Loading...
HomeMy WebLinkAboutP_Design_186049280_V1_180612317461-165128 / 225kVA 2771480v 317460-165142 25kVA 120/240v ABC 317453 100T P01 165141 X7466 �\ P 9 '1200' KING COUNTY SOUTH °s9 TREATMENT PLANT 317429 1 x15kVA 120/240v P02 \65154 2x15kVA 120/208v G \ PQ 317426-165149 \� 317425 P03 \ 165152 \ 317428.165164 3 �\ 10kVA1201240v RJN 317408-16517 \ 3•100kVA 1201208Y '1215' 317402-1651 8 SITE PLAN: P01 THROUGH P03 SCALE: 1:100 EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) ' SITE SPECIFIC NOTES POWER GENERAL NOTES P01:317453-165141 - REMOVE TRANS. FRAMING 1. --All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this - REMOVE TRANS. DWN GUYS work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. - RAISE DIST. FRAMING 4'& TOP POLES & INSTALL POLE WRAP - EXTEND PRI & SEC RISERS TO NEUTRAL HEIGHT 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three - EXTEND & RAISE DIST. DWN GUYS (3) working days in advance. - REMOVE TRANS. ANCHOR NORTH 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work P02: 317429-165154 to get the underground facilities located. - REMOVE TRANS. FRAMING ! - REMOVE TRANS. SPAN GUY 4. All work is to be done in accordance with local municipal and county permit requirements as applicable. - RAISE DIST. FRAMING 4'& TOP POLES & INSTALL POLE WRAP f - EXTEND & RAISE DIST. SPAN GUY 5. Inclement weather conditions may cause delays in construction times and dates. - ADD NEUTRAL SPAN GUY P03: 317425-165152 - ADJUST EXIST DOWN GUY WIRE FOR PRIMARY SPAN GUY SPAN NOTES P01 TO P02 - WRECKOUT 1 SPAN TRANSMISSION WIRES 317461-165128 226kVA 2771480Y \ AOACH887I - - 60ACTf8881 / `\ C©ACH889 , P01 317453 100T 165141 X7466 UNDERGROUND CIRCUIT MAP SCALE: 1:100 65T 65T 3X6880 T >� ' )771 ST 30' )770:SK00782 S r; .30 3 3�. I FORT 3 -3 *NO 3� ... �*NO A•• A.: C.;c . S' �.U167 DENT . ;.., ..; •3�'• '• %B 30• :3� 3 0r ••30 p . •' z : •PARK A•' .3� .... •30 130 , s 30 a . c•• x;154 ST 5.i : •: S7i I...: B :C MRJN 13 cn: 117R1 nt :b 30. X7261 XT .30 :3b i11 im;n OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE 3 0 —� r •, U0445 .--N - 3 b' RJN ` 11 OAKESpgLE' 3••0274•; 3f�'r.•; '--'30 30 ••30 30: JL JOB SITES T @EAR W ....3009691..., 10 • • S 30 *.U-776 S X0734 X5712 X5713 ;'s S •'Y•.1(724 100T 150E �•H(f� 0410 S X7243 • M 3 30 831 B 30 Y 405 A� •30. 03 0 cel •30 GR co 10OT 30 � -Sit/ .B....,,... �C),e AYE L3_1 co V166 X5667 U2270 &EAR) 02271 cc 3�• ^ 2 405 RJN X X X1634 11 ENGR-1: #110715 FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior Transmission Removal Expense Work Order 504757406 186049280 N/A 108104763 N/A 186050533 N/A N/A Vicinity Map N f-ii8fden s C 8 SYegrY _" - -.A{{LLENTOWN _ it �wr5�ay Ren d # JOB SITE.. �k K s Rna ` ` a"OwN'i OW .wswwleTukw :k RFNTON 7. TukMIaF' fun Center & acoma hOna) - anMMx� b.SQUTHCENTER:: - _ E'4. `ia.. prt For contacts below dial 1 -888 -CALL PSE (225-5773) CALL (800) 424-5555 Developer Yes "Locates Required" No X "Outages Required" Yes x "Flagging Required" Yes x Yes x PSE 2 BUSINESS DAYS BEFORE YOU DIG No THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES No REAL ESTATE/EASEMENT PERMIT No N/A CITY OF RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR S.VEGA 253-327-3162 12/12/17 1 ENGR - POWER V.EDER 253-234-6129 12/12/17 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KING Emer Sect Gas Wk Ctr N/A N/A POWER WK CTR QCSOKE DRAWN BY V.EDER 253-234-6129 12/12/17 CHECKED BY 1/4 SEC T23 R04E NW24 OP MAP N/A PLAT MAP NIA APPROVED BY /C FOREMAN #1 U -MAP NO (POWER) 2304EO94 OH CKT MAP 2305EO76 JUGCKTMAP 2304EO94 ICIRCUITNO RJN-11 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# N/A N/A NIA N/A N/A N/A N/A N/A NIA N/A N/A N/A PUGET 2404EO94 RJN-11 CLINK RENTON TK_#110715. SOUND WRECKOUT 1 SPAN TRANS, RAISE DIST & 2 TOP POLES ENERGY 1201 MONSTER AVE SW RENTON WA 98057 DESIGNED BY POTELCO INCIDENT N/A ;7 MAOP . N/A Gas Order N/A Elect Order 186049280 SCALE 1:100 PAGE 1/1