Loading...
HomeMy WebLinkAboutD-3570590 LO m M r` N a TEMPORARY TRACK REMOVAL (APPROX. 70 FT) BALLAST LAYER TO BE PROVIDED w AND PLACED BY BNSF DURING w TRACK REINSTALLATION RAILROAD TRACK, RR TIES, AND CONCRETE PANELS TO BE REMOVED 0 AND RE —INSTALLED BY BNSF CONTRACTOR TO SURVEY FINISHED GRADE OF 0 Z SUBBALLAST AND PROVIDE TO BNSF FOR APPROVAL BEFORE BNSF TRACK RE —INSTALLATION, GROUND/TRACK SURFACE E M 1111-11-11 PERVIOUS BACKFILL MATERIAL — — — — COMPACTED TO 95% MODIFIED — - DENSITY. CONTRACTOR SHALL USE PERVIOUS BACKFILL MATERIAL TO — — — A POINT 5 FT BEYOND EDGE OF - - - CONCRETE PANEL AND THEN TRANSITION TO SELECT IMPORTED — — — TRENCH BACKFILL MATERIAL — — — — — — (2)CONSTRUCTION GEOTEXTILE FOR SEPARATION WHERE REQUIRED BY ENGINEER — TRENCH WIDTH = PIPE ID + 30" (15" DIA PIPES AND SMALLER) 1.5 x PIPE ID + 18" (18" DIA PIPES AND LARGER) r r TRENCH WIDTH PAY LIMIT SECTION GO TYP TRENCH SECTION AT BNSF CROSSINGS O3 SCALE: 1/2"=1'—O" z� Louis Berger 'ZONALG 520 Pike St, Ste 1005, Seattle, WA 98101 - 206.453.1043 z 'n BALLAST LAYER SUBBALLAST LAYER SUBGRADE COMPACTED SUBGRADE O COMPACTED SUBBALLAST LAYER TO BE PROVIDED AND INSTALLED BY CONTRACTOR FOR ENTIRE TRACK LENGTH PIPE ZONE BEDDING 1' MIN ABOVE PIPE GRAVEL BACKFILL FOR PIPE ZONE BEDDING IN ACCORDANCE WITH STANDARD SPECIFICATION SECTION 9-03.12(3) PIPE ZONE BEDDING 1' MIN BELOW PIPE RAIL �ONCRETE PANEL � I �n RAILROAD TIES TYPICAL BNSF RAILROAD CROSSING RR TRACK, CONCRETE PANELS, AND TIES REMOVED BY BNSF TEMPORARY ASPHALT PATCH 3" MIN SAWCUT EACH SIDE — — — T — — — TEMPORARY SELECT IMPORTED TRENCH BACKFILL INTERIM PATCH AFTER TRACK REMOVAL REMOVE TEMPOARARY ASPHALT PATCH AND BACKFILL TO SUBGRADE ELEVATION 5" MIN BALLAST TO BE PROVIDED AND PLACED BY BNSF 0 N COMPACTED SUBBALLAST LAYER — 2° TO BE PROVIDED AND INSTALLED COMPACTED SUBGRADE �5 BY CONTRACTORr� PREPARATION TO REINSTALL TRACK GRIND AND OVERLAY FINAL RR TRACK, PANELS, TIES, AND PATCH 2" TO 6" DEPTH AS CONCRETE REINSTALLED BY BNSF NEEDED. SEE SEQUENCE NOTE 8 3' MIN (OR AS DIRECTED BY ENGINEER) SAW CUT EACH SIDE RESTORATION AFTER BNSF REINSTALLS TRACK SECTION B BNSF TYPICAL REMOVAL & RESORATION SEQUENCE C9 SCALE: NTS NOTE: SEE CONSTRUCTION SEQUENCING NOTES, THIS DWG PACB AS NOTED _11F/JE/RL JILT REVISIONS 1 MSG 9/22/2018 MSGABG DATUM BID SET MSG 4/18/2016 MSG '� eon REVISION BY I DATE APPIR " R°'R"` CITY OF RENTON Planning/Building/Public Works Dept. CONSTRUCTION NOTES DSEE PAVEMENT OVERLAY EXTENTS AND REQUIREMENTS ON DWGS C13 AND C14. CONTRACTOR SHALL INSTALL A GEOTEXTILE FABRIC OVER THE NATIVE SOILS AND UNDER THE PIPE ZONE BEDDING IN AREAS WHERE THE SUBGRADE SOILS IN THE TRENCH EXCAVATION CONSIST OF FINE—GRAINED SOILS SUCH AS SILT, CLAY, OR ORGANIC RICH SOILS, AS DIRECTED BY THE ENGINEER. FOR CROSSING AT STA 18+20, BACKFILL BETWEEN THE (2) 36" PIPES WITH CDF FROM THE BOTTOM OF THE PIPES TO THE TOP OF THE PIPES. THIS MAY REQUIRE THE PIPE BEDDING TO BE PLACED IN TWO LIFTS: FIRST LIFT BELOW THE SPRINGLINE AND SECOND LIFT ABOVE THE SPRINGLINE. SEE SECTION DETAIL ON DWG C15. REMOVE APPROXIMATELY 12" OF UNSUITABLE FOUNDATION MATERIAL AND REPLACE WITH NEW MATERIAL WHERE REQUIRED BY ENGINEER. UNLESS OTHERWISE DIRECTED BY ENGINEER NEW MATERIAL SHALL BE QUARRY SPALLS. IF UNSUITABLE MATERIAL IS ENCOUNTERED CONTRACTOR SHALL REMOVE UNSUITABLE SOILS AND REPLACE WITH COMPACTED PERVIOUS BACKFILL AS DIRECTED BY ENGINEER. CONSTRUCTION SEQUENCING NOTES 1. BNSF WILL REMOVE TRACKS AND CONCRETE PANELS (BNSF WILL PROVIDE OWN EQUIPMENT AND LABOR FOR THIS WORK AND MOVE MATERIALS TO NEARBY BNSF RIGHT—OF—WAY OUTSIDE OF THE SW 7TH STREET RIGHT—OF—WAY). 2. CONTRACTOR SHALL REMOVE PAVEMENT ADJACENT TO THE CONCRETE PANELS IN ADVANCE OF THIS WORK IF REQUESTED BY CITY. 3. FOLLOWING REMOVAL OF TRACKS AND CONCRETE PANELS, CONTRACTOR SHALL INSTALL TEMPORARY BACKFILL AND PAVEMENT PATCH TO RESTORE TRAFFIC. 4. CONTRACTOR SHALL PROCEED WITH PIPELINE INSTALLATION. 5. FOLLOWING PIPELINE INSTALLATION AND BACKFILL, CONTRACTOR SHALL PROVIDE TEMPORARY PAVEMENT PATCH FOR TRAFFIC. 6. PRIOR TO BNSF RE —INSTALLING TRACKS, CONTRACTOR SHALL REMOVE TEMPORARY PATCH AND BACKFILL TO SUBGRADE ELEVATION, AND PLACE COMPACTED SUBBALLAST LAYER TO ELEVATION SHOWN ON PLANS AND AS REQUIRED BY BNSF. 7. BNSF SHALL THEN PLACE BALLAST AND INSTALL THE TIES, TRACKS, AND CONCRETE PANELS. 8. FOLLOWING TRACK INSTALLATION, CONTRACTOR SHALL REMOVE/GRIND ADJACENT PAVEMENT AND PLACE HMA PATCH TO PROVIDE A SMOOTH TRANSITION. 2 1 0 2 4 Scale Feet AS -BUILT RECOMMENDED FOR APPROVAL BY SW 7th ST, POWELL AVE SW TO LIND AVE SW 09/25/2018 STORM SYSTEM IMPROVEMENT PROJECT - PHASE 2 —R RAILROAD RESTORATION DETAILS C 1 0 14 oF: 20 D- 3 5 7 0 5 9