Loading...
HomeMy WebLinkAboutRS_Technical Information Report_161230_v1m T- oL- .0 r: 'Z l 0 0 c V 0 c°0 -0 :9 E t0 N , XG) Z E 0 z LU M U. Lu a 0 z 0 < Z co Z 0 m w z 0 w LL ad w cr 00 —D < 0 0 iD Z < Z 0 E Co LU tr* 5- z x 11 < � w CL + N Co 0 Z 0 m w z L) z 0 0 E 0 LL M tr* 0 m E w CL = E 691 61% 69 603 s N 0 CN CIN 0) Nit 0) 0 W CL > (D 0 0 m IN CN 0 a T- C) o 04 C14 04 V- o , Q 0 > a) 0 CL O Go o 0 CD 0 o 0 C) 0 o 0 0 0 o 0 o 0 In 0 o 0 CD 0 o <Do o CD 0 CD CD o CD CD 0 cl 0 0 0 o 0 o 0 o 0 CD 0 o 0 o 0 o 0 o 00 o . . . . . . . . . . . . . . . . . . . . . . . . . LL co w CL w tt Oo0(:>Ooc)o(=Oc)or->OOOC)OOOOOOC)(DOOS" C = 00000 a000cC . . . . . . . . . . . . . 0 0 0 0 00 00080000000000 00 40 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 a 0 0 0 0 0 0 0 00 yt >- U. 0 U. m U- U- R NEP Nu. -i cc uj -j 0 0 CO 0) M ui Co ui (n r N CG m tq (0 cl CD T7 0 III (D q U) U r OR cq V7 fl- UC W I;t LO oQ cl 0 oq M "It N q 0 q M V7 M OR 0 V: W N 4, tq WOMMIZIM V7 to cl T7 "t 0 W 0 W r V 0 M N N N 0 IN 1- M d N m N 0 to m IN I- M co W LO 0 co 1- M M oi co N rl_ LO CIST 64 61.!)- 613! 611). 64 toil 61!3� to 6q 61�1 6s ell). 6s lus 69' 090 VT vl� 61% 61* 64 61) 613f 6n� 6FI, 64-:1, 6% 61)0 61% C 14 C9 LO to I- N N N N N IN N IN N N I Poll N, 0-Mcn EO ca 11,052 32 > (D E 0 E 0) E c w -0 c 0 E OL M- L (D C 4) Co C2• 0 cc 0 -0 'D -c '—.2 r- ' cc = 0) 7 C: o E M Z 0 0 Q) (D 0) CL r- CO IN "0 (D 0 .0 DO 5: 0 ZY) E >M 0) T c IT c 10- m r so-- co -Ne LO-) ow ci 'i ci >' -r- c ci 0) cc 0 E E 03 75°tS 0 1 0 (D 0 mom, 0 0 0 E r_ c ca m cl Co CL M CL ;o w .0 2 2 CI- 'g 3 otS O o c a a c E E 8 E ou 6 CF m d Sm C ) 4> 0 2 t0 Y 10- m mCOO > 0 c ' c 2 .0 S? aa JR -C co c0 ca X LU X w 4) U- 4) U- (D LL LL LL U- U- Ctl LO . CO 0 . a, 0 , 0 (D -M (n co w w it IN CN 0 a T- C) o 04 C14 04 V- o , Q 0 > a) 0 CL O 0 w W OZ 0 ti 4- 0 C14 Ob LL co w CL w V! 0 4-0 c cu :3 0 0 E 0 E Yj Rzml 6,1_1111K Mo o o o 0 o o 0 a 0 oci 000000000 6 000 000 - - - - - - - - - - I'M 066600000006006060060000 OD O o 0 C> o a o o C> o o o o 0 o 0 CD o c:> c) o a o o o 10 0 o C) 0 0 CD a C) 0 0 0 0 0 0 0 0 0 0 0 C, 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD 0 0 0 0 0 C) 0 LA cr ID >- LL U- U. U. U- U- U. U. U. LL > > > > 0 U. 0) co cn -j -j V) U) U) co cn U3 LU ui 0) 0 o U) P w It 7 m U") fl- 0 w M IQ N OR (q 0 q m tq cq Lq m f�: In (P co Rl N OC! CO cl N LO N 0 M LOT 0 LO M M N m cq ODto 6091 6A� 6Cj- 60� 641� 03' CO 6% OIJ tO 6C 609� 6C� 64 6C)' 6% 61)� 64 6cp 696969 - ul� CO r T T Nq N N 22 IR IR R R R IR R F2 R R w ERE >1 0 > 0 0 (o C> o C� 0 0 a CL ca 8 0 C) CL v SON cvii gg, V T A 2 0 (D 0 m 0 0 (D .0 a O = 40- -C E E 0 iii (D (D o 0 E 0 E 4) 0 CD 0 0 =CL CL (D L� n N Z3 i3 "a 0 CL (D -0 cc 0 'o Je tc m CL to 'q- 0 .0 0 (D c a >m (D 10 :3 la =1 a 0 c 0) 4) 0 me =3 , C'3 A5 CL:s t7 C9 c C7 4)(D ix ad CO m -Ef 1� :3 :3 0 co 'M Do z ca m 0 CF m c cm C 0) r- E cc E m -2 M. -2 :3 -2 :3 :3 5 C13 3: ca 4) a- o L z30) < co I ca I o co C/) (D (j) (1) (1) w co co (p (1) (1) I F- 0 F- in D U) .�2 x F - w w z D Z 0 im UL w x m 0 q 0 10 0 0 D U) cli C14 0 2 V- 20 C%4 CN Z7 C r- 0) 0 -0 Co 4- M a- > C) 0 CL N CL D F- LIJ LU YNJ 0 z D a Cl Z 0 cri m ob U- uj w o O o O o a o 0 c) 0 a 0 o 0 o 0 (D 0 0 0 0 to C) 0 0 0 0 a C> 0 C) 0 0 0 N 751 C! C> 0 0 0 0 0 6 6 c; 0 6 c; MINE, U- -j C) 0) M In I- d N CD m M W co to Cn P* N lo: U Lq Oq ()q U) V M CN N 6q 6C 61)- 6S 64% 60� 64 (Vq 61 6F 6 M -CT U) cc r- co 0) VI vl W W Of X W w W- W ry 0 >- cc 4) > CD 0 > C) C) C> C) Uj (D LO 0) LO - Z6 o .0 C) 0 (D C) cl Lo C2N o 0 C14 4) Lr) C-4 C's 0 i TL a) -ld -le -ld Je (N > 0 CNI > 0 m o o cu m -0 0 0 —0 O 4 cc im 2 2 o 0 U-) 0 U- V* c CD cli 9) N 04 CO M LO In w 0 N "a '0-0 CO CC , C', M M M M M Cc DC > 0 0 0 w w 0 w 0 w 0 ct 0 Ix 0 cccc 0 co = > > 0 L) 0 CL lu < < < 0 a. E 0 q 0 10 0 0 D U) cli C14 0 2 V- 20 C%4 CN Z7 C r- 0) 0 -0 Co 4- M a- > C) 0 CL N CL D F- LIJ LU YNJ 0 z D a Cl Z 0 cri m ob U- uj w m ......... .......Ci em 0 0 C> 0 0 CD 0 a 0 0 0 0 0 0 0 C) 0 0 C) 0 0 o a MOR a A'A n C! o do C> 0 0 0 0 C3 0 0 0 0 0 0 0 CD CD 0 0 0 CD C> 0 C3 0 C3a C> C) mm - -601 0 0 0 0 0 0 0 0 0 0 o 0 Ct7 0 0 0 0 0 C> C) CD a 0 0 0 CD 0 0 0 0 0 0 0 0 C> 0 0 0 0 0 0 0 o o o 0 0 CD 'o j- 0- F -u mRS m -C C.) M C.) U- LL U. J U- J U- LL LL LL Li- U- U - Ill w Ill U- ID U. Ill ill W w 0) t,- C14 cj M Lq 04 "qr Iq r Cq 0) LO 41 0 CY! 0) 0 CO M Cl) t- I- U (N U) wt Ce) I- CO M ct T7 (R U') eta,'Lq 00 r- U� M kq M In u J N 0 ul CO N N q W 0 't04 00 Mt-.: C.6 N P (Y) ("i u) r- d CY) 04 ru CS! -t C� d r -tt cl! 0 CN CO M r r CV v- r 04 V- C*4 CV) r V- N Z5 04 C\f C-4 C6 609, 69 V9r 09 Eft 6s Afl 6q � er& Vfl 6s 61.* 6s 6F} Eft 69, Eft 696 6s 69- 6s 64)- 69t Wr 64), 649,09, V- It LO C4,4 Q N F4 F4 N N Q F.) Ann nannnnnnnnnonnnnnnnnnnnnnnn jf� 10? # VIM, 0 6. L- 4) L- 4) ?> 0 2 2 0 E cc (D r 0) 0) 4)E E a E a E cL u - i CO 0) ca (D 0 (0 W co 04 9: It (D rl- It 0 E N = co !4 M :: 0 c: N m �E (5 00 m co x 1�t 0 V) .0 W 0 1-- 0 72 > > a: a: tL a. a. a: a: o: 2 ILwcu'" LL > > > > c (D 4) "0 ID '0 41 �a _x CL iL (L EL 00000 0 Oo (01) �o '10- a(3) L CL CLL (U CL M C, 0) o o o t� lz t� t� V-- V- V- mai mai mai 0 10. , =0 a T cla T m 0 0 0> 0 4) Z 0 > > > > 0 0 m CD 1"D m co co I- 75 -5 5 '5 CO co UUU U U U hUUUUUUUUUUUUUUUU 0 co D R F- LU U) 0 F - z Z 0 ca LO 00 (1) U - a. 0 >I 4-j 0 co CD E a) 0 E 0 -4-a m I t-7 I 0 D cn r- 45 ca rn cu a. N N Cq 04 C 4) 0 -0 cu 0 0. a) CA. :t! c Dij 0 I- CL C: D a 0 0 co 6 0 0 0 s 0 o� co 0 o 0 0 z o 0 ul 0 I.- m z— rt D co NO tr 0 I- CL C: D a 0 0 co 6 0 0 0 s 0 o� co 7: -D 0 I- CL C: D a 0 0 0 IL 0 s 0 o� co co 0 I- CL C: D z 0 z LU 0 IL ou Z 0 co co z 0 ul 0 I.- m z— D co I. - z 0 0 I- CL C: D 19116 --116TH AVENUE S.E. E f 113 _of EN PITTMAN ENGINEERING 12819 SE 38TH STREET #159 BELLEVUE, SVA. 98006 425-562-7226 xb....:is .sss✓.�.s�am�.ai m�#z� s3a�v.'�Y �.- -.< Section 1 -. Technical Information Worksheet Section 2: Project Overview Section 1 Drainage Review Requirements (CORE requirement revie Section 4.- Special Reports and Studies Section 5: Other Permits Section 6: Declaration of Covenant(s) CITY OF RENTON SURFACE WATER DESIGN MANUAL It E F E" R E 11 V4 C E z"i". A TECHNICAL INFORMATION REPORT (TIR) WORKSHEET U Project Owner lijA toy,.. BJ4--% Phone tt G, - -:1--19 - ( -2L !t Address n 1%, 6 —11 Lw A Project Engineer .1,Nn n C - Company I V.,P -AZLIn4 Phone L - t-- sa-rL-q-za, L • # • Technical Info Type of Drainage Review (check one): Date (include revision dates): µ' -• LJ Large Project LJ Directed 0 Project Name CED Permit # Location Township. Range Section -5's Site Address I I I I (e —11 2 LJ U DFW HPA L3 Shoreline L! COE 404 Management • DOE Dam Safety A Structural RockeryNault/ • FEMA Floodplain LJ ESA Section 7 LJ COE Wetlands Ll Other Site Improvement Plan (En9r. Plans) Plan Type (check one): Date (include revision dates): Date of Final: a4 Full U Modified Ll Simplified 12- LCL 2017 City of Renton Surface Water Design Manual 12/1/2016 8-A-1 REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 12/1/2016 2017 City of Renton Surface Water Design Manual REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Soil Type Slopes Erosion Potential 4 High Groundwater Table (within 5 feet) ❑ Other ❑ Additional Sheets Attached LJ Sole Source Aqu LJ Seeps/Springs REFERENCE LIMITATION / SITE CONSTRAINT ❑ Core 2 — Offsite Analysis ❑ Sensitive/Critical Areas ❑ SEPA ❑ LID Infeasibility ❑ Other Ll ❑ Additional Sheets Attached Threshold Discharge Area: (name or description~ Core Requirements (all 8 apply): Discharge at Natural Location Number of Natural Discharge Locations: Offsite Analysis Level: 1 / 2 / 3 dated: Flow Control (include facility Standard: summary sheet) or Exemption Number: On-site BMPs: Conveyance System Spill containment located at: e_x m Erosion and Sediment Control i CSWPP/CESCVESC Site Supervisor: Construction Stormwater Pollution Contact Phone: Prevention After Hours Phone: 2017 City of Renton Surface Water Design Manual 12/1/2016 Ref 8-A-3 REFERENCE 8: PLAN RENEW FORMS AND WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold discharge Area) Maintenance and Operation Responsibility (circle one):Privat J Public If Private, Maintenance Log Required: Yes / No Financial Guarantees and Liability Provided: Yes I No Water Quality (include facility Type (circle one): ' / Sens. Lake 1 Enhanced Basic I Bog summary sheet) or Exemption No. Special Requirements (as applicable): Area Specific Drainage Type: SDO / MDP 1 BP / Shared Fac. / None Requirements Name: Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None 100 -year Base Flood Elevation (or range): Datum: Flood Protection Facilities Describe: Source Control Describe land use: (commercial / industrial land use) Describe any structural controls: Oil Control High -Use Site: Yes / No Treatment BMP: Maintenance Agreement: Yes / No , with whom? Other Drainage Structures Describe: 12/1/2016 2017 City of Renton Surface Water Design Manual REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION AFTER CONSTRUCTION Clearing Limits Stabilize exposed surfaces ❑ Cover Measures ❑ Remove and restore Temporary ESC Facilities ❑ Perimeter Protection ❑ Clean and remove all silt and debris, ensure ❑ Traffic Area Stabilization operation of Permanent BMPs/Facilities, restore L) Sediment Retention operation of BMPs/Facilities as necessary ❑ Flag limits of sensitive areas and open space ❑ Surface Water Collection preservation areas ❑ Dewatering Control ❑ Other ❑ Dust Control ❑ Flow Control ❑ Control Pollutants ❑ Protect Existing and Proposed BMPs/Facilities ❑ Maintain Protective BMPs / Manage Project 2017 City of Renton Surface Water Design Manual Ref 8-A-5 12/]/2016 REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 1, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report. To the best of my knowleda&lhe.informatiolU oroviAd hweis accurate. 12/1/2016 0 M'' 2017 City of Renton Surface Water Design Manual ; Project This proposed project is to create 4 single family lots from one king county tax parcel (#618940-0161) located in the southerly portion of the City of Renton at 19116 116th Avenue SE. The project is a single lot having 30,038 square feet of property. The property has an existing residence and driveway located on the westerly side. This existing house will be retained after development. A new access road will be provided along the southerly portion of the project to provide access and a utility corridor for the other three lots. This project will be reviewed for drainage under the 2009 King County Surface Water Drainage Manual and provide (h ,.� " •y Renton " A detentionin:. # +. . y:. 11 .+r project ,urinstall aA� water vault the southeasty comer yoao rm water 5 yY.Br. 33. 3 5Z s 5 yY.Br. 33. 3 5Z Based n Table 1.1.2.A., the project drainage rev "Full The proposed discharge for the proposed project is to convey the developed runoff from the onsite proposed vault and into the road side ditch on the north side of SE 192rO Street. This ditch flows to the east and into the same conveyance system that the natural discharge connects. propertyCore Requirement #2 — Oftife Analysis The ill direct discharge into the City storm n itchy on the north side of SE 192n Street. itch is coil 12" storm pipe that flows to the east. Thegroject runoff ill continue within a closed conveyance system (catch basins and pipe)until reaching 124 Avenue. At this point new project is being constructed and the storm systemcould not be Poll The proposed roj ill connect to the downstream starupstream of the natural discharge int. There does not appear to be any capacity or overtopping issues within the downstream rsystem along 192nd Street. al 11-1. mmv, CL CL CL CL CL �.: �' " �t « - i �!' +1 f i! � ' �� . � � ,,. � .., :... � ! � � � �. � +II 1, ";' . � � # " �' �► � ' � � � • • a � ,� . Reference 11 -A Flow Control Standards Peak Rate Flow Control Standard Conditions) Mw Control Duration Conditions) Flood Problem Flow Unincorporated Kng County Flow Control Standards a Ronton City Limits Potential r ' Area � � r f pq^ F yy Flow Frequency Analysis Time Series File:predev.tsf Pro-iect Location :Sea -Tac ---Annual Peak Flow Rates --- Flow Rate Rank Time of Peak (CFS) 0.056 1 100.00 0.0,44 2 2/09/01 18:00 0.012 7 1/06/02 3:00 0.032 4 2/28/03 3:00 0.0018 0.028 3/24/04 21:00 0.019 6 1/05/05 9: 0.034 3 1/18/06 21:0000 0.028 5 11/24/06 4:00 0.056 1 1/09/08 9:00 Computed Peaks -----Flow Frequency Analysis ------- Peaks Rank Return Prot (CFS) Period 0.056 1 100.00 0.990 0.044 2 25.00 0.960 0.034 3 10.00 0.900 0.032 4 5.00 0.800 0.028 5 3.00 0.667 0.019 6 2.00 0.500 0.012 7 1.30 0.231 0.001 8 1,10 0.091. 0.052 50.00 0.980 =0 116 .. Avenue SE and SE 192"' Street, Renton 2009 KCRTS DETENTION CALCULATIONS Developed Area Peak es� Till Forest 0.00 8 cri Flow Rate rill Pasture, 0.00 acres Time of Till Grass, 0.33 acres (CFS) Outwash Forest 0.00 acresl 1 Outwash Pasturecres, 0.117 Outwash Grass! 0-008 cres, 2/09/01 Wetland' 0.00 acres= 0.092 lmpervious�0.36 acresil" 1/05/02 F- Total 0.141 0.69 acresI 2/27/03 ----- ------------------ - ---- - ---- Scale Factor: 1.00 Hourly Reduced 0.096 Time Series: 8/26/04 Compute rime Series 0.116 Modify User Input 10/28/04 File for computed Time Series J.TSF) ......... .. Flow Frequency Analysis Time Series File:dev.tsf Project Locaton: Sea -Ta c ---Annual Peak Flow Rates --- Flow Rate Rank Time of Peak (CFS) 0.240 1 100.00 0.117 5 2/09/01 2:00 0.092 8 1/05/02 16:00 0.141 2 2/27/03 7:00 0.096 7 8/26/04 2400 0.116 6 10/28/04 16:00 0.124 4 1/1.8/06 16600 0.139 3 10/26/06 0:00 0.240 1 1/09/08 6:00 Computed Peaks ----- Flow Frequency Analysis------_ Puke s ------- Peaks Rank Return Prot (CFS) Period 0.240 1 100.00 0.990 0.24 2 25.00 0.960 0.139 3 10.00 0.900 0.3-24 4 5.00 0.800 0.117 5 3.00 0.667 0.116 6 2.00 0.500 0.096 7 1.30 0.231 0.092 8 1.10 0.091 0.207 50.00 0.980 116th Avenue SE and SE 192 nd Street, Renton ,inna L4fe,,,,oT-q nI=Tr-MTInM r.AI M11 ATInN.R Type of Facility: Detention Vault Facility Length: 101.00 ft Facility Width: 20.00 ft Facility Area: 2020. sq. ft Effective Storage Depth: 4.00 ft Stage 0 Elevation: 4.00 ft Storage Volume: 8080. cu. ft Riser Head: 4.00 ft Riser Diameter: 12.00 inches Number of orifices., 2 Full Head Pipe orifice # Height Diameter Discharge Diameter (ft) (in) (CFS) (in) 1 0.00 0.50 0.014 2 3.00 1.10 0.033 4.0 Top Notch Weir: None Outflow Rating Curve: None 116'hAvenue SE and SE 192 d Street, Renton 2009 KCRTS DETENTION CALCULATIONS Stage Elevation Storage Discharge Percolation (ft) (ft) (cu. ft) (ac -ft) (cfs) (cfs) 0.00 4.00 0. 0.000 0.000 0.00 0.01 4.01 20. 0.000 0.001 0.00 0.02 4.02 40. 0.001 0.001 0.00 0.03 4.03 61. 0.001 0.001 0.00 0.04 4.04 81. 0.002 0.001 0.00 0.05 4.05 101. 0.002 0.001 0.00 0.15 4.15 303. 0.007 0.003 0.00 0.25 4.25 505. 0.012 0.003 0.00 0.35 4.35 707. 0.016 0.004 0.00 0.45 4.45 909. 0.021 0.005 0.00 0.55 4.55 1111. 0.026 0.005 0.00 0.65 4.65 1313. 0.030 0.005 0.00 0.75 4.75 1515. 0.035 0.006 0.00 0.85 4.85 1717. 0.039 0.006 0.00 0.95 4.95 1919. 0.044 0.007 0.00 1.05 5.05 2121. 0.049 0.007 0.00 1.15 5.15 2323. 0.053 0.007 0.00 1.25 5.25 2525. 0.058 0.008 0.00 1.35 5.35 2727. 0.063 0.008 0.00 1.45 5.45 2929. 0.067 0.008 0.00 1.55 5.55 3131. 0.072 0.008 0.00 1.65 5.65 3333. 0.077 0.009 0.00 1.75 5.75 3535. 0.081 0.009 0.00 1.85 5.85 3737. 0.086 0.009 0.00 1.95 5.95 3939. 0.090 0.009 0.00 2.05 6.05 4141. 0.095 0.010 0.00 2.15 6.15 4343. 0.100 0.010 0.00 2.25 6.25 4545. 0.104 0.010 0.00 2.35 6.35 4747. 0.109 0.010 0.00 2.45 6.45 4949. 0.114 0.011 0.00 2.55 6.55 5151. 0.118 0.011 0.00 2.65 6.65 5353. 0.123 0.011 0.00 2.75 6.75 5555. 0.128 0.011 0.00 2.85 6.85 5757. 0.132 0.011 0.00 2.95 6.95 5959. 0.137 0.012 0.00 3.00 7.00 6060. 0.139 0.012 0.00 3.01 7.01 6080. 0.140 0.012 0.00 3.02 7.02 6100. 0.140 0.013 0.00 3.03 7.03 6121. 0.141 0.014 0.00 3.05 7.05 6161. 0.141 0.016 0.00 3.06 7.06 6181. 0.142 0.018 0.00 3.07 7.07 6201. 0.142 0.020 0.00 3.08 7.08 6222. 0.143 0.021 0.00 3.09 7.09 6242. 0.143 0.022 0.00 3.19 7.19 6444. 0.148 0.026 0.00 3.29 7.29 6646. 0.153 0.030 0.00 3.39 7.39 6848. 0.157 0.033 0.00 3.49 7.49 7050. 0.162 0.036 0.00 3.59 7.59 7252. 0.166 0.038 0.00 3.69 7.69 7454. 0.171 0.040 0.00 3.79 7.79 7656. 0.176 0.042 0.00 M Z 4 116 th Avenue SE and SE 192 nd Street, Renton 2009 KCRTS DETENTION CALCULATIONS ----------------------------------- Route Time Series through Facility Inflow Time Series File:dev.tsf Outflow Time Series File:rdout Inflow/Outflow Analysis Peak Inflow Discharge: 0.240 CFS at 6:00 on Jan 9 in Year 8 Peak Outflow Discharge: 0.073 CFS at 11:00 on Jan 9 in Year 8 Peak Reservoir Stage: 4.01 Ft Peak Reservoir Elev: 8.01 Ft Peak Reservoir Storage: 8097. Cu -Ft 0.186 Ac --Ft 3.89 7.89 7858. 0.180 0.044 0.00 3.99 7.99 8060. 0.185 0.046 0.00 4.00 8.00 8080. 0.185 0.046 0.00 4.10 8.10 8282. 0.190 0.356 0.00 4.20 8.20 8484. 0.195 0.921 0.00 4.30 8.30 8686. 0.199 1.650 0.00 4.40 8.40 8888. 0.204 2.450 0.00 4.50 8.50 9090. 0.209 2.730 0.00 4.60 8.60 9292. 0.213 2.990 0.00 4.70 8.70 9494. 0.218 3.220 0.00 4.80 8.80 9696. 0.223 3.440 0.00 4.90 8.90 9898. 0.227 3.650 0.00 5.00 9.00 10100. 0.232 3.840 0.00 5.10 9.10 10302. 0.237 4.030 0.00 5.20 9.20 10504. 0.241 4.210 0.00 5.30 9.30 10706. 0.246 4.380 0.00 5.40 9.40 10908. 0.250 4.540 0.00 5.50 9.50 1111-0. 0.255 4.700 0.00 5.60 9.60 11312. 0.260 4.850 0.00 5.70 9.70 11514. 0.264 5.000 0.00 5.80 9.80 11716. 0.269 5.150 0.00 5.90 9.90 11918. 0.274 5.290 0.00 6.00 10.00 12120. 0.278 5.420 0.00 Hyd Inflow Outflow Peak Storage Target Calc Stage Eley (Cu -Ft) (Ac -Ft) 1 0.24 0.06 0.07 4.01 8.01 8097. 0.186 2 0.12 0.04 3.71 7.71 7496. 0.172 3 0.14 0.04 3.46 7.46 6997. 0.161 4 0.12 0.03 3.20 7.20 6456. 0.148 5 0.12 0.01 2.76 6.76 5585. 0.128 6 0.07 0.01 2.28 6.28 4605. 0.106 7 0.09 0.01 1.90 5.90 3841. 0.088 8 0.10 0.01 1.25 5.25 2515. 0.058 ----------------------------------- Route Time Series through Facility Inflow Time Series File:dev.tsf Outflow Time Series File:rdout Inflow/Outflow Analysis Peak Inflow Discharge: 0.240 CFS at 6:00 on Jan 9 in Year 8 Peak Outflow Discharge: 0.073 CFS at 11:00 on Jan 9 in Year 8 Peak Reservoir Stage: 4.01 Ft Peak Reservoir Elev: 8.01 Ft Peak Reservoir Storage: 8097. Cu -Ft 0.186 Ac --Ft 116'hAvenue SE and SE 192nd Street, Renton C009 KCRTS DETENTION CALCULATION& Flow Duration from Time Series File:rdout.tsf Cutoff Count Frequency CDS' Exceedence-Probab ilii y CFS 0.001 31429 51.254 51.254 48.746 0.487E+00 0.002 8873 14.470 65.724 34.276 0.343E+00 0.003 2783 4.538 70.263 29.737 0.297E+00 0.004 6427 10.481 80.744 19.256 0.193E+00 0.005 5198 8.477 89.220 10.780 0.108E+00 0.006 1823 2.973 92.193 7.807 0.781E-01 0.007 1602 2.613 94.806 5.194 0.519E-01 0.009 1.304 2.127 96.932 3.068 0.307E-01 0.010 771 1.257 98.190 1.810 0.181E-01 0.011 507 0.827 99.017 0.983 0.983E-02 0.012 407 0.664 99.680 0.320 0.320E,-02 0.013 69 0.113 99.793 0.207 0.207E-02 0.014 11 0.018 99.811 0.189 0.189E-02 0.015 12 0.020 99.830 0.170 0.170E-02 0.016 7 0.011 99.842 0.158 0.15 °02 0.017 4 0.007 99.848 0.152 0.152E-02 0.019 4 0.007 99.855 0.145 0.145E-02 0.020 2 0.003 99.858 0.142 0.142E-02 0.021 4 0.007 99.865 0.135 0.135E-02 0.022 2 0.003 99.868 0.132 0.132E-02 0.023 8 0.013 99.881 0.119 0.119E-02 0.024 8 0.013 99.894 0.106 0.106E-02 0.025 5 0.008 99.902 0.098 0.978E-03 0.026 8 0.013 99.915 0.085 0.848E-03 0.027 2 0.003 99.918 0.082 0.815E-03 0.029 4 0.007 99.925 0.075 0.750E-03 0.030 4 0.007 99.932 0.068 0.685E-03 0.031 7 0.011 99.943 0.057 0.571°03 0.032 5 0.008 99.951 0.049 0.489E-03 0.033 6 0.010 99.961 0.039 0.391E-03 0.034 4 0.007 99.967 0.033 0.326E-03 0.035 4 0.007 99.974 0.026 0.261E-03 0.036 3 0.005 99.979 0.021 0.212E-03 0.037 2 0.003 99.982 0.018 0.179E-03 0.039 3 0.005 99.987 0.013 0.130E-03 0.040 3 0.005 99.992 0.008 0.815E-04 1 16thAvenue SE and SE 192nd Street, Renton 2009 KCRTS DETENTION CALCULATIONS Duration Comparison Anaylsis Base File: predev.tsf New File: rdout.tsf Cutoff Units: Discharge in CFS ----- Fraction of me-_-_- --------- Check of Tolerance ------- Cutoff Base New %Change Probabilit y Base New %Change 0.010 0.80E-02 0.10E-01 28.1 1 0.8DE-02 0.010 0.011 4.9 0.013 0.58E-02 0.20E-02 -65.4 0.58E-02 0.013 0.011 0.01-6 0.43E-02 0.16E-02 -62.0 0.43E-02 0.016 0.011 -29.7 0.018 0.33E-02 0.15E-022 -56.4 1 0.33E-02 0.018 Oa012 -35.9 0.021 0.26E-02 0.14E-02 -48.1 1 0.26E-02 0.021 0.012 -42.8 0.024 0.20E-02 0.11E-02 -43.0 1 0s4E-202 0.024 0.014 -42.4 0.026 0.13E-02 0.86E-03 -33.8 .13E-02 0.026 0.022 -15.8 0.029 0.83E-03 0.72E-03 -13.7 0.83E-03 0.029 0.027 -7.4 0.031 1 0.51E-03 0.54E-03 6.5 1 0.51E-03 0.031 0.032 0.8 0.034 0.29E-03 0.34E-03 16.7 1 0.29E-03 0.034 0.035 2.2 0.037 0.18E-03 0.20E-03 9.1 1 0.18E-03 0.037 0.037 2.2 0.039 0.15E-03 0.98E-04 -33.3 0.15E-03 0.039 0.038 -3.2. 0.042 0.65E-04 O.00E+00 -IS-00.0 0.65E-04 0.042 0.040 -4.3 MaximLLTn positive excursion = 0.001 cfs ( 4.9%) occurring at 0.010 cfs on the Base Data:predev.tsf and at 0.011 cfs on the New Data-.rdout.tsf Maximum negative excursion = 0.011 cfs (-46.9%) occurr'incr at 0.023 cfs on the Base Data:predev.tsf and at 0.012 cfs on the New Data:rdout.tsf C.2.11 PERFORATED PIPE CONNECTION Your property contains a stormwater management flow control BMP (best management practice) called a ,*perforated pipe connection," which was installed to reduce the stormwater runoff impacts of some or all of the impervious surface on your property. A perforated pipe connection is a length of drainage conveyance pipe with holes in the bottom, designed to "leak" runoff, conveyed by the pipe, into a gravel filled trench where it can be soaked into the surrounding soil, The connection is intended to provide opportunity for infiltration of any runoff that is being conveyed from an impervious surface (usually a roof) to a local drainage system such as a ditch or roadway pipe system. The size and composition of the perforated pipe connection as depleted by the flow control BMP site plan Ie. design details must be maintained and may not be changed without written approval either from the King County Water and Land Resources Division or through +4 development permit from King County. The soil overtop of the perforated portion of the system must not be compacted or covered with impervious materials. FIGURE C.2.11.A PERFORATED PIPE CONNECTION FOR A SINGLE FAMIELY RESIDENCE 7102TITT"ITHI filter fabric 6 pert pipe 71 Von 0 8" min a V a 11/2" - 3/4" washed rock CIO � aa V On 0 7a a 24" min TRENCH X -SECTION NTS to road PLAN VIEW OF ROOF NTS 2009 Surface Water Design Manual — Appendix C 1/9/2009 C-81 Core Requirement #4 — Conveyance System The proposed on-site conveyance improvements will include a catch basin inlet proposed over the lid f the stormwater facility. This will allow for the private access road to dischargedirectly into the facility (vault). The proposed new houses will connect into the vault via C fight line. The utf ll storm pipe that discharges the storm water facility ill be sized at the time of the civil engineering utility plans with calculations. Based upon the outlet flows form the t nti n volume sizing, 2" outfall at 0.50% slope will provide tcapacity for this project. Core Requirement The on-site storm ill be owned andmaintained riv t ly. The maintenanceand operations for this systemill be included within the Declaration of Covenants for the individual BMPs providedn the project and the final civil construction plans. Core Requirement #7 — Finandal Guarantees and Liability The Financial Guarantees and Liabilities will be required prior to the project being finalized by the City of Renton. Bond Quantity worksheets will be provided at time of final engineering plan submittal. core nequirement #8 - water quality The proposed project will include the installation of a wet sump within the proposed stormwater vault for water quality treatment. Check project for Water Quality Exemption: Section 1.2.8.1 Surface Area tions® Project creates gmaterthan 5,,000 square feet of new PGIS — road plus proposed driveways (6,700 square feet). Therefore water quality treatment is required. Water Quality Sizing — calculations for the water quality volume are attached to this section. The calculated volume required is 2,081 cubic feet. The minimum water quality depth within a stormwater vault (per code) is 3'. The proposed water quality volume within the vault would be T(minimum) x 20'x 50'OR 3,000 cubic feet proposed. The westerly half of the vault will be used for water quality volume. Facility Description: WaterQuality Sizing ((01/10/201'q-, Step 1: Identify required wetpool volume factor (f). f = 3 Per KCSWDM 6.4.1 .1 Step 2: Determine rainfall (R) for the mean annual storm. R = 0.47 Per KCSWDM Fig. Step 3: Calculate runoff from the mean annual storm (V,) for the developed site. Vr = (0. gAq + 0.25Atg + 0. 1 OAtf + 0.01 Aj where, Ai Impervious Surface Area 15,681 s.f. Ala Till Grass Area 14,375 s,f. Atf Till Forest Area 0 S.f. k Outwash Area 0 s-f- 1177-r=' MH Spedal Requirement #5 — Olt CantrvI The project is NOT a hig-use site or the re -development of a high -use site. Project is exempt from oil control. Reference - t"% of Date: 01/0912014 k.,-jroundwater Protection Areas rMr0 1 2 a1 Section 4.- Special Reports and Studies Geotechnical Site Assessment prepared by Robert Pride, P.E. dated October 8,, 2015 Reference 11-C Soil (} 1 2Miles s Mr. Simon Bilti c/o Mr. James Hanson 17446 Mallard Cove Lan,; Mt. Vernon, WA 98274 This report summanizes the results of our geologic evaluation of the property located on the east side of ii6thAvenue SE and just north of SE ig2nd Street in Renton. Preliminary design shows that there will be three proposed residences constructed on these lots as shown on the Dryco survey plan. The purpose of this report is to describe the geologic conditions onsite, and to provide recommendations for the proposed residential construction. References include geologic mapping by Booth, et al and previous geotechnical investigations performed in this area of Renton. The three lots are located east of an existing residence that is located on the east side of 116th Avenue. Access to the three lots to the rear of this residence will be provided by a driveway along the south side of these lots. Impervious surface areas will require collection of storm water runoff with discharge into the city storm drain system. I Concrete slabs and driveway pavement should be supported with a minimum six inch layer of compacted crushed gravel that is placed on the dense native soils. It is . 0-'#V1W-1-Mff4 1- k74r1-.&4- �*yxAx r-Mz) our recommendations are achieved during site development and building construction. Our conclusions, recommendations and opinions presented in this report are based on prior experience in this area combined with my site assessment and geologic research. The findings and recommendations of this report were prepared in accordance with generally accepted principles of geotechnical engineering as practiced in the Puget Sound area at the time this report was submitted. We make no warranty, either express or implied. Robert M. Pride, P. E. Principal Geotechnical Engineer dist.- (i) Addressee Robert M. Pride Page 13203 Holmes Point Drive NE Kirkland, WA 98031 s.ection S,: Mer Permol);; None at this time Section W, Declaration of Covenants The proposed storm water BMP covenants will be provided as part of the final engineering plan submittal for City review and approval. Grantor: Grantee: City of Renton Legal Description: Additional Legal(s) on: Assessor's Tax Parcel ID#: IN CONSIDERATION of the approved City of Renton(cheek one of the following) L1 residential building permit, U commercial building it, LJ clearing and grading permit, U subdivision it, or U short subdivision permit for Application File No. LUA/SWP relating to the real property ("Property") described above, the Grantor(s), the owner(s) in fee of that Property, hereby he/she(they) will observe, consent to, and abide by the conditions and obligations set forth and describoi in Paragraphs I through 8 below with regard to the Property. Grantor(s) hereby grants(grant), 1. Grantor(s) or his/her(their) successors in interest and assigns ("Owners") shall retain, uphold, zu 31=11=31PI1 pi II 111 111 pil 2. The Owners shall at their own cost, operate, maintain, and keep in good repair, the Property's BMPs as described in the approved Design and Maintenance Details for each BN4P attached hereto ani] 3. City or Renton shall provide at least 30 days written notice to the Owners that entry on the Property is planned for the inspection of the BMPs. After the 30 days, the Owners shall allow the City of Renton to enter for the sole purpose of inspecting the BMPs. In lieu of inspection by the City, the Owners may elect to engage a licensed civil engineer registered in the state of Washington who has expertise in drainage to inspect the BMPs and provide a written report describing their condition. If the engineer option is chosen, the Owners shall provide written notice to the City of Renton within fifteen days of receiving the City's notice of inspection. Within 30 days of giving this notice, the Owners, or the engineer on behalf of the Owners, shall provide the engineers report to the City of Renton. If the report is not provided in a timely manner as specified above, the City of Renton may inspect the BMPs without further notice. 4. If the City determines from its inspection, or from an engineer's report provided in accordancm with Paragraph 3, that maintenance, repair, restoration, and/or mitigation work is required for the BMPs, The City shall notify the Owners of the specific maintenance, repair, restoration, and/or mitigation work (Work) required under RMC 4-6-030. The City shall also set a reasonable deadline for completing the Work or providing an engineer's report that verifies completion of the Work. After the deadline has passed, the Owners shall allow the City access to re -inspect the BMPs unless an engineer's report has been provided verifying completion of the Work. If the work is not completed properly within the time frame set by the City, the City may initiate an enforcement action. Failure to properly maintain the BMPs is a violation of RMC 4-6-030 and may subject the Owners to enforcement under the RMC 1-3, including 5. Apart from performing routine landscape maintenance, the Owners are hereby required to obtain written approval from the City or Renton before performing any alterations or modifications to the Ityl 6. Any notice or approval required to be given by one party to the other under the provisions of this Declaration of Covenant shall be effective upon personal delivery to the other party, or after three (3) days from the date that the notice or approval is mailed with delivery confirmation to the current address on record with each Party. The parties shall notify each other of any change to their addresses. 7. This Declaration of Covenant is intended to promote the efficient and effective management of surface water drainage on the Property, and it shall inure to the benefit of all the citizens of the City of Renton and its successors and assigns. This Declaration of Covenant shall run with the land and be 8. This Declaration of Covenant may be terminated by execution of a written agreement by the Owners and the City of Renton that is recorded by King County in its real property records. fN WITNESS WHEREOF, this Declaration of Covenant for the Maintenance and Inspection of Flow Control BMPs is executed this - day cif__ 20-. IT'Imp=# STATE OF WASHfNGTON ) COUNTY OF KING )ss —, to me known to be the individual(s) described in and who executed the within and foregoing instrument and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein stated., Given under my hand and official seal this ___ day of .20-. Printed name ®t Public in and for the State of Washington, residing at My appointment expires "-IOU This lot contains stormwater management flow control BMP (best management practice) called a "Perforated pipe connection," which was installed to reduce the stormwater runoff impacts of some or all of the impervious surface on your property. A perforated pipe connection is a length of drainage conveyance pipe with holes in the bottom, designed to "leak" runoff, conveyed by the pipe, into a gravel filled trench where it can be soaked into the surrounding soil. The connection is intended to provide opportunity for infiltration of any runoff that is being conveyed from an impervious surface (usually a roof) to a local drainage system such as a ditch or roadway pipe system. The size and composition of the perforated pipe connection as depicted by the flow contr BMP site plan and design details must be maintained and may not be changed witho written approval from the City of Renton. The soil overtop of the perforated portion of thl- system must not be compacted or covered with impervious materials. . ......... .. 4k I J tJ 4 � 01 A Your property contains a stormwater management flow control BMP (best management practice) known as "restricted footprintF" the practice of restricting the amount of impervious surface that may be added to a property so as to minimize the stormwater runoff impacts caused by impervious surface. The total impervious surface on your property may not exceed 2,600 square feet without written approval from the City of Renton. m t,