HomeMy WebLinkAboutD-357055EXISTING UTILITY DATA o r'- 1O M POTHOLE # TYPE OF UTILITY MATERIAL SIZE OF UTILITY GROUND EL MEASUREMENT TO TOP OF UTILITY MEASUREMENT TO BOTTOM OF UTILITY DISTANCE FROM FOG LINE/CENTER LINE/CURB NOTES r` 11 POWER PVC 4"+2" 23.70 36" 42" 23' / 0" / 24' LOCATED ® CENTER OF 7TH ST. & LIND AVE INTERSECTION a 12 GAS IRON 4" 23.71 44" 48" 23' / 0" / 24' LOCATED @ CENTER OF 7TH ST. & LIND AVE INTERSECTION d 13 POWER STEEL 6" 23.58 40" 46" 23' / 0" / 24' LOCATED ® CENTER OF 7TH ST. & LIND AVE INTERSECTION 14 FIBER CONCRETE CASED 2'x3' 23.59 8" 43" 23' / 0" / 24' LOCATED ® CENTER OF 7TH ST. & LIND AVE INTERSECTION 15 GAS IRON 2" 23.95 34" 36" 23' / 0" / 24' LOCATED ® CENTER OF 7TH ST. 16 POWER STEEL 2" 23.94 54" 56" 23' / 0" / 24' LOCATED ® CENTER OF 7TH ST. 17 FIBER CONCRETE CASED 2'x 2' 23.48 50" 74" 23' / 0" / 24' LOCATED @ CENTER OF 7TH ST. 18' POWER PVC 2"x 4" 23.31 53" 65" 22' / 0" / 23' LOCATED ® CENTER OF 7TH ST. 19' FIBER CONCRETE CASED 12"x 9" 23.08 39" 48" 22' / 0" / 23' LOCATED @ CENTER OF 7TH ST. 20 HIGH PRESSURE GAS STEEL CASING SEE NOTES 23.34 45" 61" 22' / 0" / 23' LOCATED ® CENTER OF 7TH ST. "OPL", SIZE OF GAS IS 12" INSIDE 16" STL CASING 21' POWER PVC 2.5" 22.97 62" 63" 22' / 0" / 23' LOCATED ® CENTER OF 7TH ST. 22 GAS IRON 2.5" 22.82 40" 42.5" 23' / 0" / 24' LOCATED ® CENTER OF 7TH ST. 23 FIBER CONCRETE CASED 2'x 2' 22.81 60" 84" 23' / 0" / 24' LOCATED @ CENTER OF 7TH ST. 24 GAS IRON 2.5" 22.66 50" 53" 22' / 0" / 23' LOCATED ® CENTER OF 7TH ST. 25 FIBER CONDUIT MULTIPLE 2" 2" 21.95 38" 46" 22' / 0" / 23' LOCATED ® CENTER OF 7TH ST. 26 FIBER N/A N/A 21.96 N/A N/A 22' / 0" / 23' TRENCHED UNDERGROUND 7' DEEP 6' LONG - DID NOT FIND, *FIBER RUN IS TOGETHER WITH FIBER ® POTHOLE 25 PER CITY INSPECTOR* 27 WATER IRON 12" 21.96 35" 47" 22' / 0" / 23' LOCATED ® CENTER OF 7TH ST. 28 GAS IRON 2.5" 22.01 32" 35" 23' / 0" / 24' LOCATED ® CENTER OF 7TH ST. 29 FIBER CONCRETE CASED 2'x2' 22.01 49" 73" 23' / 0" / 24 LOCATED ® CENTER OF 7TH ST. 30' POWER PVC 4" 21.96 47" 51" 20' / 3' / 21' LOCATED IN WESTBOUND LEFT LANE 31 POWER PVC 2" 21.93 20" 22" 20' / 3' / 21' LOCATED IN WESTBOUND LEFT LANE 104 UFO DUCT BANK N/A NOT SURVEYED N/A N/A N/A DUG 10' DEEP x 4' WIDE ON LOCATED MARKS ON SURFACE. DID NOT FIND UTILITY. 105 GAS PE 4" NOT SURVEYED 40" 44" N/A 5" FROM EDGE OF CURB SOUTH OF PIPE, 104" FROM SIDEWALK EDGE NORTH OF PIPE. 105 PHONE/SPRINKLER PVC 1", 4.75" NOT SURVEYED 16", 11" 17", 11.75" N/A 5" FROM EDGE OF CURB SOUTH OF PIPE, 104" FROM SIDEWALK EDGE NORTH OF PIPE. 106 GAS STEEL 4" NOT SURVEYED 35" 39" N/A 242" FROM TREE NORTH OF PIPE, 21" FROM CURB EDGE SOUTH OF PIPE. 107 UFO CDF DUCT BANK N/A NOT SURVEYED 12" TO TOP OF BANK 48 TO BOTTOM OF BANK N/A N/A 242" FROM TREE NORTH OF PIPE, 21" FROM CURB EDGE SOUTH OF PIPE. 108 GAS PE 4" NOT SURVEYED 38" 42" N/A 83" FROM EDGE OF SIDEWALK NORTH OF PIPE, 24" FROM PIPE TO CURB EDGE SOUTH OF PIPE. 109 UFO CDF DUCT BANK N/A NOT SURVEYED 7"09" WIDE 46" N/A 80" FROM CURB SOUTH TO DUCT BANK EDGE, 66" FROM OUTSIDE EDGE OF SIDEWALK NORTH OF DUCT BANK 110 COMCAST TV N/A N/A NOT SURVEYED N/A N/A N/A DUG 12' DEEP x 4' WIDE ON LOCATED MARKS ON SURFACE. DID NOT FIND UTILITY. ill GAS PE 4" NOT SURVEYED 34" 38" N/A 158" FROM EDGE OF SIDEWALK NORTH OF PIPE, 26" FROM EDGE OF CURB SOUTH OF PIPE. 112 GAS PE 4" NOT SURVEYED 38" 42" N/A 23" FROM PIPE TO CURB SOUTH OF PIPE, 86" FROM PIPE TO SIDEWALK EDGE NORTH OF PIPE. 113 UFO N/A N/A NOT SURVEYED 29"x38" WIDE 41" BANK N/A 69" FROM EDGE OF DUCT BANK TO SIDEWALK EDGE NORTH OF BANK, 78" FROM EDGE OF DUCT BANK TO CURB SOUTH OF BANK 114 UFO CDF DUCT BANK N/A NOT SURVEYED 24"x38" WIDE 55" N/A 16" FROM SIDE OF BANK TO SIDEWALK NORTH OF DUCT BANK, 70" FROM EDGE OF BANK TO CURB SOUTH OF DUCT BANK. 115 GAS STEEL 4" NOT SURVEYED 34" 38" N/A 25" FROM EDGE OF CURB SOUTH OF HOLE TO CENTER OF PIPE, 79" FROM CRISSWALK BUTTON POLE NORTH OF HOLE. 116 FIBER BANK CONCRETE DUCT BANK N/A NOT SURVEYED 51" 74" TO BOTTOM OF BANK N/A 239" FROM STORM DRAIN LID EDGE EAST OF BANK EDGE. 202 COMCAST TV PVC 4" NOT SURVEYED 37" 41" N/A / 4'11" / 18' 204 - COPPER 2" NOT SURVEYED 37" 40" N/A / 4' / 20' 205 - COPPER 2" NOT SURVEYED 45" 47" N/A / 4' / 20' 206 STORM CONCRETE 8"-10" NOT SURVEYED 77" 87" N/A / 4' / 20' 207' GAS STEEL 2" NOT SURVEYED 58" 60" N/A / 2' / 22' 29'6" EAST OF SEWER MH 301 WATER DIP 10" 22.71 49" 62" N/A AS-BUILTS INDICATE 10" DIA PIPE. CONTRACTOR TO FIELD VERIFY 302A FO/TV CONCRETE DUCT BANK 22.04t 24" 42" N/A 52" GAP BETWEEN FO/TV AND PSE POWER 302E PSE POWER CONCRETE DUCT BANK 22.04 30" 48" N/A 303 COMCAST CONCRETE DUCT BANK 23.30 11" 20" N/A / 6" / 18'6" 304 WATER DIP 12" 23.57 4'9" 5'7" N/A / 6'8" / 17' DIAMETER NOT CONFIRMED. CONTRACTOR TO POTHOLE BEFORE ORDERING PIPE MATERIALS. 305' FO/TV PVC (2) 2" 23.56 7' 7'4" N/A / 6'8" / 17' COMCAST 306 GAS IF 3" 22.40 28" 31" N/A / N/A / 58"t 307 POWER METAL CONDUIT BANK 22.44 55" 72" N/A / 32' / N/A ALL POWER GROUPED INTO ONE DUCT BANK. 5 PIPES. 308 POWER METAL CONDUIT BANK 22.48 42" 46" N/A GROUPED ALL POWER TOGETHER, 6 PIPES VISIBLE. 309 FO/TV PVC 4" 22.52 58" 62" N/A / 285" / 118" 400 - CONCRETE CASED 12"x5" 23.34 42" 47" N/A / N/A / 19'9" 57'7" EAST OF RR CROSSING, 19'9" FROM FACE OF CURB SOUTH OF HOLE (POTHOLE INFO PROVIDED BY CENTURYLINK PH #2) 401 - CONCRETE CASED 18"x8" 23.45 44" 52" N/A / N/A / 20'6" 20'6" FROM FACE OF CURB S OF HOLE, 61' FROM FIRE HYDRANT (POTHOLE INFO PROVIDED BY CENTURYLINK PH #3) 402 - CONCRETE CASED 18"x8" 23.87 1 50" 1 58" 1 N/A / N/A / 20'6" 20'6" FROM FACE OF CURB S OF HOLE, 12' FROM WATER VALVE (POTHOLE INFO PROVIDED BY CENTURYLINK PH #6) 403 FO/TV PVC 0'-2" NOT SURVEYED 1 38" 1 40" 1 N/A / N/A / 199" 256" FROM WEST RAIL, 199" FROM SOUTH CURB ' THIS UTILITY WAS RELOCATED AFTER POTHOLING. WHERE INFORMATION WAS AVAILABLE, APPROXIMATE NEW LOCATION IS SHOWN. CONTRACTOR TO VERIFY NEW LOCATION WITH UTILITIES PRIOR TO WORK IN AREA. WHERE UTILITY IS ABOVE NEW STORM, CONTRACTOR TO PROTECT AND PROVIDE TEMPORARY SUPPORT. Louis Berger �I TCRV���aFE4 o. 'ZONALG 520 Pike St, Ste 1005, Seattle, WA 98101 - 206.453.1043 PACE AS NOTED rc 1`/JE/RL 1 AS -BUILT REVISIONS MSG 9/22/2016W -- ABG BID SET MSG 4/18/2016 DATUM NO. REVISION BY DATE � �`"" ""°"°'"°" AS -BUILT RECOMMENDED FOR APPROVAL BY E)aa BY CITY OF SW 7th ST, POWELL AVE SW TO LIND AVE SW 09/25/2018 RENTON STORM SYSTEM IMPROVEMENT PROJECT - PHASE 2 PSE°°°" Planning/Building/Public Works Dept. EXISTING UTILITY DATA N°C7 11 °F. 20 ,0m mmmm