1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 2016 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS AMENDED BY THE CITY OF
RENTON PUBLIC WORKS DEPARTMENT.
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION MEETING MUST BE HELD BETWEEN THE CITY OF
FEDERAL WAY, THE APPLICANT, AND THE APPLICANT'S CONSTRUCTION REPRESENTATIVE.
3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
4. IT SHALL BE THE APPLICANTS/CONTRACTORS RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION EASEMENTS NECESSARY BEFORE
INITIATING OFF -SITE WORK WITHIN THE ROAD RIGHTS OF WAY.
5. VERTICAL DATUM: CITY OF RENTON, 1988 NAVD.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT,
FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT
PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. ANY WORK WITHIN THE
TRAVELED RIGHT OF WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH
LANE OF TRAFFIC AFFECTED. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-07.23-TRAFFIC CONTROL, SHALL
APPLY.
7. ALL UTILITIES SHALL BE ADJUSTED TO FINAL GRADE.
CONSTRUCTION SEQUENCE
1. PRE -CONSTRUCTION MEETING.
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF
CONSTRUCTION SIGN).
3. FLAG OR FENCE CLEARING/CONSTRUCTION LIMITS.
4. INSTALL CATCH BASIN PROTECTION IF REQUIRED.
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
7. GRADE AND STABILIZE CONSTRUCTION ROADS.
8. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING
FOR PROJECT DEVELOPMENT.
9. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND
MANUFACTURER'S RECOMMENDATIONS.
10. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND
SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS.
11. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET
SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT.
12. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
13. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
14. UPON
COMPLETION
OF THE PROJECT, ALL DISTURBED AREAS MUST BE
STABILIZED AND BMP5 REMOVED
IF APPROPRIATE.
CITY
OF
RENTON EROSION
CONTROL
NOTES
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH
THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE
CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION.
3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND
CLEARING AND/OR CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE
SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME
THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE
IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE
THE RESPONSIBILITY OF THE PERMITEE.
4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL
CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES
WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF
CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS
THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING
DRAINAGE SYSTEM.
5. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF
STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
6. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH APRIL 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER
THAN 5,000 SQUARE FEET, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY
MULCH, SODDING OR PLASTIC COVERING.
7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A
PERIOD 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING
OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR. GRASS SEEDING ALONE WILL
BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER, INCLUSIVE. SEEDING MAY PROCEED,
HOWEVER, WHENEVER IT IS IN THE INTEREST OF THE PERMITEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING OR
OTHER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE SPECIFIED TIME PERIOD.
8. FOR ALL EROSION/SEDIMENTATION CONTROL PONDS WHERE THE DEAD STORAGE DEPTH EXCEEDS 6 INCHES, A FENCE IS
REQUIRED WITH A MINIMUM HEIGHT OF THREE (3) FEET, 3:1 SIDE SLOPES.
9. A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE, 24 FEET X 50 FEET X 8 INCHES OF 4 TO 6 INCH QUARRY SPALLS
SHALL BE LOCATED AT ALL POINTS OF VEHICULAR INGRESS AND EGRESS TO THE CONSTRUCTION SITE.
Know what's below.
Call before you dig.
coterra
ENGINEERING PLLC
321 3rd Ave South, Suite 307
Seattle, Washington 98104
ph 206.596.7115
coterraengineering.com
PERMIT CONDITIONS OF APPROVAL
1. BUILDING ON LOT 5 SHALL BE CONSTRUCTED WITH A FIRE SPRINKLER SYSTEM.
2. APPLICANT SHALL SUBMIT STRUCTURAL CALCULATIONS FOR THE STORMWATER DETENTION TANK CONFIRMING THAT THE TANK CAN SUPPORT A 30 TON LOADING WITH 75-PSI POINT LOADING PRIOR TO CONSTRUCTION OF THE STORMWATER
DETENTION TANK OR FINAL RECORDING OF SHORT PLAT, WHICHEVER COMES FIRST
3. PRECONSTRUCTION MEETING REQUIRED PRIOR TO THE START OF WORK.
4. BOND OR CASH SURETY IS REQUIRED PRIOR TO THE START OF CONSTRUCTION.
LIMELITE SHORT PLAT - U15006542
RENTON, WASHINGTON
SURFACE WATER DRAINAGE NOTES AND SPECIFICATIONS
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH
THE CITY OF RENTON PLAN REVIEWER.
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 1996 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND
MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS AMENDED
BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT.
3. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS, WHICH ARE ON
FILE IN THE PUBLIC WORKS DEPARTMENT. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL
FROM THE CITY OF RENTON PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION.
4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
5. DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM 1988 METERS, AND FOR HORIZONTAL
CONTROL SHALL BE NORTH AMERICAN DATUM 1983/1991 METERS UNLESS OTHERWISE APPROVED BY THE CITY OF
RENTON PUBLIC WORKS DEPARTMENT. REFERENCE BENCHMARK AND ELEVATIONS ARE NOTED ON THE PLANS.
6. ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING CONSTRUCTION, AND
THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON -SITE
EROSION HAS PASSED. AFTER CONSTRUCTION ACTIVITY IS COMPLETE THEY MUST BE REMOVED.
7. ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN CONJUNCTION WITH ALL
CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY
SECTION.
8. GRASS SEED MAY BE APPLIED BY HYDROSEEDING. THE GRASS SEED MIXTURE, OTHER THAN CITY OF RENTON APPROVED
STANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND APPROVED BY THE PUBLIC WORKS
DEPARTMENT, SURFACE WATER UTILITY SECTION.
9. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION
7-02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION.
THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS
WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE
LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING SHALL BE
APWA CLASS "C", WITH THE EXCEPTION OF PVC PIPE. ALL TRENCH BACKFILL SHALL BE COMPACTED TO MINIMUM 95%
FOR PAVEMENT AND STRUCTURAL FILL AND 90% OTHERWISE PER ASTM D-1557-70. PEA GRAVEL BEDDING SHALL BE 6
INCHES OVER AND UNDER PVC PIPE.
10. GALVANIZED STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DRAINAGE FACILITIES SHALL HAVE ASPHALT TREATMENT #1
OR BETTER INSIDE AND OUTSIDE.
11. STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING LINE OF ANY STORM DRAINAGE PIPE, OR 15
FEET FROM THE TOP OF ANY CHANNEL BANK.
12. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL.
13. OPEN CUT ROAD CROSSINGS THROUGH EXISTING PUBLIC RIGHT OF WAY WILL NOT BE ALLOWED UNLESS SPECIFICALLY
APPROVED BY CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS ADMINISTRATOR.
14. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY
ROCK PLACED TO A DEPTH OF ONE (1) FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS:
4 - 8 INCH ROCK / 40 - 70% PASSING;
2 - 4 INCH ROCK / 30 - 40% PASSING; AND
LESS THAN 2 INCH ROCK / 10 - 20% PASSING.
15. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS
APPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY SECTION. AN ACCURATELY DIMENSIONED, CERTIFIED
AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY UPON COMPLETION.
16. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT RELIEVE THE OWNER OF
THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORM SURFACE WATER DISPOSITION. FURTHER,
THE CITY OF RENTON DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE
SYSTEM PROVIDED DURING CONSTRUCTION.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES, PROTECTIVE
EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC,
AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACT. ANY
WORK WITHIN THE TRAVELED RIGHT OF WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC
CONTROL PLAN APPROVE BY THE PUBLIC WORKS DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF
THE WSDOT STANDARD SPECIFICATIONS 1-07-23 TRAFFIC CONTROL SHALL APPLY.
18. SPECIAL DRAINAGE MEASURES WILL BE REQUIRED IF THE PROJECT LOCATION IS WITHIN THE AQUIFER PROTECTION AREA
(APA).
SURVEY INFORMATION
1. METHOD OF SURVEY: INSTRUMENTATION FOR THIS SURVEY WAS A TRIMBLE ELECTRONIC DISTANCE MEASURING UNIT.
PROCEDURES USED IN THIS SURVEY WERE DIRECT AND REVERSE ANGLES, NO CORRECTION NECESSARY. MEETS STATE
STANDARDS SET BY WAC 332-130-090.
2. VERTICAL DATUM: PER CITY OF RENTON SURVEY CONTROL PT #1863; CONIC MON ® INTX OF 116TH AVE SE & SE 168TH ST,
ELEV=459.08'
3. BASIS OF BEARINGS: PER CITY OF RENTON SURVEY CONTROL, THE EAST LINE OF NE QUARTER SEC 29-29T-R5E BEARS
N01'47'08"E.
4. EXISTING LEGAL DESCRIPTION: THE NORTH HALF OF LOT 6, BLOCK 4 OF AKER'S FARM NO. 6 AS PER PLAT RECORDED IN
VOLUME 42 OF PLATS, PAGE 15, RECORDS OF KING COUNTY, WASHINGTON.
5. SEE SURVEY FOR MORE INFORMATION.
SURVEYED: SCALE:
nI��w983/1991
1988
7 SHARED DRIVEWAYS MB 3 29 17 PA DESIGNED: 1 =10>' HORZONTNAD
6 CITY COMMENTS MB 9 09 16 PA MB
5 CITY COMMENTS MB -8/-15/1-6 PA DRAWN: MB
4 CITY COMMENTS MB 7 07 16 PA CHECKED: ONE INCH DATUM
PA AT FULL SCALE
IF NOT ONE INCH
NO. REVISION BY DATE A P P R APPROVED: SCALE ACCORDINGLY
co
<
77777777/7
SE 162ND STREET
co
PROJECT SITE
SE 164TH STREET
VICINITY MAP
SCALE 1 " = 200'
ABBREVIATIONS
BC: BOTTOM OF CURB
BW: BACK OF WALK
TC: TOP OF CURB
EX: EXISTING
DI: DUCTILE IRON
SD: STORM DRAIN
SS: SANITARY SEWER
W: WATER
CIVIL SHEET INDEX
C1
COVER AND NOTES
C2
PERVIOUS CONCRETE SPECIFICATIONS
C3
TESC PLAN
C4
PAVING AND GRADING PLAN
C5
DRAINAGE AND UTILITY PLAN
C6
FRONTAGE IMPROVEMENTS- SE 162ND ST
C7
ROADWAY SECTIONS- SE 162ND ST
C8-10
FRONTAGE IMPROVEMENTS- 114TH AVE SE
C11
ROADWAY SECTIONS-114TH AVE SE
C12-16
CIVIL DETAILS
SOOS CREEK WATER AND SEWER DISTRICT PLANS
1 SEWER PLAND AND PROFILES & NOTES
2 MATERIALS & SURFACE RESTORATION
3 CONSTRUCTION PROVISIONS
4 SEWER DETAILS
CONTACTS
OWNER
LIMELITE DEVELOPMENT
CIVIL ENGINEER
COTERRA ENGINEERING
321 3RD AVENUE , SUITE 406
SEATTLE, WA 98104
CONTACT: PETER APOSTOL, PE
TEL: (206) 596-7115
SURVEYOR
GEODIMENSIONS, INC
10801 MAIN ST, SUITE 102
BELLEVUE, WA 98004
CONTACT: EDWIN J GREEN
TEL: (425) 458-4488
PLANNER
TERRANE
FORMERLY (GEODIMENSIONS, INC)
10801 MAIN ST, SUITE 102
BELLEVUE, WA 98004
CONTACT: ANDY MCANDREWS
TEL: (425) 458-4488
LANDSCAPE
ROOT OF DESIGN
7104 256TH ST NW #218
STANWOOD, WA 98292
CONTACT: DEVIN PETERSON
TEL: (206) 491-9545
ELECTRICAL
TRAFFEX
11410 NE 124TH ST., #590
KIRKLAND, WA 98034
CONTACT: LARRY HOBBS, PE
TEL: (425) 522-4118
UTILITY PURVEYOR
SOOS CREEK WATER AND SEWER DISTRICT
14616 SE 192ND ST
RENTON, WA 98058
TEL: (253) 630-9900
SAFE WALK TO SCHOOL PLAN
LITCHEFIELD ENGINEERING
12840 81ST AVENUE NE
KIRKLAND, WA 98034
CONTACT: KEITH A. LITCHFIELD
TEL: 425-821-5038
ILLUMINATION PLANS
IL1 ILLUMINATION PLAN
IL2-3 ILLUMINATION DETAILS
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
LANDSCAPE PLANS
L1 LANDSCAPE PLAN
LIRRIENT PLANNING
DEVELOPMENT ENGINEERING �
L2 LANDSCAPE PLAN
davis 06/20/2017
Brianne Bannwarth 06/22/2017
1 SAFE WALK TO SCHOOL PLAN
SURFACE WATER UTILITY
UTILITY SERVICE NOTES
rstraka 06/20/2017
0
COORDINATE BLDG. SYSTEM CONNECTION SIZES, LOCATIONS AND INVERT ELEVATIONS WITH PLUMBING CONTRACTOR. VERIFY THAT THERE ARE NO
CONFLICTS WITH PROPOSED SYSTEMS AND OTHER UTILITIES.
2. COORDINATE INSTALLATION OF NEW WATER AND SEWER SERVICES WITH CITY OF RENTON AND SOOS CREEK WATER DISTRIC.
3. DESIGN BUILD FIRE SPRINKLER CONTRACTOR SHALL VERIFY SIZE OF FIRE METER, LINE SIZE, AND FDC LINE SIZES PRIOR TO CONSTRUCTION.
CONSTRUCTION PERMIT SUBMITTAL
-]
DATE: 5/3
Z
CITY OF LIMELITE SHORT PLAT FlELDB5/31/17
RENTON 16204 114TH AVE SE, RENTON, WA 98055 PAGE:
DRAWING NO:
Planning/Building/Public Works Dept. COVER AND NOTES ci
SHEET: OF:
R-398001