Loading...
HomeMy WebLinkAboutMFP18003619DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18003619 IVR Number: 18003619 Permit Informaon Permit Name:Comcast Cable Franchise Permit Address/Locaon :07/03/2018Application Date:7565100025Parcel Number:1222 BRONSON WAY N Permit Type:07/30/2018Issue Date:Franchise Permit Work Class:07/30/2019Expiration Date:Minor Utility Job Number:288340Franchise Type:Cable Description:APPROVED WITH COMMENTS OR REDLINES Comcast propose to tie into aerial splice case and overlash 12ct fiber on 7 poles. Restoration per City of Renton standards. Conditions of Approval: 1. Any existing height violations would need to be resolved at the time of construction. New aerial fiber must have a minimum vertical clearance of 15' 6". 2. Any abandoned or unused cable would need to be removed at the time that construction is taking place. 3. The aerial fiber will be required to be installed underground in the future when other utilities are undergrounded. Contacts Name Address PhoneTypeBilling Comcast Cable Communication Management & Comcast Cable B: (215) 665-1700Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Scott Nall SEFNCO Communications Inc 2904 4th Ave NE Puyallup, WA 98372 B: (877) 385-2903 C: (253) 444-9057 Contractor Business License Number: BL.041108Construction Contractor: SEFNCCI850QD CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES MFP18003619Scott Warlick7/3/2018Justin Johnson7-25-2018 MFP18003619Justin Johnson7-25-2018Monday through Friday8:00 am to 3:00 pm EOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPPOLE-6POLE-7POLE-5POLE-4PARK AVE NROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWN 2nd STR.O.W. ALLEY"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUE FOR:BY QC DATE REVISION BY QC 1222 BRONSON WAY N RENTON , WA 288340 SITE SPECIFIC-TCP1 36/22/2018 PERMIT HBBCOMCASTSCALE: N.T.S.ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THEFEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST52''&253035455055155200250360425495570.10)+67&+0#.$7(('452#%'$.'0)6*4030560657078084010105150205270450500550---11115160225295495550605660--12125180245320540600660720780840.#0'9+&6*25303540455055606570/+0+/7/6#2'4.'0)6*+0(''6.2156'&52''&.+/+6 /2* LIMITSPEEDR2-125 5+6'016'5MAINTAIN DRIVEWAY ACCESS AT ALL TIMESSIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BYA SPOTTER TO INSURE FLOW AND SAFETY DURING WORKUNLESS OTHERWISE NOTED.5+6'52'%+(+%64#((+%%10641.2.#0#..';9#;"0PF56 914-<10'Ä =241215'&914-#'4+#.18'4Ä.#5*?%10641.6;2' 5*17.&'4914-Ä%.1574'9'0%41#%*/'06.1952''&41#&9#;ÄORJ14.'55 WORKVEHICLEROADWORKAHEADBEPREPAREDTO STOPDIRECTION OF AERIAL OVER-LASHSLOW MOVING WORK ZONE-1WORKVEHICLEFLAGGERFLAGGERFLAGGERSPOTTER*SPOTTER*SPOTTER*SPOTTER*ROADWORKAHEADBEPREPAREDTO STOPROADWORKAHEADNO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000 NO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000 NOTE:ADJACENT BUSINESSES AND/ORRESIDENT'S WILL BE NOTIFIED IN WRITING48 hrs IN ADVANCE OF PLACEMENT OF NOPARKING SIGNSMFP18003619Signs needed here EOPEOPEOPEOPEOP EOP EOP EOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOPEOPEOPEOPPOLE-6POLE-7POLE-5POLE-4POLE-2POLE-3N 2nd STPELLY AVE NPARK AVE NROWROWROWROWROWROWROWROWROWROWROWROWROWN 2nd STR.O.W. ALLEY"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUE FOR:BY QC DATE REVISION BY QC 1222 BRONSON WAY N RENTON , WA 288340 SITE SPECIFIC-TCP2 36/22/2018 PERMIT HBBCOMCASTSCALE: N.T.S.ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THEFEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST52''&253035455055155200250360425495570.10)+67&+0#.$7(('452#%'$.'0)6*4030560657078084010105150205270450500550---11115160225295495550605660--12125180245320540600660720780840.#0'9+&6*25303540455055606570/+0+/7/6#2'4.'0)6*+0(''6.2156'&52''&.+/+6 /2* LIMITSPEEDR2-125 5+6'016'5MAINTAIN DRIVEWAY ACCESS AT ALL TIMESSIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BYA SPOTTER TO INSURE FLOW AND SAFETY DURING WORKUNLESS OTHERWISE NOTED.5+6'52'%+(+%64#((+%%10641.2.#00PF56 2#4-#8'0 914-<10'Ä =241215'&914-#'4+#.18'4Ä.#5*?%10641.6;2' 5*17.&'4914-Ä%.1574'.1952''&41#&9#;ÄORJ14.'55 WORKVEHICLEROAD WORK AHEAD BE PREPARED TO STOPWORKVEHICLEFLAGGERFLAGGERDIRECTION OF AERIAL OVER-LASHSLOW MOVING WORK ZONE-2SPOTTER*SPOTTER*SPOTTER*SPOTTER*FLAGGERROADWORKAHEADRIGHTLANECLOSEDAHEADROADWORKAHEADBEPREPAREDTO STOPFLAGGERBEPREPAREDTO STOPROADWORKAHEADRIGHTLANECLOSEDAHEADBEPREPAREDTO STOPFLAGGERNO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000 ROADWORKAHEADRIGHTLANECLOSEDAHEADFLAGGERNO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000 NO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000 NO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000 NO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000 NO PARKINGFROMTOTOW-AWAY AREAPHONE (CONTACT #)NAME OF FIRM 000-0000NOPARKINGFROMTOTOW-AWAY AREAPHONE (CONTACT #)NAME OF FIRM 000-0000NOPARKINGFROMTOTOW-AWAY AREAPHONE (CONTACT #)NAME OF FIRM 000-0000 NOTE:ADJACENT BUSINESSES AND/ORRESIDENT'S WILL BE NOTIFIED IN WRITING48 hrs IN ADVANCE OF PLACEMENT OF NOPARKING SIGNSROADWORKAHEADRIGHTLANECLOSEDAHEADROADWORKAHEADBEPREPAREDTO STOPFLAGGERFLAGGERDIRECTION OF AERIAL OVER-LASHSLOW MOVING WORK ZONE-30PF56 2'..;#8'0 914-<10'Ä =241215'&914-#'4+#.18'4Ä.#5*?%10641.6;2' 5*17.&'4914-Ä%.1574'.1952''&41#&9#;ÄORJ14.'55 MFP18003619 EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPPOLE-1POLE-2POLE-3N 2nd STWELLS AVE NPELLY AVE NONE WAYONE WAY "DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUE FOR:BY QC DATE REVISION BY QC 1222 BRONSON WAY N RENTON , WA 288340 SITE SPECIFIC-TCP3 36/22/2018 PERMIT HBBCOMCASTSCALE: N.T.S.ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THEFEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST52''&253035455055155200250360425495570.10)+67&+0#.$7(('452#%'$.'0)6*4030560657078084010105150205270450500550---11115160225295495550605660--12125180245320540600660720780840.#0'9+&6*25303540455055606570/+0+/7/6#2'4.'0)6*+0(''6.2156'&52''&.+/+6 /2* LIMITSPEEDR2-125 5+6'016'5MAINTAIN DRIVEWAY ACCESS AT ALL TIMESSIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BYA SPOTTER TO INSURE FLOW AND SAFETY DURING WORKUNLESS OTHERWISE NOTED.5+6'52'%+(+%64#((+%%10641.2.#00PF56 9'..5#8'0 914-<10'Ä =241215'&914-#'4+#.18'4Ä.#5*?%10641.6;2' 5*17.&'4914-Ä%.1574'.1952''&41#&9#;ÄORJ14.'55 ROAD WORK AHEAD BE PREPARED TO STOP WORKVEHICLE FLAGGERNO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000NOTE:ADJACENT BUSINESSES AND/ORRESIDENT'S WILL BE NOTIFIED IN WRITING48 hrs IN ADVANCE OF PLACEMENT OF NOPARKING SIGNSFLAGGERDIRECTION OF AERIAL OVER-LASHSLOW MOVING WORK ZONE-3WORKVEHICLEROADWORKAHEADBEPREPAREDTO STOPNO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000NOPARKINGFROMTOTOW-AWAY AREAPHONE (CONTACT #)NAME OF FIRM 000-0000FLAGGERSPOTTER*SPOTTER*LIMITSPEEDR2-125MFP18003619 SCOPE OF WORK:SHEET INDEX:1- COVER SHEET2- NOTES & LEGEND SHEET3 - 4 - DESIGNBILL OF MATERIALS*:CONTACTS:EVERGREEN BEAUTY COLLEGETHIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONSPROJECT VICINITY MAP:COVEROVER-LASH 48CT FIBER BETWEEN (7) POLES855'PROJECT DESCRIPTION*1222 BRONSON WAY N, RENTON, WASEFNCO:JOSE COSME 253-271-9982COMCAST:KYLE KINNEY*ALL FOOTAGES AND MATERIALS ARE ESTIMATED"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUE FOR:BY QC DATE REVISION BY QC 1222 BRONSON WAY N RENTON , WA 288340 PERMIT146/22/2018 PERMIT HBB COMCASTCOMCASTJT#: 288340QTY.(855') 48CT OVER-LASHTIE-IN TO AERIAL SPLICE CASE, OVER-LASH 48CT FIBER APPROX - 855'BETWEEN (7) POLESTOTAL FOOTAGE855'==LOCATION OF WORKMFP18003619 NOTES & LEGEND"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUE FOR:BY QC DATE REVISION BY QC 1222 BRONSON WAY N RENTON , WA 288340 PERMIT246/22/2018 PERMIT HBBCOMCAST FIBER PLACEMENT NOTES:GENERAL NOTES: DISCLAIMER:1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAYBEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE BEEN FIELD LOCATED.3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTIONAND IS COLLECTED IN THE AS-BUILT PHASE.1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITYSEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOPAND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECTCOMPLETION.3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESSON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICECASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUMPRODUCTS.6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THELOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.8.ALL RISERS WILL BE CAPPED AT ALL TIMES.9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, ANDBLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS SPECIFIED OTHERWISE.4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAYOWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES AREREQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARDSPECIFICATIONS.7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ONBUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMESWITH BUILDING MANAGEMENT.8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TOCONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEINGPERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOTBEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDEREWORK AT HIS OWN COST.10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUITPATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHINALLOWED (9AM-3PM) BUSINESS HOURS.12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THECONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCESHOULD BE ANTICIPATED. ADJUST AS NEEDED.14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FORROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THEMINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVEOR APPROVED EQUIVALENT.15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,NOT FIELD VERIFIED.16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANECLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BECOORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERESHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BENECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANECLOSURES.STORM DRAINMANHOLECOMMUNICATIONSWATERSEWERPOWERGAS6ROWRPROPOSED VAULT PROPOSED BORE PITSTREET/SIGNAL/TRAFFIC LIGHTCONSTRUCTION NOTECATCH BASINFIRE HYDRANTEXISTING POLE W/ NEW RISERBUILDING OUTLINETRAFFIC FLOWLANDSCAPING/TREEPOTHOLE LOCATIONCHANNELIZATION5+39STATIONING(xxx') OPEN TRENCHPROPOSED DIRECTIONAL DRILLEXISTING PULL THRUPROPOSED BOREPROPOSED OPEN TRENCH(xxx') EXISTING PULL THRU(xxx') BORE(xxx') DIRECTIONAL DRILLRIGHT-OF-WAYCENTERLINETRAFFIC LANEFENCEDCBSCGAURD RAILAERIAL STRANDLEGEND:VUUUUUUSWPCGDEOPEDGE OF PAVEMENTMFP18003619 EOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOP EOP EOPEOPEOPEOP POLE-1POLE-5POLE-4POLE-2POLE-3130'150'185'175'110'N 2nd STWELLS AVE NPELLY AVE NPARK AVE NROWROWN 2nd STONE WAYONE WAY "DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUE FOR:BY QC DATE REVISION BY QC 1222 BRONSON WAY N RENTON , WA 288340 PERMIT346/22/2018 PERMIT HBBCOMCAST TIE-IN TO EXISTING POLEOVER-LASH 48CT FIBERMFP18003619 EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP1222POLE-6POLE-7POLE-5CONTINUES ON PRIVATE175'110'105'PARK AVE NN 2nd STGAEDEN AVE NROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWN 2nd STR.O.W. ALLEY"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUE FOR:BY QC DATE REVISION BY QC 1222 BRONSON WAY N RENTON , WA 288340 PERMIT446/22/2018 PERMIT HBBCOMCAST OVER-LASH 48CT FIBERMFP18003619 July 30, 2018 Cody Shackett Comcast Cable Communications, LLC 410 Valley Ave NW Puyallup, WA 98371 Via Email: owen_shackett@comcast.com SUBJECT: Request for Undergrounding Exemption (JT#288340, MFP18003619, 1222 Bronson Way N) Dear Mr. Shackett: The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. Comcast proposes to have SEFNCO Communications overlash approximately 820 lineal feet of 48-count aerial fiber to existing Puget Sound Energy (PSE) poles beginning at a located on the west side of Wells Avenue N at the intersection of N 2nd Street, then extending east along the north side of N 2nd Street to the property line of 1200 N 2nd Street then approximately 100 lineal feet south crossing N 2nd Street. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) i and ii. Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and across the streets, avenues and alleys of City of Renton within the right- of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its Cable System’s distribution cables underground within that area; provided that such underground locations are actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the Cable Systems’ signal quality. The proposal would utilize existing poles and attach to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for, and existing obsolete cable would need to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an exemption with conditions, per RMC 4-6-090(D)(1)(h) i and ii which allows for extensions of existing overhead communication facilities when there are continuing requirements for poles and it is not likely that there will be undergrounding in the foreseeable future; and, when there are existing overhead electrical or communication facilities that will not be removed and the facilities that would have been required to be removed are parallel to the facilities that will not be removed. Comcast Job JT#288340 Page 2 of 2 July 30, 2018 DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(h) i and ii. Conditions of Approval: 1. Any existing height violations would need to be resolved at the time of construction. New aerial fiber must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused cable would need to be removed at the time that construction is taking place. 3. The traffic control plan requires separate approval. 4. The aerial fiber will be required to be installed underground in the future when other utilities are undergrounded. This decision to grant the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, August 13, 2018. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Gregg Zimmerman, PW Administrator Jennifer Henning, Planning Director Justin Johnson, Civil Engineer II Scott Warlick, Engineering Specialist II Holly Powers, Permit Technician Pat Miller, Construction Inspection Supervisor Stefania Spencer, SEFNCO sspencer@sefnco.com Franchise Permits