Loading...
HomeMy WebLinkAboutR-390811w Q Z i- U LL1 3 O 3 0 z w I 0 M /' 0 z X w w z 0 z w N ir 0- a w O 00 O M_ N 0 O r w zZ J 00 0 m 0 W Q I 0 W z W n Q U F S. W. 114 OF N. E. 114 OF SECTION 32, T. 24 N., R. 05 E., W. M. CITY OF RENTON, STATE OF WASHINGTON T.L.#3345700225 S88'34'07"E 295.92 ----- T.L.#3345700230 I Lncompass', ENGINEERING & SURVEYING Western Washington Division 165 NE Juniper Street, Suite 201 ■ IssaQuah, WA 98027 ■ Phone: (425) 392-0250 ■ Fax: (425) 391-3055 Eastern Washington Division 407 Swiftwater Blvd. ■ Cle Elum, WA 98922 ■ Phone: (509) 674-7433 ■ Fax: (509) 674-7419 APPROXIMATE CUT / FILL VOLUMES CUT 800 CU. YARDS FILL 800 CU. YARDS DISTURBANCE AREA 0.6 t ACRES .a SILT FENCE PER C.O.R. PLAN 214.00 CLEARING LIMITS, TYP. 3 go T.L. #3345700235 LAMES oy WASH, j U� .r x Z 38285 O�SS ONAS L�� 0- �U cP` . a .. I. Ix 0 z 0 5 10 20 SCALE 1 " = 20' CB RIM=184.03 - 18"ADS N INV=179.23 18"ADS S INV=179.33 INLET PROTECTION PER C.O.R. STANDARD PLAN 216.20, TYP. T.L.#3345700230 I. O . . . . . . . . CB RIM=196.04 _ 18"ADS N INV=191.29 Sn 18"ADS S INV=191.49 ern _INI _ I - I M i� :' _ CB RIM=196.04 �/ 12"ADS E INV=192.64 INLET PROTECTION PER C.O.R. STANDARD PLAN 216.20, TYP. o I I CB RIM=203.09 TREES TO BE RETAINED r, ' i---------- 18" ADS S INV=198.49 - -- I 18 ADS E IINV=198 39 12" ADS I 0 . . . . . . vvv ✓T v/ VV 30.00'------- -�_12;1 ADS IE=205.99 I wLU I I z a I �10 I I . . a 12" ADSI`q IE210..� JZ04Z18IT.L.#3345700215 6 AS -BUILT DRAWINGS JEF TJ . "I 5 REVISED DITCH STORM DRAIN BCS 11/27/17 TJR SURVEYED: SCALE: VERTICAL: NAVD 1988 4 TAPER FRONTAGE CURB/ MOVE SS BCS 1/17/1 » TJR DESIGNED: 1 -20> HORIZONTAL: NAD 1983/1991 3 REVISED PER CITY REVIEW BCS 4/20/17 NEM TJR 2 REVISED PER CITY REVIEW BCS 3/20/17 TJR DRAWN: BCS 1 REVISED PER CITY REVIEW / ADD VAULT BCS 2/16/17 TJR CHECKED: ONE INCH DATUM AT FULL SCALE TJR NO. REVISION BY DATE APPR APPROVED: IF NOT ONE INCH SCALE ACCORDINGLY TJR EROSION CONTROL GENERAL NOTES 1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS: 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER. 3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. 5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE. 6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITTEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. 8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST TROUGH MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST TOUGH SEPTEMBER 30) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). 9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS. 10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL. 11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. 13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. 15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW. 17. ALL ESC MEASURES MUST BE REMOVED AFTER CONSTRUCTION ACTIVITY IS COMPLETED. CONSTRUCTION SEQUENCE 1. PRE -CONSTRUCTION MEETING. 10. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING 2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF PLASTIC SHEETING OR EQUIVALENT. CONSTRUCTION SIGN). 11. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN 3. FLAG OR FENCE CLEARING LIMITS. DAYS. 4. INSTALL CATCH BASIN PROTECTION AS SHOWN. CONSTRUCT TREE 12. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE PROTECTION FENCING. THAN 30 DAYS. 5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 13. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND EROSION CONTROL BMPS REMOVED. 6. INSTALL SILT FENCE AS SHOWN.. CONSTRUCT SEDIMENT TRAP AS NEEDED. 7. GRADE AND STABILIZE CONSTRUCTION ROADWAY AREAS. 8. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. 9. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. LEGEND CLEARING LIMITS X SILT FENCE INLET PROTECTION ® CONSTRUCTION ENTRANCE IN COMPLIANCE WITH CITY OF RENTON STANDARDS BY: Date: Date: Know what's below. BY: Date: Call before you dig. BY: Date: CARPENTER SHORT PLAT DATE: CITY OF 10/27/17 RENTON PAGE: LUA14-001200 U16-004636 FFIEN BOOK:/A DRAWING NO: Planning/Building/Public Works Dept. TESC PLAN 13708 SHEET: 12 OF: R 3 9 0 8 1 T1