Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutP_Design_101101184_V1_170907SCOPE OF WORK
OVERHEAD CONSTRUCTION
9S,
COMBINATION J -BOX & TOTAL UNDERGROUND TRANSFORMER
h�
INSTALL NEW 120/240v POWER SUPPLY FOR AMI NETWORK UNIT.
POLES & STRUCTURES
ABBREVIATION
KEY
TO
�■
ti
ANKH
ANCHOR
S�
PADMOUNT SWITCH
GENERAL
- POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED. UNLESS OTHERWISE NOTED,
BRKT
BRACKET
Q
EXISTING PSE POLE
0
NEW PSE POLE
X
ALL POLE LOCATION MEASUREMENTS ARE FROM THE ROAD SIDE FACE OF THE POLE.
CHG
CHANGE
1
FUSED DISCONNECT: 10T, 15T, 25T, 40T, 100T
I I
NORMAL OPEN (N.O.)
- ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES OF ALL PSE
- ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH, OR BETTER. DO
CL
CLASS
®
NEW OVERHEAD TO UNDERGROUND CABLE TERMINATION SOLID
®
8"_10"
STANDARDS ARE AVAILABLE UPON REQUEST.
NOT SET A LOWER CLASS POLE THAN SPECIFIED.
C/N
COMMON NEUTRAL
CABLE SPLICE
QM
PRIMARY METERING
- WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION MATERIALS,
- INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES.
CU
COPPER
— — — —
THREE PHASE THREE WIRE/CABLE 7.2 kV
—
EXIST 115KV CONDUCTOR
EQUIPMENT AND PACKING SHALL BE REMOVED DAILY.
- INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH.
C/0
CUTOUT
REMOVE CONDUCTOR
- RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE TO PSE,
- STRAIGHTEN EXISTING POLES AS INDICATED OR AS NECESSARY.
DE
DEADEND
TELEPHONE FACILITIES
—G—G—
NATURAL GAS FACILITIES
—W—W—
WATER LINES AND MAINS
STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY IT IS REMOVED
- TREAT ALL FIELD -DRILLED POLES WITH COPPER NAPTHENATE WOOD PRESERVATIVE.
DISC
DISCONNECT
I
FROM THE POLES. REMOVE ALL UNUSED PINS AND INSULATORS.
-REMOVE OLD POLES AFTER COMMUNICATION COMPANIES HAVE TRANSFERRED OFF AND
DBL
DOUBLE
- RETURN ALL STREET LIGHTS, AREA LIGHTS AND FLOODLIGHTS TO PSE.
RETURN TO PSE STOREROOM. FILL AND CROWN POLE HOLES AND RESTORE AREA SIMILAR TO
DA
DOUBLE ARM
- PROVIDE FOR EROSION AND SEDIMENT CONTROL PER PSE STANDARD 0150.3200 AND
ADJACENT LANDSCAPING.
DDE
DOUBLE DEADEND
6" COMPACTED
LAYERS
ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
DWN GUY
DOWN GUY
I
10%+2'
INSTALL PER POLE
O.H. CONDUCTORS & EQUIPMENT
E
EAST
6"
I I
I
I
I
2 BEARING PLATES
(MATL.ID #89688)
IIVST
INSTALL
1
SEE STD. PRAC.
PRECONSTRUCTION
- TRANSFER ALL OVERHEAD AND UNDERGROUND PRIMARY, SECONDARY AND SERVICE
LATL
LATERAL
CRUSHED ROCK /
2124.3145
CONDUCTORS TO NEW POLES SET, UNLESS OTHERWISE INDICATED ON THIS SKETCH.
LB
LOADBREAK
OR SELECTED
BACKFILL
-NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS, ORAS
- TRANSFER EXISTING TRANSFORMERS TO NEW POLES UNLESS OTHERWISE INDICATED ON THIS SKETCH.
MT
MOUNT
REQUIRED BY PERMITTING AGENCY, IN ADVANCE OF STARTING WORK IN RIGHT-OF-WAY
- USE STIRRUPS TO CONNECT ALL OVERHEAD AND UNDERGROUND PRIMARY TAPS, AND
NEUT
NEUTRAL
INVOLVING A PERMIT.
TRANSFORMERS. INSTALL AT ALL SITES BEING WORKED WITHIN THE SCOPE OF THE PROJECT WHERE
N
NORTH
1+
- ALL SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM OPERATIONS A
THEY ARE CURRENTLY MISSING.
OH
OVERHEAD
MINIMUM OF 48 HOURS IN ADVANCE.
- USE 397 AAC AND AMPACT CONNECTORS FOR ALL BARE CONDUCTOR FEEDER JUMPERS AND
PH
PHASE
DETAIL
- NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE.
600 AMP SWITCH JUMPERS. INSTALL TREE WIRE CONDUCTOR FOR JUMPERS ON ALL POLES
PTP
POLE TOP PIN
WORK DRAWINGS AND DOCUMENTS
THAT ARE DOUBLE DEADENDED WITH TREE WIRE.
PRI
PRIMARY
POLE SETTING IN ALLUVIAL SOIL
- APPLY GRIT INHIBITOR ON ALL AMPACT, STIRRUP, AND DEAD-END CONNECTIONS.
RELOC
RELOCATE
NO SCALE
- FIELD DESIGN CHANGES SHALL BE APPROVED BY PSE PROJECT MANAGER OR ENGINEER.
- CONNECT PRIMARY TAPS AND TRANSFORMERS TO SAME PHASE AS EXISTING UNLESS
REPL
REPLACE
THIS METHOD IS REQUIRED IN POOR SOIL WHERE TALL POLES, HEAVY EQUIPMENT,
- MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND UNDERGROUND CABLE
OTHERWISE SHOWN ON THE DRAWING.
REMV
REMOVE
HEAVY GUYED POLES OR LONG SPANS ARE ENCOUNTERED.
INFORMATION IN RED ON FOREMAN'S COPY OF WORKSKETCH.
-ALL NEUTRAL CONNECTIONS TO BE MADE WITH SOLID COMPRESSION CONNECTORS.
RIC
RIGID CLEVIS
PREPARE A HOLE LARGE ENOUGH TO ALLOW FOR 8" TO 10" OF BACKFILL AROUND
THE POLE.
- RETURN ONE FOREMAN'S COPY OF WORKSKETCH TO PROJECT MANAGER AT COMPLETION OF JOB.
CONNECT ALL POLE GROUNDS TO COMMON NEUTRAL. (
- USE LOAD -INTERRUPTER CUTOUTS WITH ARC SHIELDS ON ALL PRIMARY OVERHEAD AND
SVC
SGL
SERVICE
SINGLE
FILL BOTTOM 12" OF HOLE WITH CRUSHED ROCK OR AVAILABLE SELECTED BACKFILL.
- WHEN PERMITS ARE REQUIRED, A COPY SHALL BE AVAILABLE ON WORK SITE AT ALL TIMES.
UNDERGROUND TAPS WITH FUSED PROTECTION ABOVE 40T.
SA
SINGLE ARM
CENTER POLE IN HOLE.
SAFETY
- INSTALL WILDLIFE PROTECTORS ON ALL TRANSFORMERS PER STANDARD 6015.2000.
S
SOUTH
IALS SHOWN ABOVE IN ILLUSTRATION AND COMPACT WITH A
MECHANICAL TAMPER.
SWBD
SWITCH BOARDS
- REFER TO PSE STANDARDS 6275.3000 AND 6275.6000 FOR SYSTEM GROUND REQUIREMENTS.
SW GRDS
SWITCH GROUNDS
- REFER TO PSE STANDARDS 6275.9050 FOR PERSONAL PROTECTIVE GROUNDING REQUIREMENTS.
SWITCH NUMBER
- REFER TO PSE STANDARDS 6275.9150 FOR VEHICLE GROUNDING AND BARRICADING
TAN
TAN
TANGENT
REQUIREMENTS.
TE
TEL /TELEVISION
- PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND RELEASED AT THE
TERM
M
TERMMINATIINATI ON
END, OF EACH WORK DAY, OR AS OTHERWISE INSTRUCTED BY THE SYSTEM OPERATOR.
X-FER
TRANSFER
- PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE WITH PERMIT
XFMR
TRANSFORMER
REGULATIONS.
XMSN
TRANSMISSION
- UTILIZE FLAGGING AND OTHER VEHICLE TRAFFIC CONTROL AS NECESSARY AND IN
TRIPLEX
CONFORMANCE WITH LOCAL TRAFFIC REGULATIONS.
UG
UNDERGROUND
- MAINTAIN TRAFFIC FLOW AS REQUIRED BY PERMITTING AGENCY.
W
W
WEST
W/
WITH
VERT
VERTICAL
.101 L G.
-.;.B 100T SrE P:1k..
• ',• •• • • ;•• C- 1B .....:
r 25
is .00• one
ill
�40T B rI _ A _ �. Sk
—see5 '_ ` �o PRE
Cmemo'sWN 0 ` ,f-
■, S� �• ?. - C: C
•.■•meeag - •
31 - /40T ,�'i s� . ,1 A.: :• �.L 15T 65T ; :�
A one
• S 25 ....�- ��.•......: ST ; =V :� •� 142: ■........ST3 ii
sA
Nib
a 40T
. B• •
JB FN p Ai
q�s� • 25T r. :co NElse so-so:
•we
SST �.... • . y........ •,
a.
• .30 A C.w III�25T A so :
X623 d•.•Px •• A
896
•••• GaF ••. B p 003561
A e� 65T •...,.•
••X8 25Tt OOT X5491
M
Si 10T
^100T 450KVARR`
--map 04263 '�,9 25K 45 3S� ...
.•
aw
t's
' :'p.. s. r ■ 1f�. T
• .,ti - ` 4
,Co..01
AO C.I
N.O. A ''' C0
.• h''••. OPEN 1 J@ j ;
'C A •• ®: Be'4� y o
�E''''••' 1k B9. .,s'T L Xl 25T
Xfi735
A,e ; •..;..w, �„ — q. _ 30 X6987 " d
wasseseeememem
`C`.tX676
7C : 1 OOT 25T
6:1• ms .X8805
� A B- seems A/ a: 40T X,
�— FWD ��X5
, ���o� : B ..,,•.45
I 1 •• 16 GD ;
30 1
••' Project 40TH :154 •••.•, • .
` • • • -
•' •• Location '•41.00- -&
3 = -'�
C' :`" :A
NY 38
PARK p ''9 .
•••
65T' _ '••. ■• -
a X1518 B -•.•••.B •
• •B
4�T S
asses -1 869606630 C.-
C.B,C SE X58 ' . ■. .�
•. 65T 40T :...A ROL :•s je.......:• ...
�• ••••••• X3539
ry 25T AO : 17
S" SE !60 ST 00• Q1\,.' 100T
-
A — -- -- -- • A OPEN ClSE 159 PL ' 159
.sww•w-wwwwwwas
.iaw
selbee•... •.
-
ges 3
OVERHEAD CIRCUIT MAP 2305-E-088
NOT TO SCALE
_"".I, 100
ELECTRONIC MARKER
9S,
COMBINATION J -BOX & TOTAL UNDERGROUND TRANSFORMER
h�
COMBINATION J -BOX & PADMOUNT TRANSFORMER
�'C
Pam
FA-]
TO
�■
ti
I
2]
4
OOD '•�
°M
ILI
1.1 �G ■
map!
a
_r. •�i►
31 O#W
Cake
_T 2_3 N
• \ ; T 22N - -
L S
o
q 3 2 6
LAKE YO(/A47S '
NATEgSHEO
LAKE YOUNGS
-CJTY OF SEATTLE• �
Uniiay • ,
RAE --
``J �� YATEASHEO .
/ vCITYSEATTLEa - - - -
J r —
Vicinity Map
EQ
ELECTRONIC MARKER
J ❑
COMBINATION J -BOX & TOTAL UNDERGROUND TRANSFORMER
J A
COMBINATION J -BOX & PADMOUNT TRANSFORMER
F❑
EXISTING TOTAL UNDERGROUND TRANSFORMER (T.U.T.)
FA-]
EXISTING PADMOUNT TRANSFORMER
�■
NEW UNDERGROUND TRANSFORMER (T.U.T.)
NEW PADMOUNT TRANSFORMER
S�
PADMOUNT SWITCH
©
PULL VAULT
HANDHOLE
Q
EXISTING PSE POLE
0
NEW PSE POLE
X
REMOVED PSE POLE
0
SOLID BLADE DISCONNECT
1
FUSED DISCONNECT: 10T, 15T, 25T, 40T, 100T
I I
NORMAL OPEN (N.O.)
WNO
WILL NOT PHASE (WNO)
EXIST OVERHEAD TO UNDERGROUND CABLE TERMINATION SOLID
®
NEW OVERHEAD TO UNDERGROUND CABLE TERMINATION SOLID
®
EXIST OVERHEAD TO UNDERGROUND CABLE TERMINATION FUSED
1111I
NEW OVERHEAD TO UNDERGROUND CABLE TERMINATION FUSED
-oll
FAULT INDICATOR
CABLE SPLICE
QM
PRIMARY METERING
---
SINGLE PHASE THREE WIRE/CABLE 120/240V
--
SINGLE PHASE ONE WIRE/CABLE 7.2 kV
— — — —
THREE PHASE THREE WIRE/CABLE 7.2 kV
—
EXIST 115KV CONDUCTOR
-
NEW TRENCHING
— — — — -
NEW OVERHEAD CONDUCTOR
REMOVE CONDUCTOR
DOWN GUY
SPAN GUY
-�
PUSH BRACE
—T—T—
TELEPHONE FACILITIES
—G—G—
NATURAL GAS FACILITIES
—W—W—
WATER LINES AND MAINS
CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
"Locates Required" Yes El No®
"Outages Required" Yes X No❑
"Flagging Required" Yes X I
N _ ...... _. f ,
eb
15445 15473
`N
15449 1
15453 5457
15477 15481
o�
11 U
317173-167448 3gc
1007 �7
X3538
317172-167448
14012
317153-167467
'3967
( 14008
317143-167458
15601
`l 14007
317131-167 9
15607 /
1548 z\
1
15486
15490
15494
15485
Q
317190-167490
15kVA 120/240v \ 39 -6'
14016 cM�c
c� 14010
-�d 317157-1
~ D 317148-167484 /
37.5kVA 1201240V
............ _..___.........
14015
317142-167485
15622
15613 `\•\` ��
317119-167477
50kVA 1201240v
14011 / 15648
15632
13930 15619 �. `` •� `rF
o`.- "....317114-167489
13936
15625
\ 13942
317104-167465 15631
317104-167466 37.5kVA 120/240v
13948
317103-167465
�K \ 14006
13931
13941
15805
15809
317074-167402
37.5kVA 120/240v
VA
o�
14007
14013
15637 1 15643
/ 14012
14022
317087-167489
50kVA 120/240v
167482 i
1 68THsr
15706
15649
pgGN
14068 317123-167541
100T
X3539
14048 14058 Ile-
14038 312122-167544
ABCN
14030 /A
2Q ' 317088-1675
317088-167521
...............
...............
25kVA 120/240v -
.:r
,
-"" 317088-167529
S
U
rn
M
14039
14063
14025
14019 317022-167531
14031
f ; (t 14059
317068-167522
15812 g1 37.5kVA 1201240V `
4AAAA t t r
f1 51
7098-167552
CONSTRUCTION NOTES
P01 (317140 - 167511)
3ti
INSTALL NEW AMI NETWORK UNIT PER STANDARD 0700.8525.
INSTALL NEW RIGID CLEVIS SOUTHEAST (6015.1000) INDNRC.
317198'
75kV, P02 (317126 - 167535)
I INSTALL NEW RIGID CLEVIS NORTHWEST (6015.1000) INDNRC.
INSTALL APPROXIMATELY 130' OF #1/0 TRIPLEX FROM TRANSFORMER TO P02.
CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
"Locates Required" Yes ❑ No®
"Outages Required" Yes No El
"Flagging Required" Yes [K No El
15713
15707
i`
15712
15720
15721
{
... ,' _.�
�.. -
15726
___3171622-1675611"."
17162-167561
50kVA 120/240v --3171 2-167562
15729 15709
C �``•
15732
15725
/
509
15740
15734
=`
15741 • ` '
-`" -_- _
15735
� ,`
�,- _..._"............',..
15748
15750
y
145-1675
15743
317139-167590 \
15652
317140-167511
15756
`. `
l
75kVA 1201240v \
........._
15749
15754
15656
%+
15751
15760
15757 \ . ....... _...... �,
�f
15762
�'p
15759
317128-167591
15768
...........
._..
15765 ; ;
15766
15660
.'v
= �
^4d
317126-167535
15767
25kVA 1201240v
15773
-
15772
317118 167509""`--
317117-167562
317115-167 3
1
.',
`
50kVA 120/240v
37.5kVA 120/240v
14243
15657
15781
V
It
14237
lY
1'
14231
15653
15789 1f.
14219
14225
15649
pgGN
14068 317123-167541
100T
X3539
14048 14058 Ile-
14038 312122-167544
ABCN
14030 /A
2Q ' 317088-1675
317088-167521
...............
...............
25kVA 120/240v -
.:r
,
-"" 317088-167529
S
U
rn
M
14039
14063
14025
14019 317022-167531
14031
f ; (t 14059
317068-167522
15812 g1 37.5kVA 1201240V `
4AAAA t t r
f1 51
7098-167552
CONSTRUCTION NOTES
P01 (317140 - 167511)
3ti
INSTALL NEW AMI NETWORK UNIT PER STANDARD 0700.8525.
INSTALL NEW RIGID CLEVIS SOUTHEAST (6015.1000) INDNRC.
317198'
75kV, P02 (317126 - 167535)
I INSTALL NEW RIGID CLEVIS NORTHWEST (6015.1000) INDNRC.
INSTALL APPROXIMATELY 130' OF #1/0 TRIPLEX FROM TRANSFORMER TO P02.
CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
"Locates Required" Yes ❑ No®
"Outages Required" Yes No El
"Flagging Required" Yes [K No El