Loading...
HomeMy WebLinkAboutD-357057REC. N0. 7907300548 20, / CP// / MON18 LO / SDN H20 / ?a / IE 1 17595 �75950.46 -95597.85 EV.=23.18 I b CI SSMH_RIM=23.23 l'�- / IE=17.24 IE 1 h 12"CMP O.F. -- ���....../// 12�EC I OLYMPIC P PIELINE CO." 6i N. i� C14 CL CHAN �� 8•'Pvc(E.W)=14.9 / v y 0 _/ 1hhhh� 2 I El d - - - - - 8"DEC / Q 5"CO3)3"DEC (3)4°1 I D60 - _ _ - - / // IRR / 1e v ASPHALT b I ASPHALT C_ - \ CONC WALK Po E T F NC 1 UF {r {- 12'bEC 15"DEC i `^� // u CON D 55 - _ _ ss ss 23-- T B -------- - 3 -- - -- -c ° 5"D C C10 G F 3 60" SD PF J-ss 18+00-ss 1 ��PH2O 18+50 13 18 +50 113+00 I SW 7TH 13+50 - w APPROXIMATE BNSF - - - - - - - - -2.7 \ ___---- w w -EASEMENT 12"DEC DWY. I _ RIGHT-OF-WAY (TYP.) pAOPEL 5 u, uro NC DWY CIXJC DWY uro �rG GCP uro ur G ro uro up P up 16 663-14.16MON .I y CP 15 N 663-14.15MON -uro uro uro _ N -ro uro N=17590140 E-129558145 ELEV.=23.39 � B 3 N=175901.09 E=1295632,87 ELEV-23.55 I 2 PLAN PLAN RAILROAD CROSSING AT 13+13 RAILROAD CROSSING AT 18+20 SCALE: 1 "=20' SCALE: 1 "=20' 27.5 25 22.5 20 17.5 15 p z ? p a W wm s w m O O w O Z p O ¢ Of O s CDw Of 0' W CO 3 LO a u� 0 0� W w� � o U x xx W W w w w - 12.5 10 NEW 6V STEEL PIPE 1 SECTION rA RAILROAD CROSSING AT 13+13 - HORIZ SCALE: 1 "=20' S . GIS VERT SCALE: 1 "=5' Q, of WA,1 z� Louis Berger a o� RE'GISTG�� ti'F�4 �' •. esstUNAL e� 520 Pike St, Ste 1005, Seattle, WA 98101 -206.453.1043 4181 p o pz a = w w m m w U W W O z z O O � 27.5 p O Q o N o s = = a O 27.5 25 0 J r N n n 0 J o 1 25 Y V W n W 22.5 22.5 20 20 d - ----N __ -- 17.5 17.5 w IE 18.41± x x EX 12" HP GAS 15 G 15 CROSSING AT 12.5 �- --Sf*- 18+30t 12.5 A-56" EX 60" RCP SD 10 10 IE 12.08 Q SECTION B RAILROAD CROSSING AT 18+20 - HORIZ SCALE: 1 "=20' VERT SCALE: 1"=5' REVISION I I PLAN RAILROAD CROSSING AT 25+63 SCALE: 1"=20' p p d z = p = w p a w d U O r W CD O � U z C) o Of Q S r p N S r I p O Of Q O O W x x w w NEW 60" STEEL PIPE IE 12.38 SECTION G RAILROAD CROSSING AT 25+63 - HORIZ SCALE: 1 "=20' VERT SCALE: 1"=5' 4z,u 1 9/ZZ/Zu It MJIi ABG ASG 4/18/201( BY I DATE I APPR AS NOTED DATUM 17 1- BNSF CROSSING WORK BNSF COORDINATION NOTES SCHEDULING NOTES 1. CONTRACTOR SHALL MEET ALL REQUIREMENTS IN THE 1. CONTRACTOR SHALL SCHEDULE ALL CROSSING PIPELINE LICENSE AGREEMENT BETWEEN THE CITY OF WORK WITH BNSF CONTACT, AND PROVIDE RENTON AND BURLINGTON NORTHERN SANTA FE (BNSF) AS WEEKLY CONSTRUCTION UPDATES TO THE CITY DESCRIBED IN SECTION 1-07.18(5). THE AGREEMENT AND BNSF REGARDING THE PROGRESS TOWARD INCLUDES REQUIREMENTS FOR SAFETY CERTIFICATION, THE SCHEDULED CROSSING WORK. INSURANCE REQUIREMENTS, AND OTHER PROVISIONS. 2. RAILROAD CROSSINGS AT STA 13+13 AND 2• THE CONTRACTOR SHALL ASSUME ALL RISK AND LIABILITY 18+20 ARE INACTIVE. IT IS ANTICIPATED THAT FOR ACCIDENTS AND DAMAGES THAT MAY OCCUR TO BSNF CAN REMOVE THESE TRACKS IN 1 DAY. PERSONS OR PROPERTY ON ACCOUNT OF THIS PROJECT WORK, AND SHALL INDEMNIFY AND HOLD BNSF HARMLESS 3. THE CONTRACTOR SHALL PROVIDE TEMPORARY FROM ANY AND ALL COSTS, LIABILITIES, EXPENSE, SUITS, PAVEMENT PATCH AFTER BNSF WORK AT EACH JUDGMENTS OR DAMAGES TO PERSONS OR PROPERTY OR CROSSING. CLAIMS OF ANY NATURE WHATSOEVER ARISING OUT OF OR IN CONNECTION WITH THE BNSF PIPELINE LICENSE 4. RAILROAD CROSSING AT 25+63 IS ACTIVE AND AGREEMENT. CROSSING MAY ONLY BE CLOSED FOR ONE WEEK. THE ONE WEEK PERIOD INCLUDES ONE 3. A SAFETY ORIENTATION COURSE WILL BE COMPLETED BY ALL DAY FOR BNSF TO REMOVE THE TRACKS AND THE CONTRACTOR'S AND SUBCONTRACTOR'S WORKERS PRIOR ONE DAY TO RE -INSTALL THE TRACKS, SO THAT TO ENTERING BNSF PROPERTY. IT IS THE CONTRACTOR'S THE CONTRACTOR HAS FIVE CONSECUTIVE DAYS RESPONSIBILITY TO CONDUCT THE SAFETY TRAINING AND TO COMPLETE ITS WORK AND READY THE SITE IMPLEMENTATION OF A SAFETY PROGRAM FOR ITS FOR BNSF TO RE -INSTALL TRACKS. EMPLOYEES. TRAINING MATERIALS ARE AVAILABLE ON THE CONTRACTOR SHALL PREPARE A DETAILED WEB SITE: WWW.BNSFCONTRACTOR.COM. THE CONTRACTOR SCHEDULE FOR WORK AT THIS CROSSING MUST COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY DEMONSTRATING THE ONE WEEK CLOSURE CAN REGULATIONS. BE ACHIEVED. WORK AT THIS CROSSING MAY 4. ALL CONTRACTOR PERSONNEL AND ALL THE CONTRACTOR'S REQUIRE EXTRA WORK SHIFTS. SUBCONTRACTOR'S PERSONNEL THAT ARE ON SITE MUST BE 5. IT IS ANTICIPATED THAT BNSF WILL RE -INSTALL "E-RAIL-SAFE" (BACKGROUND CHECK) CERIFIFIED. ALL THE TRACK CROSSINGS AFTER THE STORM CONTRACTOR IS ADVISED THAT THIS PROCESS TAKES DRAIN IS INSTALLED BEYOND THE CROSSING AT APPROXIMATELY 2-3 WEEKS. "E-RAIL-SAFE" APPLICATION 25+63. MAY BE FOUND AT: WWW.E-RAILSAFE.COM 6. BNSF RE -INSTALLATION OF CONCRETE PANELS 5. ALL WORK ON THE RAILROAD PROPERTY (INCLUDING THE AND TRACK IS ANTICIPATED TO TAKE A FULL CORRIDOR CROSSING SW 7TH STREET) SHALL BE SUBJECT DAY AT EACH CROSSING. IF PERMITTED BY CITY, TO THE INSPECTION AND DIRECTION OF THE BNSF CONTRACTOR MAY REMOVE TEMPORARY ROADMASTER OR HIS REPRESENTATIVE. A BNSF PAVEMENT THE DAY BEFORE BNSF WORK AND REPRESENTATIVE MUST BE ON -SITE AT ALL TIMES WHEN USE STEEL PLATES FOR NIGHT TIME TRAFFIC. ACTIVELY WORKING ON RAILROAD PROPERTY. CONTRACTOR SHALL COORDINATE ALL WORK IN THE RAILROAD PROPERTY WITH BNSF'S PRIMARY CONTACT: DANIEL BAKER, ROADMASTER CONSTRUCTION NOTES BNSF RAILWAY COMPANY, 206-625-6462 OFFICE, O EXTREME CAUTION. HIGH PRESSURE GAS. SEE Daniel.baker2@bnsf.com CONSTRUCTION NOTE 1 ON DWG C3. 6. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK ON BNSF PROPERTY WITH THE ROADMASTER AT LEAST 10 O SAWCUT AND REMOVE EX. ASPHALT AS BUSINESS DAYS IN ADVANCE OF ENTERING THE BNSF NEEDED. REPLACE WITH NEW ASPHALT AND PREMISES. BNSF REMOVAL AND RE -INSTALLATION OF THE BLEND WITH ADJACENT SURFACES. REVIEW TRACKS IS SUBJECT TO BNSF CREW AVAILABILITY, AND MAY EXTENT WITH CITY INSPECTOR BEFORE SAWCUT. BE SUBJECT TO CHANGE. CONTRACTOR'S WORK SHALL CONFORM TO BNSF AVAILABILITY. SEE PRELIMINARY BNSF SA 3 O SAWCUT AND REMOVE EX. CONCRETE SIDEWALK CROSSING WORK SCHEDULING NOTES, THIS SHEET, AND OR DRIVEWAY AS NEEDED. REPLACE WITH NEW TYPICAL BNSF REMOVAL AND RESTORATION SEQUENCE ON CONCRETE SIDEWALK OR DRIVEWAY AND BLEND C10. SHOULD BNSF CREW AVAILIBILITY, OR ANY OTHER WITH ADJACENT SURFACES. REVIEW EXTENT REASON, RESULT IN DELAY OF WORK AT A PARTICULAR WITH CITY INSPECTOR BEFORE SAWCUT. REFER CROSSING, CONTRACTOR SHALL SHIFT WORK TO OTHER TO CITY OF RENTON STANDARD PLAN 102 FOR AREAS (E.G. UPSTREAM PIPE SEGMENT) WITH APPROVAL OF SIDEWALKS AND 104.4 FOR DRIVEWAY. NOTE CITY. SUCH DELAYS SHALL BE AT NO ADDITIONAL COST TO THAT CONCRETE FOR COMMERCIAL DRIVEWAYS CITY. SHALL BE CONSTRUCTED WITH AIR ENTRAINED CLASS 4000 PER WSDOT STANDARD 7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY SPECIFICATION 8-06.3 AND SHALL BE 10" TRAFFIC CONTROL FOR BNSF WORK. SEE TRAFFIC CONTROL THICKNESS. REQUIREMENTS IN SECTION 1-10. SUCH TRAFFIC CONTROL MAY NEED TO BE BEFORE, DURING, OR AFTER NORMAL ® CONTRACTOR SHALL PROVIDE TEMPORARY WORK HOURS. DURING REMOVAL AND REPLACEMENT OF PAVEMENT PATCH TO REOPEN STREET AND TRACKS, ALL TRAFFIC WILL BE DETOURED. TRAFFIC WILL SIDEWALK AFTER BNSF TRACK REMOVAL. NEED TO BE RE -OPENED AT THE END OF THE WORK SHIFT. STREET SHALL NOT BE CLOSED OVERNIGHT. CONTRACTOR SHALL ASSUME THAT ONLY ONE BLOCK AT A STEEL PLATES MAYBE USED FOR UP TO (1) TIME MAY BE DETOURED. ALL DRIVEWAYS UP TO THE TRACK DAY PRIOR TO PAVEMENT PATCH. CROSSING WORK AREA SHALL BE KEPT OPEN FOR LOCAL 5O BNSF TO REPLACE EXISTING WOOD OR GRAVEL TRAFFIC DURING TRACK REMOVAL AND RE -INSTALLATION. SIDEWALK BETWEEN TRACKS WITH NEW 8. CONTRACTOR IS RESPONSIBLE FOR PROVIDING CONSTRUCTION CONCRETE PANEL SIDEWALK. SURVEY SUPPORT TO CONFIRM GRADES AS REQUESTED BY BNSF. THIS MAY INCLUDE PRE -CONSTRUCTION SURVEY, SETTING GRADE POINTS FOR BACKFILL, AND POST -CONSTRUCTION SURVEY. 2 1 0 6"=1'-0" 125mmITTSI Scale 5 2.5 0 1"=5' Scale 20 10 0 1"=20' T22nimmI Scale CITY OF RENTON Planning/Building/Public Works Dept. 5 Inches 10 AS BUILT MEniiiiiiiiiiaFeet FF ROVALCOMMENDED R APP20 40 7 4L/`�%Feet SW 7th ST, POWELL AVE SW TO LIND AVE SW os/2s/2o1s STORM SYSTEM IMPROVEMENT PROJECT - PHASE 2 RAILROAD CROSS SECTIONS C9 13 or: 20 D- 3 1 5 1 7 0 5 7