HomeMy WebLinkAboutMFP18006331DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18006331
IVR Number: 18006331
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :11/13/2018Application Date:0886600040Parcel Number:719 N 10TH ST
Permit Type:11/16/2018Issue Date:Franchise
Permit Work Class:11/16/2019Expiration Date:Minor Utility
Job Number:302444Franchise Type:Cable
Description:Digging, setting vault in ROW; trenching 5' on private property. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management, LLC
302444
Cody Shackett
253 235-7406
owen_shackett@comcast.com
719 North 10th St RN32 - Red Robin Renton
Digging, setting vault in ROW; trenching 5' on private property.
SEFNCO Communications, Inc.253 299-8587
SEFNCC1850QD BL029666
10-29-2018
4
MFP18006331
Scott Warlick 11/15/2018
RESTORATION PER CITY OF RENTON STANDARDS
Justin Johnson 11-15-2018
MFP18006331Scott Warlick11/15/2018Monday - Friday
MFP18006331
EOPEOPEOPEOPEOPEOPROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWLO
G
A
N
A
V
E
N
5'SCOPE OF WORK:SHEET INDEX:1- COVER SHEET2- NOTES & LEGEND SHEET3 - DESIGNCONTACTS:RN32 - RED ROBIN RENTONTHIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONSPROJECT VICINITY MAP:NO SCALECOVER719 N 10TH ST. RENTON, WASEFNCO:- PAUL JENSENCOMCASTCOMCASTJT-302444DIGGING, SETTING VAULT IN ROW, TRENCHING 5' ONTO PRIVATEPROPERTYLOCATION OF WORK-NEW U/G=5'PROJECT DESCRIPTION*TOTAL FOOTAGE=5'*ALL FOOTAGES AND MATERIALS ARE ESTIMATED"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUED FOR:BY QC
DATE REVISION BY QC 719 N 10TH ST.
RENTON, WA
302444
DESIGN
10/29/2018 PERMIT MN
13MFP18006331
NOTES & LEGENDCOMCASTFIBER PLACEMENT NOTES:GENERAL NOTES: DISCLAIMER:1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAYBEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE BEEN FIELD LOCATED.3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTIONAND IS COLLECTED IN THE AS-BUILT PHASE.1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITYSEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOPAND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECTCOMPLETION.3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESSON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICECASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUMPRODUCTS.6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THELOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.8.ALL RISERS WILL BE CAPPED AT ALL TIMES.9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, ANDBLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.1. ALL VAULTS / HAND-HOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS SPECIFIED OTHERWISE.4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAYOWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES AREREQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARDSPECIFICATIONS.7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ONBUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMESWITH BUILDING MANAGEMENT.8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TOCONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEINGPERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOTBEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDEREWORK AT HIS OWN COST.10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUITPATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHINALLOWED (9AM-3PM) BUSINESS HOURS.12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THECONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCESHOULD BE ANTICIPATED. ADJUST AS NEEDED.14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FORROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THEMINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVEOR APPROVED EQUIVALENT.15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,NOT FIELD VERIFIED.16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANECLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BECOORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERESHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BENECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANECLOSURES.STORM DRAINMANHOLECOMMUNICATIONSWATERSEWERPOWERGAS6ROWRPROPOSED VAULT PROPOSED BORE PITSTREET/SIGNAL/TRAFFIC LIGHTCONSTRUCTION NOTECATCH BASINFIRE HYDRANTEXISTING POLE W/ NEW RISERBUILDING OUTLINETRAFFIC FLOWLANDSCAPING/TREEPOTHOLE LOCATIONCHANNELIZATION5+39STATIONING(xxx') OPEN TRENCHPROPOSED DIRECTIONAL DRILLEXISTING PULL THRUPROPOSED BOREPROPOSED OPEN TRENCH(xxx') EXISTING PULL THRU(xxx') BORE(xxx') DIRECTIONAL DRILLRIGHT-OF-WAYCENTERLINETRAFFIC LANEFENCEDCBSCGUARD RAILAERIAL STRANDLEGEND:VUUUUUUSWPCGDEOPEDGE OF PAVEMENT"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUED FOR:BY QC
DATE REVISION BY QC 719 N 10TH ST.
RENTON, WA
302444
DESIGN
10/29/2018 PERMIT MN
23MFP18006331
EOPEOPEOPEOPEOPEOPROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWLOGAN AVE
N
5'COMCAST"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUED FOR:BY QC
DATE REVISION BY QC 719 N 10TH ST.
RENTON, WA
302444
DESIGN
10/29/2018 PERMIT MN
33OPEN TRENCH 1(2")CONDUIT WITH RG11DROPINTERCEPT/OVERSET17"X30" VAULTRG11 DROPMFP18006331