HomeMy WebLinkAboutD-3570630
n
m
M
r`
N
EL
RIM-i3.56 CP# 12
\N -CONC(E,W)=14.6 663-14. 8.5
N=175898.52
E=1295690.76
ELEV.=23.33
I
30- 9254
VE MENT LLC
N7H ST
I■ � 1
12•coN I)
■ (NO PAINT)
CONC WALK nFO
I
c �2"IL
ASFIHALT
IS 3 RIM=22.27
IE 6"CONC(NE)=19.5 .. .
30" Q�
Ui
ED
Z
PLAN I ��
FROM STA 19+05 TO STA 24+2 LLJ
SCALE: 1 "=20'
]BURIED FIBER OPTIC'
F)SPHALT
DWY
w
I II IS RIM=22.22 Cb
Ir IE 6"CONC(NW)=19.3 '4�sS''�
30, SSMH RIM=23.08
IE 8"DI(NE)=16.2
CL CHAN 8"CONC(S,W)=15.4 o22 �A.SS
Bi?69
TL# 182305-9251
PUGET SOUND ELECTRIL AP
550 SW 7TH ST
ASPHALT PARKING
ASPHALT PARKING
PT1` -2s DOtpl 1
UFO UFO
--24---
--- UFO UFO UFO UFO fD UFO
-24-
4
VOL 83, P. 10
CB RIM=22.71
IE 6"CONC(S)=19.8
IE 6"CONC(SE)=19.7
IE 8'.CONC(E)=19.6
SDMH RIM=23.17
IE 8"PVC(N)=18.1
IE 12"PVCZNf�_17.7
\ IE 6"CONC(S)=17.7'24.
IE 60"CONC(E)=13.4 \
IE 21"CMP(S)=13.63 \
4"DEC
W115 .. E-
4 STW IP
OR AREAS WITH INADEQUATE PAVEMENT,
C WHERE REQUIRED BY ENGINEER.
L 4. THE SOUTH EASTBOUND LANE IS ASSUMED
I TO NEED RESTORATION (WITH 2" OVERLAY)
DUE TO DETERIORATION FROM BEING USED
FOR CONSTRUCTION ACTIVITIES. CITY MAY
I ELECT TO REDUCE EXTENTS OF PAVEMENT
REMOVAL AND OVERLAY ALONG THIS LANE
DEPENDING ON THE EXTENT OF DAMAGES.
' 5. A TEMPORARY HOT PATCH SHALL BE
PLACED OVER THE TRENCH EXCAVATION
TO ALLOW THE LANES TO BE REOPENED
TO TRAFFIC AS WORK PROCEEDS. ALSO
SEE CONSTRUCTION NOTE 6 ON DWG C15.
6. FINAL ROADWAY RESTORATION SHALL
OCCUR IN PHASES AS CONSTRUCTION
PROCEEDS, PER SPECIAL PROVISION
SECTION 5-06.9.
7. WHERE EXISTING PAVEMENT MARKINGS
CROSS THE FULL WIDTH OF WESTBOUND
LANES, PAVEMENT MARKING RESTORATION
SHALL EXTEND ACROSS THE FULL WIDTH,
INCLUDING THE EXISTING LANE NOT
RECEIVING OVERLAY.
CONSTRUCTION NOTES
CONTRACTOR TO PROVIDE NEW
THERMOPLASTIC CROSSWALK PER CITY
29+50- OF RENTON STD PLAN 127.
/
/ W-
i
UFQ� UFQF , FB 8 LF8 dip uGo uF0 IE 6"CONC(NE)=21.2 �p i
UFO UFO UFo T
0 U USP
■ I � s CB F
I 6 SSMH R 682 LIJ - 5 A IE 1:
CL CHAN 8'CONC(N,S)=19.2 P
■ CP# 10 uN lFLi9a 9)89,y 9 CB RIM=22.86
■ 663-14.101.
I N=175910.28 p N '.� s IE 6"CONC(W)=21.0
E=1296673.65
ELEV.=22.67 0
De RIM=22.74 3 AS -BUILT
JJo
IE 6"CONC(N)=20.8 -2.1
PLAN I I
FROM STA 24+25 TO STA 29+50 RECOMMENDED
SCALE: 1"=20' FOR APPROVAL
20 10 0 20 40
1"=20' BY E)pa
Scale Feet
BY
S. GI
,yl WA��s,7�Gt'� F, once
o w PAGE AS NOTED "ro""" CITY OF SW 7th ST, POWELL AVE SW TO LIND AVE SW 09/25/2018
Louis Berger , �" JF/JE/RL DATUM "� STORM SYSTEM IMPROVEMENT PROJECT - PHASE 2
AS -BUILT REVISIONS MSG 9/22/26 8 MSG "": AEG RENTONN.
FcrsT���`` BID SET MSG 4/18/2016 MSG a "�W�NC14