Loading...
HomeMy WebLinkAboutD-3570450 n M M 1` N a yQ� oFSWA H ONAL SW 7TH STREET, POWELL AVE SW TO LIND AVE SW STORM SYSTEM IMPROVEMENT PROJECT 405 o 99 Kirkland 3 305 Redmond 5 ainbddge Island _ 303 520 901 3 SEATTLE Be evue �..E11iotL �� La So mamish Bay Amer Ian Issaquah �N 509 16 T 99 rar u i Renton ao PROJECT Vachon LOCATION Island 167 Kent 302 16 181 s LOCATION MAP SCALE: NTS s rae,est si mst a' w. 8 � n�res s> seem° unyy � s+saasr we— 5 ems, yh4 III III ITI III �l Faebar a as swa ss,� DOD �eq�sW D a3 ° g PROJECT LOCATION VICINITY MAP SCALE: 1 "=1000' Louis Berger 520 Pike St, Ste 1005, Seattle, WA 98101 -206.453.1043 REVISION PHASE 2 DRAWING INDEX SHEET NO DWG NO SHEET TITLE 1 31 COVER SHEET 2 G2 LEGEND AND ABBREVIATIONS 3 G3 GENERAL NOTES, TESC NOTES AND CONSTRUCTION SEQUENCE 4 G4 SURVEY AND ALIGNMENT CONTROL 5 C1 PLAN AND PROFILE, SHEET 1 of 5 6 C2 PLAN AND PROFILE, SHEET 2 of 5 7 C3 PLAN AND PROFILE, SHEET 3 of 5 8 C4 PLAN AND PROFILE, SHEET 4 of 5 9 C5 PLAN AND PROFILE, SHEET 5 of 5 10 C6 STRUCTURE SCHEDULE AND LATERAL PIPES PROFILES 11 C7 EXISTING UTILITY DATA 12 C8 MISCELLANEOUS CIVIL DETAILS AND SECTIONS 13 C9 RAILROAD CROSS SECTIONS 14 C9A CONNECTION TO EXISTING SO VAULT No. 1 15 C10 RAILROAD RESTORATION DETAILS 16 C11 STRUCTURES WITH CASED SANITARY SEWERS 17 C12 WATER LINES RELOCATION DETAILS 18 C13 ROADWAY RESTORATION PLAN, SHEET 1 OF 2 19 C14 ROADWAY RESTORATION PLAN, SHEET 2 OF 2 20 C15 ROADWAY RESTORATION DETAILS AS —BUILT RECOMMENDED L-.110 R APPROVAL PLAN AND PROFILE SHEET LAYOUT Roa 4L/`-! SCALE: 1"=500' m rsPACE AS NOTED ' SW 7th ST, POWELL AVE SW TO LIND AVE SW o9/25/2018 JF/JE/RL� " �� CITY OF STORM SYSTEM IMPROVEMENT PROJECT - PHASE 2 ; °°°" MSG 9/22/2018 MSG ABG RENTON ., MSG 4/18/2016 MSG DATUM "°17 1— G 1 zED'N 11"Planning/Building/Public Works Dept. COVER SHEET BY DATE APPR —Msc �`"" ""°"°'""` Ems. 1 °r: 20 D- 3 5 7 0 4 5