIRED Overlashing new 48 ct 800' and overlash 144 ct 6200'. Pull new 48 ct through existing UG onto private property. Set new node cabinet on private property. Restoration per City of Renton standards. Conditions of Approval: 1. Any existing height violations would need to be resolved at the time of construction. New aerial fiber must have a minimum vertical clearance of 15' 6". 2. Any abandoned or unused cable would need to be removed at the time that construction is taking place. 3. The aerial fiber will be required to be installed underground in the future when other utilities are undergrounded. Contacts Name Address PhoneTypeBilling Comcast Cable Communication Management & Comcast Cable B: (215) 665-1700Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Scott Nall SEFNCO Communications Inc 2904 4th Ave NE Puyallup, WA 98372 B: (877) 385-2903 C: (253) 444-9057 Contractor Business License Number: BL.041108Construction Contractor: SEFNCCI850QD CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES MFP18002371Scott Warlick5/7/2018Justin Johnson5-16-2018 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: RN22D NEW NODE RN59 SEFNCO Communications, Inc. CODY SHACKETT 253 235-7406 410 Valley Ave NW, Ste 12, Bldg C, Puyallup, WA 98371 owen_shackett@comcast.com 4600 DAVIS AVE S 9:00 am to 3:00 pm 5-21-2018 Reset FormPrint Form MFP18002371 Justin Johnson 5-16-2018 8:00 am to 3:00 pm Monday through Friday SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). S 48TH ST TALBOT RD STALBOT RD SS 48TH STEOPEOPEOPEOPEOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLEOPEOPEOPEOP EOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLS 46TH PLTALBOT RD SBE PREPARED TO STOP ROAD WORK AHEAD BE PREPARED TO STOP ROAD WORK AHEAD COMCAST SCALE: N.T.S. ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) LIMIT SPEED R2-1 25 SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED. SITE SPECIFIC TRAFFIC CONTROL PLAN BROADWAY [ PROPOSED WORK UNDER GROUND ] CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS) "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA275106TCP-11 54/20/2018TCP PERMITMNJWMFP18002371 S 192ND ST FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FLFLFLFLFLF L FL FLEOP EOP EOP EOP EOP EOP EOP EOP EOPEO P EOPFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FLFLFLFLFLFL FLFLEOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOP98TH AVE SS 192ND ST 267' 156'171'176' BE PREPARED TO STOP ROAD WORK AHEAD R O A D W O R K A H E A D B E P R E P A R E D T O S T O P BE PREPARED TO STOP ROAD WORK AHEAD COMCAST SCALE: N.T.S. ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) LIMIT SPEED R2-1 25 SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED. SITE SPECIFIC TRAFFIC CONTROL PLAN BROADWAY [ PROPOSED WORK UNDER GROUND ] CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS) "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA275106TCP-12 54/20/2018TCP PERMITMNJWMFP18002371 FLFLFLFLFLFLFLFLFLFLFL FL FL FL FL FLEOPEOPEOPEOPE O P E O P EO P EOP EOPFLFLFLFLFLFLFLFLFLFLFL FL FL FL FL FL FL FL FL FLEOPEOPEOPEOPEOPE O P E O P EOP EOP EOPEOP EOP EOP EOP EOP EOP EOP EOP EOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFL FLFLFLFLFLFLFLFLFLFLFLFLFLFL EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP FL EOP FLEOPEOP104TH PL SES 192ND STEOP EOPEOPEOP92'150'145'185'200'164' 143 ' 25 5 ' 250' BE PREPARED TO STOP ROAD WORK AHEAD BE PREPARED TO STOP ROAD WORK AHEAD 108TH AVE SES 192ND ST BE PREPARED TO STOP ROAD WORK AHEAD BE PREPARED TO STOP ROAD WORK AHEAD ROAD WORK AHEAD BE PREPARED TO STOP COMCAST SCALE: N.T.S. ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) LIMIT SPEED R2-1 25 SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED. SITE SPECIFIC TRAFFIC CONTROL PLAN BROADWAY [ PROPOSED WORK UNDER GROUND ] CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS) "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA275106TCP-13 54/20/2018TCP PERMITMNJWMFP18002371 FL FL FLEOP FL FL FL EOP FL FL FL FL FL FL FL FL FL EOP EOP EOP EOP FL FL FL FL FL FL FL FL EOP EOP EOP EOP EOP FLFLFLFLFLFLFLEOPEOPFL FL FL FL FL FL FL EOP EOP EOP FL FL FL FLEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOP EOPEOP108TH AVE SES 192ND ST 107TH AVE SES 192ND ST 106TH AVE SES 192ND STEOPEOP EOPEOPEOP101' 117'107'86'102'186'134'103' BE PREPARED TO STOP ROAD WORK AHEAD BE PREPARED TO STOP ROAD WORK AHEAD BE PREPARED TO STOP ROAD WORK AHEAD BE PREPARED TO STOP ROAD WORK AHEAD BE PREPARED TO STOP ROAD WORK AHEAD ROAD WORK AHEAD BE PREPARED TO STOP POLICE OFFICER FASCOMCAST SCALE: N.T.S. ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) LIMIT SPEED R2-1 25 SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED. SITE SPECIFIC TRAFFIC CONTROL PLAN BROADWAY [ PROPOSED WORK UNDER GROUND ] CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS) "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA275106TCP-14 54/20/2018TCP PERMITMNJWMFP18002371 Kent ROW 116TH AVE SES 192ND ST EOP EOP EOP EOPEOP EOP EOPEOPEOPEOPEOP EOPEOPEOP215'46'94' FL FL FL FL FL FL FL FL FL FL FLFLFLFLFLFLFLFLFLFLFLFL FL FL FL FL FL FL FL FL FL FL FL EOP EOP EOP EOPEOPFLFLFLFLFLFLBE PREPARED TO STOP ROAD WORK AHEAD BE PREPARED TO STOP ROAD WORK AHEAD ROAD WORK AHEAD BE PREPARED TO STOP POLICE OFFICER COMCAST SCALE: N.T.S. ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) LIMIT SPEED R2-1 25 SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED. SITE SPECIFIC TRAFFIC CONTROL PLAN BROADWAY [ PROPOSED WORK UNDER GROUND ] CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS) "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA275106TCP-15 54/20/2018TCP PERMITMNJWMFP18002371 Kent ROW renton ROW traffic signal is maintained by the city of kent 101'117'107'86'102'186'134'103'201'251'92'150'145'185'200'164' 143' 255'250' 200' 267' 156'171'176'273'81'240'238'108'134'263'229'165'250'127'188'215'46'94' SCOPE OF WORK: SHEET INDEX: 1 - COVER SHEET 2 - NOTES & LEGEND SHEET 3 TO 5 - DESIGN BILL OF MATERIALS*: CONTACTS: RN22D NEW NODE RN59 THIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONS PROJECT MAP: COVER 5900' PROJECT DESCRIPTION* 4600 DAVIS AVE S, RENTON, WA SEFNCO:- JUSTIN WITHROW (253)457-2940 COMCAST: - JERRY STEELE *ALL FOOTAGES AND MATERIALS ARE ESTIMATED "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT1 94/16/2018PERMITMNJWCOMCAST COMCAST JT#:275106 TOTAL FOOTAGE 5900' = = = OVERLASH NEW 48 CT APPROX 800', OVERLASH 144 CT APPROX 6200', PULL NEW 48 CT THROUGH EXISTING UG ON PRIVATE PROPERTY, SET NODE CABINET ON PRIVATE PROPERTY. -OVERLASH AERIAL OVERLASH AREA OF WORK MFP18002371 NOTES & LEGEND "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT2 94/16/2018PERMITMNJWCOMCAST FIBER PLACEMENT NOTES: GENERAL NOTES: DISCLAIMER: 1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY. 2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE BEEN FIELD LOCATED. 3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION AND IS COLLECTED IN THE AS-BUILT PHASE. 1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY. 2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT COMPLETION. 3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED. 4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND. 5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM PRODUCTS. 6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED. 7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER. 8.ALL RISERS WILL BE CAPPED AT ALL TIMES. 9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER. 1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS. 2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION. 3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS SPECIFIED OTHERWISE. 4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS, AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET. 5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION. 6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD SPECIFICATIONS. 7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES WITH BUILDING MANAGEMENT. 8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s). 9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE REWORK AT HIS OWN COST. 10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER. 11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN ALLOWED (9AM-3PM) BUSINESS HOURS. 12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED. 13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE SHOULD BE ANTICIPATED. ADJUST AS NEEDED. 14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE OR APPROVED EQUIVALENT. 15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS, NOT FIELD VERIFIED. 16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS. 17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED. 18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION. 19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING. 20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE CLOSURES. STORM DRAIN MANHOLE COMMUNICATIONS WATER SEWER POWER GAS 6 ROW R PROPOSED VAULT PROPOSED BORE PIT STREET/SIGNAL/TRAFFIC LIGHT CONSTRUCTION NOTE CATCH BASIN FIRE HYDRANT EXISTING POLE W/ NEW RISER BUILDING OUTLINE TRAFFIC FLOW LANDSCAPING/TREE POTHOLE LOCATION CHANNELIZATION 5+39 STATIONING (xxx') OPEN TRENCH PROPOSED DIRECTIONAL DRILL EXISTING PULL THRU PROPOSED BORE PROPOSED OPEN TRENCH (xxx') EXISTING PULL THRU (xxx') BORE (xxx') DIRECTIONAL DRILLRIGHT-OF-WAY CENTERLINE TRAFFIC LANE FENCE D CB S C GAURD RAIL AERIAL STRAND LEGEND: V U U U U U U S W P C G D EOP EDGE OF PAVEMENT MFP18002371 S 48TH ST TALBOT RD SEOPEOPEOPEOPEOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLTALBOT RD S"DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT3 94/16/2018PERMITMNJWCOMCAST OVERLASH 48CT FIBER MFP18002371 FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FLFLFLFLFLF L FL FLFLFLFLFLFLFLFLFLFLFLFL F L EOP EOP EOP EOP EOP EOP EOPE O P EOPEOPEOPEOPEOPFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FLFLFLFLFLFL FLFLFLFLFLFLFLFLFLFLFLFLFL F L EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOP99TH PL SEOP98TH AVE SS 192ND ST 200' 267' 156'171'176' "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT4 94/16/2018PERMITMNJWCOMCAST OVERLASH 144CT FIBER MFP18002371 FLFLFLFLFLFLFL FL FL FL FL FLEOPEOPEOPE O P E O P EO P EOP EOPFLFLFLFLFLFLFL F L FL F L FL FL FL FL FL FLEOPEOPEOPE O P E O P EO P EOP EOPEOP EOP EOPFLFLFLFLFLFLFLFL FLFLFLFLFLFLFLFLFLFL FL EOP EOP EOP EOP EOPEOP EOPEOPEOP185'200'164' 143 ' 25 5 ' "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT5 94/16/2018PERMITMNJWCOMCAST OVERHEAD WORK WILL BE AUBURN PERMIT OVERLASH 144CT FIBER MFP18002371 work in renton EOP EOP EOP EOP FL FL FL FL FL FL FL FL FL EOP EOP EOP FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOP EOP EOP EOP EOP EOP FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOP EOP EOP EOP EOP104TH PL SES 192ND ST 103'201' 251'92'150' "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT6 94/16/2018PERMITMNJWCOMCAST MFP18002371 FLFLFLFLFLFLFLEOPEOPFL FL FL FL FL FL EOP EOP EOP FL FL FL FL FL FL FL FL FL FL FL FL EOP EOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOP EOP EOP EOP EOP108TH AVE SES 192ND ST 101' 117'107'86' 127'188' "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT7 94/16/2018PERMITMNJWCOMCAST OVERLASH 144CT FIBER MFP18002371 FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOP EOP EOP EOP EOP EOP EOP EOP SE 192ND STS 192ND ST EOP EOP EOP EOP EOP EOPEOPEOP EOP EOP EOP EOP EOP EOPEOPEOP EOP EOP EOP 108'134'263'229'165' FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT8 94/16/2018PERMITMNJWCOMCAST OVERHEAD WORK WILL BE AUBURN PERMIT OVERLASH 144CT FIBER MFP18002371 116TH AVE SES 192ND ST EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOP EOPEOPEOP273'81'240' 215'46'94' FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FLFLFLFLFL FL FL FL FLFLFLFLFLFLFL "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC1000 3rd AVE WBREMERTON, WA272779PERMIT9 94/16/2018PERMITMNJWCOMCAST OVERHEAD WORK WILL BE AUBURN PERMIT OVERLASH 144CT FIBER MFP18002371 MFP18002371 July 30, 2018 Cody Shackett Comcast Cable Communications, LLC 410 Valley Ave NW Puyallup, WA 98371 Via Email: owen_shackett@cable.comcast.com SUBJECT: Request for Undergrounding Exemption (JT#275106, MFP18002371, 4600 Davis Ave S) Dear Mr. Shackett: The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. Comcast proposes to have SEFNCO Communications perform the following: 1. Overlash approximately 460 lineal feet of 48-count aerial fiber to existing Puget Sound Energy (PSE) poles beginning at a located on the west side of Talbot Road at the south side of the Copper Ridge Apartments at the 400 block of Talbot Road S extending 460 feet south to an existing pole on the northwest corner of S 48th Street and Talbot Road S. 2. Overlash approximately 3,780 lineal feet of 144-count aerial fiber to existing Puget Sound Energy (PSE) poles beginning at the southwest corner of 108th Avenue SE and SE 192nd St and extending west along the south side of SE 192nd for approximately 3,780 lineal feet ending at an existing pole located approximately 80 feet east of the Talbot Road S and SE 192nd Street. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) i and ii. Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and across the streets, avenues and alleys of City of Renton within the right- of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its Cable System’s distribution cables underground within that area; provided that such underground locations are actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the Cable Systems’ signal quality. The proposal would utilize existing poles and attach to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for, and existing obsolete cable would need to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an exemption with conditions, per RMC 4-6-090(D)(1)(h) i and ii which allows for extensions of existing Comcast Job JT#275106 Page 2 of 2 July 27, 2018 overhead communication facilities when there are continuing requirements for poles and it is not likely that there will be undergrounding in the foreseeable future; and, when there are existing overhead electrical or communication facilities that will not be removed and the facilities that would have been required to be removed are parallel to the facilities that will not be removed. DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(h) i and ii. Conditions of Approval: 1. Any existing height violations would need to be resolved at the time of construction. New aerial fiber must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused cable would need to be removed at the time that construction is taking place. 3. The traffic control plan requires separate approval. 4. The aerial fiber will be required to be installed underground in the future when other utilities are undergrounded. This decision to grant the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, August 13, 2018. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Gregg Zimmerman, PW Administrator Jennifer Henning, Planning Director Justin Johnson, Civil Engineer II Scott Warlick, Engineering Specialist II Holly Powers, Permit Technician Pat Miller, Construction Inspection Supervisor Stefania Spencer, SEFNCO Communication Inc., sspencer@sefnco.com Franchise Permits