Loading...
HomeMy WebLinkAboutP_Design_101112713_V1_180614316637-166164 25kVA 120/240v 316664-16616 40T UNK 75kVA 120/240v 1/0 TPX, L = 140' JOB SITEGeneral -All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. -Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. -Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. -Return all streetlights, area lights and floodlights to Sumner yard. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of worksketch. - Return one Foreman's copy of worksketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. - Provide signs, barricades, and traffic control in conformance with permit regulations. - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. - Maintain traffic flow as required by permitting agency. Erosion & Sediment Control - Refer to PSE standards 0150.3200 for minimum requirements. - Comply with all requirements of permitting agency. - Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. Joint Facilities - Coordinate with Communication Companies for transfers. NOTES: CORE HOURS, FLAGGERS, RENTON PERMIT, NO CUSTOMER OUTAGES. PROBLEM: CUSTOMER OVERLOADED THE SYSTEM AND PSE IS REQUIRED TO UPGRADE TO MEET STANDARDS. CUSTOMER IS CURRENTLY WITHOUT POWER. AT P01: GRID 316637-166164 REMOVE 25kVA 120/240v XFMR REMOVE PARALLEL RUNS OF 1/0 TRIPLEX APPROX. 160 FT. AT P02: GRID 316664-166165 INSTALL 75kVA 120/240v OH XFMR PER STD 6025.1000 CUID TRFSXF. INSTALL PARALLEL RUNS OF 1/0 TRIPLEX APPROX. 140 FT. HOOK UP METER A20644048 GENERAL SPECIFICATIONS Scope of Work GAS PHONE CABLE TV N/A 583059656 N/A 593196339 N/A 108106848 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)101112713N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP A. WILSON 253-395-6913 6/1/18 A. WILSON 253-395-6913 6/1/18 A. CABRERA 562-292-0135 6/1/18 N/A RENTON ROL-15 / 3507 CEDAR AVE S SECONDARY 1/0 REPL 3507 CEDAR AVE S. RENTON, WA, 98055 ASPLUNDH CONSTRUCTION CORP. 101112713 AS NOTED 1/1 KING QCSOKE SW 29-23N-05E 2305E115 2305E136 ROL-152305E115 505750937 101112713 Owner / Developer Contact Info officeATTN: E-Mail: Cell Phone: Project Manager Contact Information: Manager:ANNETTE WILSON 425-766-3891 ANNETTE.WILSON@PSE.COM THOMAS GUIDE 656-C7 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2305E136 SITE MAP - UNIVERSAL MAP SCALE: 1" = 50' MAP#: 2305E115 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. PSE No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" OVERHEAD CONSTRUCTION Poles & Structures -Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the center of the pole. -All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. -Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. -Install grid numbers on all new and existing poles as shown on sketch. -Straighten existing poles as indicated or as necessary. -Treat all field-drilled poles with copper napthenate wood preservative. -Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore the area similar to adjacent landscaping. Conductors & Equipment -Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. -Transfer existing transformers to new poles unless otherwise indicated on this sketch. -Use stirrups to connect all overhead and underground primary taps, and transformers above 25 kVA. Install at all sites being worked within the scope of the project where they are currently missing. - For 12vK construction, install avian protection with #4 CU-covered jumpers (MID#9998076) and #4 SD Aluminum covered tie-wire (MID#8309760). For 34vK construction use bare wire primary jumpers with pre-formed helical-grip ties and avian protection devices when required per Std. 6015.2000. Jumpers for poles that are double dead ended with tree wire can be either the same size tree wire conductor or covered CU. -Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. -Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. -All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral. -Use Load-interrupter cutouts (with arc shields) on all primary overheads and underground taps with fused protection above 40T. -Install Wildlife Protectors on all transformers.75kVA 120/240v OH XFMR (CUID TRFSXF) NOT TO SCALE PER STD. 6025.100-1 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 316637-166164 25kVA Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P02 316664-166165 75kVA 6211400