UPDATE BQWS PER REDLINES. BQWS NEEDS
TO BE COMPLETED IN EXCEL. BOND
QUANTITIES WILL BE CHECKED WITH THE
RESUBMITTAL.
Ian Fitz-James (38)
Subject: Cloud+
Page Label: 9
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 6:00:54 PM
Color:
Depth:
PLEASE REORDER THE TIR TO CONFORM TO
THE REQUIRED LAYOUT FOUND IN SECTION
2.3.1.1 OF THE 2009 KCSWDM. PER THAT
SECTION, THE TIR SHALL HAVE 10 SECTIONS.
Subject: Text Box
Page Label: 11
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 10:51:49 AM
Color:
Depth:
DETENTION VAULT
Subject: Cloud+
Page Label: 13
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 10:54:27 AM
Color:
Depth:
INCOMPLETE
Subject: Cloud+
Page Label: 17
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 11:05:06 AM
Color:
Depth:
PARCEL
UPDATE BQWS PER REDLINES. BQWS NEEDS TO BE COMPLETED INEXCEL. BOND QUANTITIES WILL BECHECKED WITH THE RESUBMITTAL.
PLEASE REORDER THE TIR TO CONFORM TO
THE REQUIRED LAYOUT FOUND IN SECTION
2.3.1.1 OF THE 2009 KCSWDM. PER THAT
SECTION, THE TIR SHALL HAVE 10 SECTIONS.
DETENTION VAULT
INCOMPLETE
PARCEL
Subject: Cloud+
Page Label: 20
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 11:08:31 AM
Color:
Depth:
CHECK
Subject: Cloud+
Page Label: 21
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 11:18:36 AM
Color:
Depth:
THIS STATEMENT DOES NOT APPEAR TO
MATCH THE CITY OF RENTON "COR" MAPS.
FIELD VERIFY.
Subject: Cloud+
Page Label: 21
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 11:18:55 AM
Color:
Depth:
THIS SECTION IS INCOMPLETE. AT A
MINIMUM, A LEVEL 1 DOWNSTREAM
ANALYSIS SHALL BE INCLUDED. THE
DOWNSTREAM ANALYSIS SHALL BE PER
SECTION 1.2.2.1 OF THE 2009 KCSWDM. ALL
FOUR TASKS SHALL BE CLEARLY
ADDRESSED. A MAP OF THE DOWNSTREAM
FLOWPATH SHALL BE PROVIDED. A FIELD
VISIT EVALUATING THE DOWNSTREAM
FLOWPATH COMPELTE WITH PICTURES
SHALL BE INCLUDED.
Subject: Cloud+
Page Label: 23
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 1:32:20 PM
Color:
Depth:
PRESENSE
CHECK
THIS STATEMENT DOES
NOT APPEAR TO MATCH
THE CITY OF RENTON "COR"
MAPS. FIELD VERIFY.
THIS SECTION IS INCOMPLETE. AT A MINIMUM, A LEVEL
1 DOWNSTREAM ANALYSIS SHALL BE INCLUDED. THE
DOWNSTREAM ANALYSIS SHALL BE PER SECTION 1.2.2.1
OF THE 2009 KCSWDM. ALL FOUR TASKS SHALL BE
CLEARLY ADDRESSED. A MAP OF THE DOWNSTREAMFLOWPATH SHALL BE PROVIDED. A FIELD VISIT
EVALUATING THE DOWNSTREAM FLOWPATH COMPELTE
WITH PICTURES SHALL BE INCLUDED.
PRESENSE
Subject: Cloud+
Page Label: 23
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 1:31:21 PM
Color:
Depth:
THIS SECTION RELATES TO THE FLOW
CONTROL BMP REQUIREMENTS FOR THE
INDIVIDUAL LOTS. PLEASE REVISE THIS
SECTION OF THE REPORT TO INCLUDE
DISCUSSION ON HOW THIS PROJECT
COMPLIES WITH THE FLOW CONTROL
REQUIREMENTS FOUND IN SECTION 1.2.3 OF
THE 2009 KCSWDM.
IN THE FLOW CONTROL DURATION
STANDARD (FORESTED CONDITIONS) AREA,
A FLOW CONTROL FACILITY IS REQUIRED IF
A PROJECT CREATES MORE THAN A 0.1 CFS
DIFFERENCE IN THE SUM OF THE
DEVELOPED 100-YEAR PEAK FLOWS AND THE
HISTORIC SITE CONDITIONS.
THE FLOW CONTROL FACILITY SHALL MATCH
DEVELOPED DISCHARGE DURATIONS TO
PREDEVELOPED DURATIONS FOR THE
RANGE OF PREDEVELOPED DISCHARGE
RATES FROM 50% OF THE 2-YEAR PEAK
FLOW TO THE FULL 50-YEAR PEAK FLOW.
ALSO MATCH DEVELOPED PEAK DISCHARGE
RATES TO PREDEVELOPED DISCHARGE
RATES FOR THE 2 AND 10 YEAR RETURN
PERIODS.
Subject: Text Box
Page Label: 25
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:24:45 PM
Color:
Depth:
PROVIDE A DEVELOPED CONDITIONS BASIN
MAP SHOWING AREAS OF IMPERVIOUS,
POLLUTION GENERATING IMPERVIOUS.
PROVIDE A TABLE WITH A BREAKDOWN OF
ALL THE SURFACES WITH THE MAP. THE
AREAS IN THE TABLE SHOULD MATCH THE
INPUTS FOR THE KCRTS MODEL.
Subject: Cloud+
Page Label: 28
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 5:58:42 PM
Color:
Depth:
THIS DOESN'T MATCH THE PLANS.
Subject: Text Box
Page Label: 32
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 6:00:24 PM
Color:
Depth:
PROVIDE CALCULATIONS CONFIRMING THAT
THE RISER IS SIZED TO HANDLE 100 YEAR
PEAK 15 MINUTE FLOW WITH 0.5 FEE OF
FREEBOARD.
THIS SECTION RELATES TO THE FLOW CONTROL BMP
REQUIREMENTS FOR THE INDIVIDUAL LOTS. PLEASEREVISE THIS SECTION OF THE REPORT TO INCLUDEDISCUSSION ON HOW THIS PROJECT COMPLIES WITH THEFLOW CONTROL REQUIREMENTS FOUND IN SECTION 1.2.3OF THE 2009 KCSWDM.
IN THE FLOW CONTROL DURATION STANDARD (FORESTEDCONDITIONS) AREA, A FLOW CONTROL FACILITY ISREQUIRED IF A PROJECT CREATES MORE THAN A 0.1 CFSDIFFERENCE IN THE SUM OF THE DEVELOPED 100-YEARPEAK FLOWS AND THE HISTORIC SITE CONDITIONS.
THE FLOW CONTROL FACILITY SHALL MATCH DEVELOPEDDISCHARGE DURATIONS TO PREDEVELOPED DURATIONSFOR THE RANGE OF PREDEVELOPED DISCHARGE RATESFROM 50% OF THE 2-YEAR PEAK FLOW TO THE FULL50-YEAR PEAK FLOW. ALSO MATCH DEVELOPED PEAKDISCHARGE RATES TO PREDEVELOPED DISCHARGERATES FOR THE 2 AND 10 YEAR RETURN PERIODS.
PROVIDE A DEVELOPED CONDITIONS BASIN MAP SHOWING
AREAS OF IMPERVIOUS, POLLUTION GENERATING
IMPERVIOUS. PROVIDE A TABLE WITH A BREAKDOWN OF ALL
THE SURFACES WITH THE MAP. THE AREAS IN THE TABLE
SHOULD MATCH THE INPUTS FOR THE KCRTS MODEL.
THIS DOESN'T MATCH THE PLANS.
PROVIDE CALCULATIONS
CONFIRMING THAT THE RISER IS
SIZED TO HANDLE 100 YEAR PEAK 15
MINUTE FLOW WITH 0.5 FEE OF
FREEBOARD.
Subject: Cloud+
Page Label: 32
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 5:58:13 PM
Color:
Depth:
MODEL IS NOT IN COMPLIANCE WITH THE
STANDARDS FOUND IN THE 2009 KCSWDM.
FIRST CUTOFF SHALL HAVE A PERCENTAGE
CHANGE LESS THAN OR EQUAL TO 0.0.
Subject: Text Box
Page Label: 33
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:38:10 PM
Color:
Depth:
FLOW CONTROL BMPS ARE REQUIRED PER
SECTION 1.2.3.3 AND 5.2 OF THE 2009
KCSWDM AS AMENDED BY THE CITY OF
RENTON. UPDATE THE REPORT TO SHOW
AND EXPLAIN HOW THIS PROJECT IS
COMPLYING WITH THE REQUIREMENTS OF
THIESE SECTIONS. A PERFORATED PIPE
CONNECTION IS NOT AN APPROVED FLOW
CONTROL BMP. INSTEAD IT IS REQUIRED
FOR ALL CONNECTIONS TO THE PUBLIC
STORM DRAINAGE SYSTEM.
Subject: Cloud+
Page Label: 35
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:39:24 PM
Color:
Depth:
THIS DESCRIPTION DOES NOT MATCH THE
PLANS. REVISE. INCLUDE CONVEYANCE
CALCUATIONS FOR BOTH THE FRONTAGE
AND ON-SITE STORMWATER CONVEYANCE
PER CHAPTER 4 OF THE 2009 KCSWDM AS
AMENDED BY THE CITY OF RENTON.
Subject: Cloud+
Page Label: 36
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 5:50:49 PM
Color:
Depth:
REVISE. PROVIDE DISCUSSION OF THE TESC
MEASURES PROPOSED FOR THE SITE.
SEDIMENT TRAP SHALL BE SIZED IN
ACCORDANCE WITH SECTION D.3.5.1 OF THE
2009 KCSWDM. INCLUDE SIZING
CALCUATIONS IN REVISED TIR. SIZING SHALL
USE THE 2-YEAR PEAK FLOW FROM KCRTS
WITH 15-MINUTE TIME STEPS AS DESCRIBED
IN THIS SECTION.
Subject: Text Box
Page Label: 37
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:52:54 PM
Color:
Depth:
INCLUDE AN OPERATIONS AND
MAINTENANCE MANUAL IN ACCORDANCE
WITH APPENDIX A OF THE 2009 KCSWDM AS
AMENDED BY THE CITY OF RENTON.
INCLUDE THE MAINTENANCE INSTRUCTIONS
FOR EACH STORM DRAINAGE STRUCTURE /
FACILITY ON-SITE.
Subject: Cloud+
Page Label: 37
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:52:51 PM
Color:
Depth:
REVISE
MODEL IS NOT IN COMPLIANCE WITH
THE STANDARDS FOUND IN THE 2009
KCSWDM. FIRST CUTOFF SHALLHAVE A PERCENTAGE CHANGE LESSTHAN OR EQUAL TO 0.0.
FLOW CONTROL BMPS ARE REQUIRED PER SECTION 1.2.3.3
AND 5.2 OF THE 2009 KCSWDM AS AMENDED BY THE CITY OF
RENTON. UPDATE THE REPORT TO SHOW AND EXPLAIN
HOW THIS PROJECT IS COMPLYING WITH THE
REQUIREMENTS OF THIESE SECTIONS. A PERFORATED PIPE
CONNECTION IS NOT AN APPROVED FLOW CONTROL BMP.
INSTEAD IT IS REQUIRED FOR ALL CONNECTIONS TO THE
PUBLIC STORM DRAINAGE SYSTEM.
THIS DESCRIPTION DOES NOT MATCH THE
PLANS. REVISE. INCLUDE CONVEYANCE
CALCUATIONS FOR BOTH THE FRONTAGE
AND ON-SITE STORMWATER CONVEYANCE
PER CHAPTER 4 OF THE 2009 KCSWDM AS
AMENDED BY THE CITY OF RENTON.
REVISE. PROVIDE DISCUSSION OF THE TESC
MEASURES PROPOSED FOR THE SITE.
SEDIMENT TRAP SHALL BE SIZED IN
ACCORDANCE WITH SECTION D.3.5.1 OF THE 2009
KCSWDM. INCLUDE SIZING CALCUATIONS IN
REVISED TIR. SIZING SHALL USE THE 2-YEAR
PEAK FLOW FROM KCRTS WITH 15-MINUTE TIME
STEPS AS DESCRIBED IN THIS SECTION.
INCLUDE AN OPERATIONS AND MAINTENANCE MANUAL IN
ACCORDANCE WITH APPENDIX A OF THE 2009 KCSWDM
AS AMENDED BY THE CITY OF RENTON. INCLUDE THE
MAINTENANCE INSTRUCTIONS FOR EACH STORM
DRAINAGE STRUCTURE / FACILITY ON-SITE.
REVISE
Subject: Cloud+
Page Label: 38
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:51:56 PM
Color:
Depth:
REVISE
Subject: Cloud+
Page Label: 39
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 5:50:36 PM
Color:
Depth:
REVISE. WHAT IS DESCRIBED HERE DOES
NOT MATCH WHAT IS SHOWN ON THE PLANS.
CLEARLY EXPLAIN HOW THIS PROJECT
MEETS THE REQUIREMENTS FOUND IN
SECTION 1.2.8 OF THE 2009 KCSWDM.
Subject: Cloud+
Page Label: 41
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 5:43:16 PM
Color:
Depth:
WHERE ARE THESE NUMBERS COMING
FROM? PROVIDE A BASIN MAP.
Subject: Cloud+
Page Label: 42
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 5:42:17 PM
Color:
Depth:
REVISE. THIS SETION SHOULD ACCURATELY
DESCRIBE THE SPECIAL REQUIREMENTS AT
THE PROJECT SITE. CORE REQUIREMENT #6,
WHICH IS SPECIFIC TO THE CITY OF RENTON
SHALL ALSO BE ADDRESSED.
Subject: Text Box
Page Label: 46
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 5:47:47 PM
Color:
Depth:
THIS GEOTECHNICAL REPORT IS
INCOMPLETE AND INADEQUATE. THE SOILS
REPORT SHALL FOLLOW THE STANDARDS IN
APPENDIX C OF THE 2009 KCSWDM. NO
BORING LOTS OF SUBSURFACE
EXPLORATION IS SHOWN IN THE REPORT.
THERE IS NO INDICATION THAT THE SITE
WAS EVER VISITED. REVISE.
Subject: Text Box
Page Label: 49
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:47:47 PM
Color:
Depth:
A SEPARATE BUILDING PERMIT WILL BE
REQUIRED FOR CONSTRUCTION OF THE
DETENTION VAULT.
REVISE
REVISE. WHAT IS DESCRIBED HERE
DOES NOT MATCH WHAT IS SHOWN
ON THE PLANS. CLEARLY EXPLAIN
HOW THIS PROJECT MEETS THE
REQUIREMENTS FOUND IN SECTION
1.2.8 OF THE 2009 KCSWDM.
WHERE ARE THESE
NUMBERS COMING FROM?
PROVIDE A BASIN MAP.
REVISE. THIS SETION SHOULD
ACCURATELY DESCRIBE THE SPECIALREQUIREMENTS AT THE PROJECT SITE.
CORE REQUIREMENT #6, WHICH IS
SPECIFIC TO THE CITY OF RENTON
SHALL ALSO BE ADDRESSED.
THIS GEOTECHNICAL REPORT IS INCOMPLETE AND
INADEQUATE. THE SOILS REPORT SHALL FOLLOW THE
STANDARDS IN APPENDIX C OF THE 2009 KCSWDM. NO
BORING LOTS OF SUBSURFACE EXPLORATION IS
SHOWN IN THE REPORT. THERE IS NO INDICATION
THAT THE SITE WAS EVER VISITED. REVISE.
A SEPARATE BUILDING PERMIT WILL BE
REQUIRED FOR CONSTRUCTION OF
THE DETENTION VAULT.
Subject: Cloud+
Page Label: 50
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:43:29 PM
Color:
Depth:
A RECORDED DRAINAGE FACILITY
COVENANT PER REFERENCE 8-J OF THE CITY
AMENDMENTS TO THE 2009 KCSWDM IS
REQUIRED FOR THE PRIVATE STORMWATER
VAULT AND STORMWATER PIPES AND
STRUCTURES LOCATED IN THE SHARED
DRIVEWAY. SUBMIT A DRAFT COVENANT
WITH THE NEXT SUBMITTAL FOR REVIEW.
Subject: Line
Page Label: 51
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:40:08 PM
Color:
Depth:
Subject: Line
Page Label: 51
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:40:02 PM
Color:
Depth:
Subject: Line
Page Label: 52
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:40:15 PM
Color:
Depth:
Subject: Line
Page Label: 52
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:40:41 PM
Color:
Depth:
Subject: Line
Page Label: 53
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:40:32 PM
Color:
Depth:
A RECORDED DRAINAGE FACILITY COVENANT PER
REFERENCE 8-J OF THE CITY AMENDMENTS TO THE 2009
KCSWDM IS REQUIRED FOR THE PRIVATE STORMWATER
VAULT AND STORMWATER PIPES AND STRUCTURES
LOCATED IN THE SHARED DRIVEWAY. SUBMIT A DRAFT
COVENANT WITH THE NEXT SUBMITTAL FOR REVIEW.
Subject: Line
Page Label: 53
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:40:26 PM
Color:
Depth:
Subject: Line
Page Label: 54
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:40:55 PM
Color:
Depth:
Subject: Line
Page Label: 54
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:40:49 PM
Color:
Depth:
Subject: Line
Page Label: 55
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:41:07 PM
Color:
Depth:
Subject: Line
Page Label: 55
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:41:02 PM
Color:
Depth:
Subject: Line
Page Label: 56
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:41:27 PM
Color:
Depth:
Subject: Line
Page Label: 56
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: Ian Fitz-James
Date: 3/15/2017 4:41:23 PM
Color:
Depth:
UPDATE BQWS PER REDLINES.
BQWS NEEDS TO BE COMPLETED IN
EXCEL. BOND QUANTITIES WILL BE
CHECKED WITH THE RESUBMITTAL.
PLEASE REORDER THE TIR TO CONFORM TO
THE REQUIRED LAYOUT FOUND IN SECTION
2.3.1.1 OF THE 2009 KCSWDM. PER THAT
SECTION, THE TIR SHALL HAVE 10 SECTIONS.
DETENTION VAULT
INCOMPLETE
PARCEL
CHECK
THIS SECTION IS INCOMPLETE. AT A MINIMUM, A LEVEL
1 DOWNSTREAM ANALYSIS SHALL BE INCLUDED. THE
DOWNSTREAM ANALYSIS SHALL BE PER SECTION 1.2.2.1
OF THE 2009 KCSWDM. ALL FOUR TASKS SHALL BE
CLEARLY ADDRESSED. A MAP OF THE DOWNSTREAM
FLOWPATH SHALL BE PROVIDED. A FIELD VISIT
EVALUATING THE DOWNSTREAM FLOWPATH COMPELTE
WITH PICTURES SHALL BE INCLUDED.
THIS STATEMENT DOES
NOT APPEAR TO MATCH
THE CITY OF RENTON "COR"
MAPS. FIELD VERIFY.
THIS SECTION RELATES TO THE FLOW CONTROL BMP
REQUIREMENTS FOR THE INDIVIDUAL LOTS. PLEASE
REVISE THIS SECTION OF THE REPORT TO INCLUDE
DISCUSSION ON HOW THIS PROJECT COMPLIES WITH THE
FLOW CONTROL REQUIREMENTS FOUND IN SECTION 1.2.3
OF THE 2009 KCSWDM.
IN THE FLOW CONTROL DURATION STANDARD (FORESTED
CONDITIONS) AREA, A FLOW CONTROL FACILITY IS
REQUIRED IF A PROJECT CREATES MORE THAN A 0.1 CFS
DIFFERENCE IN THE SUM OF THE DEVELOPED 100-YEAR
PEAK FLOWS AND THE HISTORIC SITE CONDITIONS.
THE FLOW CONTROL FACILITY SHALL MATCH DEVELOPED
DISCHARGE DURATIONS TO PREDEVELOPED DURATIONS
FOR THE RANGE OF PREDEVELOPED DISCHARGE RATES
FROM 50% OF THE 2-YEAR PEAK FLOW TO THE FULL
50-YEAR PEAK FLOW. ALSO MATCH DEVELOPED PEAK
DISCHARGE RATES TO PREDEVELOPED DISCHARGE
RATES FOR THE 2 AND 10 YEAR RETURN PERIODS.
PRESENSE
PROVIDE A DEVELOPED CONDITIONS BASIN MAP SHOWING
AREAS OF IMPERVIOUS, POLLUTION GENERATING
IMPERVIOUS. PROVIDE A TABLE WITH A BREAKDOWN OF ALL
THE SURFACES WITH THE MAP. THE AREAS IN THE TABLE
SHOULD MATCH THE INPUTS FOR THE KCRTS MODEL.
THIS DOESN'T MATCH THE PLANS.
MODEL IS NOT IN COMPLIANCE WITH
THE STANDARDS FOUND IN THE 2009
KCSWDM. FIRST CUTOFF SHALL
HAVE A PERCENTAGE CHANGE LESS
THAN OR EQUAL TO 0.0.
PROVIDE CALCULATIONS
CONFIRMING THAT THE RISER IS
SIZED TO HANDLE 100 YEAR PEAK 15
MINUTE FLOW WITH 0.5 FEE OF
FREEBOARD.
FLOW CONTROL BMPS ARE REQUIRED PER SECTION 1.2.3.3
AND 5.2 OF THE 2009 KCSWDM AS AMENDED BY THE CITY OF
RENTON. UPDATE THE REPORT TO SHOW AND EXPLAIN
HOW THIS PROJECT IS COMPLYING WITH THE
REQUIREMENTS OF THIESE SECTIONS. A PERFORATED PIPE
CONNECTION IS NOT AN APPROVED FLOW CONTROL BMP.
INSTEAD IT IS REQUIRED FOR ALL CONNECTIONS TO THE
PUBLIC STORM DRAINAGE SYSTEM.
THIS DESCRIPTION DOES NOT MATCH THE
PLANS. REVISE. INCLUDE CONVEYANCE
CALCUATIONS FOR BOTH THE FRONTAGE
AND ON-SITE STORMWATER CONVEYANCE
PER CHAPTER 4 OF THE 2009 KCSWDM AS
AMENDED BY THE CITY OF RENTON.
REVISE. PROVIDE DISCUSSION OF THE TESC
MEASURES PROPOSED FOR THE SITE.
SEDIMENT TRAP SHALL BE SIZED IN
ACCORDANCE WITH SECTION D.3.5.1 OF THE 2009
KCSWDM. INCLUDE SIZING CALCUATIONS IN
REVISED TIR. SIZING SHALL USE THE 2-YEAR
PEAK FLOW FROM KCRTS WITH 15-MINUTE TIME
STEPS AS DESCRIBED IN THIS SECTION.
INCLUDE AN OPERATIONS AND MAINTENANCE MANUAL IN
ACCORDANCE WITH APPENDIX A OF THE 2009 KCSWDM
AS AMENDED BY THE CITY OF RENTON. INCLUDE THE
MAINTENANCE INSTRUCTIONS FOR EACH STORM
DRAINAGE STRUCTURE / FACILITY ON-SITE.
REVISE
REVISE
REVISE. WHAT IS DESCRIBED HERE
DOES NOT MATCH WHAT IS SHOWN
ON THE PLANS. CLEARLY EXPLAIN
HOW THIS PROJECT MEETS THE
REQUIREMENTS FOUND IN SECTION
1.2.8 OF THE 2009 KCSWDM.
WHERE ARE THESE
NUMBERS COMING FROM?
PROVIDE A BASIN MAP.
REVISE. THIS SETION SHOULD
ACCURATELY DESCRIBE THE SPECIAL
REQUIREMENTS AT THE PROJECT SITE.
CORE REQUIREMENT #6, WHICH IS
SPECIFIC TO THE CITY OF RENTON
SHALL ALSO BE ADDRESSED.
THIS GEOTECHNICAL REPORT IS INCOMPLETE AND
INADEQUATE. THE SOILS REPORT SHALL FOLLOW THE
STANDARDS IN APPENDIX C OF THE 2009 KCSWDM. NO
BORING LOTS OF SUBSURFACE EXPLORATION IS
SHOWN IN THE REPORT. THERE IS NO INDICATION
THAT THE SITE WAS EVER VISITED. REVISE.
A SEPARATE BUILDING PERMIT WILL BE
REQUIRED FOR CONSTRUCTION OF
THE DETENTION VAULT.
A RECORDED DRAINAGE FACILITY COVENANT PER
REFERENCE 8-J OF THE CITY AMENDMENTS TO THE 2009
KCSWDM IS REQUIRED FOR THE PRIVATE STORMWATER
VAULT AND STORMWATER PIPES AND STRUCTURES
LOCATED IN THE SHARED DRIVEWAY. SUBMIT A DRAFT
COVENANT WITH THE NEXT SUBMITTAL FOR REVIEW.