Franchise Permit: MFP18005867
IVR Number: 18005867
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :10/22/2018Application Date:2146100015Parcel Number:700 POWELL AVE SW
Permit Type:11/14/2018Issue Date:Franchise
Permit Work Class:11/14/2019Expiration Date:Minor Utility
Job Number:299749Franchise Type:Cable
Description:Pull 12ct fiber through 510' of occupied conduit and onto private property.
APPROVED WITH COMMENTS OR REDLINES
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Scott Nall
SEFNCO Communications Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: 41108Construction Contractor: SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management, LLC
299749
Cody Shackett
253 235-7406
owen_shackett@comcast.com
700 POWELL AVE SW DISTRIBUTION INTERNATIONAL
Pull 12 ct fiber through ~510' of occupied conduit and onto private
property.
SEFNCO Communications, Inc.253 299-8587
SEFNCC1850QD BLO29666
10-3-2018
MFP18005867
Scott Warlick 10/22/2018
Holly Powers 11/14/2018
MFP18005867Scott Warlick10/22/2018Monday - Friday
MFP18005867start lane shiftbefore driveway
MFP18005867
SCOPE OF WORK:
SHEET INDEX:
1 - COVER SHEET
2 - NOTES & LEGEND SHEET
3 - DESIGN
BILL OF MATERIALS*:
CONTACTS:
DISTRIBUTION INTERNATIONAL
THIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONS
PROJECT MAP:
COVER
510 FT
FT
FT
PROJECT DESCRIPTION*
700 POWELL AVE SW RENTON, WA
SEFNCO:JOSE COSME 253-271-9982
COMCAST:KYLE KINNEY
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC700 POWELL AVE SWRENTON, WA299749PERMIT1 310/08/2018PERMITMDB***COMCAST
COMCAST
JT#: 299749
TOTAL FOOTAGE 510 FT
=
=
=
=
NEW 12CT FIBER
PROOF PULL 12CT FIBER THRU EXISTING CONDUIT
WORK AREA
PULL 12 CT FIBER THRU ~510' OF OCCUPIED CONDUIT AND ONTO
PRIVATE PROPERTY.
MFP18005867
NOTES & LEGEND
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC700 POWELL AVE SWRENTON, WA299749PERMIT2 310/08/2018PERMITMDBCOMCAST
FIBER PLACEMENT NOTES:
GENERAL NOTES:
DISCLAIMER:
1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY
BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.
2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE
BEEN FIELD LOCATED.
3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION
AND IS COLLECTED IN THE AS-BUILT PHASE.
1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY
SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP
AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT
COMPLETION.
3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,
REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS
ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.
4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE
CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.
5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
PRODUCTS.
6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.
7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE
LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.
8.ALL RISERS WILL BE CAPPED AT ALL TIMES.
9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND
BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.
1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.
3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
SPECIFIED OTHERWISE.
4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,
AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.
5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
SPECIFICATIONS.
7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
WITH BUILDING MANAGEMENT.
8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).
9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING
PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
REWORK AT HIS OWN COST.
10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
ALLOWED (9AM-3PM) BUSINESS HOURS.
12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
SHOULD BE ANTICIPATED. ADJUST AS NEEDED.
14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE
MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE
OR APPROVED EQUIVALENT.
15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,
NOT FIELD VERIFIED.
16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.
17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.
18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.
19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE
CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE
COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.
20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE
SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE
NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
CLOSURES.
STORM DRAIN
MANHOLE
COMMUNICATIONS
WATER
SEWER
POWER
GAS
6
ROW
R
PROPOSED VAULT
PROPOSED BORE PIT
STREET/SIGNAL/TRAFFIC LIGHT
CONSTRUCTION NOTE
CATCH BASIN
FIRE HYDRANT
EXISTING POLE W/ NEW RISER
BUILDING OUTLINE
TRAFFIC FLOW
LANDSCAPING/TREE
POTHOLE LOCATION
CHANNELIZATION
5+39 STATIONING
(xxx') OPEN TRENCH
PROPOSED DIRECTIONAL DRILL
EXISTING PULL THRU
PROPOSED BORE
PROPOSED OPEN TRENCH
(xxx') EXISTING PULL THRU
(xxx') BORE
(xxx') DIRECTIONAL DRILLRIGHT-OF-WAY
CENTERLINE
TRAFFIC LANE
FENCE
D
CB
S C
GAURD RAIL
AERIAL STRAND
LEGEND:
V
U U U U U U
S
W
P
C
G
D
EOP EDGE OF PAVEMENT
MFP18005867
700EOPEOPEOPEOP
EOP EOP
RRRREOPEOPEOP EOP EOP EOP
EOP EOP EOP EOP EOP
EOPEOPEOPEOP EOP EOP EOP EOP EOPEOPEOPEOPSW 7TH ST
SW 7TH ST
SW 7TH ST
SW 7TH ST POWELL AVE SWPOWELL AVE SWPOWELL AVE SWSIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK SIDEWALK
SIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALK228'150'132'
SP.WAUK.1919(SP.BU79.5057)
SIDEWALK
DRIVEWAY
DRIVEWAYDRIVEWAYSIDEWALKSIDEWALKDRIVEWAY"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC700 POWELL AVE SWRENTON, WA299749PERMIT3 310/08/2018PERMITMDBCOMCAST
CONTINUE TO PRIVATE
EXISTING VAULT
PROOF PULL 12CT FIBER THRU
EXISTING CONDUIT.
TIE IN TO EXISTING VAULT.
SP.WAUK.1919(SP.BU79.5057)
PROOF PULL 12CT FIBER THRU
EXISTING CONDUIT.
PROOF PULL 12CT FIBER THRU
EXISTING CONDUIT.
EXISTING VAULT
END OF ROW DESIGN
MFP18005867