Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutP_Design_101102119_V1_170830CL
U
O
N
N_
W
U)
O
0
L0
.L
W
w
cr
W
coU
PSE GENERAL SPECIFICATIONS
General
- All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards
are available upon request.
- Work sites shall be kept clear of debris and all construction materials, equipment and
packing shall be removed daily.
- Return all unused and removed poles, transformers and hardware to PSE, storeroom. All
copper shall be coiled and returned the day it is removed from the poles. Remove all unused
pins and insulators.
- Return all Streetlights, area lights and floodlights to Sumner yard.
- All fault indicators will be maintained in their current location on the 1/0 cables upon
completion of the job. If it is noted to remove any of the indicators they shall be returned to
local PSE first response department for re -issue.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by
permitting agency, in advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a minimum
of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in red on
Foreman's copy of work sketch.
- Return one Foreman's copy of work sketch to Project Manager at completion of job.
When permits are required, a copy shall be available on work site at all times.
Safety
Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of each
work day, or as otherwise instructed by the System Operator.
dost control a
Traffic /Pedestrian n n r
of notes
-
Utilize flagging and other vehicle traffic control as necessary and in conformance with local
traffic regulations.
-The uniform code of traffic control shall be adhered to at all times..
-Provide signs barricades and traffic control in conformance with local permit regulations
ABANDONING PRIMARY CABLES PSE std. 6825.6200
In a Vault if the cable is
Existing Utilities:
In conduit,
-Remove the cable
Not in conduit or it cannot be pulled out,
-Cut the cable off approximately one foot
8. The System Operator will then close the Incident Number (1 -number).
from the vault wall.
Existing System:
-When practical, attach the old cable
10T, 15T, 25T, 40T, 100T -INDICATES FUSE SIZE
number to the cable stub.
In a Minipad hand hole
Maintain 6" minimum clearance at crossings between existing utilities and new duct
In conduit,
-Remove the cable
Not in conduit or it cannot be pulled out,
-Cut the cable off as much as practical
The general scope of this project is to remediate primary 1/0 cables within the project area by the most economic
-When practical, attach the old Cable number to
means possible using replacement, or abandonment.
the cable stub.
The project involves replacing existing electrical cables in new conduit.
-Stuff the tail into the bottom of the
NEW COMBINATION J-BOX/PADMOUNT XFMR
handhole. Be sure the re,,,, cables are not
Project type : Planned
trapped by the old cables or the concentric
Project location: 15706 SE 128TH ST RENTON, WA 98059
neutrals.
At Risers if the cable is
- No rocks larger than 6" shall be included in backfill
In Conduit
-Remove Cable
Direct buried or it cannot be pulled out,
-Cut off & cap the cable at the top of the riser.
and the pole will remain.
-Attach the old cable number to the cable stub.
DIRECT BURIED
Date
Direct buried or it cannot be pulled out,
-Remove the riser.
and the pole will be replaced
-Cut off & cap the cable underground near the base of the
Trench Footage Estimated :286'
pole.
The cable is direct buried or it cannot be
-C off the cable undergroundr se of the
-Cut o & ca near the ba
p
pulled out, and the pole will be removed.
pole.
-Provide route for pedestrians when working on or near sidewalks. NOTE: If the pole is to be replaced, remove the abandoned riser and elbow, and stand off brackets
(unless they support other conduits).
-Maintain traffic flow as required by permitting agency. NOTE: If the riser is made of transite material, it shall be removed following procedures in standard 0100.5000,
"Transite Pipe Removal and Disposal."
NOTE: Completely rebuild terminations. EXCEPTION: DO NOT REPLACE CUTOUTS
UNLESS THEY ARE THE OLDER "BOX TYPE" OR 50 AMP "TRIP LINK" TYPE CUTOUT. -Remove (not abandon) aboveground transite riser when it is encountered in the field. Belowground transite may be left in
REPLACE J -BOXES IF REQUIRED. UTILIZE FEED-THRU T.U.T.S AND REMOVE place and backfilled. (Transite is a mixture of asbestos and cement. It is nonmetalVic, flame-retardant, and resistant
to moisture, low temperature, and corrosive agents).
J -BOXES IF POSSIBLE. REPLACE ALL TRANSFORMER JUMPERS WITH NEW 1/0 -For removal use an approved certified abatement contractor. Call the Environmental Services Department 24-hour pager
JACKETED CABLE. (206-994-3186) to have a contractor dispatched.
Procedure to Abandon Primary Cables:
UNDERGROUND CONSTRUCTION 1. Call the Systems Operator to request a clearance.
2. Follow the directions to ensure the cable is de -energized, apply proper tags as specified in Standard PraCtice
Additional notes to standards. 0201. 1011, "Switching and Clearances Handbook," and report back to the Systems Operator. EROSION CONTROL
-Erosion control must be placed before construction starts. Silt bags must be installed in 3. Obtain a clearance from the Systems Operator on the cable to be abandoned. NOT TO SCALE
downstream catch basins. 4. Cut the ends of the cable.
5 The cable number to ma be left on the abandoned Cable
SURFACE IMPROVEMENT AND RESTORATION
1) FOLLOWING FINAL GRADING ACTIVITY, SOD SHALL BE PLACED ON EXPOSED
SOIL TO PROVIDE PERMANENT AND IMMEDIATE EROSION PROTECTION.
2) TEMPORARY COLD MIX SHALL BE PLACED ON EXPOSED GRAVEL
IN HARD SURFACE FOR IMMEDIATE EROSION PROTECTION AND HOT MIX ASPHALT
WILL BE APPLIED AT FINAL RESTORATION TO PROVIDE PERMANENT EROSION
PROTECTION.
EXPOSED SOIL PROTECTION NOTES:
AREAS WHERE THE GRADING ACTIVITIES, BORE PIT EXCAVATION OR UTILITY POT HOLING,
WILL BE TEMPORARILY STABILIZED BY ONE OF THE FOLLOWING METHODS WHICH ARE
BASED ON PERIOD OF EXPOSED SOILS ARE LEFT UNWORKED.
-THERE WILL BE NO EXPOSED SOILS ON SITE DURING CONSTRUCTION.
ALL SPOILS FROM EXCAVATION WILL BE VAC EXCAVATED INTO THE TRUCK.
EROSION & SEDIMENT CONTROL REQUIREMENTS
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES'.
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION''.
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)'
Filter fabric skirt—
Secured with grate.
v Overt ow
Catch Basin Grate
�-- F ter fabric walls for
Collected Sediment �' de"vatering sediment
Catch Basin Insert
MID 9995728
Gravel bags (MID 9995692)
must be higher at sides
than center.
,. 6" Min
and concrete In accordance with requirements of local permitting agency. Cold patch or plate
trench when necessary. Leave area in its original state or better at the end of construction.
OVERHEAD APPARATUS
"When performing planned work on a pole with an existing transformer or device, the Service
Provider will change out bolted connectors to pressed connectors". Use unit 1-3A to charge
time.
If you are working on a pole with the pole ground connected with a hot tap, replace it. If the
transformer has split bolts on the secondary neutral or services, replace them. If the primary
neutral is connected with a hot tap, replace it. If the transformer bank has a 2 -bolt connector on
the neutral bus, replace it.
POTELCO DESIGN AND
QUALITY ASSURANCE
❑ This design complies with PSE
Design/Engineering Standards.
Any/all variations have been
pre-approved/documented by the
appropriate PSE Representative.
Signature ®� /T/l G
Print Name r7liy i ( A • 70.-171A, -17/A
Date
INDEX
PAGE 1 - GENERAL NOTES
PAGE 2 - SITE PLAN. CABLE & CONDUIT DIAGRAM
-NG
LEGEND
QE
NOTE: The cable number shall not be reused.
Existing Utilities:
6. Call the Systems Operator and release the clearance.
Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point
7. Remove all "Danger Do Not Operate" tags.
of crossing. Protect underground utilities during excavation. Use hand excavation methods if
8. The System Operator will then close the Incident Number (1 -number).
necessary to avoid damage to existing utilities. Fabricate and install adequate temporary
Existing System:
structures to support and protect underground utilities while exposed during construction.
10T, 15T, 25T, 40T, 100T -INDICATES FUSE SIZE
❑
Maintain existing electrical system in service until new system is complete, tested, and ready for service.
Maintain 6" minimum clearance at crossings between existing utilities and new duct
Disable existing system only to make cutovers and connections as directed by PSE System Operator.
installations. Transition trench or tunnel profile gradually as required at crossings. Maintain
SCOPE OF WORK
24" minimum separation between new trench or tunnel and parallel existing utilities or as
The general scope of this project is to remediate primary 1/0 cables within the project area by the most economic
required by the permit agency.
means possible using replacement, or abandonment.
Excavation
The project involves replacing existing electrical cables in new conduit.
- Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of
NEW COMBINATION J-BOX/PADMOUNT XFMR
36" of cover for primary conductors and 24" of cover for secondary conductors.
Project type : Planned
- Road crossings and all trenches within the Right-of-way shall be of sufficient depth to
Project location: 15706 SE 128TH ST RENTON, WA 98059
provide a minimum of 36" of cover for all conductors or as required by the permitting Agency.
Number of Cables: 1
- No rocks larger than 6" shall be included in backfill
Cable Footage Estimated : 286'
- Back fill in road crossings and within the Right-of-way shall be compacted to 95% density or
Cable Numbers Injected : 0
as required by the permitting Agency.
Cable Numbers Repaired: 0
- Restore all excavated areas to original condition.
Cable Numbers Abandoned: 0
Date
Cable Numbers Replaced: 16864
Vaults &Hand holes
FAULT INDICATOR
- Refer to PSE standard 6775.0040 "Vault and Hand hole Installation"
Trench Footage Estimated :286'
- Vaults shall be placed level and 2" above final grade in landscaped areas and flush with
There will be an advance notice provided by the contractor
final grade when placed in hard surface areas.
24-hour advance notice of no parking in work areas. Access will be maintained to all residences and their
- A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults.
driveways. When work is occurring directly in front of driveways, the contractor will work with the residence to
- All conduit entrances shall be grouted.
manage access.
Conductors & Conduit
Traffic Revisions
- Refer to PSE standard 6800.6000 "PVC Conduit Installation".
Flagging crews will maintain one lane; flaggers will assist vehicles alternating through the roadway during work
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be
hours.
plumbed directly to road crossing conduits.
For more information on the project
- Install insulating Caps on all unused primary bushings.
24-hour project information (888) 471-7339, (360) 825-5236
- Civil crew to install Conduit plug on each end until new cable to be installed.
TRENCH PATH
- All "spare" conduits shall be capped at each end.
ABBREVIATIONS
Surface Restoration
Restore ground surface to original contour and original condition or better. Restore asphalt
P.E. = POLYETHYLENE
and concrete In accordance with requirements of local permitting agency. Cold patch or plate
trench when necessary. Leave area in its original state or better at the end of construction.
OVERHEAD APPARATUS
"When performing planned work on a pole with an existing transformer or device, the Service
Provider will change out bolted connectors to pressed connectors". Use unit 1-3A to charge
time.
If you are working on a pole with the pole ground connected with a hot tap, replace it. If the
transformer has split bolts on the secondary neutral or services, replace them. If the primary
neutral is connected with a hot tap, replace it. If the transformer bank has a 2 -bolt connector on
the neutral bus, replace it.
POTELCO DESIGN AND
QUALITY ASSURANCE
❑ This design complies with PSE
Design/Engineering Standards.
Any/all variations have been
pre-approved/documented by the
appropriate PSE Representative.
Signature ®� /T/l G
Print Name r7liy i ( A • 70.-171A, -17/A
Date
INDEX
PAGE 1 - GENERAL NOTES
PAGE 2 - SITE PLAN. CABLE & CONDUIT DIAGRAM
-NG
LEGEND
QE
ELECTRONIC MARKER
Q
SOLID BLADE DISCONNECT
J ❑
UNDERGROUND COMBINATION J-BOX/XFMR
t
FUSED DISCONNECT:
J 7,L
COMBINATION J-BOX/PAbMOUNTXFMR
Cables or Conduit
10T, 15T, 25T, 40T, 100T -INDICATES FUSE SIZE
❑
❑
Material VERIFIED and CHANGES noted on Paperwork.
NORMAL OPEN (N.O.)
J ■
NEW UNDERGROUND COMBINATION J-BOX/XFMR
❑
❑
PAVEMENT / SIDEWALK
❑
WNL
WILL NOT PHASE (WNO)
J A
NEW COMBINATION J-BOX/PADMOUNT XFMR
Correct QC Checklist(s) reviewed.
❑
❑
TOTAL UNDERGROUND XFMR (T.U.T.)
C>—
OVERHEAD TO UNDERGROUND CABLE TERM.
✓
���/j ,
�—
NEW OVERHEAD TO UNDERGROUND CABLE
a
PAD MOUNT XFMR
#1 Print
TERMINATION
Date
NEW UNDERGROUND XFMR
O
FAULT INDICATOR
MATCH EXISTING
NEW PADMOUNT XFMR
FOREMAN #1
CABLE SPLICE
U -MAP NO (POWER)
2305EO44
UNDERGROUND J -BOX
UG CKT MAP
2305EO44
PRIMARY METERING
FOREMAN #2
UNDERGROUND SWITCH
,—,
CABLE TERMINATION BUS (J -BOX)
IMAPPING
PULL VAULTI, — — —��
CUT LINE
THREE PHASE WIRE/CABLE - 12.5 KV
Q
HANDHOLE
36" MIN (ROW)
SINGLE PHASE, ONE WIRE/CABLE - 7.2 KV
_____________
TRENCH PATH
ABBREVIATIONS
TO 95% MAX DENSITY.
P.E. = POLYETHYLENE
PUGET
SOUNDer
ENERGY
DESIGNED BY Potelco, Inc.
X.F.M.R. = TRANSFORMER
INCIDENT MAOP
N/A N/A
Ga N Order 101102Elect 1 9
SCALE PAGE
AS NOTED 1!2
N.T.S. = NOT TO SCALE
Trench and backfill requirements for primary electric line extension trenches
A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
- A 3" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Excavated Dirt Pile
ROADSIDE
12" Typical 24" Min -----------
Final
Final Grade l ✓� ./'. ''
is
C
36" Min Cover (ROW) Backfill
24"Min cover fNo rocks over 10" diameter
(Pvt. Property) ` r )
48" l/
Max % Fr
a 12" Min Sand Shading
'y
3" Sand Bedding
❑
12" MIN
12" MIN
Primary Power in DB120 Conduit (ROW)
❑
Primary Power in SCH80 Conduit (Pvt. Property)
❑
Cables or Conduit
TRENCH DETAIL
NOT TO SCALE
25T25T X11488
-""'- ..
_............
i
I X11489 25T
15T I I I 40T
67..A : I I r NK00384
eJ Y
I I C 25T B
•• � NI 1 ....fir......
- I 1
I
::B� 1 25T
) T
•• L. _ � MAP
C /f''•C CO2769 I 15
e
.A ''� II
B ,A
':....:
Q .
• �:..i E �: QI I ' 47320 �25T
1+
ca : 'B
�••.............. wl I i C LnLf
0••
100T1 X I25T I o . �o.
C MLO�I ,B
65T A 25TH I C T x 100T X723 X427 M 477 100T
AI 171615 X480 25T I 3 1100T 25T
:O MAP 13 I 100T +65T N1 Z;1 Ni6T -- 140T
C: Ni 11796 �y �Vi MAP 1 Al
.� X1100 I 65T 30 STS 'KI
,....:y ... �I X11797 — — B i 1
X11205
:A .... QI 25T X _79_8 I � �`t IB Q
CK547
A 65T I X11799 25 A I `_ I I913
•.;? : • ST SE 1.32 ST A t NI 1 %I
I
• 65 601 100T 1— ~ _ J4;0 -T-- —I
A AC 1132 PL
A - � r- 1
C03536©....,•*X10062 40T •-A I A.... r _ _ _ _ co
.A ."A, C5 65T 25
,................... .6
. I X879X1180 I --o
NK9965T..I 40T — — A 15TI X_ EL
..A.... C : X10271 NI A 25T SE
X10272 X11801' N
.. X1.0�51:� X8899 �' X9177 - g 1 ` ST 25� -h Jo C) ° �I
. �...CT •' 0 25T' 4L,- 10Q A 40T t SE 40T 135 I + '1j p� t (N p A
1.36 `r ST 30 `': `ro3� X8900 I CI 6ss�2p 3 X ^I
A 65T i h t•• .'�' — -� t I S L. T
40T
A�' .. A 80 97 . A 3: eX8898 CX9137 125 11739•••• ,X11208 R
65T;.� M 1
1 03 D 65T
3¢.... 5T_ — •� X8901 B�• I •� ... 3�•, i©C00593 I X11615
'B &c• - �• ' B� X12523
I O B ' X11802 40T I C LIBERTY I 40T
�• id1... 1,� C00824 1.38_ PL p.......... H.S _
c•:c e c •A•40T' Qc NK00034 IJ8 ST
1;i9. • a.. pt I F : 1.39 C PL X9139 X1183 25T •WOB SITE
X11804 a 25T
• :Q C.� T76549 15T — —
100TA .. _ _ ... ••: MAPLEMVW
�O A. 'N X546 MAP . X11805 HEX)YrS
ST 65T 13 25T .... PARK
3••S ... raw A _ — .�
U492 X581 X575 X11806 sE �¢2,:c Q �B_ 15T
65E 100T A 15T �'•"" �, 0� I
A.. SE 1�1ti3 SY". X108207 e:C v;A Q: I MAP
e 100T f
X5806 MAP t25T e�:....: h: :B I 15
c�
100T 15 X11807 3 X11211 `•.°� `^°: `O' X11210
C: �� 65 65T oo , .
................... TWy
I �IX1317 c �...... ...
L•� • °Q
OVERHEAD CIRCUIT MAP: #2306E028
SCALE 6" = 1 MILE
12" Min Sand Shading
Primary Cable(S)
in Conduit 3" Sand Bedding
EXCAVATION AND HARD RESTORATION DETAIL
SCALE: NONE
#1
#2
12"MIN
❑
12" MIN
12" MIN
❑
❑
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
❑
❑
Field Changes RED -LINED On As -built.
❑
❑
Material VERIFIED and CHANGES noted on Paperwork.
EXISTING
❑
Total PRIMARY Cable noted on As -built.
❑
❑
PAVEMENT / SIDEWALK
❑
❑
Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
❑
❑
Correct QC Checklist(s) reviewed.
❑
❑
Deviations noted on the As -built and their reason.
❑
❑
✓
���/j ,
�
and that all quality requirements are met.
ASPHALT PATCH, 2" MIN
Signature
#1 Print
Name
Date
#2 Foreman's
�
#2 Print Name
MATCH EXISTING
FOREMAN #1
U -MAP NO (POWER)
2305EO44
OH CKT MAP
23 )6E028
UG CKT MAP
2305EO44
CIRCUIT NO
MAP -15
FOREMAN #2
VERTICAL SAW
IMAPPING
CUT LINE
48" MAX
36" MIN (ROW)
CRUSHED SURFACING
24" MIN (Pvt. Property)
MATERIAL COMPACT
TO 95% MAX DENSITY.
12" Min Sand Shading
Primary Cable(S)
in Conduit 3" Sand Bedding
EXCAVATION AND HARD RESTORATION DETAIL
SCALE: NONE
#1
#2
FOREMAN (CHECK BOX WHEN COMPLETED)
❑
❑
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
❑
❑
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
❑
❑
Field Changes RED -LINED On As -built.
❑
❑
Material VERIFIED and CHANGES noted on Paperwork.
❑
❑
Total PRIMARY Cable noted on As -built.
❑
❑
Company ID#'s RECORDED in correct location on As -built.
❑
❑
Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
❑
❑
Correct QC Checklist(s) reviewed.
❑
❑
Deviations noted on the As -built and their reason.
❑
❑
I certify that the work perforrried meets PSE's standards and procedures
DRAWN BY
F. SHANK
and that all quality requirements are met.
#1 Foreman's
Signature
#1 Print
Name
Date
#2 Foreman's
Signature
#2 Print Name
Date
PROJECT PHASE NOTIF# ORDER#
SUPERIOR 11267447 101102119
FAILED SILICONE
REMOVAL 108098122
O&M
MAINTENENCE
EXPENSE
CABLE REPLACEMENT
REAL ESTATE/EASEMENT
RW -
FUNCTION
Trench Method:
TRENCH
Approximate Trench Footage:
365'
Abandon Cable Segments:
0
Replaced Cable Segments:
1
Approximate New 10 1/0 pri. Cable Footage:
410'
Approximate 2" SCH80 Conduit Footage:
365'
Vaults:
0
"Locates Required" Yes No
VICINITY MAP
C)
O
Contact Information
PSE: PLANNER
355 - 110TH AVE NE
BELLEVUE, WA 98004
RICK BUELL
425-462-3936
For contacts below dial 1 -888 -CALL PSE (225-5773)
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
"Flagging Required" Yes No
REAL ESTATE/EASEMENT
RW -
FUNCTION
CONTACT
PERM r
PHONE NO
DATE
3
2
PROJECT MGR
C. YLENNI
253-720-9700
04-29-17
1
ENGR - POWER
A. BERRY
253-326-1524
04-19-17
REV# DATE
BY
DESCRIPTION
ENGR - GAS
N/A
N/A
NIA
COUNTY
KING
Emer Sect
N/A
Gas Wk Ctr
N/A
POWER WK CTR
QSEPRE
DRAWN BY
F. SHANK
253-234-6114
04-19-17
CHECKED BY -�f _
51'r /
1/4 SEC
T23N, R05E, 11 -SE
OP MAP
N/A
PLAT MAP
N/A
APPROVED BY
FOREMAN #1
U -MAP NO (POWER)
2305EO44
OH CKT MAP
23 )6E028
UG CKT MAP
2305EO44
CIRCUIT NO
MAP -15
FOREMAN #2
IMAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
CONTACT
PHONE#
PUGET
SOUNDer
ENERGY
DESIGNED BY Potelco, Inc.
MAP -15 15706 SE 128TH 2017 CRP
CABLE REMEDIATION PROGRAM
15706 SE 128TH ST RENTON, WA 98059
INCIDENT MAOP
N/A N/A
Ga N Order 101102Elect 1 9
SCALE PAGE
AS NOTED 1!2
inem
i
a.
H,
0
n
n
0
CIRCUIT FEET REMOVED: 290'
CIRCUIT FEET ADDED: 365'
C
EOP
17'
i
NO
0
15632 O
P# 1123059007 Lu
w
Q,
f,y
Ll
..
LOCATIONS CABLE EXISTING CABLE
FROM TO (LF) EST MFG. NAME
EXISTING CABLE
MFG. DATE
LL
318121-167940
1
25kVA 1201240v
i
VAULT SIZE &
�y'? yI
. "5 %/
BUSHINGS
TRANSFORMER
ID NUMBERS
i
I
CABLE
SIZE
3
t
:
NUMBER
i
J I
1311-137934
(COMPANY ID)
...
yi., u/
7.50P240v
22
11
LB
DC
YEAR
NQ
I
EOP
EXISTING
C
EOP
17'
i
NO
0
15632 O
P# 1123059007 Lu
w
Q,
f,y
`
SAP
EQUIP
LOCATIONS CABLE EXISTING CABLE
FROM TO (LF) EST MFG. NAME
EXISTING CABLE
MFG. DATE
LL
_)
1
I
i
`
SAP
EQUIP
LOCATIONS CABLE EXISTING CABLE
FROM TO (LF) EST MFG. NAME
EXISTING CABLE
MFG. DATE
LL
_)
10629327
SITE
GRID
VAULT SIZE &
TYPE & SIZE
BUSHINGS
TRANSFORMER
ID NUMBERS
REMARKS
CABLE
SIZE
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
NUMBER
COVER
#,,.
(COMPANY ID)
POLY
yi., u/
<..
22
11
LB
DC
YEAR
NQ
I
EOP
EXISTING
37.5kVA PM XFMR
365
Gas Wk Ctr
N/A
4
REPLACE ELBOWS & CONDUCTORS
17'
(
P# 1123059102
120/240v
1
1 X996-167935
1/0 AL JKT
318092
P01
APPROVED BY
- - EHN728
EXISTING
FOREMAN #1
TOTAL 2"
167950
I
15706
1
FOREMAN 02
2 -
-
25T
TOTAL 10
410
3`8092-167963
k�W T78637
(..,.
UTILITIES
CONTACT
PHONE#
4'A
'
ROW 85'
PUGET
SOUND
ENERGY
DESIGNED BY Potelco, Inc.
MAP -15 15706 SE 128TH 2017 CRP
CABLE REMEDIATION PROGRAM
15706 SE 128TH ST RENTON, WA 98059
INCIDENT ENT MN OP
Gas Order Elect Order
N/A 101102119
SCALE PAGE
AS NOTED 2/2
'17,5kVA 120/240v
EUP 50_
m ruiw,<.„
G ;36.4MC
64*318093-167935
. ,.,....,...,
F
4\3
„
SE 128TH ST—
. ........
932
37-161934
..... .....
-- --. _
318088-167936
SITE PLAN
SCALE: 1:50
VAULT & EQUIPMENT TABLE
1 Ilk 0 1 ♦ 1
D
V011 318122
67953 PX
-- C
C016864
318092
167950 P01
25T
UNK --
SE 128TH ST
EXISTING UNDERGROUND MAP #: 2305EO44
SCALE: 1:50
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE EXISTING CABLE
FROM TO (LF) EST MFG. NAME
EXISTING CABLE
MFG. DATE
PRIMARY
16864
10629327
SITE
GRID
VAULT SIZE &
TYPE & SIZE
BUSHINGS
TRANSFORMER
ID NUMBERS
REMARKS
CABLE
SIZE
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
NUMBER
COVER
EQUIPMENT IN VAULT
(COMPANY ID)
POLY
SCH 80
90 45
22
11
LB
DC
YEAR
ENGR - GAS
P01
318122
EXISTING
37.5kVA PM XFMR
365
Gas Wk Ctr
N/A
POWER WK CTR
QSEPRE
REPLACE ELBOWS & CONDUCTORS
Vol
167953
VAULT
120/240v
1
-
1/0 AL JKT
WIRE CREW TO INSTALL GRID NUMBERS
APPROVED BY
- - EHN728
EXISTING
FOREMAN #1
TOTAL 2"
365
OH CKT MAP
2306EO28
TOTALS:
1
FOREMAN 02
2 -
-
1 Ilk 0 1 ♦ 1
D
V011 318122
67953 PX
-- C
C016864
318092
167950 P01
25T
UNK --
SE 128TH ST
EXISTING UNDERGROUND MAP #: 2305EO44
SCALE: 1:50
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE EXISTING CABLE
FROM TO (LF) EST MFG. NAME
EXISTING CABLE
MFG. DATE
CABLE
REPLACED?
16864
10629327
P01 I V01 290
DESIGN
LENGTH
(ft)
YES
TOTAL CIRCUIT FEET 290
CONSTRUCTION NOTES
P01
-CUT OFF & CAP OLD CABLES AT TOP OF RISER
-ATTACH OLD CABLE # TO CABLE STUB
-REMOVE OLD C/O & TERM
-INST 10 LB C/O TERM F:25T STD 6043.1000 (TSU1C1)
-INST 1-2" RISER ON STAND-OFF BRKTS STD 6042.1000 (RIS2CSS)
-INST SW# T78637
-INST GRID# 318092-167950
LOCATION
CONDUIT
PRIMARY CABLE
REMARKS
FROM
TO
SIZE
(in)
QTY
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
TYPE
BENDS
PULL
(lbs)
PULL
REV
(lbs)
CABLE
SIZE
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
CABLE NUMBERS
PLEASE RECORD
FOREMAN - COMPLETE
DB120
POLY
SCH 80
90 45
22
11
A B C
MANUFACTURER
YEAR
ENGR - GAS
P01
V01
2
1
365
Gas Wk Ctr
N/A
POWER WK CTR
QSEPRE
DRAWN BY
X
2 -
-
-
140
175
1/0 AL JKT
410
APPROVED BY
- - EHN728
•bo
FOREMAN #1
TOTAL 2"
365
OH CKT MAP
2306EO28
JUGCKTMAP
2305E044
ICIRCUrrNO
MAP -15
FOREMAN 02
2 -
-
-
TOTAL 10
410
JOINT FACILITIES ARRANGEMENTS
QTS OF GLUE I 0.5 I GALS OF LUBE I 1.2
CIVIL CREW NOTE: ALL 2" - 90° BENDS MIN 48" RADIUS SCH-80 PVC
N ALL 2" - 450 BENDS SCH-80 PVC
ALL CONDUITS SHALL BE CAPPED AT EACH END UNTIL
CABLE IS INTALLED
P01 M
25T 900
T78637
90°
�J 90°
SE 128TH ST
PRIMARY CABLE & CONDUIT DIAGRAM
NOT TO SCALE
1-2" - L '
EHN728 - CO
Trench and backfill requirements for primary electric line extension trenches
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
- A 3" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Excavated Dirt Pile
ROADSIDE �
12" Typical 24" Min
Final Grade
1
36 Min Cover (ROW) Backfill
24"Min Cover
(No rocks over 10" diameter)
(Pvt. Property)
48"
Max
/ 12" Min Sand Shading
i
j 3" Sand Bedding
Primary Power in DB120 Conduit (ROW)
Primary Power in SCH80 Conduit (Pvt. Property)
Cables or Conduit
(NTS)
Standoff Bracket
15" Min Length
Conduit Clamp 5" Min
Climbing
onduit Field Face Road Face Space
Quadrant Quadrant
Climbing
Space
Direction of Vehicular Traffic
TOP VIEW
CONDUIT RISER REPLACEMENT DETAIL @ P01
NOT TO SCALE
Crew to provide all property owner's that are impacted by
project prior notice and make an effort to work with
property owner's to maintain their access to their property,
as well as, reduce the impact of our work on their use of
their property."
FOREMAN NOTF,:
Call (800) 424-5555 Utility Notification Center 24/7 before beginning any
excavation prevents damage to underground facilities, service interruptions &
bodily injury.
CIVIL CREW FOREMAN NOTE:
Maintain on site, in good condition, a complete file of all work drawings. These
drawings shall be available at all times to a Puget Sound Energy representative.
Corrections and changes made during the job shall be recorded continuously on these'
drawings. Mark all underground utilities encountered during construction on these
drawings. Furnish Puget Sound Energy a complete set of as -built prints (foreman's
copies) at the end of the job.
WIRE CREW FOREMAN NOTE:
ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT LOCATION ON
1/0 CABLES AFTER NEW CABLE IS INSTALLED UNLESS OTHERWISE SPECIFIED.
PLEASE RED -MARK ALL FAULT INDICATORS ON "CABLE DIAGRAM" FOR MAPPING.
O
O
N
Cfl
REAL ESTATE/EASEMENT
REQUIRED'
PERMIT,,
3
FUNCTION
CONTACT
PHONE NO
DATE
2
PROJECT MGR
C. YLENNI
253-720-9700
04-29-17
1
ENGR - POWER
A. BERRY
253-326-1524
04-19-17
REV# DATE
BY
DESCRIPTION
ENGR - GAS
N/A
N/A
N/A
COUNTY
KING
Emer Sect
N/A
Gas Wk Ctr
N/A
POWER WK CTR
QSEPRE
DRAWN BY
F. SHANK
253-234-6114
04-19-17
CHECKED BY
S /
1/4 SEC
T23 N, R05 E: 11 -SE
OP MAP
N/A
PLAT MAP
N/A
APPROVED BY
•bo
FOREMAN #1
U -MAP NO (POWER)
2305EO44
OH CKT MAP
2306EO28
JUGCKTMAP
2305E044
ICIRCUrrNO
MAP -15
FOREMAN 02
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
CONTACT
PHONE#
PUGET
SOUND
ENERGY
DESIGNED BY Potelco, Inc.
MAP -15 15706 SE 128TH 2017 CRP
CABLE REMEDIATION PROGRAM
15706 SE 128TH ST RENTON, WA 98059
INCIDENT ENT MN OP
Gas Order Elect Order
N/A 101102119
SCALE PAGE
AS NOTED 2/2