HomeMy WebLinkAboutP_Utility_Design_101105503_V1_170711GENERAL 1.
Pre -construction Notify appropriate City or County 48 to 72 houirs or as required by
permitting agency before starting work on any right-of-way involving a permit.
Follow all requirements as outlined by the permitting agency.
Locate and mark all underground utilities prior to start of construction. If there is a
conflict with the intended trench route as shown on the site plan and existing utilities or
obstructions, trench route may need to be moved to opposite side of street.
Cooperation with Quality Inspector, Puget Sound Energy Contractor, City or County
authorities during Pre -construction meeting will determine the fiinal trench route.
2. Existing Utilities
Hand excavate (pothole) all marked utility crossings to verify exact location and depth
at point of crossing. Protect underground utilities during excavation. Use hand
excavation methods if necessary to avoid damage. Fabricate and install adequate
temporary structures to support and protect underground utilities while exposed during
construction.
Maintain 6" minimum clearance at crossings between existing utilities and new duct
installations. Transition trench or tunnel profile gradually as required at crossings.
Maintain 24" minimum separation between new trench or tunnel and parallel existing
utilities or as required by the permit agency.
In the event of damage to an underground utility, notify Puget Sound Energy at once.
Contractor agrees to make work force and resources available .at once to Puget Sound
Energy or municipal authorities to repair damage at no cost.
3. Work Drawings
ai drawings. Maintain on site, in good condition, a complete file of all work d s. These g
drawings shall be available at all times to a Puget Sound Energy representative.
Corrections and changes made during the job shall be recorded continuously on these
drawings. All underground electrical facilities shall have a minimum of 36 inches of
cover. Any change must be approved by the PSE engineer or [project manager.
Furnish Puget Sound Energy a complete set of as built prints (foreman's copies) at the
end of the job.
4. Safety
Provide signs, barricades, and traffic control in conformance with local jurisdictions and
regulations. Provide flagging and or other vehicle traffic control as needed in
conformance with local regulations. (see SPM # 100.4000) Provide adequate signage
and protection to traffic during non -working hours. Maintain traffic flow as required by
permitting agency. Provide signs and barricades to warn pedestrians, motorcycles and
bicycles.
Install warning barricades at least every 50 feet along the trench route from the time the
trench is opened until the trenching is complete.
5. Existing Systems
Maintain existing electrical system in service until new system is complete, tested, and
ready for service. Disable existing system only to make cutove:rs and connections as
directed by Puget Sound Energy's representative.
Provide temporary wiring and connections to maintain existing systems in service during
construction; if a scheduled outage is not possible. When work must be performed on
energized equipment or circuits, use qualified personnel for such operations.
EARTHWORK
See Puget Sound Energy SPM 6800.4050
1. Back hoe, Hand Dug Excavations
Paved Surfaces
Cut the edges of the trench prior to digging. Use the narrowest bucket practical or plow
off the edge of paved surface far enough to minimize asphalt disturbance. Repair any
blow out areas (where edge has been broken) by sawing. The; depth of the trench shall
be enough to allow 36" of cover. Backfill material shall be Contlrolled Density Fill (CDF)
cover or select fill (5/8" minus) to meet permit requirements.
Unpaved Surfaces
Conduit/cable trenches are to be excavated just off the existing (road edge or in the
shoulder of the road behind the existing ditch line. Contractor sthall use a back hoe with
the narrowest width bucket practical or plow. Trench shall be deep enough to allow a
minimum of 36" of cover over the top most cable. All ditch crossings shall have a
minimum of 36" cover from the lowest point within the existing diitch line.
Culverts; when installing facilities under a culvert, excavation must be filled with packed
crush rock. If any culvert is damaged it will be repaired or replaced in accordance with
permitting agency and contractors responsibility.
Spoils shall be removed quickly to minimize blocking of traffic. /All spoils and wastes
become the property of the contractor immediately upon removal. Remove spoils and
wastes promptly to an approved disposal site. Remove spoils containing asphalt or
concrete to a disposal site specifically approved for such materiials. Provide Puget
Sound Energy with a disposal receipt for all spoils.
2. Backfill
Unpaved Road Surfaces
Backfill for unpaved road crossings shall consist of 1-1/2" to 2-1//2" material compacted
to 95% density. Backfill for unpaved road sections shall consist of native material
compacted to 95% density.
At the end of each workday, backfill or plate all trench, remove all spoils and clean
roadway surface of large hazardous debris.
3. Surface Restoration
Unpaved Surfaces
Restore ground surface to original contour. Restore to original condition or better.
4. Landscaping
Arrange and perform work to minimize impact to existing landscaping. Restore
landscaping that has been disturbed during the course of work, including seeding of
banks and fills. Vaults set in bank areas may require re -sloping the surrounding land to
avoid sloughing. Leave area in its original state or better at the end of construction.
Hand dig if required to prevent damage to tree roots.
8,11A PRIOR I� ZL MWE NPIA ME' r CQ90' OOLe
ger H :-J,], FD Ut LF � 3XIM V
00 TF� ��7s�"����dTr��
GENERAL OVERHEAD NOTES:
1. Poles, conductors, devices to be installed per PSE: Standards & Specifications.
2. Poles are to be installed or relocated as staked.
3. All new poles set shall be the class indicated on the sketch or better.
4. Install ground plate assembly on all new poles.
5. Install grid numbers on all new and existing poles as shown on sketch.
6. Treat all field -drilled poles with copper Naphthenate wood preservative.
7. Customer/Developer to coordinate between utilities.
8. All new and relocated poles -locations- to be approved by King Co.
ELECTRICAL
1. Conduit
Conduit for installation in unpaved areas shall be 2", 3", 4", or 6" PVC DB120 or 2", 3", 4", or 6"
DB120 for direct burial. Maintain 36" minimum cover above top conduit at all times or as required
by the permitting agency.
Where conduit is routed from road edge to vault location, maintain 36" minimum cover above top
conduit at all times or as required by the permitting agency. Bends shall be made with as long a
radius as possible (48" minimum). Avoid making sharp bends or kinks in conduit during
installation. Obtain exact location of conduit entrance into vault from Puget Sound Energy before
penetrating vault. Penetrate the vault using existing knockout or use core drilled holes. Stub the
4" or 6" PVC 2"-3" into vault interior and grout between the conduit and vault wall. Leave a 10'
minimum of extra pull rope in each end of installed conduit where 4" or 6" PVC is installed and
cap conduit to prevent the entry of dirt and moisture.
Arrange work so conduit plays directly off reel into trench.. Place the conduit in the trench as
straight as possible. Avoid vertical and horizontal "snaking" of the conduit. Multiple conduit runs
may be stacked vertically. Where conduit must be pulled through a trench to allow a crossing
under an existing utility, cap conduit end before pulling to avoid contamination. If a kink occurs,
cut the conduit ahead of kink and splice to new conduit to continue run.
2. Underground Primary Cable
Primary cable shall be 1/0 Alum Sol Jacketed Cable rated for 15 KV service with a polyethylene
jacket. Primary cable shall be 61 strand 750 MCM alumiilnum conductor rated for 15 KV service
with a copper tape neutral conductor and polyethylene jacket. A 4/0 copper neutral shall be run
with each 3 phase circuit of 750 MCM.
Install cable into existing or new conduit systems using approved installation equipment.
Approved equipment includes either cable pullers and/or gable pushers. Pulling socks shall be
non-conductive or similar material. Steel pulling socks are prohibited. Bare steel cable shall not
be used to pull cable. Cable pulling equipment (winches, 'hoist, driven reels, etc.) shall be
equipped with instrumentation to continually monitor and (record peak tension encountered during
a pull. Before installing cable, obtain rated pulling tension for cable from Puget Sound Energy.
Do not exceed rating at any time during installation. Notify Puget Sound Energy immediately if
pulling tension equals or exceeds rating (828/16571bs for 1/0 or 5000lbs for 750 .) Do not exceed
minimum bend radius of cable or impose kinks or sharp bends on cable during pulling operations.
Install cable directly off reel without dragging it on the ground. Apply Puget Sound Energy
approved lubricant to cable continually during pulling to reduce pulling tension and to permit future
removal.
Install adequate amounts of 3/4 " plywood on existing sidewalk areas to support pulling equipment
and prevent un -necessary damage to sidewalks.
Train and coil cables in vaults as required to form a smooth transition from conduit to termination.
if terminations are to be performed by others, coil 15' of cable in vault and cap end.
3. Terminations and Splices
Install approved terminations on cables in accordance with Puget Sound Energy SPM 2247.5115-
5119. Unless otherwise directed, approved terminations will be load break elbows in vaults and
cold shrink pin terminals on pole risers per Puget Sound Energy SPM 2247.9317.
Splice cable with approved splice kits in vaults, hand holes or similar enclosures. Do not splice
cables in runs between vaults. See Puget Sound Energy:SPM 2233.2075-2076.
4. Concrete Vaults
Excavate, install base material, and compact base material in accordance with Puget Sound
Energy SPM 6775.0040.
Install and seal precast sections in accordance with Puget Sound Energy SPM 6775.0040. Use
precast neck and shaft sections to bring manhole entrance to proper elevation. Install manholes
plumb. Set the top of each manhole to finished elevation or no higher than 6" above existing road
elevation. Install hillholders as required on sketch or by construction notes.
5. Grounding
Install ground rod per Puget Sound Energy SPM 6275.6100 at each vault in which primary cable
is terminated. Locate rod in trench excavation wherever possible to obtain maximum driven depth
in undisturbed soil. Connect each ground individually to ground loop inside vault with bare no. 2
copper jumper or to Concentric neutral at each splice vault location. Minimum grounding
requirement is 4 grounds per mile.
6. Existing Underground Primary Cable (if applicable)
Abandon existing primary cable in place. Cut off old cable ends inside vault flush with wall.
Before cutting, pigtail concentric neutral strands and connect to ground loop inside vault. Return
scrap cable and existing cable tags to Puget Sound Energy. Remove or fill existing vaults as
required by permitting agency.
7. Traffic Control
All traffic control to comply with current specifications in M,U.T.C.D.
1 L, 18 I JJX405 30 880 � : HIG C l r: �'' `a B 657
4kV ;3 T ; II25T CK00424 IM: M r0 00 00 U0127 s 13 16 �� A I 11 I NE6 p�
3�: X72016 • I 00422 H Rws �r x S 759 ; S = 657 407 - ��� `N� �15T �+,\� I ATA Z
257 25 T • N 6 Sr � `�`I\c„< I
I 40r"X�o� '.Z r' CK0042®M :8......... OR
X/15V 171 I a. U318 22 - ;p --2 ID`�'.�zST
BOEING ALT. FEE CK00421 42 IFI M PCR `iu 100 X10359 I - 1172,[ NEr `^�
A X386 'K 1 758 1a 1 1 N -� B,
1 , C 1141007 1 • S :30 pn� 1 c C 1 8 E5PG30: 40T' �_ v -p
..:
--4 I I c ;30 X54 �.. rn ST PCR T76249: i� �°' 1407 i�� 1 A\S2A\<40
1 Jy u~i : BOE[ G SYSTE M RlE7V7AV I.� T 13 ; •3 �$) �� .� ". \� it
1 m :38 FROM X386 VO STAaw +� 1 ^I p� 40887 in p N : I ; . 44, F
B�� AI T 25TB N; METERING BY X733 1� I SU N •' ai \ @.'"•••••'' n
1 1 AI m• / I ..G. WORKZ NE .1 h 15A c
38 401Q A• y Sr r x47 ... •\Y o
AI A 65 38,:x: 38 :::J...... I 0F'I OOT 18 : ,..�T4 t ` i0b7.. 7
B 1007 �1�7
..
` C/ 25T� X71848 t¢ B A , BI 11 1 r 38'ro A• j �.fi•• ''�:.. �F•
W� ,257 F : U390 X3 . ¢ C Y $ } A•B'7:9 38 LOOT
`'
X36 x401 11j ¢� .s iV ..G. ... Sr,.?..� �bb03 X30 :� d4 p
/ r X7 75 X4
1�25TT40T e'iB:� 38...X1195�T /jsr3B �y I21 40! � 013 ' oo�E 5 407 1007
V .••A F y ox.'X�b$ �� ry y AI ,X55 1 BI zz 657 X1019 M •••1K v
:•
#A 9 I - Sf T : o X291 r WAY , 9 : L 85 CO2308 657 BOOS • : ' A
B. 1007• A
:•' '• 3 y R :38 OOT 30-14...�:
100T 110 X36 G rn ' a © 28 ,r T •X6002
40T(� 170 N gT nF Sro:`' ' x 1045 X769 }0346 '. •:•:••. ,,'{� Ir 30
\ PSR i %g xv:3B. t 657 •38 ... /`.. 5T AA4 3(�'••,,
30i'")...30 �% M 100T : ^Y A s� ' 65
/C 38 tI3 A7EA/TGIy�oo Fo~ �e30y 9i8 ''38 PCRV.
,�30
� p1 p yp ti
wmc mew i 38 ,30 S• �:E`• GRA ... i'i
..... e
r ' ' S 1'sr' "
IB I 657/ y i.. 38:..v11.....4138 S S 2„�, sr.
39i.. S 38X1208538'' S U3216 ......y '�...•., • �� s30
B / ; U352 , • 0...:....100T 34
r 40 H X408 30'• 391 r' �'�' 38 X9144 ... '.B ; •. A, .....
S E S E U2554 °
3r XsOT: �r.;..FT..''o s3sr';d •sr tt '•41Fp'„ �•''hr' •c '
B :3 S R5 •'•
` 5 ; 5 iia:' A.C? ' . : B :.;.......
-7 WS. r y �!
1
�y ,B U38 386:; X520 ' U s 5 11315 . + ....... '' 30
25r� , ..° 3 e X1034 3 ao �� U 481 X5003 �°� "A.0
.. •''••4j65T EAR °;...41..;.a-tp.y..:� 5' 'r'r i $ 2544 : .8 M�
23 ti/ X15573 17 !� Q 257111 : 1301 01!'�1�•�+„••� :' y 40)>
r.. 5_ _ �°� if 98 ` a �C B, 1ooi 8� 341YqL
�nzsr i ¢¢ T•• `. 83
GRA �p
100T6-'_ m: .• �:' X2297 1 13f!8.J'T8 \ ..•n0 4. 30 S5 ST IDs �"'X5002 1 +
s U464
0 2216. ••' -i. 1 ml I N ::1110 �-� 407 I
. �s •( r 717 1
�...:..G.i y ....38 I N: X �X I' 1 B
1 SIN X nt x X7175 I 1
.f110
: o loon30 1
I I�
OVERHEAD CIRCUIT MAP (23,05E040, 088)
SCALE: 6" = 1 MILE
NOTE:
DEVELOPER TO PROVIDE ALL CAVIL WORK: TO AND INCLUDING
EXCAVATION, BACKFILL, SHORING, TRENCH MAINTENANCE,
SANDING FOR DUCT, SELECT 5/8" CRUSH FOR UNDER VAULTS,
COMPACTION, ALL HARDSURACE RESTORATION AND RELATED
LANDSCAPING RESTORATION. DEVELOPER TO PROVIDE
TEMPORARY EXCAVATION PLATTING (IF REQUIRED).
EROSION & SEDIMENT CONTROL REQUIREMENTS
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
& ANY ADDITIONAL LOCAL JURISDICITON REQUIREMENTS.
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
ARE TO BE INSTALLED, CROSS SECTI ON DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
LEGEND
- - 4I4 EXIST. 101 WIRE
- - - - k EXIST. 30 WIRE
- - - - - EXISTING SECONDARY SERWICE LINE
NEWTRENCH LINE
EXISTING RIGHT OF WAY
EXISTING PROPERTY LINE
EXISTING CENTER LINE
EXISTING CONDUCTOR TO BE REMOVED
© PROPOSED PULL VAULT
PROPOSED PADMOUNT TRAiNSFORMER
Q EXISTING PADMOUNT TRANSFORMER
JD J -Box
• NEW POLE
O EXISTING POLE
1 DISCONNECT - FUSED
0 DISCONNECT -UNFUSED
D EXISTING UG RISER
10- NEW UG RISER
E-- DOWN GUY
EXISTING STREETLIGHT
HANDHOLE
Vicinity Map
Manager., Brad Elkin
Cell Phone: 425-495-6489
E -Mail: brad.elkin@pse.com
"Locates Required" Yes No
For contacts below dial 1 -888 -CALL PSE (225-5773)
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
-uu,ages nequ,red" Yes No
"Flagging Required" Yes o
REAL ESTATE/EASEMENT
RW#
PERMIT
PERMIT#
3
FUNCTION CONTACT
PHONE NO
DATE
2
PROJECT MGR Brad Elkin
425-495-6489
05/15/17
1
ENGR - POWER Brad Elkin
425-495-6489
05/15/17
REV# DATE
BY DESCRIPTION
ENGR - GAS N/A
N/A
N/A
COUNTY
KING
Emer Sed Gas \Wk Ctr
WA IN/A
POWER WK CTR
CSPSKIEN
DRAWN BY Guy Rider
425-449-9596
05/15/17
CHECKED BY Ni , k p
Si
1/4 SEC
NW17 T23N R05E
OF MAP
N/A
PLAT MAP
N/A
APPROVED BY
FOREMAN 91
U -MAP NO (POWER)
2305EO66
OH CKT MAP
2305EO40
UG CKT MAP
2305EO66
CIRCUIT NO
GRA -17
FOREMAN #2
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
N/A
N/A NIA
N/A
CONTACT
N/A
N/A N/A
N/A
PHONE#
N/A
NA N/A
N/A
PUGET SARTORI ELEMENTARY SCHOOL SCH 73
SOUND OVERHEAD TO UNDERGROUND CONVERSION
ENERGY 315 GARDEN AVE NORTH, RENTON 98057
INCIDENT MAOP
N/A N/A
Elect Order
Ga N Order 101105503
SCALE PAGE
NOTED 1 of 4
318136-166182 WORKZONE
E 41 D A� X806
S 406 401
E. -b - ILE
1002
/318129- 6163 318129-166183
o ....... ---..._ .....................---....-o ..... 318129-166196
25kVA 1 1240v 25kVA 120/240V
�.-_...-...—.. ....- ...... __.............. =
SL1023949 N 4TH ST SL102395 N 4TH ST
j SL1023946
i
350 .
318120-166175 318121-166181
350
318116-166174
346 318116-166182
4 X6239
346
340 351 340
338 337 318103-166180
336
335 318102-166180
332 2 4 50kVA 1201240v 330
318096-166174 0
330 329
LU
Q
� 326
318089-166
326 4
318088 166174 315
318088-166180—
322 3x25kVA 1201208v
323
314
—Q 315
318074 166174 314
2 310 318069-166179
25kVA 1201240v
0 18071-166158 4 T1204 1206
15OkiA 1201208v 301 318067166178 1200
300
318062-166160 i.. 2 8 3Q
100kVA 120/240V ' r; 318062-166161 ,i' ! \
1 318057-166178 318061-166207
75kVA 1201240v 3 80601166173 318061 166191 '
0kVA 1201240v
75kVA 1201240v
.......................................................................
166150 ._.-._._...................................... ...... _
N E UTRAt'1......................................................................
.-__.
318055-166180
1009 ... ............._........_�
318055-16 63 a----- ......................_........_.._....._....... ....
.....
318050-1661 1 318049-166178 250 �j•-
D 5T 1201
250 UNK Y48 8050166190
318048-1661 0 247 1
1207 1211
240 rA
240 0 238
IUNIVERSAL MAP (2305E066)
SCALE: 1" = 50'
UNDERGROUND CIRCUIT MAP (2305E066
SCALE: 1 " = 50'
I0w .li.dliupl Wl p u i.Nnf,
wsl��l�i llhl,l'
REAL ESTATE/EASEMENT
RW#
PERMIT
PERMIT#
3
FUNCTION CONTACT
PHONE NO
DATE
2
PROJECT MGR Brad Elkin
425-495-6489
05/15/17
1
ENGR - POWER Brad Elkin
425-495-6489
05/15/17
REV# DATE
BY DESCRIPTION
ENGR - GAS N/A
N/A
N/A
COUNTY
KING
Emer Sect Gas Wk CtrPOWER
N/A N/A
WK CTR
CSPSKIEN
DRAWN BY Guy Rider
425-449-9596
05/15/17
CHECKED BY f j LA 4-,1115/
�
1/4 SEC
NW17 T23N R05E
OP MAP
N/A
PLAT MAP
N/A
APPROVED BY
a9S(�Yu S
•23•
FOREMAN #1
U -MAP NO (POWER)
2305EO66
OH CKT WAP
2305E040
UG CKT MAP
2305E066
CIRCUIT NO
GRA -17
FOREMAN #2
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
N/A
N/A N/A
N/A
CONTACT
N/A
N/A N/A
N/A
PHONE#
N/A
I NA I N/A
N/A
PUGET SARTORI ELEMENTARY SCHOOL SCH 73
SOUNDGas
OVERHEAD TO UNDERGROUND CONVERSION
ENERGY 315 GARDEN AVE NORTH, RENTON 98057
NCH/NT MN AP
Order Elect Order
N/A 101105503
SCALE PAGE
NOTED 2 of 4
N
A
U096039511 @— — —
351 PARK AVE N APT D
1-3' COND
1-3' COND
B035897992 \
337 PARK AVE N
331 PARK AVE N APT D&— _ — —
B032122196
335 PARK AVE N APT D /
8032358737
SITE PLAN MATCHLINE SEEPAGE4
SCALE: 11"= 20'
9no
Internal vault ground
installed by manufacturer
Heigtht Adjusting
Three 3' Sq . ..:............1..........:
or ATiti-Skid Doors
._.: .._.
11,600 lbs Max
A v` K .
11'-4" Min 4/0 CU
11'-10" Max
\ \ S-1 0" Min
6
6'-4" Max
TOP VIEW
Rock
IN
2"
1 56,.
SIDE VIEW
Excavation - 32-1/2 cubic yards
VAULT AND EXCAVATION DETAIL
NOT TO SCALE
42"
MID # 7906630 OR 9996167
MINIPAD TRANSFORMER
NOT TO SCALE MID # 7662010
SITE CONSTRUCTION NOTES:
P02- 318116-166174 (EXISTING)
INSTALL 3" SEC RISER ON STANDOFFS (RIS3CSS) 6042.1000
P03- 318096-166174 (EXISTING)
INSTALL 3" SEC RISER ON STANDOFFS (RIS3CSiS) 6042.1000
AT EMI, EM2
STUB OUT 2-6" AND 2-4" CONDUITS
INSTALL ELECTRONIC BALL MARKER (MID: 7668)501)
Vault & Equipment Table
t
/.i.Y:yli11�5 „1
IA ,.
<ik 6,
i
61 FRONT
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
2"
17711
61
-
6"
Crushed T-6"
Ground Lino
6' Minimum above common neutral.
n even with The common neutral for xcordary.
20'
DB 120
Conduit
p4 10, (Overall)
8. Schedule 80
Min Conduit
A z4":
Schedule 80 Berl
Common Neutral
Note: 56edule 80 conduit shall
.Mend a minimum of B' above
and 12" belay ground lire.
TYPICAL POLE WITH RISER DETAIL
NOT TO SCALE
Mt
IIu
Excavated Dirt Pile
ROADSIDE 48" Typical
(Power, Gras, and 24" Min < �\
Final Grade Communications)
t \ 24" Mim \\ \\i\\ REAL ESTATE/EASEMENT PERMIT
Separatimn �j�"' RW# PERMIT#
NOTE: Install 12' Shading 3 FUNCTION CONTACT PHONE NO DAT
36"if the backfill contains rocks 2 PROJECT MGR Brad Elkin 425-495-6489 05/15
Min Separation A " � p Min
% greater than 10" die 1 ENGR - POWER Brad Elkin 425-495-6489 05/15
M12
Cover > \, REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/F
%\
481, /,, COUNTY Emer Sect (Gas Wk Ctr POWER WK CTR 1DRAWN BY Guy Rider 425-449-9596 05/15
Max j��\\ 6" Min Sand Cover KING N/A N/A CSPSKIEN CHECKED BY ({ti_ y— S SI
Over Power Conduits 1/4 SEC OP MAP PLAT MAP yyS Sz
T MA/17 T94M Pf F: MIA, nun rnorssna n.
(When Present)
Approximate
'--Primary Power
Cable TV 24'
2-6" and 2-4"
Station &
Grid
Vault Size
ASBUILT INFORMATION
Site
DETAIL
NOT TO SCALE
Offset From
Number
& Cover
Foreman -Complete
Vit Center
STA 24+69
318105
36"X42"X38"
Vol
Unistrut HH
44 RT
166190
MATID: 7663001
STA 25+78
318116
5'110"X11'4"X5'0" VAULT
PV1
51 RT
166191
W//3-3' Sq A S Doors
:MATID: 9996167
Ground Lino
6' Minimum above common neutral.
n even with The common neutral for xcordary.
20'
DB 120
Conduit
p4 10, (Overall)
8. Schedule 80
Min Conduit
A z4":
Schedule 80 Berl
Common Neutral
Note: 56edule 80 conduit shall
.Mend a minimum of B' above
and 12" belay ground lire.
TYPICAL POLE WITH RISER DETAIL
NOT TO SCALE
Mt
IIu
Excavated Dirt Pile
ROADSIDE 48" Typical
(Power, Gras, and 24" Min < �\
Final Grade Communications)
t \ 24" Mim \\ \\i\\ REAL ESTATE/EASEMENT PERMIT
Separatimn �j�"' RW# PERMIT#
NOTE: Install 12' Shading 3 FUNCTION CONTACT PHONE NO DAT
36"if the backfill contains rocks 2 PROJECT MGR Brad Elkin 425-495-6489 05/15
Min Separation A " � p Min
% greater than 10" die 1 ENGR - POWER Brad Elkin 425-495-6489 05/15
M12
Cover > \, REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/F
%\
481, /,, COUNTY Emer Sect (Gas Wk Ctr POWER WK CTR 1DRAWN BY Guy Rider 425-449-9596 05/15
Max j��\\ 6" Min Sand Cover KING N/A N/A CSPSKIEN CHECKED BY ({ti_ y— S SI
Over Power Conduits 1/4 SEC OP MAP PLAT MAP yyS Sz
T MA/17 T94M Pf F: MIA, nun rnorssna n.
(When Present)
Telephone 2-,V'—J
'--Primary Power
Cable TV 24'
2-6" and 2-4"
(When Present)
A TRENCH
EXCAVATION
DETAIL
NOT TO SCALE
U
0.
B028856000
329 PARK AVE N
i
i
B029034179
323 PARK AVE N APT D
1-3' COND
1-3' COND
166174
B029186291
315 PARK AVE N
'U
B031738415
B021174730
303 PARK AVE N APT D
MATCH LINE SEE PAGE3
�'\ 1-...- 13 --
IIAPN 722400 0595
( 330 PARK AVE N
DS
I I.
IDS
IDS
AF'N 722400-0590
326 PARK AVE N
Ii
i
ii
)5~ 1 3 X 25kVA
DATION
DS 2-4'
f 2-2'
(MAIN LINE TRENCH)
ILTi
DS
I
J '722400 0580
4 PARK AVf:'. N
SITE PLAN
SCALE: 1 " = 20'
318049
166178 650
SITE CONSTRUCTION NOTES:
P06- 31 &088-166174 (EXISTING)
INSTALL 3" SEC RISER ON STANDOFFS (RIS3CSS) 6042.1000
P07- 3181074-166174 (EXISTING)
INSTALL 3" SEC RISER ON STANDOFFS (RIS3CSS) 6042.1000
AT EM3
STUB OUT 2-6"
INSTALLELECTRONIC BALL MARKER (MID: 7668501)
AT EM4
STUB OUT 1-4" CONDUIT
INSTALL ELECTRONIC BALL MARKER (MID: 7668501)
Vault & Equipment Table
CURB OR EDGE: OF PAVEMENT
— — 5' MIN
5'
MIN .3' MIN
I
I
I
3, TYP. PAD
MIN y & TRANS-
FORMER
COOLING
Approximate
ASBUILT INFORMATION_
CONDUIT
SCH 80
LENGTH
Design
(ft)
FINS
Station &
Grid
Vault Size
ASBUILT INFORMATION
Site
Offset From
Number
& Cover
Foreman -Complete
90° 45° 1 220
Vit Center
AREA
PV1
+
6
STA 20+47
318063
4'8"X7'X5' Vault
1
J01
33.5 RT
166188
w/ 2-3' Sq Anti -Skid doors
6
2
1 560
Emer Sled Gas WkCtr
N/A1 N/A
MATID: 9996162
2
Guy Rider
STA 22+41
318082
36"X42"X38"
2
V02
OP MAP
N/A
1
Unistrut HH
APPROVED BY
J01
49.5 RT
166190
1
10
U -MAP NO (POWER)
2305EO66
OH CKT MAP
2305EO40
UG CKT MAP
2305EO66
MATID: 7663001
J01
CURB OR EDGE: OF PAVEMENT
— — 5' MIN
5'
MIN .3' MIN
I
I
I
3, TYP. PAD
MIN y & TRANS-
FORMER
COOLING
CONDUIT
SCH 80
ASBUILT INFORMATION_
CONDUIT
SCH 80
LENGTH
Design
(ft)
FINS
ASBUIILT INFORMATION
SIZE
(in)
Qty
LENGTH
Design
(ft)
—3'MIN
—
REQUIRED
I
5' MIN
WORK SPACE
90° 45° 1 220
1 110
AREA
PV1
+
5' MIN
ACCESS
/ DOOR
10' MIN —
��— ACCESS
J DOOR
CONCRETE PAD -
I
ROAD OR
PARKING AREA
CURB (OR EDGE OF PAVEMENT y
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
NEW
2-6"
NEW i
2-4' I
I PV1
I
I
NEW I
1-3" I NEW
2-6'
PO2 � I
r-----
I I I
P03 II I I
U I
I
NEW I
1-3'
NEW
I I
I I
I
NEW I
1_3" I I
I I
I
P06 0 I I
I
I I II
P07 A& I I I
l NEW
NEW
1-3" I I
I II
I II
I II
I II
I II
I
CONDUIT DIAGRAM
SCALE: NONE
— NEW
1-4'
M4
NEW
2-4"
PRIMARY CABLE & CONDUIT TABLE
ROAD SIDE (PREFERRED)
3' MIN
0 0
3' m 3'
MIN MIN
o ® o
6' MIN
FIELD SIDE (PREFERRED)
CLEAR WORKING SPACE FOR VAULTS
NOT." TO SCALE
LOCATION
CONDUIT
SCH 80
ASBUILT INFORMATION_
CONDUIT
SCH 80
LENGTH
Design
(ft)
BENDS
ASBUIILT INFORMATION
SIZE
(in)
Qty
LENGTH
Design
(ft)
Vol P02
BENDS
135
Forefman- Complete
FROM TO
90° 45° 1 220
1 110
Actual Amount Installed (Conduit & Cable)
PV1
EMI
6
2
35
1
1
V02 P07
1 3
PV1
EM3
6
2
1 560
Emer Sled Gas WkCtr
N/A1 N/A
2
2
Guy Rider
EM2
J01
4
2
560
OP MAP
N/A
1
2
APPROVED BY
J01
EM4
4
1
10
U -MAP NO (POWER)
2305EO66
OH CKT MAP
2305EO40
UG CKT MAP
2305EO66
CIRCUIT NO
GRA -17
J01
J02
4
2
15
JOINT FACILITIES ARRANGEMENTS
J02
V01
2
1
455
2
N/A
2
CONTACT
J02
V02
2
1
230
2
N/A
1 2
N/A
SECONDARY CABLE & CONDUIT TABLE
LOCATION
CONDUIT
SCH 80
ASBUILT INFORMATION_
SIZE
(in)
LENGTH
Design
(ft)
BENDS
_
Foreman - Complete
FROM TO
900 1 45° 220 110
Actual Amount Installed (Conduit & Cable)
Vol P02
3
135
2
425-495-6489
Vol P033
1
135
2
V02 P06
3
130
2 1
REV#
V02 P07
1 3
1 130
2 1
N/A
REAL ESTATE/EASEMENT PERMIT
A\AHF DCO nn i'ru
I
U1
C)1
O
W
oil
3
FUNCTION
CONTACT
PHONE NO
DATE
2
PROJECT MGR
Brad Elkin
425-495-6489
05/15/17
1
ENGR - POWER
Brad Elkin
425-495-6489
05/15/17
REV#
DATE
BY' DESCRIPTION
ENGR - GAS
N/A
N/A
N/A
COUNTY
KING
Emer Sled Gas WkCtr
N/A1 N/A
POWER WK CTR
CSPSKIEN
DRAWN BY
Guy Rider
425-449-9596
05/15/17
CHECKED BY N - LU /L--
s/u/171
1/4 SEC
NW17 T23N R05E
OP MAP
N/A
PLAT MAP
N/A
APPROVED BY
2> -NS rl
-
FOREMAN #1
U -MAP NO (POWER)
2305EO66
OH CKT MAP
2305EO40
UG CKT MAP
2305EO66
CIRCUIT NO
GRA -17
FOREMAN #2
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
WA
N/A
N/A
N/A
CONTACT
N/A
N/A
N/A
N/A
PHONE#
N/A
NA
N/A
N/A
PUGET SARTORI ELEMENTARY SCHOOL SCH 73
SOUND OVERHEAD TO UNDERGROUND CONVERSION
ENERGY 315 GARDEN AVE NORTH, RENTON 98057
INCIDENT
N/A
MAOP
N/A
Gas Order
N/A
Elect Order
101105503
SCALE
NOTED
PAGE
4 of 4