Loading...
HomeMy WebLinkAboutD-230614w Q z C) w 0 ry a_ tMOM 'J N N CL U) 295 290 285 WE Cl CIVIL ENGINEERS & LAND SURVEYORS 2009 MINOR AVE. EAST (206) 323-4144 SEATTLE, Washington 1-800-935-0508 98102-3513 FAX# (206) 323-7135 E—MAIL: info@brhinc.com RECOMMENDED FOR APPROVAL BY DANIEL CAREY An 9/4/13 SCALE: SURVEYED: B R H VERTICAL NAw 198E As Noted HORIZONTAL: MAD 1983/ DESIGNED: DWC \ DATU M DRAWN: DWC ONE INCH CHECKED: DWC, RJS AT FULL SCALE IF NOT ONE INCH NO. REVISION BY DATE A P P R SCALE ACCORDINGLY APPROVED: RJS PAVING NOTES 1. TEMPORARY HOT PATCHES SHALL BE PLACED AS THE NEW STORM SYSTEM IS INSTALLED. USE COLD MIX PATCHES SHALL BE LIMITED TO ACTIVE WORK AREA. 2. PERMANENT TRENCH PATCH SHALL BE PER DETAIL TYPICAL PATCH FOR FLEXIBLE PAVEMENT (PER STD PLAN 110). 3. CITY MAY REQUIRE DAMAGED ASPHALT OUTSIDE OF TRENCH PATCH AREA TO BE REMOVED AND REPLACED AS NEEDED. 4. CONTRACTOR SHALL PLAN THE WORK TO PLACE THE PERMANENT ASPHALT TRENCH PATCH IN PHASES AS THE NEW STORM SYSTEM IS INSTALLED. THE PERMANENT TRENCH PATCH SHALL BE COMPLETED IN EACH PHASE BEFORE STARTING WORK TO INSTALL THE STORM SYSTEM IN THE NEXT PHASE. PHASING SHALL BE AS SHOWN OR OTHERWISE APPROVED BY THE CITY. 5. ALL NEW STORM WATER STRUCTURES SHALL BE INSTALLED FOR EACH PHASE BEFORE PAVING OCCURS, UNLESS APPROVED OTHERWISE BY CITY. D=230614 DATE: 991 CITY OF NE 5TH PL / EDMONDS AVE NE 9-4-13 STORM SYSTEM REPLACEMENT PROJECT FIELDBOOK: R ENT 0 N PAGE: R DRAWING N0: Planning/Building/Public Works Dept. PAVING PHASING 2013009.00 SHEET: OF: 14 X IDI-12131ol6l z �= c mG �m CT)Cil N W z z T m Je! S D m$ Do c coco cn D 71 Z C<m< G mo D m mLTI - Lnn K R) 2 z m m 0 D c1 D T I� v 30 $ �o D