HomeMy WebLinkAboutP_Design_101105560_V1_170605GENERAL SPECIFICATIONS
Scope of Work
5-18-17 PER LUKE NEELY CELL 253-569-2523:
NOTE: RENTON PERMIT & 2 FLAGGERS REQ'D
CORE HOURS, LOCATES, OUTAGE ON 3 RESIDENTIAL CUSTOMERS,
BORE, VAC TRUCK, BACKHOE
CUSTOMER CONTACTS: ASHLEY & DYKKI SETTLE 919.758-7760 OR 206-886-8274 justashq@gmail.com
ELECTRICIAN: GARRETT DAVIS - B&G ELECTRIC 425-7864649 garrett@bgpmaintenance.com
RENTON ELECTRICAL INSPECTOR: JACK OXFORD CELL 206-999-1822 joxford@mntonwa.gov
PROBLEM: THE UG SVC TO THE CUSTOMER IS AN OLD #4 CU TRIPLEX RATED FOR APPROX 110AMPS,
PASSES THROUGH THE BASEMENT OF THE HOME IN A 1.5" STEEL CONDUIT, AND IS UNDERRATED FOR
THE CUSTOMER'S PROPOSED 320 CLASS PANEL.
General
- All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon
request.
- Work sites shall be kept dear of debris and all Construction materials; equipment and packing shall be removed
daily.
- Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled
and returned the day it is removed from the poles. Remove all unused pins and insulators.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance
of starting work in Rightof-way involving a Permit.
- All system switching shall be approved by System Operations (425-8824652) a minimum of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground Cable information in red on Foreman's copy of
worksketch
- Return one Foreman's copy of worksketch to Project Manager at completion of job.
-When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise
instructed by the System Operator.
- Provide signs, barricades, and traffic control in conformance with permit regulations.
- Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations.
- Maintain traffic flow as required by permitting agency.
Erosion & Sediment Control
- Refer to PSE standards 0150.3200 for minimum requirements.
- Comply with all requirements of permitting agency.
- Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil
has been otherwise permanently stabilized.
Joint Facilities
- Coordinate with Communication Companies for transfers.
OVERHEAD CONSTRUCTION
Poles & Structures
- Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from
the center of the pole.
- All new poles set shall be the class indicated on the sketch, or better. Do not set a lower Gass pole than specified.
- Install ground plate assembly on all new poles.
- Install grid numberson all new and existing poles as shown on sketch.
- Straighten existing poles as indicated or as necessary.
- Treat all field -drilled poles with copper napthenate wood preservative.
- Remove old poles after Communication companies have transferred off and return to PSE storeroom. Fill and
crown pole holes and restore area similar to adjacent landscaping.
Conductors & Equipment
- Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set,
unless otherwise indicated on this sketch.
- Use stirrups to Connect all overhead and underground primary taps, and all transformers. Install at all sites being
worked within the scope of the project where they are currently missing.
- For 12kV construction, always install avian protection with 4/0 Cu covered jumpers and #4 SO aluminum -covered
tie -wire (MID 8454500), For 34 kV construction, use bare wire primary jumpers with preformed helical grip ties.
- Apply avian protection devices when required per Standard 6015.2000.
-Appy grit inhibitor on all Ampact, stirrup, and dead-end connections.
- Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing.
- All neutral connections to be made with solid compression connectors. Connect all pole grounds to common
neutral
- Use Load -interrupter cutouts (with arc shields) on all primary overhead and underground taps with fused protection
above 40T.
- Install Wildlife Protectors on all transformers.
323
319
SCALE. 17=50'
327
507
� 335
508
343 g
��--�
317790-165658
25kVA 120/240v
560 U
317782-165642
25kVA 1201240v
r
317776-1655 e
fto m
Sw3R0 Pt
4S4
SITE PLAN
SCALE: V= 50'
50WA
317777-165659
-- t
(101081114)
360
II
354
304 SITE SPECIFIC NOTES
2Q)/ AT P01 AT GRID 317790-165658:
REPLACE 40'1943 POLE WITH A NEW 40' CL 3 POLE & GND PL ON NORTH SIDE OF EXIST POLE.
INST 1PH PTP & R/C FOR COM NEUT PER STD 6031.1010 FIG 1 TAN112
TRANSF 1 P PRIMARY AND COM NEUT
318 INST NEW 37.5KVA 120/240V XFMR & NEW LBC/O FUSE 15T
INST NEW 3" RISER ON SO BKTS FOR NEW 350MCM UG SVC TO ADDRESS 338
TRANSF 2 OH SVCS & ST LT
\ TEL & TV TO TRANSF
FROM P01 TO I131:
324 /BORE ONE 3" RED POLYPIPE 40 FEET (TO AT LEAST 5 FEET EAST OF EAST EDP)
330 / FROM IPI TO HH1:
BORE ONE 3" RED POLYPIPE 83 FEET (TO AT LEAST 5 FEET NORTH OF NORTH EDGE OF 18
FOOT WIDE DRIVEWAY)
335
EROSION & SEDIMENT CONTROL REQUIREMENTS
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING'.
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
U2T4
• I Al
Cl zs
q 1
1
I j 7
I 132r�5r1
l
e .Y
v -'A
W—€ ---S
3s
FROM HH1 TO THE NEW METER BASE:
BORE ONE 3" RED POLYPIPE 55 FEET (TO GO UNDER THE TREE ROOTS) TO NEW 320 CLASS
METER BASE
AT HH1:
INST NEW 17" X 30" PE HH (MID 7664500) WITH THREE 3 -POS FARGOS PER STD 6050.2000 FIG 4
HH16350
FROM P01 TO HH1:
PULL IN NEW 350MCM TPLX 154 FEET
FROM HH1 TO NEW 320 CLASS METER BASE:
PULL IN NEW 350MCM TPLX 55 FEET + 8 FEET
TRANSFORMER REMOVAL
Removed at site: PO l
Grid Number: 317790-165658
kVA Rating: 25 - -
Foremen to redline the following information
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
TRANSFORMER INSTALLATION
Installed at site: Poll
Grid Number. 317790_-_1.65658
kVA Rating: 37.5
Foreman to redline the following Information
Company ID#: _
Primary phase connected to:
Tested Secondary Voltage /
Excavation
- Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for primary
conductors and 24" of cover for secondary conductors.
- Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36" of
cover for all conductors or as required by the permitting Agency.
- All conductors/conduits shall have a minimum of 3" of bed and 3" of clean sand cover.
- No rocks larger than 6" shall be included in backfill-
-
ackfdL- Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the
permitting Agency.
- Restore all excavated areas to original condition.
Vaults & Handholes
- Refer to PSE standard 6775.0040 "Vault and Handhole Installation"
- Vaults shall be placed level and 2" above final grade in landscaped areas and flush with final grade when placed in
hard surface areas.
- A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults.
- All Conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 "PVC Conduit Installation".
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road
Crossing conduits.
- Install insulating caps on all unused primary bushings.
- All "spare conduits shall be capped at each end.
— — — — —
— NEW CONDUCTOR AND OR TRENCH LINE
•
NEW POLE
O
EXISTING POLE
ORI
DISCONNECT -FUSED
^+-•OR0
DISCONNECT -UNFUSED
Enter Sect Gas Wk CI1
WA WA
OVERHEAD JUMPER CONNECTION
V
OVERHEAD TRANSFORMER
D OR D
CONDUIT RISER
M SEC
SW18T23NR05E
STREET LIGHT
E-
DOWN GUY
® OR®
ENERGY CUSTOMER DEMAND POINT
O
SECONDARY HANDHOLE
LEGEND
FOREMAN (CHECK BOX WHEN COMPLETED)
❑ PSE Equipment LOCKED/SECURED& Nock Area lot in CLEAN/SAFE Condbon.
❑ Griq Cable, and Setb:lr numbers INSTALLED & VERIFIED.
❑ Field Changes RED-LWED on AadA&
D Material VERIFIED and CHANGES noted! on Paper gnat.
D Trial PRIMARY Caae mfed on A It.
D Cwnpany IDK. RECORDED in correct krabon an As k
D Indirate crxrect FUSE SIZE on AElxa8& VERIFY proper PHASE
❑ DeNalions nptetl on Be Asbu6 antl Mer raexn.
D Ioawy Mat Me work pertwmed nreeh PSE'. atanow,19 and vocedu
and Mataliquant, requirements are mot
Foreman's
Not Na.
once
Vicinity Map
Thomas Guide page 656
SITE
Xl /Umeter ase I •'� ST OH Expense WA 583
• \ PCR UG ExPanse N/A 564
13 N AW OH Expense N/A 593
9
�E
UO tIr/�$ Expense N/A 694
25Td 40TH.I, A. 30 '• C 3! gm • Removal N/A 108101019 .r
�TyNa..:�.....-1..."", Owner/Developer Contact Info
i S 2 Sr• •..••..,
.. �5T5. / y� IB IB fi5T '3� :• 30 •••�h•••?I Ashley &Dykki Sale
"•r; •py\ /C rS ... —.l 30• 30 C TV 338 Stevens Ave SW
r ` 40 3 Renton, Ash"
& 57
Dy
,. ,� JOB SITE :�, PU7 ATTN:Ashey&DykkiSe�e WAOMa
��r,� Bal ••: " „•{ F••S••$J.• t Project Manager Contact la ormation: 91&758-7760 or 206-886-6274
/ © �' T B • • ; •cam •• • 5 Luka rteeN For contacts below dial 1 -888 -CALL PSE (2253773)
` y CALL (800) 424ZSSS
002733/ ,g 1. 4 16 0 S N385 •s•�r•_r / X52 (253)569-2523 Cog Phone
r 4QTk r / ,.t ••• 3 : X1034 Intal R eed" 2 BUSINESS DAYS BEFORE YOU DIG
�y ti X15573 EAR„ 155T:
....".�AV :... BSSS.Y`.'e... 5/ if• = ESTATE/ NT R
}..{l••:• •. tg aQV NO IRS SKETCHNm TO BE REIIFD UPON FOR EUCT LOCN110N OF E%ISIWG FACIIIIIE$
g %t 2s1
TC Q •Outages Requite•
No
REAL EASEAME PE MR
B
"Plaggirg Requi No City of Renton
�.....:. : `••1""i&•. a••-. - - � r :_ "..c [ ' Inn
OVERHEAD CIRCUIT MAP (2305E076)
SCALE: 6"= 1 MILE
SCALE: NONE
1 I
I I
IENGR-POWER I Luke Neely
1 253389-2523 05/18/17
REV# I DATE
By DESCRIPTION
Gas Orae
ENGR-GAS WA
WA N/A
COUNTY
KING
Enter Sect Gas Wk CI1
WA WA
POWERWKCTR
QCSOKE
DRAWN BY Todd Zumwalt
253-2663231 0526/17
CHECKED BY
PAGE
M SEC
SW18T23NR05E
OP MAP
WA
PLAT MAP
WA
APPROVED BY -
FOREMAN#1
U -MAP NO (POWER)
OH CWT MAP
UG CKT MAP CIRCUIT NO
FOREMAN #2
PUGET
EAR -17 338 STEVENS AVE SW RENTON
muvcm
N/A
nwvr
N/A
SOUND
Gas Orae
Order
ENERGY
REPLACE BAD ORDER UNDERGROUND SERVICE
N/A
101Ele
101105560
338 STEVENS AVE SW, RENTON, WA 98067
SCALE
PAGE
PSE
1^=50'
ih