SW 7TH STREET, POWELL AVE SW TO LIND AVE SW
STORM SYSTEM IMPROVEMENT PROJECT
405 o
99
Kirkland
3 305 Redmond
5
ainbddge
Island _
303 520 901
3
SEATTLE Be evue
�..E11iotL �� La So mamish
Bay Amer
Ian
Issaquah
�N 509
16 T 99
rar
u i Renton
ao
PROJECT
Vachon LOCATION
Island 167
Kent
302
16 181
s
LOCATION MAP
SCALE: NTS
s rae,est si mst a' w.
8 � n�res
s> seem°
unyy � s+saasr we—
5
ems,
yh4 III III ITI III
�l Faebar
a
as
swa ss,� DOD
�eq�sW D
a3
° g PROJECT
LOCATION
VICINITY MAP
SCALE: 1 "=1000'
Louis Berger
520 Pike St, Ste 1005, Seattle, WA 98101 -206.453.1043
REVISION
PHASE 2 DRAWING INDEX
SHEET NO
DWG NO
SHEET TITLE
1
31
COVER SHEET
2
G2
LEGEND AND ABBREVIATIONS
3
G3
GENERAL NOTES, TESC NOTES AND CONSTRUCTION SEQUENCE
4
G4
SURVEY AND ALIGNMENT CONTROL
5
C1
PLAN AND PROFILE, SHEET 1 of 5
6
C2
PLAN AND PROFILE, SHEET 2 of 5
7
C3
PLAN AND PROFILE, SHEET 3 of 5
8
C4
PLAN AND PROFILE, SHEET 4 of 5
9
C5
PLAN AND PROFILE, SHEET 5 of 5
10
C6
STRUCTURE SCHEDULE AND LATERAL PIPES PROFILES
11
C7
EXISTING UTILITY DATA
12
C8
MISCELLANEOUS CIVIL DETAILS AND SECTIONS
13
C9
RAILROAD CROSS SECTIONS
14
C9A
CONNECTION TO EXISTING SO VAULT No. 1
15
C10
RAILROAD RESTORATION DETAILS
16
C11
STRUCTURES WITH CASED SANITARY SEWERS
17
C12
WATER LINES RELOCATION DETAILS
18
C13
ROADWAY RESTORATION PLAN, SHEET 1 OF 2
19
C14
ROADWAY RESTORATION PLAN, SHEET 2 OF 2
20
C15
ROADWAY RESTORATION DETAILS
AS —BUILT
RECOMMENDED
L-.110
R APPROVAL
PLAN AND PROFILE SHEET LAYOUT Roa 4L/`-!
SCALE: 1"=500'
m rsPACE AS NOTED ' SW 7th ST, POWELL AVE SW TO LIND AVE SW o9/25/2018
JF/JE/RL� " �� CITY OF STORM SYSTEM IMPROVEMENT PROJECT - PHASE 2 ; °°°"
MSG 9/22/2018 MSG ABG RENTON .,
MSG 4/18/2016 MSG DATUM "°17 1— G 1
zED'N 11"Planning/Building/Public Works Dept. COVER SHEET
BY DATE APPR —Msc �`"" ""°"°'""` Ems. 1 °r: 20
D- 3 5 7 0 4 5