Loading...
HomeMy WebLinkAboutP_Utility Plan_Alpine Nursery_101103493_170501_V13 w O UJ Z CL 0 0 Q) CZ .( Q) Q LLI 0 w or.W _-J0 CL W Or 0 Z UJ Z CL J �C 0) �t- 0 0 .o U 0 c� v 0 CL 0 0 o� cu 0 i n 0 U 1-00CX 0 44O v� i a� Q) Q L0 N l h. 0 N 00 w 0 L! 31ej I imp) :1 omit k*A Tit] 3mm mt I Di I P EP!, 31 r !E;,d4 % �01 1 Mk Mill qNmr%i4mopp, plej � we�L 9))C�� � Prive))iVie GENERAL SPECIFICATIONS General - All work is to be completed per PSE Standards &Practices. Copies of all PSE Standards are available upon request. Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. - Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from. the poles. Remove all unused pins and insulators. - Return all streetlights, area lights and floodlights to Sumner yard. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, oras required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings &Documents - Field design changes shall be approved by PSE Project Manager or Engineer. Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of worksketch. - Return one Foreman's copy of worksketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safe - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, oras otherwise instructed by the System Operator. - Provide signs, barricades, and traffic control in conformance with permit regulations. - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. - Maintain traffic flow as required by permitting agency. Erosion &Sediment Control - Refer to PSE standards 0150.3200 for minimum requirements. - Comply with all requirements of permitting agency. - Installed erosion &sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. Joint Facilities - Coordinate with .Communication Companies for transfers. OVERHEAD CONSTRUCTION Poles &Structures - Poles are to be installed or relocated as .staked. Unless otherwise noted, all pole location measurements are from the center of the pole. -All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. - Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. - Install grid numbers on all new and existing poles as shown on sketch. - Straighten existing poles as indicated or as necessary. -Treat all field -drilled poles with copper napthenate wood preservative. -Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and .crown pole holes and. restore area similar to adjacent landscaping. Conductors &Equipment -Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. - Transfer existing transformers to new poles unless otherwise indicated on this sketch. - Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sites being worked within the scope of the project where they are currently missing. - Use 397 AAC and Ampact connectors for all bare conductor feeder jumpers and 600 amp switch jumpers. Install tree wire conductor for jumpers on all poles that are double deadended with tree wire. - Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. - Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. - All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral - Use Load -interrupter cutouts (with arc shields) on all primary overhead and underground taps with fused protection above 40T. - Install Wildlife Protectors on all transformers. UNDERGROUND CONSTRUCTION Excavation - Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for primary conductors and 24" of cover for secondary conductors. - Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for all conductors oras required by the permitting Agency. - All conductors/conduits shall have a minimum of 3" of bed and 3" of clean sand cover. - No rocks larger than 6" shall be included in backfill - Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. - Restore all excavated areas to original condition. - If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be installed around the conduits to a depth of six inches above and to the sides of the conduit, and two inches underneath, per PSE Standard 6790.0140. Vaults & Handholes - Refer to PSE standard 6775.0040 "Vault and Handhole Installation" - Vaults shall be placed level and 2" above final grade in landscapedareas and flush with final grade when placed in hard surface areas. - A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults. - All conduit entrances shall be grouted. Conductors &Conduit - Refer to PSE standard 6800.6000 "PVC Conduit Installation". - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. -All "spare" conduits shall be capped at each end. UNIVERSAL MAP (2305E051, 056, 089, 094) SCALE: 1" = 100' r as t I . 25T Q EXISTING CONDUCTOR TO BE REMOVED 583056015 P44— • ..,, 14302 14300 X427 „� 471' '` O 1OOT I DISCONNECT -UNFUSED 25T X480 I % Al `1 n13 X11795 ..... 001 '''i I T � 5T % COUNTY • MMAP i 100T 1 65TI DRAWN BY Guy Rider 425-449-9596 12/30/16 I ' t W ! T J� X153 100T 1 317580.168031 X11798 `1 ♦► TOTAL UNDERGROUND TRANSFORMER O i At 761tVA 1211Z40v FOREMAN #1 317579.168M UG CKT MAP CIRCUIT NO FOREMAN #2 2305E0511056,089,094 2306E076 311577-166073 MAP -15 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES MOM 12VMW 15831 PHONE# PUG INCIDENT MAOP SOUND 2505E056 ALPINE NURSERY POLE RELOCATE Gas Order Elect Order ENERGY 16023 SE 144TH ST, RENTON 98059 101103493 SCALE .PAGE AS NOTED 1/4 15841 14314 14312 14247 317572-168031 1: 14 26kvA 12000.- 13®00 RKZC)NE,,.10 10028 � 14320 � 159 AW SE 144TH ST 100T 3M.4 MOMCSR X11807 SE 144TH ST 317553-168021 317553.168032 25kNA 1201240v 65T 317552-168061 (10 068867) ; ° X11808 50WA 12VMW (101 15917 317641-1 15005 13911 1 14405 14423 317529-168031 15903 "'`-` VAWA 12VMW 317523.168046 317527-168041 31753D-168016 1002,3 14505 317508.188014 37MA 12&7^ y 11111 1 024cm ` 317507-168031 1 17 y �3 14326 fr, 317489.168030 1451928kVA =240v 25T f UNK --------------- f 3-- ;. :f 14009 14011 ;� 14521 f�. 317475-168010 ar 26kkVA 120t240v © 317467-168068 14025 UNIVERSAL MAP (2305E051, 056, 089, 094) SCALE: 1" = 100' .EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) - - - - - r as t I . 25T Q EXISTING CONDUCTOR TO BE REMOVED 583056015 P44— • S OOT410orT •• 723 X427 „� 471' '` O 1OOT I DISCONNECT -UNFUSED 25T X480 I % Al `1 n13 X11795 ..... 001 '''i I T � 5T % COUNTY • MMAP i 100T 1 65TI DRAWN BY Guy Rider 425-449-9596 12/30/16 I ' t W ! T J� X153 100T 1 65Tr X11798 `1 ♦► TOTAL UNDERGROUND TRANSFORMER O i At 13 .EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) - - - - - - NEW CONDUCTOR AND OR TRENCH LINE PWR Superior OH Expense OH Expense UG Expense Removal EXISTING CONDUCTOR TO BE REMOVED 583056015 OR ABANDONED • NEW POLE O EXISTING POLE 'Ap OR DISCONNECT -FUSED -+� OR Q DISCONNECT -UNFUSED .� OVERHEAD JUMPER CONNECTION REV# DATE OVERHEAD TRANSFORMER D ORD CONDUIT RISER COUNTY STREET LIGHT F- DOWN GUY DRAWN BY Guy Rider 425-449-9596 12/30/16 ENERGY CUSTOMER DEMAND POINT PULL VAULT OR SPLICE VAULT J� JUNCTION VAULT/JUNCTION BOX a PADMOUNT TRANSFORMER PLAT MAP TOTAL UNDERGROUND TRANSFORMER O SECONDARY HANDHOLE LEGEND. t X11797 — — 1 A N I 12 .. aasar• t 25T X 1798 I 1 X 1 C15 l - M" ` B A: CK547 I X11799 25T A I 85T t ..� ... 15 STA t 1 # some 601I P! ��. —._ •.1 T 1(*T aC I l- ... 4 T A AC N K 3 1' pY 41 X1006 `% I w 1 woo . A t 65T .. r • 25T - �- 1 X8795 X11 1 �r,,aly �rrarr8rraraararaeeer• •ar•rraa $� � • NK9965 I 4QT •" — _. — , 15 M A X10271 A 25T .•...! .ra...a...a.: X10272 *� X11831 2 X10451. X9177 A i �'- 25Tw X8899 4OT 1.35 r -. ST;,,. s° i 4�0T „r •ease** 440T 1 � ���� N � A 1 +"" I �` 1 M .rear. sF 30 • @3 , - X8900 CI �����0 �"'� x X112 CC ..r•ri�. rr .*.•arra., ,•� _ �► �' �/\/�T ...a... a i �s97 a ..0 c s5 c 40T I R .. 1 �» 1 OOT B: ,..X889 X9137 25T 11 ?3 -'a ; X11208 C r .....� 65T;.•030I ....� 1 �T. B ' r.. 65T I X11615 i i X8901 3� G C00593 r 40T �]h X1 2523 1 �/��� X11802 � � c �' OT �iVWL4 ���rr•rrr•r•rs' �, I 'C ,!•else.!!„ - ._ rr B 40T e C NKtX�034 �.. sr a r F. X9139 X1183 25T 1 f C 25T 8 X11804 X1180 `�`"X11 C• w 15T ;. .., s.251 • 176549 l...l.. 1OOT A ! ear •eeee seise* � X X11 t MAP hill 65 i 3 25T • t AWORV70N94W115 h! X58 X575 X1 1806 ' '�s?.: C '�C _ 15T X X1 100T'�• •i a. • ! r .r. • 1 51 1 16 ae is 'I r s! see 806 !!a I• r • •� 1 rMAP 100T 4OT A •'B 00 8? X11 `` 0's "• ' 1121 1 � w�mop�a!lraaerarararra X11210► � 65 5T �o ...l.•e..•• TW --so- TW w - : 1 x1317: *are• �..+ .• C e•ee••!=!e•agas Noun r 46C5T F-.-- 65T : r X131 X11337 •t65T- 4 »r rac Osage65T*** 65T IRV* at Bftft OA 5T p B: •• .4 NK003710 :! ... i i. : O: ' : 40T!•• 40 •a . . °v •s ware.!• • • • i '9•6% • • MAP ��, '" ,. �: :•*�f•a:Iaaor: MA "#Vt 13 X1 �;oi 0 T .... r...or, 25 40T 40 "IyS %a :o.w .0 as are • gars r� ,P. Go' a 0 00 • ''•+rseeX1544 1OOT t 25T OVERHEAD CIRCUIT MAP__(�306EO_7 SCALE: 6" = 1 MILE FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built, ❑ Company lD#'s RECORDED in correct location on As -built. ❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets 'SE's standards and procedures and that all quality requirements are met, Foreman's Signature Print Namew Date PROJECT PHASE NOTIF# ORDER# PWR Superior OH Expense OH Expense UG Expense Removal 504104723 101103493 583056015 593180310 594112547 108099269 2 PROJECT MGR Dennis Booth 425-417-9188 12/30/16 CABLE TV PHONE ENGR -POWER Brian Swart 253-395-6839 12/30/16 Project Manager Contact Information: DENNIS BOOTH 425-417-9188 Cell Phone "Locates Required" Ye No Vicinity Map O C) W IA& W Owner / Developer Contact Info TOLL WA LP 16023 SE 144TH RENTON, WA 98059 AT N: ERIC WELSENSTEIN 425-825-1955 office For contacts below dial 1 -888 -CALL PSE (2255773) CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES "vutages rtegwred" CYes-3 No REAL ESTATE/EASEMENT PERMIT "Flagging Required" Qe No R/W# CIN OF RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR Dennis Booth 425-417-9188 12/30/16 1 ENGR -POWER Brian Swart 253-395-6839 12/30/16 REV# DATE BY DESCRIPTION ENGR -GAS COUNTY Emer Sect Gas Wk Ctr POWER WK CTR DRAWN BY Guy Rider 425-449-9596 12/30/16 KING CSPSKEIN CHECKED BY I?s �. 1/4 SEC OP MAP PLAT MAP APPROVED BY _ 2A)b NE23,SE14 T23N R05E FOREMAN #1 U -MAP NO (POWER) OH CKT MAP UG CKT MAP CIRCUIT NO FOREMAN #2 2305E0511056,089,094 2306E076 2305E089,094 MAP -15 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# PUG INCIDENT MAOP SOUND 2505E056 ALPINE NURSERY POLE RELOCATE Gas Order Elect Order ENERGY 16023 SE 144TH ST, RENTON 98059 101103493 SCALE .PAGE AS NOTED 1/4 WIRE REMOVAL TABLE Location Wire Size & Type Quantity I Length (Circuit FT) Remarks From To Pol P02 #2 ACSR 4 175 FROM P01 PO4 #2 ACSR 2 250 P01 P01 BRIDLE 2 TPX 1 65 SWITCH NUMBER X78204 FUSE: (3) 100T (MID: 3142700) P01 PO4 SPAN GUY 1 250 INSTALL (1) "H## CONNECTORS (MID: 2167000) Pol PlA #2 TPX 1 140 AT P10 NEW 17662-468037) Total Feet 415((#2 ACSR) ACTUAL Removed Total Feet 205 (#2 TPX) ACTUAL Removed Total, Feet 250 (SPAN GUY) ACTUAL Removed EXISTING 75kVA 317580 P03 120/240V 1680316---- 2-25 X 1 REFRAME TO 9' DBL ARMS 2-26 X1 2-20A X 2 CABLE REMOVAL SCHEDULE CABLE LOCATIONS CABLE REFRAME TO DOUBLE 9' STD ARMS (ARD2S09) PER STD 6011. 1010 REMOVE EXISTING UG TPX CABLE NO. INSTALL NEW UG 1/0 TPX CABLE (LF) EST CABLE TYPE YEAR INST To AT P09 NEW(317553-168035) 2-23 FROM TO INSTALL 9' SINGLE STD ARM IN LINE POSITION (EAST .& WEST) TRAN INSTALL DOUBLE 11' STD ARMS (ARD4S1 1) IN BUCK POSITION (NORTH & SOUTH) PER STD 6011.1020 UG SVC P01 MTR 105 1/0 UG TPX INSTALL 30 #2 ACSR PRI NEUTRAL DE BUCK SLACK SPAN NORTH (SSDB312) PER STD 6033.5010 Total Feet 105 (UG TPX) ACTUAL Removed 2-54A X 105 SITE NOTES SITE NOTES AT IN (FROM P11 TO METER B AT P02 EXISTING (317572-168031) 45'CL3 2011 INTERCEPT EXISTING CONDUIT 2-21 REFRAME TO DOUBLE 9' STD ARMS (ARD2S09) PER STD 6011. 1010 REMOVE EXISTING UG TPX CABLE POLE INSTALL NEW UG 1/0 TPX CABLE AT P03 EXISTING (317580-168031) 50# CL2 2011 2-21 REFRAME TO DOUBLE 91 STD ARMS (ARD2S09) PER STD 6011. 1010 To AT P09 NEW(317553-168035) 2-23 INSTALL 50' POLE CL -1 W/ GND (STA 10+24 24.5 RT AS STAKED) (PD501) PER STD 6010. 1000 TV INSTALL 9' SINGLE STD ARM IN LINE POSITION (EAST .& WEST) TRAN INSTALL DOUBLE 11' STD ARMS (ARD4S1 1) IN BUCK POSITION (NORTH & SOUTH) PER STD 6011.1020 ID NUMBER INSTALL 30 336.4 PRI NEUTRAL TANGENT (TAP313) PER STD 6033.3012 P11 INSTALL (3) 11H#1 CONNECTORS (MID: 2168000) XX INSTALL 30 #2 ACSR PRI NEUTRAL DE BUCK SLACK SPAN NORTH (SSDB312) PER STD 6033.5010 #2 ACSR SWITCH NUMBER X78204 FUSE: (3) 100T (MID: 3142700) GRID # INSTALL 10 #2 ACSR DE BUCK SLACK SPAN SOUTH (SSD1 12) PER STD 6031.5010 CLASS SWITCH NUMBER X78205 FUSE: (1) 65T (MID: 3142600) TOPPED INSTALL (1) "H## CONNECTORS (MID: 2167000) #2 ACSR TRANSFER 30 PRIMARY 336.4 2151 COMMUNICATIONS TO TRANSFER Total Feet 170'(#2 ACSR 30 PRI / NEUT) ACTUAL Total Feet 215' (#2 ACSR 10 PRI / NEUT) ACTUAL AT P10 NEW 17662-468037) 2-23 INSTALL 451 POLE CL -2 W/ GND (STA 19+34 12.5 RT AS STAKED) (PD452) PER STD 6010.1000 45 INSTALL DOUBLE 11' STD ARMS 1959 INSTALL 30 PRI NEUTRL DOUBLE DEADEND (DDP312) PER STD 6033.4044 El INSTALL 30 PRI NEUTRAL DE SLACK SPAN SOUTH #2 ACSR (SSDB312) PER STD 6033-5010 1:1 TAP TO AO 1:1 ROLL NEUTRAL IN PRIMARY POSITION TO COMMON POSITION AT POLE PO4 JOINT FACILITIES ARRANGEMENTS INSTALL SINGLE HELIX ANCHOR (ANDH1) PER STD 6012.1000 L-201 SOUTH FORMER INSTALLATION at site: P 11 ober: 317547-168035 2-23 19: 25 D#: i to redline the following information 2-24 ID#: 2.24 )hase connected to: econdary Voltage SERVICE RELOCATIONS AND CONVERSIONS INSTALL 7/16" PRI NEUTRAL DOWNGUY (GDY7SA) PER STD 6013.0100 COMMUNICATIONS TO TRANSFER AT P11 NEW (317547-168035) INSTALL 45' POLE CL -3 W/ GND (STA 20+ 87 25RT AS STAKED) (PD453) PER STD 6010.1000 INSTALL 10 DOUBLE DEADEND (DDE2115) PER STD 6031.1043 INSTALL 10#2 ACSR DE SLACK SPAN NORTH (SSDD112) PER STD 6031.5010 INSTALL (2) "H11 CONNECTORS (MID: 2167000) INSTALL 25kVA TRANSFORMER (TRFNXF) PER STD 6025. 1000 INSTALL 211 SERVICE RISER (RIS2CSS) PER STD 6042.1000 INSTALL SINGLE HELIX ANCHOR (ANDH1) PER STD 6012.1000 L=10# NORTH INSTALL 3/8" PRIMARY DOWNGUY (GDY3SA) PER STD 6013.0100 INSTALL 3/8" NEUTRAL DOWNGUY (GDY3SAN) PER STD 6013.0100 TRANSFER AND EXTEND (2) OH SERVICE WIRES EAST COMMUNICATIONS TO TRANSFER SITE PLAN SCALE: 1 20' -0 L? 1-1 MATCHLINE SEEPAGE3 I A 2-129 POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE POLE DATA POLE Wire Size & Type Quantity Length (per conductor) From To P09 # TEL TV FIBER TRAN RMVD, ID NUMBER P09 P11 XX Line #2 ACSR 2 GRID # HEIGHT CLASS YEAR TOPPED RMVD #2 ACSR 2 2151 Total Feet 170'(#2 ACSR 30 PRI / NEUT) ACTUAL Total Feet 215' (#2 ACSR 10 PRI / NEUT) ACTUAL Installed Installed P01 317553-168032 45 OHr CKT MAP 2306E076 1959 1:1 El 1:1 E:1 1:1 El JOINT FACILITIES ARRANGEMENTS WIRE STRINGING PRIMARY & SECONDARY L ocation PERMIT CITY OF RENTON Pri Sec Wire Size & Type Quantity Length (per conductor) From To P09 P10 .0. .N. XX 12/30/16 #2 ACSR 4 100, P09 P11 XX Line #2 ACSR 2 70' P11 P12 Direction of Vehicular Traffic XX #2 ACSR 2 2151 Total Feet 170'(#2 ACSR 30 PRI / NEUT) ACTUAL Total Feet 215' (#2 ACSR 10 PRI / NEUT) ACTUAL Installed Installed 2-16 X 170 2-17 X 215 6" Minimum above common neutral. jjlljljj even with the common neutral for secondary. 1 j% j �I jj 3 iiia j.j 6 7 Common Neutral %jlI .M. 5 ... 1. 20 Pick ' . 1-1. I I 12 ./j/ Conduit W /1 5 h Min. U. h J 0 36- Primary 2 _`.. • ;•� ;; 241' Secondary h t 4 h r.f (Z P Im Ing- -h h _hg pac y i ce :e /F EM OLM LI -.1 Schedule 80 Send -/ Road Face ./Field ./Quadrant '!Quad 5" Min. /171 Con duit-X Standoff Bracket Conduit Clamp IV' Min Length TYPICAL POLE WITH RISER DETAIL NOT TO SCALE MI A 1'►1-77 C%-rr% A I V IVIUL;aM :.D AREA PLACE PEA GRAVEL BAGS (MID 9995892) FOR SEDIMENT TRAP DITCH OR SENSITIVE AREA TYPICAL AUGERED WORK SITE.- 0150.3200 TECHNIQUES FOR EROSION AND SEDIMENT CONTROL TOTAL UNITS 2-16 x 170 2-17 x 215 2-20A X 2 2-21 X 2 2-23 X 3 2-24 X 2 2-25 X 1 2-26 X 1 P) =A A V 4 AM q REAL ESTATE/EASEMENT R/W# PERMIT CITY OF RENTON .1 10(Overall) Note; Schedule 80 conduit shall FUNCTION CONTACT 1111111111110 PROJECT MGR Dennis Booth 1 extend a minimum of 8' above 8Schedule 80 DATE 12/30/16 1 Conduit and 12" below ground line. .0. .N. Min. 12/30/16 REV# DATE BY Ground Line Ili0. ENGR -GAS lj/ljlj-Ground Line Iq Mas Wk Ctr POWER WK CTR CSPSKEIN Wfl 425-449-9596 Direction of Vehicular Traffic CHECKED BY gylss& APPROVED BY 36- Primary 2 _`.. • ;•� ;; 241' Secondary h t 4 h r.f (Z P Im Ing- -h h _hg pac y i ce :e /F EM OLM LI -.1 Schedule 80 Send -/ Road Face ./Field ./Quadrant '!Quad 5" Min. /171 Con duit-X Standoff Bracket Conduit Clamp IV' Min Length TYPICAL POLE WITH RISER DETAIL NOT TO SCALE MI A 1'►1-77 C%-rr% A I V IVIUL;aM :.D AREA PLACE PEA GRAVEL BAGS (MID 9995892) FOR SEDIMENT TRAP DITCH OR SENSITIVE AREA TYPICAL AUGERED WORK SITE.- 0150.3200 TECHNIQUES FOR EROSION AND SEDIMENT CONTROL TOTAL UNITS 2-16 x 170 2-17 x 215 2-20A X 2 2-21 X 2 2-23 X 3 2-24 X 2 2-25 X 1 2-26 X 1 P) =A A V 4 AM 2-129 REAL ESTATE/EASEMENT R/W# PERMIT CITY OF RENTON 3 2 FUNCTION CONTACT 1111111111110 PROJECT MGR Dennis Booth PHONE No man 425-417-9188 DATE 12/30/16 1 ENGR -POWER Brian Swart 253-395-6839 12/30/16 REV# DATE BY DESCRIPTION ENGR -GAS COUNTY KING Erner Sect Mas Wk Ctr POWER WK CTR CSPSKEIN DRAWN BY Guy Rider 425-449-9596 12/30/16 CHECKED BY gylss& APPROVED BY Zj at/ 1/4 SEC NE23,SE14 T23N R05E OP MAP PLAT MAP FOREMAN #1 U -MAP NO (POWER) 2305E051,056,089,094 OHr CKT MAP 2306E076 UG CKT MAP 23050891 094 CIRCUIT NO MAP -15 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# IVGET SOUND ENERGY 2505E056 ALPINE NURSERY POLE RELOCATE 16023 SE 144TH ST, RENTON 98059 INCIDENT MAOP Gas Order Elect Order 1 101103493 SCALE PAGE AS NOTED 2/4 ft N�46 15903 SE 144TH ST 8035716335 V U012431822 14505 160TH AVE SE A TREE TRIMMING ALONG RELOCATED 19� ❑H PRIMARY WIRE i i i WIRE STRINGING PRIMARY& SECONDARY Location Length (Circuit FT) Pri Sec Wire Size & Type Quantity Length (per conductor) From To P12 P13 P06 XX #2 ACSR #2 ACSR 2 190 P13 P14 1/0 SOL CONCENTRIC NEUTRAL XX UG TPX #2 ACSR 2 270 1/0 SOL CONCENTRIC NEUTRAL E:1 Total Feet 400 (#2 ACSR PRI) ACTUAL Installed 3 Total Feet 400 (#2 ACSR NEUT) ACTUAL Installed Total Feet 400 (#2 ACSR NEUT) ACTUAL Installed 2-17 X 400 14423 160TH AVE SE B033369424 M i i EXISTING TRANSFER P05 317530 168016 INSTALL 31752fi 37.5kVA 12 1 0 168035 2 /240V TREE TRIMMING WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (Circuit FT) Remarks From To PO4 P06 #2 ACSR 2 230 FROM P06 P08 #2 ACSR 2 165 P08 Total Feet 395 (#2 ACSR) ACTUAL Removed SITE PLAN SCALE: 1" = 20' zbx2 TREE TRIMMING INSTALL 317508 P13 168 034 T78206 F:40T X78217 F:40T _EXISTING -- EXISTING. � 317508 ` HH1 P07 168014 37.51�VA 120/240V TRANSFER 10� ............ i REMOVE I PO4 317529 �7-51<VA 168031 i20/240V i I i i i i I 1 i I i J REMOVE � P06 317507 168031 � J I MAT✓H LI N E SEE THIS PAGE SITE NOTES A AT P1 2 NEW (317526-168035). 2-23 INSTALL 45' POLE CL -3 W/ GND (STA 22+98 25.5RT AS STAKED) (PD453) PER STD 6010.1000 INSTALL SINGLE EPDXY ARM (EAST) B INSTALL 10#2 ACSR TANGENT (TANF152) PER STD 6031.2010 INSTALL (2) "H" CONNECTORS (MID: 2767000) 2-24 INSTALL 37.5kVA TRANSFORMER (TRFPXF) PER STD 6025.1000 TRANSFER OH SVC TO P12 COMMUNICATIONS TO TRANSFER 2-23 AT P13 NEW (317508-168034) INSTALL 45' POLE CL -3 W/ GND (STA 24+81.5 33.5RT AS STAKED) (PD453) PER STD 6010.1000 INSTALL SINGLE 11' WINGARM (EAST) INSTALL 10#2 ACSR TANGENT (TASW112) PER STD 6031.4010 2-57 INSTALL (2) "H" CONNECTORS (MID: 2167000) INSTALL 1f�J TERM (TSU1C1) PER STD 6043.1000 2-�q�5 INSTALL SWITCH NUMBER T78206 FUSE: 40T (MID: 3412500) INSTALL 2" PRIMARY RISER (RIS2CSS) PER STD 6042.1000 INSTALL 10 #2ACSR TAP (LAT1 12) PER STD 6031.5100 INSTALL SWITCH NUMBER X78217 FUSE: 40T (MID: 3412500) INSTALL DEADEND (MID: 2220150) INSTALL STIRRUP (MID 225400) INSTALL SINGLE HELIX ANCHOR (ANDH1) PER STD 6012.1000 L=6' EAST INSTALL 3/8" PRIMARY DOWNGUY (GDY3SA) PER STD 6013.1000 INSTALL 3/8" NEUTRAL DOWNGUY (GDY3SAN) PER STD 6013.1000 TRANSFER 10 #2 ACSR PRIMARY FROM P06 COMMUNICATIONS TO TRANSFER 2-23 AT P14 NEW (317587-168034) INSTALL 45' POLE CL -3 W/ GND (STA 26+ 87.5 25RT AS STAKED) (PD453) PER STD 6010.1000 INSTALL 1Q1 DEADEND NORTH (DE2115) PER STD 6031.1040 2-24 INSTALL (2) "H" CONNECTORS (MID: 2167000) 2.24 INSTALL 25kVA TRANSFORMER (TRFNXF) PER STD 6025.1000 2.57 INSTALL 2" SERVICE RISER (RIS2CSS) PER STD 6042.1000 (TO HH1) INSTALL 10 TERM (TSU I Cl) PER STD 6043.1000 (TO V01) 2-45 INSTALL SWITCH NUMBER T78207 FUSE: 25T (MID: 3412400) INSTALL 2" PRIMARY RISER (RIS2CSS) PER STD 6042.1000 INSTALL SINGLE HELIX ANCHOR (ANDH1) PER STD 6012.1000 L=10' SOUTH INSTALL 3/8" PRIMARY DOWNGUY (GDY3SA) PER STD 6013.1000 INSTALL 3/8" NEUTRAL DOWNGUY (GDY3SAN) PER STD 6013.1000 COMMUNICATIONS TO TRANSFER AT EMI STUB OUT 1-2" CONDUIT INSTALL ELECTRONIC BALL MARKER (MID: 7668501) AT IP2 (FROM P14 TO Y01) INTERCEPT EXISTING 1-2° CONDUIT CABLE REMOVAL SCHEDULE CABLE LOCATIONS CABLE SITE # POLE DATA N0. TEL (lF) EST CABLE TYPE YEAR INST RMVD ID NUMBER GRID # FROM TO YEAR TOPPED RMVD Af1J30168 P08 V01 390 1/0 SOL CONCENTRIC NEUTRAL 1:1 UG TPX P08 HH1 45 1/0 SOL CONCENTRIC NEUTRAL E:1 Total Feet 390 (1i0 JKT) ACTUAL Removed Total Feet 45 (UG TPX) ACTUAL Removed 1-b4 7% 39U 2-54A X 45 MATCHLINESEE THIS PAGE i i TREE TRIMMING ALONG RELOCATED � 10 ❑H PRIMARY WIRE �I �I REMOVE 25kVA 317489 P0$ 120/240V 168030 --� ------------- INSTALL 25kVA 317487 14 120/240V 168034.. T78207 F:25T � EXISTING HH1 POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL N FIBER TRAN RMVD ID NUMBER GRID # HEIGHT CLASS YEAR TOPPED RMVD PO4 317529-168031 40 Removed at site: P08 1968 1:1 1-1 El E:1 [:1 Company ID#: E:1 Primary phase connected to: P06 317507-168031 45 3 1974 1:1 Lj [:1 � � � El CIRCUIT NO MAP -15 P08 317489-168030 40 1 1966 E:1 1:1 El El [] E:1 E] - B EXISTING V01 317475 25kVA � 168010 120/240V I EXISTING A030168 2-129 X 3 TRANSFORMER INSTALLATION TRANSFORMER INSTALLATION Installed at site: P12 Installed at site: P14 Grid Number. 317526-168035 Grid Number: 317487-168034 kVA Rating: 37.5 kVA Rating: 25 Material ID#: Material ID#: Foreman to redline the following information Foreman to redline the following information Company ID#: Company ID#: Primary phase connected to Primary phase connected to Tested Secondary Voltage / Tested Secondary Voltage / TRANSFORMER REMOVAL TRANSFORMER REMOVAL Removed at site: PO4 Removed at site: P08 Grid Number: 317529-168031 Grid Number. 317489-168030 kVA Rating: 37.5 kVA Rating: 25 Foreman to redline the following information Foreman to redline the following information Company ID#: Company ID#: Primary phase connected to: Primary phase connected to: Tested Secondary Voltage / Tested Secondary Voltage / EM1 o � O � W TOTAL UNITS 2-17 X 400 - � 2-23 X 3 - --- - - _ 2-24 X 3 2-26 X 2 2-45X2 2-54 X 390 2-54A X 45 2-57 X 2 2-129 X 3 i f i REAL ESTATE/EASEMENT RMI# I I I L 3 2 1 I E I I I I i o � O � W TOTAL UNITS 2-17 X 400 - � 2-23 X 3 - --- - - _ 2-24 X 3 2-26 X 2 2-45X2 2-54 X 390 2-54A X 45 2-57 X 2 2-129 X 3 REAL ESTATE/EASEMENT RMI# PERMIT CIN OF RENTON 3 2 FUNCTION CONTACT PROJECT MGR Dennis Booth PHONE NO 425-417-9188 DATE 12/30/16 1 ENGR -POWER Brian Swart 253-395-6839 12/30/16 REV# DATE BY DESCRIPTION ENGR -GAS COUNTY KING Emer Sect Gas Wk Ctr POWER WK CTR CSPSKEIN DRAWN BY Guy Rider 425-449-9596 12/30/16 CHECKED BY 1/4 SEC NE23,SE14 T23N R05E OP MAP PLAT MAP APPROVED FOREMAN #1 U -MAP NO (POWER) 2305E051,056,089,094 OH CKT MAP 2306E076 UG CKT MAP 2305E089, 094 CIRCUIT NO MAP -15 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# PUGET SOUND ENERGY 2505E056 ALPINE NURSERY POLE RELOCATE 16023 SE 144TH ST, RENTON 98059 INCIDENT MAOP Gas Order Elect Order 101103493 SCALE PAGE AS NOTED 3/4 NEW 1-2M IP1 P11 B038023264 M NEW P13 T78206 F:40T /- NEW 1-2" SPARE - - --Q EM 1 T78207 R25T EXISTING HH 1 0 IP2 EXISTING 1-2" CONDUIT AOEHM934 EXISTING vat CONDUIT & CABLE DIAGRAM. SCALE -NONE W NW Q E � S -- WORKZONE -- A030168 317475-168010 25kVA 1201240v 0 UNDERGROUND CIRCUIT MAP (2305E089) SCALE: 1" = 50' PRIMARY CABLE & CONDUIT TABLE VEHICLE ACCESS Excavated Dirt Pile f �� SIDE �'°` `��`��'INS , 24 Min'. Final r (Power, Gas, and'�'`'%`°,i`',% Communications) NOTE: Install 12" shading Backfill if the backfill contains rocks � • „ 12" Min greater than 10�, dna. 36 Separation ,(No rocks over 6 diameter) Min'` CONDUIT PRIMARY CABLE ASBUILT INFORMATION LOCATION 481' 12" Min CABLE PHONE NO 425417-9188 Max Separation`s 1 ASBUILT INFORMATION Assumed 253-395-6839 12!30/16 VOLTAGE SIZE LOCATION SIZE LENGTH BENDS PULL PULL Cable LENGTH Cable Numbers Please Record Foreman -Complete 12/30116 (gin) Qty Design (ft) (ft) 900 450 220 (Ibs) Rev (lbs) Size Design eft) 2 15 1 2.3 FROM TO 900 450 22° 110 A B C Manufacturer Compound Year Actual Amount Installed (Conduit &Cable) P13 EM1 2 1 115 2 PUG SOUND ENERGY16023 2505E056 ALPINE NURSERY POLE RELOCATE SE 144TH ST, RENTON 98059 INCIDENT MAOP Gas Order Elect Order 101103493 SCALE PAGE AS NOTED 4/4 P14 IP2 2 1 5 1/0 345 EHM934 P14 Vol VEHICLE ACCESS Excavated Dirt Pile f �� SIDE �'°` `��`��'INS , 24 Min'. Final r (Power, Gas, and'�'`'%`°,i`',% Communications) NOTE: Install 12" shading Backfill if the backfill contains rocks � • „ 12" Min greater than 10�, dna. 36 Separation ,(No rocks over 6 diameter) Min'` CONDUIT TABLE REAL ESTATE/EASEMENT R/W# Cover 3 2 481' 12" Min CABLE PHONE NO 425417-9188 Max Separation`s 1 ASBUILT INFORMATION 2-49 X 120 2-54 X 345 6" Min Sand Cover Over Power Conduits 611 " 3Sand Bedding 9 Gas 1-6, 1-4" Power Conduits (When Present) Communications (When Present) TRENCH EXCAVATION DETAIL. a a 10 -ft, -00- -"- laft, -� ..& A, M On" SECONDARY CABLE & CONDUIT TABLE REAL ESTATE/EASEMENT R/W# PERMIT CITY OF RENTON 3 2 CABLE PHONE NO 425417-9188 CONDUIT 1 ASBUILT INFORMATION Assumed 253-395-6839 12!30/16 VOLTAGE VOLTAGE LOCATION SIZE LENGTH Lot Corner SIZE LENGTH BENDS DROP FLICKER Foreman - Complete Gas Wk Ctr -- -CSPSKEIN Design DRAWN BY Guy Rider Design 12/30116 CHECKED BY FROM TO (1/014ro,350) (ft) to Meter(ft) (in) (ft) 900 450 220 110 (Percent) (Percent) Actual Amount Installed (Conduit &Cable) P11 IP1 1/0 50 2 15 1 2.3 2.0 2-49 X 45 2-54A X 110 P14 HH1 1/0 60 2 30 1 2.3 2.1 TOTAL UNITS 2-54 A 345 2-54A X 60 REAL ESTATE/EASEMENT R/W# PERMIT CITY OF RENTON 3 2 FUNCTION CONTACT PROJECT MGR Dennis Booth PHONE NO 425417-9188 DATE 12/30/16 1 ENGR -POWER Brian Swart 253-395-6839 12!30/16 REV# DATE BY DESCRIPTION ENGR -GAS COUNTY KINGI Emer Sed Gas Wk Ctr -- -CSPSKEIN POWER WK CTR DRAWN BY Guy Rider 425-449-9596 12/30116 CHECKED BY /�- 1/4 SEC NE23,SE14 T23N R05E OP MAP - -- PLAT MAP APPROVED BY FOREMAN #1 U -MRP NO (POWER) 2305E05110569089,094 OH CKT MAP L 2306E076 UG CKT MAP 2305E089, 094 CIRCUIT NO MAP -15 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# PUG SOUND ENERGY16023 2505E056 ALPINE NURSERY POLE RELOCATE SE 144TH ST, RENTON 98059 INCIDENT MAOP Gas Order Elect Order 101103493 SCALE PAGE AS NOTED 4/4