HomeMy WebLinkAboutP_Utility_Plan_Design_101106162_V1_170726GENERAL SPECIFICATIONS
Scope of Work
06/19/2017 PER TARAS MARTINYUK CELL# 425-516-3525
NOTE: CITY OF RENTON PERMIT AND 2 FLAGGERS REQUIRED,
CORE HOURS, USE GATE IN FRONT OF PADMOUNT SWITCH WITH PSE PADLOCK FOR ACCESS.
LARGE RESIDENTIAL OUTAGE REQUIRED ON APARTMENT COMPLEX NEARBY, RADIAL FEED.
0#379441: BO SWITCH U0497. SERVICEMAN NOTICED ARCING & TRACKING.
CUSTOMER: THE PRESERVE AT CEDAR RIVER
ASSISTANT MANAGER CASEY 425-430-4600
V01: AT U0497:317355-167287
-USE VAC TRUCK TO DE -WATER & CLEAN THE VAULT
-INSTALL EXPANDING PLUGS TO KEEP WATER OUT OF VAULT
-REPLACE B/O PMH11 WITH NEW PMH11
(SEE STD 6056.1000, FIG 1,2,3,6, CU ID PMH1115)
-REPLACE TERMINATIONS, AS NEEDED
-USE FUSE 150E
-SWITCH BACK TO NORMAL. SEE O# FOR MORE DETAILS
General
- All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon
request.
- Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be
removed daily.
- Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be
coiled and returned the day it is removed from the poles. Remove all unused pins and insulators.
- Return all streetlights, area lights and floodlights to Sumner yard.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in
advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in
advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy
of worksketch.
- Return one Foreman's copy of worksketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safe
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as
otherwise instructed by the System Operator.
- Provide signs, barricades, and traffic control in conformance with permit regulations.
- Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations.
- Maintain traffic flow as required by permitting agency.
Erosion & Sediment Control
- Refer to PSE standards 0150.3200 for minimum requirements.
- Comply with all requirements of permitting agency.
- Installed erosion & sediment devices shall be maintained until vegetation has been re-established or
disturbed soil has been otherwise permanently stabilized.
Joint Facilities
- Coordinate with Communication Companies for transfers.
UNDERGROUND CONSTRUCTION
Excavation
- Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover
for primary conductors and 24" of cover for secondary conductors.
- Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum
of 36" of cover for all conductors or as required by the permitting Agency.
- All conductors/conduits shall have a minimum of 3" of bed and 3" of clean sand cover.
- No rocks larger than 6" shall be included in backfill.
- Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required
by the permitting Agency.
- Restore all excavated areas to original condition.
- If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be
installed around the conduits to a depth of six inches above and to the sides of the conduit, and two
inches underneath, per PSE Standard 6790.0140.
Vaults & Handholes
- Refer to PSE standard 6775.0040 "Vault and Handhole Installation"
- Vaults shall be placed level and 2" above final grade in landscaped areas and flush with final grade when
placed in hard surface areas.
- A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 "PVC Conduit Installation".
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to
road crossing conduits.
- Install insulating caps on all unused primary bushings.
- All "spare" conduits shall be capped at each end.
r336.4 \�
MC"'ACSR317369-167269
N x7242
E
S \
SCALE: AS NOTED `•..�w„ \�
67247
317355-167287 .; `"'
S :: - .........
U0497 ( �RFj1l
:
49 317356-167287 ; i,......"..........,.., �e(Y�'C
50kVA 1201240v - •.
_...
317345-167272
I
317342-167258
h is
y 167kVA 1201240v
_. --... ........... .....
i
I
IJJ 3173 5-1
\ , v �— Q
317331-167272 •' r—�-
15205 l
1� 49 40
\ 1 �OrH °A3173114732
317331-167329
,.,...� _. •••--..... a 100kVA 1201240v
.„ _
............... ,
_' .......... I --
�,.."..................... L.
1E
t 35317324 167287
X6734) r
31 31^ 1J 1G7339
35
i
" k0: . ..
gr
� r
r J
F
' 317308.167273 ;' (10100577 3149 67320 },'•". '
317308-167272 623
106kVA 1201240v
X•r � r
317311-167317
(10100 779)
(101005779)
317302-167291
ii
317297-167308
\ 100T
X6769
q0
SITE MAP - UNIVERSAL MAP (2305E086)
SCALE: 1" = 50'
Vault & Equipment Table
Site
Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings
Transformer
ID Numbers
(Company ID)
ASBUILT INFORMATION
Foreman -Complete
LB
DC
U0497
317355
EXISTING 60'
Replace PMH -11 w/
9 - 750 terms
-
STREET LIGHT
F
DOWN GUY
167287
ENERGY CUSTOMER DEMAND POINT
NEW PMH -11
PULL VAULT OR SPLICE VAULT
QJ
JUNCTION VAULT/JUNCTION BOX
fl
EROSION & SEDIMENT CONTROL REQUIREMENTS
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
750 Al XT
AO 58673
CO 58675
CO 16970
UATME[:�'Z:1:3
750 Al XT
— — — — — — NEW CONDUCTOR AND OR TRENCH LINE
EXISTING CONDUCTOR TO BE REMOVED
OR ABANDONED
•
NEW POLE
O
EXISTING POLE
Av OR
DISCONNECT - FUSED
-� OR Q
DISCONNECT - UNFUSED
N/A
OVERHEAD JUMPER CONNECTION
V
OVERHEAD TRANSFORMER
D ORD
CONDUIT RISER
N/A
STREET LIGHT
F
DOWN GUY
V
ENERGY CUSTOMER DEMAND POINT
NIA
PULL VAULT OR SPLICE VAULT
QJ
JUNCTION VAULT/JUNCTION BOX
fl
PADMOUNT SWITCH
PHONE
PADMOUNT TRANSFORMER
�❑
TOTAL UNDERGROUND TRANSFORMER
O
SECONDARY HANDHOLE
LEGEND
U0497
PMH11
2
I
I
I
I
3
150E
150E
150E
I
I
I
I
PWR Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
I
101106162
I
N/A
N/A
I
I
108101553
1 4-
1/0 Al XT
AO ACE722
BOJ 16977
CO ACE723
CO 16973
1301 16972
AO 16971
750 Al JKT
317355-167287
PMH -11 SWITCH CONNECTION DIAGRAM
SCALE: NONE
FOREMAN (CHECK BOX WHEN COMPLETED)
❑ PSE Equipment LOCKEDISECURED & Work Area left in CLEAN/SAFE Condition.
❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
❑ Field Changes RED -LINED on As -built.
❑ Material VERIFIED and CHANGES noted on Paperwork.
❑ Total PRIMARY Cable noted on As -built.
❑ Company ID#'s RECORDED in correct location on As -built.
❑ indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
❑ Correct QC Checklist(s) reviewed.
❑ Deviations noted on the As -built and their reason.
❑ I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
Foreman's Signature
Print Name Date
PROJECT PHASE
NOTIF#
ORDER#
PWR Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
11313125
101106162
N/A
N/A
N/A
NIA
N/A
108101553
N/A
N/A
N/A
N/A
GAS Distribution
HP Main
HP Svc/MSA
NIA
N/A
N/A
NIA
N/A
N/A
CABLE TV
Gas Wk Ctr
POWER WK CTR
QCSOKE
PHONE
714-893-2405 6/20/17
CHECKED BY
Project Manager Contact Information:
Manager.TARAS MARTINYUK
Cell Phone: 425-457-5476
E -Mail., TARA.MARTINYUK@PSE.COM
Vicinity Map
NOT TO SCALE
THOMAS GUIDE
656-H4
Cedar fdv1 r N
If Course
4"q,
SF TQ81h
F 1916 ay/ej,Ra CeC�at
r
Qom' i y Wa4hl gtun 169 k
L i 1 1401 ay Southeast
M v
The P`r'esel7e
t Ak Cedar R.`ver
140rh Way$
Ci
Molls:.
CWOM
hA
Owner / Developer Contact Info
PUGET SOUND ENERGY
ATTN: TARAS MARTINYUK 425-457-5476 office
For contacts below dial 1 -888 -CALL PSE (225-5773)
CALL (800) 4243665
Developer
"Locates Required"
"Outages Required"
"Flagging Required"
Yes Yes PSE 2 BUSINESS DAYS BEFORE YOU DIG
No X No X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
Yes x No REAL ESTATE/EASEMENT PERMIT
Yes X No N/A RENTON
3
FUNCTION CONTACT
PHONENO DATE
2
PROJECT MGR T. MARTINYUK
425-457-5476 6/20/17
1
ENGR - POWER T. MARTINYUK
425-457-5476 6/20/17
REV# DATE
BY
DESCRIPTION
ENGR-GAS
COUNTY
KING
Emer Sect
Gas Wk Ctr
POWER WK CTR
QCSOKE
DRAWN BY L. ORTIZ
714-893-2405 6/20/17
CHECKED BY
114 SEC
NW22-23N-05E I
OP MAP
PLAT MAP
APPROVED BY '
FOREMAN #1
U -MAP NO (POWER)
2305EO86
OH CKT MAP
2305EO88
UG CKT MAP
2305E 186
CIRCUIT NO
FWD -16
FOREMAN #2
IMAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
CONTACT
PHONE#
PUGET FWD -16 140TH AVE SE, RENTON
SOUND REPLACE B/0 PMH -11U0497
( )
ENERGY 140TH AVE SE & MAPLE -VALLEY RD. RENTON, WA 98058FAS
DESIGNED BYASPLUNDH CONSTRUCTION CORP.
INCIDENT
0-379441
MAOP
Gas Order
Elect Order
101106162
ALE
NOTED
PAGE
1/2
317352-167232
167kVA 1201240V
COACE725
317331-167221
100kVA 1201240v
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 50' MAP#: 2305EO86
COACE723
�� 13 1B B
...A .......... .••2..• I C� C �....• w
�k1 A. t;L 15 65T?� ...9....i'
{..
r l
Nt
MAPLENVW CE .130 i
Ao
•'30t «
C., d25T;
62365T G6iCF ..� G g 4.., i
..®
25T\ 00T 65T "••'
5491
B\. - - .*
� $i 1 OT
1l -18 ^100 q�p�tMOW
VCO25 P� 25K 4�R 30 ,
JJOB SITE
D��
24
113 J MAP
N
C.
X6 Ay . e `'?[[E`y 6735 25T o
X6987 ° y�
6g �.. ` ` 30.......... 5T
X617
2sr7 x880
FWD �� A,©BRT X545 X46
1s c3s .• 1X11
40TJVy54 ;100
��J r
C:
C.: ;A
A
�F J1•
02
Y
C +'B'C A J : }' • #e..:...7N....... •
4 R0L
T -re ...r"".AO: 17 r e'.S;�e......•s' X3539
• ,A OPENt Ct.4£ 159 PL 9Y 100T
_1111. r f�
°p'118 jLy/6p PL
it I N, -:A X7389
dCly C� 9 C. A:
A IL, (Qj D -i•, X7409 X7390
Z z ``Ab •. •. •.
y 0 C00774 L
25Tp
..... 162 ::; • :...
Al ;� ..
1!m POO Ay B ©'/� .
OVERHEAD CIRCUIT MAP (2305E088
SCALE: 6" = 1 MILE
A016968
B016969
C016970
317342-167258
167kVA 1201240V
AOACE722
S�R�Nr10rV
V01
317355-167287
U0497
6016977 F_
317356-167287
50kVA 1201240v
A016971
6016972
C016973
A058673
6058674
C058675
S�R�NT �NM'�p[F
317331-1
1�THW'IYSF t 100kVA1
Project Manager Contact Information:
Manager. TARAS MARTINYUK
Cell Phone: 425-457-5476
E -Mail: TARA.MARTINYUK@PSE.COM
O
O
O
N
For contacts below dial 1 -888 -CALL PSE (225-5773)
r-etl /RON d9d_GCAR
Developer
Yes Yes PSE 2 BUSINESS DAYS BEFORE YOU DIG
"Locates Required"
No x NO x THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
"Outages Required"
Yes x No REAL ESTATE/EASEMENT
PERMIT
"Flagging Required"
Yes x No
N/A
RENTON
3
FUNCTION CONTACT
PHONE NO DATE
2
PROJECT MGR T. MARTINYUK
425757-5476 6/20/17
1
ENGR - POWER T. MARTINYUK
425-457-5476 6/20/17
REV# DATE
BY
IDESCRIPTION
ENGR - GAS
COUNTY
Emer Sect
Gas Wk Ctr
POWER WK CTR
DRAWN BY L. ORTIZ
714-893-2405 6/20/17
KING
OCSOKE
CHECKED BY
114 SEC
OP MAP
PLAT MAP
APPROVED BY
NW22-23N-05E
FOREMAN #1
U -MAP NI (POWER)
OH CKT MAP
UG CKT MAP
CIRCUIT NO
FOREMAN #2
2305EO86
2305E088
23( -086
FWD -16 IMAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
CONTACT
PHONE#
P! //•�
SOUND
FWD -16 140TH AVE SE, RENTON
REPLACE B/O PMH -11 (U0497)
INCIDENT
0-379441
Gas Order EENERGN
MMAOPUG
1140TH
AVE SE & MAPLE -VALLEY RD. RENTON, WA 98058
SCALE
YASPLUNDH CONSTRUCTION
CORP.
AS NOTED