HomeMy WebLinkAboutD-230614w
Q
z
C)
w
0
ry
a_
tMOM
'J
N
N
CL
U)
295
290
285
WE
Cl
CIVIL ENGINEERS & LAND SURVEYORS
2009 MINOR AVE. EAST (206) 323-4144
SEATTLE, Washington 1-800-935-0508
98102-3513 FAX# (206) 323-7135
E—MAIL: info@brhinc.com
RECOMMENDED
FOR APPROVAL
BY DANIEL CAREY
An
9/4/13
SCALE:
SURVEYED:
B R H
VERTICAL NAw 198E
As Noted
HORIZONTAL: MAD 1983/
DESIGNED:
DWC
\
DATU M
DRAWN:
DWC
ONE INCH
CHECKED:
DWC, RJS
AT FULL SCALE
IF NOT ONE INCH
NO.
REVISION
BY
DATE
A P P R
SCALE ACCORDINGLY
APPROVED:
RJS
PAVING NOTES
1. TEMPORARY HOT PATCHES SHALL BE PLACED AS THE NEW STORM SYSTEM IS
INSTALLED. USE COLD MIX PATCHES SHALL BE LIMITED TO ACTIVE WORK AREA.
2. PERMANENT TRENCH PATCH SHALL BE PER DETAIL TYPICAL PATCH FOR FLEXIBLE
PAVEMENT (PER STD PLAN 110).
3. CITY MAY REQUIRE DAMAGED ASPHALT OUTSIDE OF TRENCH PATCH AREA
TO BE REMOVED AND REPLACED AS NEEDED.
4. CONTRACTOR SHALL PLAN THE WORK TO PLACE THE PERMANENT ASPHALT TRENCH
PATCH IN PHASES AS THE NEW STORM SYSTEM IS INSTALLED.
THE PERMANENT TRENCH PATCH SHALL BE COMPLETED IN EACH PHASE BEFORE
STARTING WORK TO INSTALL THE STORM SYSTEM IN THE NEXT PHASE.
PHASING SHALL BE AS SHOWN OR OTHERWISE APPROVED BY THE CITY.
5. ALL NEW STORM WATER STRUCTURES SHALL BE INSTALLED FOR EACH PHASE
BEFORE PAVING OCCURS, UNLESS APPROVED OTHERWISE BY CITY.
D=230614
DATE:
991 CITY OF NE 5TH PL / EDMONDS AVE NE 9-4-13
STORM SYSTEM REPLACEMENT PROJECT FIELDBOOK:
R ENT 0 N PAGE:
R DRAWING N0:
Planning/Building/Public Works Dept. PAVING PHASING 2013009.00
SHEET: OF:
14 X
IDI-12131ol6l
z
�=
c
mG
�m
CT)Cil
N
W
z
z
T
m
Je!
S
D
m$
Do
c
coco cn
D
71 Z
C<m<
G
mo
D m
mLTI
-
Lnn K
R) 2
z
m
m
0
D
c1
D
T
I� v
30
$ �o D