Loading...
HomeMy WebLinkAboutMFP18006492DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18006492 IVR Number: 18006492 Permit Informaon Permit Name:Comcast Cable Franchise Permit Address/Locaon :11/28/2018Application Date:2144800890Parcel Number:13238 RENTON AVE S Permit Type:12/06/2018Issue Date:Franchise Permit Work Class:12/06/2019Expiration Date:Minor Utility Job Number:ER-112118Franchise Type:Cable Description:ER Replace and proof/pull 144ct fiber 542'. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Comcast Cable Communication Management & Comcast Cable B: (215) 665-1700Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Scott Nall SEFNCO Communications Inc 2904 4th Ave NE Puyallup, WA 98372 B: (877) 385-2903 C: (253) 444-9057 Contractor Business License Number: 41108Construction Contractor: SEFNCCI850QD CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Comcast Cable Communications Management, LLC ER-112118 Cody Shackett 253 235-7406 owen_shackett@comcast.com 13238 Renton Ave S EMERGENCY REPAIR REPLACE AND PROOF/PULL 144 CT FIBER ~542' SEFNCO Communications, Inc. SEFNCC1850QD BLO29666 11-28-2018 MFP18006492 Scott Warlick 11/28/2018 RESTORATION PER CITY OF RENTON STANDARDS Holly Powers 12/6/2018 MFP18006492Scott Warlick11/28/2018Monday - Friday POLE POLE CROSS OVER ROWROW ROWROWROWROWROWROWFL FL FL FL EOP EOP FLFLFLFLEOPEOPEOPEOPEO P EO P EO P EO P EO P EO PEOPEOPR E N T O N A V E SROWROWR E N T O N A V E S SI D E W A L K SI D EW A L K S I D EW A L K S I D EW A L K S I D EW A L K SW 132ND ST COMCAST SCALE: N.T.S. ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST 52''&25 30 35 45 50 55 155 200 250 360 425 495 570 .10)+67&+0#.$7(('452#%'$ .'0)6* 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 .#0' 9+&6*25 30 35 40 45 50 55 60 65 70 /+0+/7/6#2'4.'0)6*+0(''6. 2156'&52''&.+/+6 /2* 5+6'52'%+(+%64#((+%%10641.2.#0 4'0610#8'5#0&50&56=241215'&914-#'4+#.? %10641.6;2' ':#/2.'Ä.#0'%.1574'2'&'564+#09+6*52166'45 "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC13238 RENTON AVE SRENTON, WAER-112118TCP-11 411/26/2018TCP PERMITMDB5+6'016'5 MAINTAIN DRIVEWAY ACCESS AT ALL TIMES SIDE WALK TO REMAIN OPEN. 2'&'54+#02#6*2418+&'&9*'4'4'37+4'& AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED.ROADWORKAHEADBEPREPAREDTO STOPWORKV EH IC LE WORKVEHIC LEROADWORKAHEADBEPREPAREDTO STOPROADWORKAHEADWORKVEHIC LE ROADWORKAHEADBEPREPAREDTO STOP 1 2 3 CROSSING WILL BE HANDLED WITH 2 SEPARATE SETUPS. LIMIT SPEED R2-1 35 NOTE: PEDESTRIAN TRAFFIC WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING CONSTRUCTION. NOTE: THIS IS A SLOW MOVING CONTINUOUS OPERATION. FLAGGERS,AND SPOTTERS TO MOVE WITH CONSTRUCTION FLOW. FLAGGER FLAGGER FLAGGER SPOTTER* SPOTTER* SPOTTER* B A ABA B PATH OF AERIAL OVERLASH PATH OF AER IA L OVER LASHPATH OF AER IAL OVER LASH MFP18006492 POLE SP.WABU.0073 ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWFL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOP EOP FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOP EOP EOP EOP DRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYS 132ND ST S 132ND ST S 132ND ST COMCAST SCALE: N.T.S. ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST 52''&25 30 35 45 50 55 155 200 250 360 425 495 570 .10)+67&+0#.$7(('452#%'$ .'0)6* 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 .#0' 9+&6*25 30 35 40 45 50 55 60 65 70 /+0+/7/6#2'4.'0)6*+0(''6. 2156'&52''&.+/+6 /2* 5+6'52'%+(+%64#((+%%10641.2.#0 56*56=241215'&914-#'4+#.? %10641.6;2' ':#/2.'Ä.#0'%.1574'2'&'564+#09+6*52166'45 "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC13238 RENTON AVE SRENTON, WAER-112118TCP-22 411/26/2018TCP PERMITMDB5+6'016'5 MAINTAIN DRIVEWAY ACCESS AT ALL TIMES SIDE WALK TO REMAIN OPEN. 2'&'54+#02#6*2418+&'&9*'4'4'37+4'& AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED.SHOULDERWORKWORK VEHICLE LIMIT SPEED R2-1 25 NOTE: PEDESTRIAN TRAFFIC WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING CONSTRUCTION. NOTE: THIS IS A SLOW MOVING CONTINUOUS OPERATION. FLAGGERS,AND SPOTTERS TO MOVE WITH CONSTRUCTION FLOW.RIGHTSHOULDERCLOSEDUTILITYWORKAHEADSHOULDERWORKSPOTTER*SPOTTER* NO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000 NO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000 NO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000 NO PARKING FROM TO TOW-AWAY AREA PHONE (CONTACT #) NAME OF FIRM 000-0000 NOTE: ADJACENT BUSINESSES AND/OR RESIDENT'S WILL BE NOTIFIED IN WRITING 48 hrs IN ADVANCE OF PLACEMENT OF "NO PARKING" SIGNS. PATH OF AERIAL OVERLASH PATH OF AERIAL OVERLASH MFP18006492 POLE POLE ROWROWROWROWEO P EOPE O P E O P E O P EO P EO P E O P E O P E O P RE N T O N A V E S R E N T O N A V E S S I D EW A L K SI D EW A L K SI D EW A L K SI D EW A L K COMCAST SCALE: N.T.S. ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST 52''&25 30 35 45 50 55 155 200 250 360 425 495 570 .10)+67&+0#.$7(('452#%'$ .'0)6* 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 .#0' 9+&6*25 30 35 40 45 50 55 60 65 70 /+0+/7/6#2'4.'0)6*+0(''6. 2156'&52''&.+/+6 /2* 5+6'52'%+(+%64#((+%%10641.2.#0 4'0610#8'5=241215'&914-#'4+#.? %10641.6;2' ':#/2.'Ä.#0'%.1574'2'&'564+#09+6*52166'45 "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC13238 RENTON AVE SRENTON, WAER-112118TCP-33 411/26/2018TCP PERMITMDB5+6'016'5 MAINTAIN DRIVEWAY ACCESS AT ALL TIMES SIDE WALK TO REMAIN OPEN. 2'&'54+#02#6*2418+&'&9*'4'4'37+4'& AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED. NOTE: PEDESTRIAN TRAFFIC WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING CONSTRUCTION.ROADWORKAHEADWO R K V E H I C L E LIMIT SPEED R2-1 35 NOTE: THIS IS A SLOW MOVING CONTINUOUS OPERATION. FLAGGERS,AND SPOTTERS TO MOVE WITH CONSTRUCTION FLOW.RIGHTLANECLOSEDAHEADFASWORK AREA ROADWORKAHEADSPOTTER* SPOTTER* P A T H O F A E R I A L O V E R L A S H MFP18006492 POLE POLE ROW EO P EOP EOP EOP EOP EO P EOP EOP EOP EOP EOP RENTON AVE S RENTON A V E S SID E W A L K SIDEWAL K SIDEWALK COMCAST SCALE: N.T.S. ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST 52''&25 30 35 45 50 55 155 200 250 360 425 495 570 .10)+67&+0#.$7(('452#%'$ .'0)6* 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 .#0' 9+&6*25 30 35 40 45 50 55 60 65 70 /+0+/7/6#2'4.'0)6*+0(''6. 2156'&52''&.+/+6 /2* 5+6'52'%+(+%64#((+%%10641.2.#0 4'0610#8'5=241215'&914-#'4+#.? %10641.6;2' ':#/2.'Ä.#0'%.1574'2'&'564+#09+6*52166'45 "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC13238 RENTON AVE SRENTON, WAER-112118TCP-34 411/26/2018TCP PERMITMDB5+6'016'5 MAINTAIN DRIVEWAY ACCESS AT ALL TIMES SIDE WALK TO REMAIN OPEN. 2'&'54+#02#6*2418+&'&9*'4'4'37+4'& AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED. NOTE: PEDESTRIAN TRAFFIC WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING CONSTRUCTION.ROADWORKAHEADWORK VEHIC L E LIMIT SPEE D R2-1 35 NOTE: THIS IS A SLOW MOVING CONTINUOUS OPERATION. FLAGGERS,AND SPOTTERS TO MOVE WITH CONSTRUCTION FLOW.RIGHTLANECLOSEDAHEADFASWORK AREA ROADWORKAHEADSPOT T E R * SPOTTER* PATH OF AERIAL OVERLASH CONTINUE TO END OF PROJECT MFP18006492 © 2018 Microsoft Corporation © 2018 HERE POLEPOLESP.WABU.0073 POLE CROSS OVER POLE POLE SP.WABU.0074POLE POLE SCOPE OF WORK: SHEET INDEX: 1 - COVER SHEET 2 - NOTES & LEGEND SHEET 3-6 - DESIGN BILL OF MATERIALS*: CONTACTS: EMERGENCY REPAIR THIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONS PROJECT MAP: COVER 542 FT FT FT PROJECT DESCRIPTION* 13238 RENTON AVE S RENTON, WA SEFNCO:KYARA SCHROEDER 253-299-8565 COMCAST:JOE WACHOWSKI *ALL FOOTAGES AND MATERIALS ARE ESTIMATED "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC13238 RENTON AVE SRENTON, WAER-112118PERMIT1 611/26/2018PERMITMDB***COMCAST COMCAST JT#: ER-112118 TOTAL FOOTAGE 542 FT = = = = REPLACE 144CT FIBER REPLACE 144CT FIBER WORK AREA REPLACE AND PROOF PULL 144CT FIBER. MFP18006492 NOTES & LEGEND "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC13238 RENTON AVE SRENTON, WAER-112118PERMIT2 611/26/2018PERMITMDBCOMCAST FIBER PLACEMENT NOTES: GENERAL NOTES: DISCLAIMER: 1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY. 2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE BEEN FIELD LOCATED. 3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION AND IS COLLECTED IN THE AS-BUILT PHASE. 1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY. 2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT COMPLETION. 3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED. 4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND. 5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM PRODUCTS. 6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED. 7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER. 8.ALL RISERS WILL BE CAPPED AT ALL TIMES. 9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER. 1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS. 2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION. 3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS SPECIFIED OTHERWISE. 4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS, AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET. 5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION. 6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD SPECIFICATIONS. 7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES WITH BUILDING MANAGEMENT. 8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s). 9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE REWORK AT HIS OWN COST. 10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER. 11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN ALLOWED (9AM-3PM) BUSINESS HOURS. 12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED. 13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE SHOULD BE ANTICIPATED. ADJUST AS NEEDED. 14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE OR APPROVED EQUIVALENT. 15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS, NOT FIELD VERIFIED. 16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS. 17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED. 18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION. 19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING. 20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE CLOSURES. STORM DRAIN MANHOLE COMMUNICATIONS WATER SEWER POWER GAS 6 ROW R PROPOSED VAULT PROPOSED BORE PIT STREET/SIGNAL/TRAFFIC LIGHT CONSTRUCTION NOTE CATCH BASIN FIRE HYDRANT EXISTING POLE W/ NEW RISER BUILDING OUTLINE TRAFFIC FLOW LANDSCAPING/TREE POTHOLE LOCATION CHANNELIZATION 5+39 STATIONING (xxx') OPEN TRENCH PROPOSED DIRECTIONAL DRILL EXISTING PULL THRU PROPOSED BORE PROPOSED OPEN TRENCH (xxx') EXISTING PULL THRU (xxx') BORE (xxx') DIRECTIONAL DRILLRIGHT-OF-WAY CENTERLINE TRAFFIC LANE FENCE D CB S C GAURD RAIL AERIAL STRAND LEGEND: V U U U U U U S W P C G D EOP EDGE OF PAVEMENT MFP18006492 SP.WABU.0074 POLE ROWROWROWROWROWROW EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP RENTON AVE SRENTON AVE S "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC13238 RENTON AVE SRENTON, WAER-112118PERMIT3 611/26/2018PERMITMDBCOMCAST OVERLASH 144CT FIBER TO EXISTING STRAND. TIE IN TO EXISTING SPLICE CASE WABU.0074. MFP18006492 POLE POLE ROW ROW EOP EOP EOP EOP EO P EOP EOP EOP EOP EOP EOP RENTON AVE S RENTON A V E S SID E W A L K SIDEWAL K SIDEWALK "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC13238 RENTON AVE SRENTON, WAER-112118PERMIT4 611/26/2018PERMITMDBCOMCAST OVERLASH 144CT FIBER TO EXISTING STRAND. RISER UP 25'. PROOF PULL 144CT FIBER THRU EXISTING CONDUIT. MFP18006492 POLE POLE CROSS OVER POLE ROW ROWROWROWROWROWROWFL FL FL EOP EOP FLFLFLFLEOPEOPEOPEOPEO P EOPE O P EO P EO P EO P EO P EO P R E N T O N A V E S R E N T O N A V E SROWROWSI D E W A L K SI D EW A L K S I D EW A L K SI D EW A L K SW 132ND ST SI D EW A L K SI D EW A L K "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC13238 RENTON AVE SRENTON, WAER-112118PERMIT5 611/26/2018PERMITMDBCOMCAST OVERLASH 144CT FIBER TO EXISTING STRAND. RISER UP 25'. PROOF PULL 144CT FIBER THRU EXISTING CONDUIT. OVERLASH 144CT FIBER TO EXISTING STRAND. MFP18006492 POLE SP.WABU.0073 ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWFL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOP EOP EOP FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOP EOP EOP EOP DRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYS 132ND ST S 132ND ST S 132ND ST "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OFDATEISSUE FOR:BYQCDATEREVISIONBYQC13238 RENTON AVE SRENTON, WAER-112118PERMIT6 611/26/2018PERMITMDBCOMCAST TIE IN TO EXISTING SPLICE CASE WABU.0073. END OF ROW DESIGN.OVERLASH 144CT FIBER TO EXISTING STRAND. MFP18006492