HomeMy WebLinkAboutCO 2CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CAG-18-120, CO #2-18
CONTRACT: Falcon Ridge Lift Station Replacement CAG-18-120 C.O.# 2
CONTRACTOR: Road Construction Northwest, Inc.
SUMMARY OF PROPOSED CHANGE:
Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra
work as outlined below:
ITEM Additional Quantities Under This Change Order Unit City. Unit Price Total Price
010. DELETED ITEM: Radio Frequesncy Identification Device (RFID) Installation _ EA (7)
_ ($250.00)
R ($1,750.00)
011. DELETED ITEM: Radio Frequesncy Identification Device Data Process and Delivery LS (1)
($3,500.00)
($3,500.00)
026 NEW ITEM: Location, Identification and Marking Force Main Location EA 7
$750.00
$5,250.00
Locate and mark angle points on force main, including excavation, placement
of magnetic marker, restoration, and marking surface of GPS location
027 NEW ITEM: Relocate existing station telemetry panel to allow for construction LS 1
$2,543.10
$2,543.10
of the new facilities while keeping the old station in operation
Sub Total
Sales Tax (10.0%)
Total
$2,543.10
$254.31
$2,797.41
ORIGINAL CONTRACT AMOUNT
CURRENT CONTRACT AMOUNT
ESTIMATED NET CHANGE
ESTIMATED CONTRACT
THIS ORDER
TOTAL AFTER CHANGE
$926,502.50
$929,762.90
$2,797.41
$932,560.31
SIGNATURES:
Contractor:
Project Engineer:
Approved 1314-.-e-,
Shane Moloney, Renton City
Approved By:
W,
Approved By:
Jeffrey M. Kanyer, President
Date:
Date:
Date: �J
Date:
Date: v fl
H:\File Sys\WWP - WasteWater\WWP-27-03939 Falcon Ridge Lift Station Replacement\Pay Estimates\Change Order #2 CAG 18-
120.doc\MB
Road Construction Northwest, Inc.
PO Box 2228 Renton, Washington 98056
November 14, 2018
To: City of Renton
1055 South Grady Way
Renton, WA 98057
ATTN.: Mr. Michael Benoit
Mr. Edwin Haim
Ms. Alex Fussell
(425) 254-9999 (425) 254-1334 fax
RE: Falcon Ridge Lift Station Replacement and Force Main Improvements
SUBJ: Change Order Request — Relocate Telemetry Pole, Panel and Power
Dear Michael / Edwin / Alex,
Our Electrical Subcontractor Advanced Power was onsite with our Project Foreman Kye Van Hoof earlier
this week to review the electrical scope and coordination of work. Drawing COI (Sheet 3 of 34) directs us
to remove telemetry panel and the electrical panel. Drawing CO2 (Sheet 4 or 34) directs us to "Do Not
Disturb Existing Appurtenances and Investigate Function as Necessary to Avoid Disturbance." Per our
attached pictures and investigation, we have determined that modifications to the existing Lift Station and
installation of the connecting 8-inch PVC Sewer Pipe cannot be completed without relocating the
telemetry pole and panel. Back-up documentation from Advanced Power, attached.
Summary of costs are as follows:
Project Foreman
Foreman Pick -Up (38-99)
Advanced Power Cost Proposal #1
Allowable Mark -Up on Labor
Allowable Mark -Up on Equipment
Allowable Mark -Up on Subs
2-Hours @ $67.19 $ 134.38
2-Hours @ $22.13 $ 44.26
1-LS @ $2,068.04 $ 2,068.04
SUBTOTAL $ 2,246.68
$134.38 @ 29% $ 38.97
$44.26 @ 21 % $ 9.29
$2,068.04 @ 12% $ 248.16
TOTAL $ 2,543.10
3A'e request an additional 1 Working Day to eomplete this added seope of work.
E
ITIONAL DAY NOTNTED
Page 1 of 3
In the best interest of the project and to keep the existing Lift Station fully operational, Road Construction
Northwest, Inc. (RCNW) request the City of Renton issue a change order for Advanced Power to relocate
the telemetry pole and panel. This contract has a provision Bid Item #11 Force Account — Unanticipated
Conflicts. For your convenience, allowable contractor mark-up for Force Account has been added per
Section 1-09.6 of the 2018 WSDOT Standard Specifications. Total cost to the City of Renton for
completing this ADDED Scope of Work is $2,543.10, excluding sales tax.
Please issue us a Work Authorization and Change Order so that we can schedule & coordinate this work.
Should you have any questions or concerns, please contact me at (425) 777-7323.
Very truly yours,
/%
Gordon Lee
Road Construction Northwest
Page 2 of 3
NI,
0
C
Advanced Power LLC
PO Box 13705
Mill Creek WA 98082
425-481-8260
Road Construction Northwest
PO Box 2228
Renton WA 98056
COP #1
Date: 11 /13/2018
Project: Falcon Ridge LS Replacement
Description: Relocate existing telemetry panel and antenna pole.
Labor
Qty
Cost
Subtotal
Markup
Total
Foreman Electrician
10
$ 88.37
$ 883.70
29%
$ 1,139.97
Service Truck and Tools
10
$ 30.00
$ 300.00
21 %
$ 363.00
Bucket Truck
10
$ 40.00
$ 400.00
21 %
$ 484.00
Material/Supplier
Qty
Cost
Subtotal
Markup
Total
Misc. Wire & Fittings
1 $ 67.00 $ 67.00 21 % $ 81.07
Sub -total
$ 2,068.04
TOTAL $ 2,068.04
OCITY AND FIRE DEPARTMENT MUST HAVE ACCESS TO FIRE HYDRANT
AT ALL TIMES. UNDER NO CIRCUMSTANCES SHALL HYDRANT ACCESS
BE BLOCKED OR LIMITED.
DO NOT BLOCK SWING GATE. PRIVATE ACCESS TO SOUTHERN
PROPERTY THROUGH GATE SHALL BE MAINTAINED AT ALL TIMES.
DO NOT BLOCK GATE. WHILE LIFT STATION IS IN OPERATION, CITY
MUST HAVE FULL ACCESS TO EXISTING LIFT STATION AT ALL TIMES.
DO NOT BLOCK ACCESS TO HOUSE AND DRIVEWAY FROM SE 8TH PL.
PROVIDE TEMPORARY FENCE ON EAST SIDE OF EXISTING PUMP
STATION WHEN EXISTING FENCE HAS BEEN REMOVED BUT EXISTING
FACILITY IS STILL OPERATIONAL.
CONTRACTOR MAY NEGOTIATE WITH THE HOME OWNER'S
ASSOCIATION (HOA) TO USE THE EXISTING RV PARKING AREA FOR
TEMPORARY STAGING OR STORAGE. IF THE CONTRACTOR USES THE
AREA, IT NEEDS TO BE RESTORED TO EXISTING OR BETTER
CONDITION,
PROTECT EXISTING MONUMENT DURING PAVING. IF THE MONUMENT
IS DISTURBED OR DAMAGED, RESTORE THE MONUMENT AS
OUTLINED IN THE SPECIFICATIONS.
SWH# IM61
1x% AIR n7
JE, TOP INSZE OF
IE 8TM INSIDE
IE TOP INS(Of DR
(E 9TM INSIDE
I
SURVEY CONTROL POINT AMW
#200, ELEV=375.53
N 175470.593
f- I 'Mr-n An A -7C
PROPOSED LEGEND
--
STORM PIPE
SANITARY SEWER PIPE
•
FENCE
—375--
MAJOR CONTOUR
--376—
MINOR CONTOUR
©
BOLLARD
ASPHALT
GRAVEL
4" PVC RJ PIPE, AF
SEE ABANDONME
NO. G01 FOR AE
AND CONSTRUCT
FITTINGS PER DETAIL THIS SHEET
202 WESTERN EXTENT OF
SE
CUL-DE-SAC PAV T
C05
EMEN
OVERLAY. EXISTING HMA
PAVEMENT TO EAST OF
THIS EXTENT TO BE — a
OVERLAYED "`