Loading...
HomeMy WebLinkAboutR-398001GENERAL NOTES ;_ LLJ I 0 0 0 0 U I N I U I 0 z N i 0 N co L,j V) 0 i E U 0 0 CD i N ai i.7 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 2016 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS AMENDED BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT. 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION MEETING MUST BE HELD BETWEEN THE CITY OF FEDERAL WAY, THE APPLICANT, AND THE APPLICANT'S CONSTRUCTION REPRESENTATIVE. 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. IT SHALL BE THE APPLICANTS/CONTRACTORS RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION EASEMENTS NECESSARY BEFORE INITIATING OFF -SITE WORK WITHIN THE ROAD RIGHTS OF WAY. 5. VERTICAL DATUM: CITY OF RENTON, 1988 NAVD. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. ANY WORK WITHIN THE TRAVELED RIGHT OF WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH LANE OF TRAFFIC AFFECTED. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-07.23-TRAFFIC CONTROL, SHALL APPLY. 7. ALL UTILITIES SHALL BE ADJUSTED TO FINAL GRADE. CONSTRUCTION SEQUENCE 1. PRE -CONSTRUCTION MEETING. 2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN). 3. FLAG OR FENCE CLEARING/CONSTRUCTION LIMITS. 4. INSTALL CATCH BASIN PROTECTION IF REQUIRED. 5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 7. GRADE AND STABILIZE CONSTRUCTION ROADS. 8. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. 9. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. 10. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. 11. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT. 12. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 13. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 14. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMP5 REMOVED IF APPROPRIATE. CITY OF RENTON EROSION CONTROL NOTES 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER. 2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION. 3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE. 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 5. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. 6. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH APRIL 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER THAN 5,000 SQUARE FEET, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. 7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER, INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT IS IN THE INTEREST OF THE PERMITEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING OR OTHER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE SPECIFIED TIME PERIOD. 8. FOR ALL EROSION/SEDIMENTATION CONTROL PONDS WHERE THE DEAD STORAGE DEPTH EXCEEDS 6 INCHES, A FENCE IS REQUIRED WITH A MINIMUM HEIGHT OF THREE (3) FEET, 3:1 SIDE SLOPES. 9. A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE, 24 FEET X 50 FEET X 8 INCHES OF 4 TO 6 INCH QUARRY SPALLS SHALL BE LOCATED AT ALL POINTS OF VEHICULAR INGRESS AND EGRESS TO THE CONSTRUCTION SITE. Know what's below. Call before you dig. coterra ENGINEERING PLLC 321 3rd Ave South, Suite 307 Seattle, Washington 98104 ph 206.596.7115 coterraengineering.com PERMIT CONDITIONS OF APPROVAL 1. BUILDING ON LOT 5 SHALL BE CONSTRUCTED WITH A FIRE SPRINKLER SYSTEM. 2. APPLICANT SHALL SUBMIT STRUCTURAL CALCULATIONS FOR THE STORMWATER DETENTION TANK CONFIRMING THAT THE TANK CAN SUPPORT A 30 TON LOADING WITH 75-PSI POINT LOADING PRIOR TO CONSTRUCTION OF THE STORMWATER DETENTION TANK OR FINAL RECORDING OF SHORT PLAT, WHICHEVER COMES FIRST 3. PRECONSTRUCTION MEETING REQUIRED PRIOR TO THE START OF WORK. 4. BOND OR CASH SURETY IS REQUIRED PRIOR TO THE START OF CONSTRUCTION. LIMELITE SHORT PLAT - U15006542 RENTON, WASHINGTON SURFACE WATER DRAINAGE NOTES AND SPECIFICATIONS 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON PLAN REVIEWER. 2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 1996 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS AMENDED BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT. 3. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS, WHICH ARE ON FILE IN THE PUBLIC WORKS DEPARTMENT. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF RENTON PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION. 4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 5. DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM 1988 METERS, AND FOR HORIZONTAL CONTROL SHALL BE NORTH AMERICAN DATUM 1983/1991 METERS UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT. REFERENCE BENCHMARK AND ELEVATIONS ARE NOTED ON THE PLANS. 6. ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. AFTER CONSTRUCTION ACTIVITY IS COMPLETE THEY MUST BE REMOVED. 7. ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION. 8. GRASS SEED MAY BE APPLIED BY HYDROSEEDING. THE GRASS SEED MIXTURE, OTHER THAN CITY OF RENTON APPROVED STANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND APPROVED BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION. 9. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7-02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA CLASS "C", WITH THE EXCEPTION OF PVC PIPE. ALL TRENCH BACKFILL SHALL BE COMPACTED TO MINIMUM 95% FOR PAVEMENT AND STRUCTURAL FILL AND 90% OTHERWISE PER ASTM D-1557-70. PEA GRAVEL BEDDING SHALL BE 6 INCHES OVER AND UNDER PVC PIPE. 10. GALVANIZED STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DRAINAGE FACILITIES SHALL HAVE ASPHALT TREATMENT #1 OR BETTER INSIDE AND OUTSIDE. 11. STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING LINE OF ANY STORM DRAINAGE PIPE, OR 15 FEET FROM THE TOP OF ANY CHANNEL BANK. 12. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL. 13. OPEN CUT ROAD CROSSINGS THROUGH EXISTING PUBLIC RIGHT OF WAY WILL NOT BE ALLOWED UNLESS SPECIFICALLY APPROVED BY CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS ADMINISTRATOR. 14. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A DEPTH OF ONE (1) FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS: 4 - 8 INCH ROCK / 40 - 70% PASSING; 2 - 4 INCH ROCK / 30 - 40% PASSING; AND LESS THAN 2 INCH ROCK / 10 - 20% PASSING. 15. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS APPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY SECTION. AN ACCURATELY DIMENSIONED, CERTIFIED AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY UPON COMPLETION. 16. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT RELIEVE THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORM SURFACE WATER DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING CONSTRUCTION. 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACT. ANY WORK WITHIN THE TRAVELED RIGHT OF WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVE BY THE PUBLIC WORKS DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-07-23 TRAFFIC CONTROL SHALL APPLY. 18. SPECIAL DRAINAGE MEASURES WILL BE REQUIRED IF THE PROJECT LOCATION IS WITHIN THE AQUIFER PROTECTION AREA (APA). SURVEY INFORMATION 1. METHOD OF SURVEY: INSTRUMENTATION FOR THIS SURVEY WAS A TRIMBLE ELECTRONIC DISTANCE MEASURING UNIT. PROCEDURES USED IN THIS SURVEY WERE DIRECT AND REVERSE ANGLES, NO CORRECTION NECESSARY. MEETS STATE STANDARDS SET BY WAC 332-130-090. 2. VERTICAL DATUM: PER CITY OF RENTON SURVEY CONTROL PT #1863; CONIC MON ® INTX OF 116TH AVE SE & SE 168TH ST, ELEV=459.08' 3. BASIS OF BEARINGS: PER CITY OF RENTON SURVEY CONTROL, THE EAST LINE OF NE QUARTER SEC 29-29T-R5E BEARS N01'47'08"E. 4. EXISTING LEGAL DESCRIPTION: THE NORTH HALF OF LOT 6, BLOCK 4 OF AKER'S FARM NO. 6 AS PER PLAT RECORDED IN VOLUME 42 OF PLATS, PAGE 15, RECORDS OF KING COUNTY, WASHINGTON. 5. SEE SURVEY FOR MORE INFORMATION. SURVEYED: SCALE: nI��w983/1991 1988 7 SHARED DRIVEWAYS MB 3 29 17 PA DESIGNED: 1 =10>' HORZONTNAD 6 CITY COMMENTS MB 9 09 16 PA MB 5 CITY COMMENTS MB -8/-15/1-6 PA DRAWN: MB 4 CITY COMMENTS MB 7 07 16 PA CHECKED: ONE INCH DATUM PA AT FULL SCALE IF NOT ONE INCH NO. REVISION BY DATE A P P R APPROVED: SCALE ACCORDINGLY co < 77777777/7 SE 162ND STREET co PROJECT SITE SE 164TH STREET VICINITY MAP SCALE 1 " = 200' ABBREVIATIONS BC: BOTTOM OF CURB BW: BACK OF WALK TC: TOP OF CURB EX: EXISTING DI: DUCTILE IRON SD: STORM DRAIN SS: SANITARY SEWER W: WATER CIVIL SHEET INDEX C1 COVER AND NOTES C2 PERVIOUS CONCRETE SPECIFICATIONS C3 TESC PLAN C4 PAVING AND GRADING PLAN C5 DRAINAGE AND UTILITY PLAN C6 FRONTAGE IMPROVEMENTS- SE 162ND ST C7 ROADWAY SECTIONS- SE 162ND ST C8-10 FRONTAGE IMPROVEMENTS- 114TH AVE SE C11 ROADWAY SECTIONS-114TH AVE SE C12-16 CIVIL DETAILS SOOS CREEK WATER AND SEWER DISTRICT PLANS 1 SEWER PLAND AND PROFILES & NOTES 2 MATERIALS & SURFACE RESTORATION 3 CONSTRUCTION PROVISIONS 4 SEWER DETAILS CONTACTS OWNER LIMELITE DEVELOPMENT CIVIL ENGINEER COTERRA ENGINEERING 321 3RD AVENUE , SUITE 406 SEATTLE, WA 98104 CONTACT: PETER APOSTOL, PE TEL: (206) 596-7115 SURVEYOR GEODIMENSIONS, INC 10801 MAIN ST, SUITE 102 BELLEVUE, WA 98004 CONTACT: EDWIN J GREEN TEL: (425) 458-4488 PLANNER TERRANE FORMERLY (GEODIMENSIONS, INC) 10801 MAIN ST, SUITE 102 BELLEVUE, WA 98004 CONTACT: ANDY MCANDREWS TEL: (425) 458-4488 LANDSCAPE ROOT OF DESIGN 7104 256TH ST NW #218 STANWOOD, WA 98292 CONTACT: DEVIN PETERSON TEL: (206) 491-9545 ELECTRICAL TRAFFEX 11410 NE 124TH ST., #590 KIRKLAND, WA 98034 CONTACT: LARRY HOBBS, PE TEL: (425) 522-4118 UTILITY PURVEYOR SOOS CREEK WATER AND SEWER DISTRICT 14616 SE 192ND ST RENTON, WA 98058 TEL: (253) 630-9900 SAFE WALK TO SCHOOL PLAN LITCHEFIELD ENGINEERING 12840 81ST AVENUE NE KIRKLAND, WA 98034 CONTACT: KEITH A. LITCHFIELD TEL: 425-821-5038 ILLUMINATION PLANS IL1 ILLUMINATION PLAN IL2-3 ILLUMINATION DETAILS IN COMPLIANCE WITH CITY OF RENTON STANDARDS LANDSCAPE PLANS L1 LANDSCAPE PLAN LIRRIENT PLANNING DEVELOPMENT ENGINEERING � L2 LANDSCAPE PLAN davis 06/20/2017 Brianne Bannwarth 06/22/2017 1 SAFE WALK TO SCHOOL PLAN SURFACE WATER UTILITY UTILITY SERVICE NOTES rstraka 06/20/2017 0 COORDINATE BLDG. SYSTEM CONNECTION SIZES, LOCATIONS AND INVERT ELEVATIONS WITH PLUMBING CONTRACTOR. VERIFY THAT THERE ARE NO CONFLICTS WITH PROPOSED SYSTEMS AND OTHER UTILITIES. 2. COORDINATE INSTALLATION OF NEW WATER AND SEWER SERVICES WITH CITY OF RENTON AND SOOS CREEK WATER DISTRIC. 3. DESIGN BUILD FIRE SPRINKLER CONTRACTOR SHALL VERIFY SIZE OF FIRE METER, LINE SIZE, AND FDC LINE SIZES PRIOR TO CONSTRUCTION. CONSTRUCTION PERMIT SUBMITTAL -] DATE: 5/3 Z CITY OF LIMELITE SHORT PLAT FlELDB5/31/17 RENTON 16204 114TH AVE SE, RENTON, WA 98055 PAGE: DRAWING NO: Planning/Building/Public Works Dept. COVER AND NOTES ci SHEET: OF: R-398001