Loading...
HomeMy WebLinkAboutMFP18002610DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18002610 IVR Number: 18002610 Permit Informaon Permit Name:Comcast Cable Franchise Permit Address/Locaon :05/16/2018Application Date:1723059105Parcel Number:324 SUNSET BLVD N Permit Type:06/01/2018Issue Date:Franchise Permit Work Class:06/01/2019Expiration Date:Minor Utility Job Number:283137Franchise Type:Cable Description:APPROVED WITH COMMENTS OR REDLINES Pushing cable through existing conduit 381' in ROW; Drilling 10' onto private property. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Comcast Cable Communication Management & Comcast Cable B: (215) 665-1700Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Scott Nall SEFNCO Communications Inc 2904 4th Ave NE Puyallup, WA 98372 B: (877) 385-2903 C: (253) 444-9057 Contractor Business License Number: BL.041108Construction Contractor: SEFNCCI850QD CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES MFP18002610Scott Warlick5/17/2018Restoration Per City of Renton StandardsHolly Powers6/1/2018 MFP18002610Scott Warlick6/1/2018Monday - Friday EOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWRO W RO W ROW EOPEOPEOPEOPEOPEO P EOPEOP EOP EOP EOP EOP EOPEOPEOP SUNS E T B L V D N "DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUE FOR:BY QC DATE REVISION BY QC 324 SUNSET BLVD N RENTON , WA 283137 SITE SPECIFIC-TCP1 25/10/2018 PERMIT HBBCOMCASTSCALE: N.T.S.ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THEFEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST52''&253035455055155200250360425495570.10)+67&+0#.$7(('452#%'$.'0)6*4030560657078084010105150205270450500550---11115160225295495550605660--12125180245320540600660720780840.#0'9+&6*25303540455055606570/+0+/7/6#2'4.'0)6*+0(''6.2156'&52''&.+/+6 /2* LIMITSPEEDR2-130 5+6'016'5MAINTAIN DRIVEWAY ACCESS AT ALL TIMESSIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BYA SPOTTER TO INSURE FLOW AND SAFETY DURING WORKUNLESS OTHERWISE NOTED.5+6'52'%+(+%64#((+%%10641.2.#05705'6$.8&0=241215'&914-70&'4)4170&?%10641.6;2' 914-$';10&6*'5*17.&'4ORJ14.'55 SHOULDERWORKLIMITSPEEDR2-130WO R K VEH I C L E 2' MINDIRE C T I O N O F U / G W O R KA - MATCH - B ON SHEET 2WORKZONE-1NOPARKINGFROMTOTOW-AWAY AREAPHONE (CONTACT #)NAME OF FIRM 000-0000NOTE:ADJACENT BUSINESS' WILL BE NOTIFIEDIN WRITING 24 hrs IN ADVANCE OFPLACEMENT OF NO PARKING SIGNSMFP18002610Please provide spottersfor pedestrian traffic.Additional laneclosure and signsneeded for this lane.Arrowboard shallbe requiredprovide notice of noparking zone 72hours before thestart of work. ROWROWR O W RO W RO W EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOP EOPEOPEOPE O P E O P E O P EO P EO P EO P RRRRRR 324NE 3rd ST"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUE FOR:BY QC DATE REVISION BY QC 324 SUNSET BLVD N RENTON , WA 283137 SITE SPECIFIC-TCP2 25/10/2018 PERMIT HBBCOMCASTSCALE: N.T.S.ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THEFEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST52''&253035455055155200250360425495570.10)+67&+0#.$7(('452#%'$.'0)6*4030560657078084010105150205270450500550---11115160225295495550605660--12125180245320540600660720780840.#0'9+&6*25303540455055606570/+0+/7/6#2'4.'0)6*+0(''6.2156'&52''&.+/+6 /2* LIMITSPEEDR2-130 5+6'016'5MAINTAIN DRIVEWAY ACCESS AT ALL TIMESSIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BYA SPOTTER TO INSURE FLOW AND SAFETY DURING WORKUNLESS OTHERWISE NOTED.5+6'52'%+(+%64#((+%%10641.2.#05705'6$.8&0=241215'&914-70&'4)4170&?%10641.6;2' 914-$';10&6*'5*17.&'4ORJ14.'55 S H O U L D E RWO R KLIMITSPEEDR2-130WOR K VEHI C L E DIRE C T I O N O F U / G W O R K B - MATCH - A ON SHEET 1WORKZONE-2SPOTTER*SPOTTER*SHOULDERWORKSHOULDERWORK2' MINDIRE C T I O N O F U/G W O R K MFP18002610Additional laneclosure and signsneeded for this lane SCOPE OF WORK:SHEET INDEX:1- COVER SHEET2- NOTES & LEGEND SHEET3 - DESIGNBILL OF MATERIALS*:CONTACTS:SPIRIT AUTO CENTERTHIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONSPROJECT VICINITY MAP:COVERPUSH NEW COAX CABLE THROUGH EXISTING CONDUITEND OF DESIGN IN R.O.W., CONTINUES ON PRIVATE381'PROJECT DESCRIPTION*324 SUNSET BLVD N, RENTON, WASEFNCO:PAUL JENSEN 253-259-0951COMCAST:KYLE KINNEY*ALL FOOTAGES AND MATERIALS ARE ESTIMATED"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUE FOR:BY QC DATE REVISION BY QC 324 SUNSET BLVD N RENTON , WA 283137 PERMIT135/10/2018 PERMIT HBB COMCASTCOMCASTJT#: 283137QTY. (381') NEW COAX CABLETIE-IN TO EXISTING VAULT, HEADING SOUTH PUSH NEW COAX CABLETHROUGH EXISTING EMPTY CONDUIT 381' TO EXISTING VAULT, END OFDESIGN IN R.O.W., CONTINUES ON PRIVATE PROPERTY.TOTAL FOOTAGE381'==LOCATION OF WORKMFP18002610 NOTES & LEGEND"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUE FOR:BY QC DATE REVISION BY QC 324 SUNSET BLVD N RENTON , WA 283137 PERMIT235/10/2018 PERMIT HBBCOMCAST FIBER PLACEMENT NOTES:GENERAL NOTES: DISCLAIMER:1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAYBEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE BEEN FIELD LOCATED.3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTIONAND IS COLLECTED IN THE AS-BUILT PHASE.1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITYSEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOPAND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECTCOMPLETION.3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESSON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICECASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUMPRODUCTS.6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THELOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.8.ALL RISERS WILL BE CAPPED AT ALL TIMES.9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, ANDBLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS SPECIFIED OTHERWISE.4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAYOWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES AREREQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARDSPECIFICATIONS.7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ONBUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMESWITH BUILDING MANAGEMENT.8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TOCONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEINGPERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOTBEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDEREWORK AT HIS OWN COST.10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUITPATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHINALLOWED (9AM-3PM) BUSINESS HOURS.12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THECONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCESHOULD BE ANTICIPATED. ADJUST AS NEEDED.14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FORROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THEMINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVEOR APPROVED EQUIVALENT.15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,NOT FIELD VERIFIED.16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANECLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BECOORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERESHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BENECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANECLOSURES.STORM DRAINMANHOLECOMMUNICATIONSWATERSEWERPOWERGAS6ROWRPROPOSED VAULT PROPOSED BORE PITSTREET/SIGNAL/TRAFFIC LIGHTCONSTRUCTION NOTECATCH BASINFIRE HYDRANTEXISTING POLE W/ NEW RISERBUILDING OUTLINETRAFFIC FLOWLANDSCAPING/TREEPOTHOLE LOCATIONCHANNELIZATION5+39STATIONING(xxx') OPEN TRENCHPROPOSED DIRECTIONAL DRILLEXISTING PULL THRUPROPOSED BOREPROPOSED OPEN TRENCH(xxx') EXISTING PULL THRU(xxx') BORE(xxx') DIRECTIONAL DRILLRIGHT-OF-WAYCENTERLINETRAFFIC LANEFENCEDCBSCGAURD RAILAERIAL STRANDLEGEND:VUUUUUUSWPCGDEOPEDGE OF PAVEMENTMFP18002610 EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWRO W RO W RO W RO W RO W RO W ROW ROW ROW EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPRRRRRR324EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP I-405I-405MFP18002610