Loading...
HomeMy WebLinkAboutD-357051GENERAL NOTES #850 SW 7TH ST II I rcy 182305-9270 HARPER 0 J & BESSIE MAE 1. ALL STORM DRAINAGE PIPES SHALL HAVE WATERTIGHT Cl) ASPHALT PARKING _ �, �' / BNSF RAILROAD #700 SW 7TH ST 700 SW 7TH ST JOINTS. N I CB RIM)-19.7 IE 8"CPEP(S)=19.7 663-14C8MON x II N=175950,46 I CO. EASEMENT I d ■IE 12"CPEP(w,NE)=19.5 so E=1295597.85 I ELEV-23.18 I b "OPL RC 1413 CPp 17 ■ CB RIM=22.35 ■ IE (E,WN)=' 2. STATION/OFFSET LOCATION CALLOUTS AND RIM ELEVATIONS PROVIDED ARE AT THE CENTER OF THE DRAINAGE _ 12'PEC OLYMPIC PIPELINE co." 663-14.17MON ASPHALT PARKING 01-19.1 I I STRUCTURE. W • I // (W-657) N=175949.57 E=1295648.89 (W-342101) NEW 12" SD IE 12"CPEP(S)=15.5 CB RIM- 235 d � E 12"ceEP(N)=15.a _ - - - _ - - - - - ELEV.=23.24 SEE PROFILE 4 ON DWG C6- _ - ,. y cPEP(s)=,s., 3. SEE DWG C15 FOR TYPICAL TRENCH SECTIONS. 6'DEC ■\DDec - _ I ASPHALT I= o®a I ASPHALT a ® o / (W-342101) I '�N m R - -24' 4. DRAINAGE STRUCTURE AND PIPE REMOVALS ARE PAID FOR 0' v g ASPHALT v l - FO BY "REMOVAL OF STRUCTURES AND OBSTRUCTIONS". C 4 • I F- =o- uFo _% u UFO _ coN D EMPTY SECTION CORNER #773 B NC DWY P CONC WAL uFo ° uF PH709 _ l CONC WALK _ UP_ _ - - 2, 5. EXISTING STORM DRAINAGE PIPES AND STRUCTURES SHALL W G 15'DEC N 15'DEC 15"DEC PH 08 JIF PH113 ZJ� �i CONC D 6"DEC �-� T w BE ABANDONED AND FILLED WHERE INDICATED ON THE w = L _ - - - - - 2, _ _ 8 PH111 = PLANS IN ACCORDANCE WITH SECTION 2-02.3(4) OF THE cn I - - - - - _ w 4 3 - - - - - 1 - - - - se'�a _ _ _ _ C64 2 - - - - - - - - - - -EX 60" SD U) SPECIAL PROVISIONS (FOR PIPES) AND SECTION 7-05.3(2) OF THE STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS _ _ _ w 6 I _ - _ _ h w 17+oo-s= W 7TH ST ----- - ----- w ; 17+50 MH755 18+ o- 3 $ 18+58 s 19+00s 19+50 - FOR STRUCTURES. Y PH2D . 20+00- 20+50 '3 21 0-ss-� z z _ NEW 60" SO - 6. CONTRACTOR IS ADVISED THAT NEW STORM IS IN CLOSE 4 NEW 60' SD ■ 5 U PROXIMITY TO THE EXISTING WATER AND AS SUCH SPECIAL -PH400 3 SHORING AND PROTECTION MEASURES ARE REQUIRED. SEE Q------ -2.7 O7 DUAL 36" STEEL SO -,Z,- w w z 6 5 -37 5 -2.3 KPH Q 1. SECTION 7-08.3(1)B OF THE SPECIFICATIONS. - 8 ------------- _- g 'NEW 12" SO ----„-_�- _ _------: - - W `-, 12"DE DWY. SEE PROFILE 3 ON DWG C6 6"'' ' CONSTRUCTION NOTES �oP up ovo u c upAUREL c uv ' up up _CB3 ° u" bB " H& DWl_ H& - O EXISTING 12"HIGH PRESSURE GAS IN 16"STEEL CASING. oFu oFu uFo uFo Fo o of UFO UFO UFO o UFO 0 1Q AS -BUILT (AB) STORM DRAIN PIPE SLOPE & ELEVATIONS. USE EXTREME CAUTION DUE TO SAFETY HAZARD. I 663-1a16MON N=175902.40 2 ss#-1ia.lsMON N=nssol.o9 SSMH RIM=23.56 CPg12 SB#3 663-14.12RC Q Q UNSTABLE FOUNDATION ENTIRE PIPE RUN THIS SHEET. CLAYEY SOIL IN CONRACTOR SHALL AVOID ANY PHYSICAL CONTACT WITH CASING. CONTRACTOR SHALL NOT PROVIDE TEMPORARY ■ • 1 E=1295582.45 ELEV.=23.39 E=12ss632.87 ELEV-23.55 a cHAN a"coNc E,w -1a.s ( )- N=175898.52 RIM: 22.63 E=1295690.76 IE: 20.0 BOTTOM 6' OF TRENCH. OVEREXCAVATED AND PLACED FABRIC, 12" OF SUPPORT FOR CASING. PER OLYMPIC PIPELINE CASING DOES NOT NEED TO BE SUPPORTED FOR 10- TO 12 - I ELEV-23.33 4"-8" QUARRY SPALLS, AND FABRIC. FT TRENCH EXCAVATION WIDTH. IF TEMPORARY SUPPORT F-2AF LI �D��� �t�����`�T11A L RR CROSSING O #705 SW 7TH ST IS NEEDED, OLYMPIC PIPELINE WILL PROVIDE. OLYMPIC PAAX NTJ I � STA 18+20 3 BETWEEN APPROXIMATELY MH8 AND MH11 PIPE WAS NOT INSTALLED AT EAROUND EGAS SPIPELINE. ESCONT CONSTANT SLOPE BETWEEN MANHOLES (SOME VARIABILITY). FUTURE TIMESINDURING WORK CTLL PLAN POTHOLING MAY BE NEEDED TO CONFIRM ACTUAL DEPTH OF PIPE KIRK PRESTON AT 206-786-1703 TO OBSERVE WORK AT IN-BETWEEN STRUCTURES. LEAST 5 DAYS AHEAD OF TIME. DEPTH OF GAS LINE FROM STA 16+90 TO 21+30 ESTIMATED BY POTHOLE, SEE PH2O ON DWG C7. SCALE: 1'=20' 4 EXISTING 10" WATER ANGLED UP FROM TEE AT ABOUT 45 DEGREES, THEN ANGLED AT 45 DEGREES TO HORIZONTAL SO THAT IT WAS APPROXIMATELY O2 PROTECT EXISTING SANITARY SEWER DURING 10" ABOVE NEW 60" SD. EXISTING WATER INCLUDED SHACKLES. CONSTRUCTION. 5 THE EXISTING 10" WATER WAS FOUND TO BE LOCATED TO THE WEST OF 3 BNSF TO REMOVE AND REINSTALL RR TRACKS AND 1 THE 1 INCH IRRIGATION LINE. �Z W:::::::::::::::::::::::::::::::::::::..a......:.........:.........:.........:.........:.........:.........:.. W..................................................................... CONCRETE PANELS FROM NORTH SIDE OF STREET TO ........ ' ' " " " " ' ' " " " " ' ' ........ ' ' " " " " ' ' " 6Q NO SECTION CORNER EXISTED PRIOR TO PROJECT AND WAS THEREFORE SOUTH SIDE OF STREET. CONSTRACTOR TO COORDINATE 35■....:.........:.........:.........:...... .........,...........................................................................................................:...................:...............:................................................................................................. n :........:::........ ..:::::.. .....::::::: ...... ......... ......... ........:: ...... ....... .. ........... .............. .............. NOT REPLACED WITH WITNESS MONUMENTS 35 AND SUPPORT. SEE DWGS C9 AND C10. . .......:.........:.........:.............. ....... ....... ....... .. .. ....... ....... :■ rn .........:.........:.... ....... e.: ....... ....... :. ....... ....... ....... ::�:: ' " .. �..:. :: at::::::::::::' :: :: ...::2::...:::.................:......... �::.; .................. &:.:........:::.....:. ..... ....... ....... 4 ..... ....... ....... ....... ....... ..... ....... ....... ....... 5 ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ..... .. .. ® PROTECT AND TEMPORARILY SUPPORT WATER SERVICE ■. ...: :........ ......... .. .. ....... ....... ........: :..�.. � ......... ........ ....... ....... ...<..:. d.. .:en .......:...... .co..: �..... ...: ..,.,. .... ...... " :' ..... �.. .. ... ....... ......:� ...... ....... ....... ....... ........ ....... ....... ....... ....... ....... 6: '..... •. 9 5:. •... ....... ....::: ....... ...... .. .. DURING CONSTRUCTION. .. .. ....... ....... 30 . ....:.........:........ . ....... :'M': id ....... :. m:. v:::.:4.:.: :.......: . . . . . . . . . . . .. ¢ . c,.. :..� d W. . : . ";.. ... .... ... ... . .(0 O M' .CO. . . . . . : . ...:o:: ....... .......�, ....w .: :........ ........r . . . .Q.':': ': ':':':':':':'. . .': ':':':':':':':':� ........ ....... ....... ....... :. ........ ..... ....... ....... ...................:...................:...................:...................:.................:.:.:..... ....... ....... ....... ....... ....... ....... ....... :: :�:: ...... .. .. ` ....... ....... .. :. ti .......: :..: .. ������ ������ � : ':': 'C4] :':':':':':':':': ': ':': ': ': ....... ....... ....... 30 O PROTECT EXISTING WATER SERVICE DURING CONSTRUCTION. ,o.....:.........:.... m ,.c j �. �' ,� ti •-sv � � � � .. .. ....... ..... ...... .. ....... � � � = v1, co:..... T � u� uj �,p" .... ��' � � : � .... ....... ..... � - ....... ....... ....... ....... ,.... � Y [ . ....... ....... ....... ..... .. .. - NOTE THAT THIS IS A SINGLE FEED LINE AND SERVICE .. .. ....... ...... '`' ....... .+.. tti ^:. .. ....... .: 1., ate.. .:. �' ...:......... - -..N:. :.:2v-.. .... .pp +..�........:..... .00._.I�. ......:..... ....... ..... U ..:. .:. ....................... ... ....... ....... ....... ....... '�' '�' '�' z ....... ....... ....... :: o . ..... .. .. U d ... LN .. MUST BE MAINTAINED DURING CONSTRUCTION THREE .. ....... .... cv.....:.........:.......W.:......... .(�■......................V-............ ....... �.W .. ..... ..... ..... z o . �.....:........ m .�.� - ........ ..... .. X :... .. W .Z ._:.. W' ... o -........:.....U...: ... ....... ..... �.. .:.........:........� ......... :......... ....... ....... ....... ....... ........ ....... ....... ....... . ....... ....... ....... - ...... .. O � .. � �...... ■.v ....... ....... ....... ..: �.......:....■.(, LOCATIONS). 25 .:.':.....:.:...................:................ �.�.� z . x....: :.....:: :.. ......................................:......w .......... ..............lK........... d V K L,,.W......:.....x , , .. ......:... ........ .:............ ..:.........:........x ..... ............................w.................................................................................................................. ....... ........ x - < �....... ...... ....................... ... ......... .... o ... . 25 w ........................:.........:...... ......... ......... 46.06 ................:.........:...................:......... 34.8 .........:.........:.........:.........:.........:.........:............... .............:.... . w 6 PRIVATE UTILITY CROSSING. CONTRACTOR TO PROTECT AN D w....:.........:.........:................ .............: 1......... ......... _ .� . �. ...._ _ ._ .. ......... .... ..:: :..:::..: ................... .........:..... :..: :.......: - :-::: ....................................................... : -.- -..-. - - .-..--.- :........ .... ..:.... .w ..-. - - ..... ....... - - -.. - :. PROVIDE TEMPORARY SUPPORT DURING CONSTRUCTION. N ... . ..:. ... ... .... .:. ................... ........: ......... ........:T........ .....�:..:..� ........�:........ ..... ... :LLI I ...: :.......: ......... 20 w■.............:.........:.........:.... ......... .... :. .. .. ....... .. .. .. .. ....... .... ....... ..... ....... ....... ....... ....... ....... ....... ....... ....... I w ■.w 20 7 FOR DUAL 36" STEEL PIPE INSTALLATION SEE SECTION AT g ..............................................................................................................:...................:..................:...................................................................................................................:...................:...................:...................:...................:...................:...................:......... l :.........:........:.........:.........:.........:.... .... .........:...... ..:........ ....... ....... . ...... ■. STA 18+00 ON DWG C15. ALSO SEE WELDED STEEL PIPE o w ....... ::::::: :: ::::::: :: ::::::: :...... ......: ......: ...... ......: ......: ......: : :w JOINT DETAIL 5 ON DWG C8. N z . J .. ....... ....... .:..::.......::.......::.......::..: _....:.........:.........:.........:.... ..... ::::::: ....... .. ....... ....... :. ..:: ......... ........: �::::: .... :..h.... N ... ........: :..: ... .. .. ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ... .... ....... z ....... ....... ....... ....... ....... ..:l.J .. ....... ....... ....... ................... _ 6 8 8 REPLACE SECTION CORNER #773 WITH TWO WITNESS - o 15 c) ... :...................:...................:...................:..................:...................:...................:...................:.....................................:...................:...................:...................:...................:.............. I....:.........:.........:.........:.... :. ....:.........:...„.....:.........:.... .... ....................................................................................' :. :. :. :. .... ....... ....... ....... V 60 4 PPP SD 5=0.04% ....... ....... ....... ... < 1 "' 3 !:Q 15 MONUMENTS, 0 FEET EAST AND WEST OF CORNER. 0 ....:.........:.........:.........:.... ■....:................................. ....: 81:LF:DUAL.36:0:GRADE:50.STEELPIPE: .. S=-0.03%:......... ......... .... .............:.........:.........:.........:.........:.........:.........:......... :::: ......... ... .. .. ■.� 9 INSTALL NEW TYPE 1 CB AND LATERAL. POTHOLE TO .... ....... ..... ....... ....... ....... ....... ....... ....... ...... CONFIRM NO CONFLICTS PRIOR TO ORDERING CB. SAWCUT M■ ■:..: :.......: :........ 10....:.........:.........:.........:.........:..... ........: :..:.....:'1 ..... ....... :.........:.........:...................:.........:. ....... ..... ..... n ....... ....... ....... :.........:.........:.........:.........:.........:.........:.........:.........:.........:....■.... ....... ....... ....... ....... ■:..: 10 AND REMOVE AND REPLACE EXISTING CURB AND GUTTER ....................................................................................:...................:..................:.. .......... .............. .. ....... ....... ....... ....... ....... ....... ....... ....... ....... ONLY AS NEEDED TO INSTALL CB 2 LOCATIONS. :I:.. ■... ■... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... I:.. ....... ....... ....... ....... ■... ....... ....... ....... ....... ....... ..■... - o, - 5 ..................................:.........:.........:.........:.........:................... I ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::I:::: :......... :......... :......... ................... :......... :........ ....... ....... ....... ....... ................... ,... 5 ■....:.........:.........:.........:.........:.........:.........:.........:.........:.........:.........:.........:.........:.........:.........:.........:......... ......... ......... ......... ......... ......... ....■.... p :::::: ::::: p AS BUILT 17+00 18+00 19+00 20+00 21+00 PROFILE F ROMMENDED APPROVAL FROM STA 16+90 TO 21+30 HORZ. SCALE: 1"=20' 5 2.5 0 5 10 20 10 0 20 401 "=5' 1"=20' VERT. SCALE: 1"=5' Scale Feet Scale Feet Ev S. CIS Q�oF rvasy7�c��y r . "10NE PACE AS 5 AS NOTED �Id CITY OF SW 7th ST, POWELL AVE SW TO LIND AVE SW os/2s/2o1e Louis Berger 1 RENTON STORM SYSTEM IMPROVEMENT PROJECT PHASE 2 ;�°` AS -BUILT REVISIONS MSG 9/22/2018 MSG """"' ABG ��op Rai ��' BID SET MSG 4/18/2016 MSG „c° � �� C3 FSstorvn E��` p�N �� „„°.. Planning/Building/Public Works Dept. PLAN AND PROFILE, SHEET 3 OF 5 4I18/16 520 Pike St, Ste 1005, Seattle, WA 96101 206.453.1043 NO. REVISION BY DATE APPR nsc 7 �. 20 5