TEMPORARY TRACK REMOVAL (APPROX. 70 FT)
BALLAST LAYER TO BE PROVIDED
w AND PLACED BY BNSF DURING
w
TRACK REINSTALLATION
RAILROAD TRACK, RR TIES, AND
CONCRETE PANELS TO BE REMOVED
0
AND RE —INSTALLED BY BNSF
CONTRACTOR TO SURVEY FINISHED GRADE OF
0
Z
SUBBALLAST AND PROVIDE TO BNSF FOR
APPROVAL BEFORE BNSF TRACK RE —INSTALLATION,
GROUND/TRACK SURFACE
E
M
1111-11-11
PERVIOUS BACKFILL MATERIAL
— —
—
—
COMPACTED TO 95% MODIFIED
— -
DENSITY. CONTRACTOR SHALL USE
PERVIOUS BACKFILL MATERIAL TO
— —
—
A POINT 5 FT BEYOND EDGE OF
-
-
-
CONCRETE PANEL AND THEN
TRANSITION TO SELECT IMPORTED
—
—
—
TRENCH BACKFILL MATERIAL
— —
— — —
—
(2)CONSTRUCTION GEOTEXTILE
FOR SEPARATION WHERE
REQUIRED BY ENGINEER —
TRENCH WIDTH =
PIPE ID + 30"
(15" DIA PIPES AND SMALLER)
1.5 x PIPE ID + 18"
(18" DIA PIPES AND LARGER)
r
r
TRENCH WIDTH PAY LIMIT
SECTION GO
TYP TRENCH SECTION AT BNSF CROSSINGS O3
SCALE: 1/2"=1'—O"
z�
Louis Berger
'ZONALG
520 Pike St, Ste 1005, Seattle, WA 98101 - 206.453.1043
z
'n
BALLAST LAYER
SUBBALLAST LAYER
SUBGRADE
COMPACTED SUBGRADE O
COMPACTED SUBBALLAST LAYER TO
BE PROVIDED AND INSTALLED BY
CONTRACTOR FOR ENTIRE TRACK LENGTH
PIPE ZONE BEDDING
1' MIN ABOVE PIPE
GRAVEL BACKFILL FOR PIPE ZONE
BEDDING IN ACCORDANCE WITH
STANDARD SPECIFICATION SECTION
9-03.12(3)
PIPE ZONE BEDDING
1' MIN BELOW PIPE
RAIL
�ONCRETE PANEL
� I
�n
RAILROAD TIES
TYPICAL BNSF RAILROAD CROSSING
RR TRACK, CONCRETE PANELS,
AND TIES REMOVED BY BNSF TEMPORARY ASPHALT PATCH 3" MIN
SAWCUT EACH SIDE
— — — T — — —
TEMPORARY SELECT
IMPORTED TRENCH BACKFILL
INTERIM PATCH AFTER TRACK REMOVAL
REMOVE TEMPOARARY ASPHALT PATCH
AND BACKFILL TO SUBGRADE ELEVATION 5" MIN BALLAST
TO BE PROVIDED AND
PLACED BY BNSF
0
N
COMPACTED SUBBALLAST LAYER — 2°
TO BE PROVIDED AND INSTALLED COMPACTED SUBGRADE �5
BY CONTRACTORr�
PREPARATION TO REINSTALL TRACK
GRIND AND OVERLAY FINAL RR TRACK, PANELS, TIES, AND
PATCH 2" TO 6" DEPTH AS CONCRETE REINSTALLED BY BNSF
NEEDED. SEE SEQUENCE NOTE 8 3' MIN (OR AS
DIRECTED BY ENGINEER)
SAW CUT EACH SIDE
RESTORATION AFTER BNSF REINSTALLS TRACK
SECTION B
BNSF TYPICAL REMOVAL & RESORATION SEQUENCE C9
SCALE: NTS
NOTE: SEE CONSTRUCTION SEQUENCING NOTES, THIS DWG
PACB AS NOTED
_11F/JE/RL
JILT REVISIONS 1 MSG 9/22/2018 MSGABG DATUM
BID SET MSG 4/18/2016 MSG '� eon
REVISION BY I DATE APPIR " R°'R"`
CITY OF
RENTON
Planning/Building/Public Works Dept.
CONSTRUCTION NOTES
DSEE PAVEMENT OVERLAY EXTENTS AND REQUIREMENTS ON
DWGS C13 AND C14.
CONTRACTOR SHALL INSTALL A GEOTEXTILE FABRIC OVER THE
NATIVE SOILS AND UNDER THE PIPE ZONE BEDDING IN
AREAS WHERE THE SUBGRADE SOILS IN THE TRENCH
EXCAVATION CONSIST OF FINE—GRAINED SOILS SUCH AS SILT,
CLAY, OR ORGANIC RICH SOILS, AS DIRECTED BY THE
ENGINEER.
FOR CROSSING AT STA 18+20, BACKFILL BETWEEN THE (2)
36" PIPES WITH CDF FROM THE BOTTOM OF THE PIPES TO
THE TOP OF THE PIPES. THIS MAY REQUIRE THE PIPE
BEDDING TO BE PLACED IN TWO LIFTS: FIRST LIFT BELOW
THE SPRINGLINE AND SECOND LIFT ABOVE THE SPRINGLINE.
SEE SECTION DETAIL ON DWG C15.
REMOVE APPROXIMATELY 12" OF UNSUITABLE FOUNDATION
MATERIAL AND REPLACE WITH NEW MATERIAL WHERE
REQUIRED BY ENGINEER. UNLESS OTHERWISE DIRECTED BY
ENGINEER NEW MATERIAL SHALL BE QUARRY SPALLS.
IF UNSUITABLE MATERIAL IS ENCOUNTERED CONTRACTOR
SHALL REMOVE UNSUITABLE SOILS AND REPLACE WITH
COMPACTED PERVIOUS BACKFILL AS DIRECTED BY ENGINEER.
CONSTRUCTION SEQUENCING NOTES
1. BNSF WILL REMOVE TRACKS AND CONCRETE PANELS (BNSF
WILL PROVIDE OWN EQUIPMENT AND LABOR FOR THIS WORK
AND MOVE MATERIALS TO NEARBY BNSF RIGHT—OF—WAY
OUTSIDE OF THE SW 7TH STREET RIGHT—OF—WAY).
2. CONTRACTOR SHALL REMOVE PAVEMENT ADJACENT TO THE
CONCRETE PANELS IN ADVANCE OF THIS WORK IF
REQUESTED BY CITY.
3. FOLLOWING REMOVAL OF TRACKS AND CONCRETE PANELS,
CONTRACTOR SHALL INSTALL TEMPORARY BACKFILL AND
PAVEMENT PATCH TO RESTORE TRAFFIC.
4. CONTRACTOR SHALL PROCEED WITH PIPELINE INSTALLATION.
5. FOLLOWING PIPELINE INSTALLATION AND BACKFILL,
CONTRACTOR SHALL PROVIDE TEMPORARY PAVEMENT PATCH
FOR TRAFFIC.
6. PRIOR TO BNSF RE —INSTALLING TRACKS, CONTRACTOR SHALL
REMOVE TEMPORARY PATCH AND BACKFILL TO SUBGRADE
ELEVATION, AND PLACE COMPACTED SUBBALLAST LAYER TO
ELEVATION SHOWN ON PLANS AND AS REQUIRED BY BNSF.
7. BNSF SHALL THEN PLACE BALLAST AND INSTALL THE TIES,
TRACKS, AND CONCRETE PANELS.
8. FOLLOWING TRACK INSTALLATION, CONTRACTOR SHALL
REMOVE/GRIND ADJACENT PAVEMENT AND PLACE HMA PATCH
TO PROVIDE A SMOOTH TRANSITION.
2 1 0 2 4
Scale Feet
AS -BUILT
RECOMMENDED
FOR APPROVAL
BY
SW 7th ST, POWELL AVE SW TO LIND AVE SW 09/25/2018
STORM SYSTEM IMPROVEMENT PROJECT - PHASE 2
—R
RAILROAD RESTORATION DETAILS C 1 0
14 oF: 20
D- 3 5 7 0 5 9