ALL WORK, MATERIALS AND TESTING SHALL CONFORM TO THE STANDARDS OF SOOS CREEK WATER & SEWER DISTRICT AND THE "STANDARD
SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION", CURRENT EDITION, AS PREPARED BY THE WASHINGTON STATE DEPARTMENT OF
TRANSPORTATION, AND HEREINAFTER REFERRED TO AS THE "STANDARD SPECIFICATIONS," EXCEPT AS HEREIN MODIFIED.
2. TRENCH EXCAVATION, BEDDING AND BACKFILL
ALL WORK WITHIN THE RIGHT-OF-WAY SHALL COMPLY WITH ALL PERTINENT PERMITS, THE GOVERNING AGENCY'S CURRENT ROAD STANDARDS, AND
THE STANDARD SPECIFICATIONS. ALL MATERIAL FROM CLEARING AND GRUBBING SHALL BE HAULED TO AN APPROVED WASTE DISPOSAL SITE
PROVIDED BY THE DEVELOPER/CONTRACTOR.
WHEN TRENCHING THROUGH EXISTING PAVEMENT, THE PAVEMENT SHALL BE CUT ON A NEAT -LINE BY SAW CUTTING. TRENCH SIDES SHALL BE KEPT AS
VERTICAL AS POSSIBLE GIVEN THE SOIL CONDITIONS. COMPACTION AND RESTORATION SHALL BE DONE AS DETAILED BELOW AND IMMEDIATELY AFTER
THE TRENCH BACKFILL IS PLACED, SO AS TO CAUSE THE LEAST DISRUPTION TO TRAFFIC. ALL PAVEMENT SHALL BE CUT 1 FOOT OUTSIDE THE EDGE OF
THE TRENCH ON EACH SIDE.
ANY TRENCH EXCEEDING FOUR FEET IN DEPTH SHALL BE PROVIDED WITH ADEQUATE SAFETY SYSTEMS MEETING THE REQUIREMENTS OF THE
WASHINGTON STATE INDUSTRIAL SAFETY AND HEALTH ACT (WISHA), CHAPTER 49.17 RCW, AND ALL REGULATIONS ADOPTED PURSUANT THERETO. THE
DEVELOPER/CONTRACTOR SHALL HAVE A STRUCTURAL ENGINEER REVIEW AND STAMP ANY AND ALL SHORING PLANS AND CALCULATIONS. THE
DEVELOPER/CONTRACTOR SHALL BE RESPONSIBLE FOR WORKER SAFETY AND THE DISTRICT AND THE DISTRICT'S ENGINEER ASSUME NO
RESPONSIBILITY.
WHEN NATIVE MATERIAL AT THE TRENCH BOTTOM IS SUITABLE FOR PIPE BEDDING, THE BOTTOM SHALL BE HAND FINISHED TO GRADE SO THAT THE PIPE
WILL HAVE UNIFORM SUPPORT ALONG THE BARREL AND BELL. AFTER THE PIPE IS IN PLACE, ADDITIONAL HAND SELECTED NATIVE MATERIAL MEETING
THE REQUIREMENTS FOR BEDDING MATERIAL SHALL BE PLACED AND TAMPED AROUND THE PIPE FOR A MINIMUM OF 4 INCHES ABOVE THE CROWN OF
THE PIPE.
WHEN NATIVE MATERIAL AT THE TRENCH BOTTOM IS STONY OR OTHERWISE NON -UNIFORM, THE TRENCH SHALL BE OVER -EXCAVATED A MINIMUM OF 6
INCHES BELOW THE SPECIFIED GRADE AND A LAYER OF PIPE BEDDING MATERIAL SHALL BE FURNISHED AND PLACED TO THE SPECIFIED GRADE. AFTER
THE PIPE IS IN PLACE, ADDITIONAL HAND SELECTED NATIVE MATERIAL MEETING THE REQUIREMENTS FOR BEDDING MATERIAL SHALL BE PLACED AND
TAMPED AROUND THE PIPE FOR A MINIMUM OF 4 INCHES ABOVE THE CROWN OF THE PIPE.
IF THE NATIVE MATERIAL AT THE TRENCH BOTTOM IS UNSUITABLE FOR FOUNDATION PURPOSES OR WILL HAVE DIFFICULTY PROVIDING UNIFORM
BEARING FOR THE PIPE, SUCH MATERIAL SHALL BE REMOVED AND REPLACED WITH A MINIMUM OF 6 INCHES OF COMPACTED FOUNDATION MATERIAL.
THE BEDDING MATERIAL SHALL BE CARRIED UP EVENLY ON BOTH SIDES OF THE PIPE SIMULTANEOUSLY IN APPROXIMATELY 6-INCH LAYERS AND EACH
LAYER THOROUGHLY COMPACTED WITH APPROPRIATE TOOLS IN SUCH MANNER AS TO AVOID INJURING OR DISTURBING THE COMPLETED PIPELINE. ALL
BEDDING AND NATIVE MATERIAL SHALL BE STORED AWAY FROM THE EDGES OF EXCAVATION AND OFF THE PAVED ROADWAY AND SHOULDER.
ALL TRENCH BACKFILL SHALL BE MECHANICALLY COMPACTED TO 95% OF THE MAXIMUM DENSITY WITHIN THE RIGHT-OF-WAY AND IN ALL AREAS (PAVED
AND UNPAVED) WHERE STREETS, ROADWAY SHOULDERS, DRIVEWAYS, SIDEWALKS, OR PARKING LOTS WILL BE CONSTRUCTED OR RECONSTRUCTED
OVER THE TRENCH EXCEPT FOR TRENCHES OVER 8 FEET IN DEPTH. WHEN THE TRENCH DEPTH EXCEEDS 8 FEET, TRENCH BACKFILL UP TO 4 FEET
FROM THE TOP OF THE TRENCH SHALL BE MECHANICALLY COMPACTED TO 90% OF THE MAXIMUM DENSITY. THE REMAINING TOP 4 FEET OF THE TRENCH
SHALL THEN BE MECHANICALLY COMPACTED TO 95% OF THE MAXIMUM DENSITY. IN UNPAVED AREAS AND OTHER AREAS NOT SUBJECT TO VEHICULAR
TRAFFIC, TRENCH BACKFILL FROM THE PIPE TO WITHIN 3 FEET OF THE SURFACE SHALL BE COMPACTED TO 90% OF THE MAXIMUM DENSITY. THE UPPER
3 FEET SHALL BE COMPACTED TO 95% OF THE MAXIMUM DENSITY.
ALL DENSITIES SHALL BE DETERMINED BY TESTING PER THE MODIFIED PROCTOR METHOD, ASTM D1557. THE DEVELOPER/CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING DENSITY TEST REPORTS CERTIFIED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF WASHINGTON. A
MINIMUM OF ONE TEST SHALL BE TAKEN WITHIN EVERY 500 FEET OF TRENCH LENGTH AND AT DEPTHS UP TO 50% OF TRENCH DEPTH, OR AS DIRECTED
BY THE DISTRICT'S FIELD REPRESENTATIVE OR THE GOVERNING ROAD AGENCY. COMPACTION OF LATERALS OR SERVICE LINE TRENCHES SHALL BE
TESTED WHERE DIRECTED BY THE DISTRICT'S FIELD REPRESENTATIVE OR THE GOVERNING ROAD AGENCY. TESTING OF CDF, WHEN USED AS REQUIRED
BY THE GOVERNING ROAD AGENCY, SHALL BE IN ACCORDANCE WITH ASTM 04832.
TRENCH BACKFILL SHALL BE PLACED IN UNIFORM LOOSE LAYERS NO MORE THAN 12 INCHES THICK AND MECHANICALLY COMPACTED AS SPECIFIED. IN
ANY TRENCH WHERE THE SPECIFIED COMPACTION CANNOT BE ACHIEVED WITH NATIVE BACKFILL, THE TOP 4 FEET SHALL BE REPLACED AND
COMPACTED TO 95% OF THE MAXIMUM DENSITY WITH IMPORTED BANK RUN GRAVEL. THE DISTRICT'S FIELD REPRESENTATIVE RESERVES THE RIGHT TO
REQUEST A COMPACTION TEST AT ANY TIME ON THE BACKFILL MATERIAL.
IN CUTS TRANSVERSE TO THE ROAD ALIGNMENT AND AT ALL UTILITY CROSSINGS, THE ENTIRE TRENCH SHALL BE BACKFILLED WITH CRUSHED
SURFACING. BACKFILL SHALL BE PLACED AND MECHANICALLY COMPACTED IN 12-INCH MAXIMUM LIFTS.
AFTER BACKFILL AND COMPACTION, AN IMMEDIATE COLD MIX PATCH SHALL BE PLACED AND MAINTAINED IN A MANNER ACCEPTABLE TO THE GOVERNING
ROAD AGENCY UNTIL REPLACED WITH PERMANENT SURFACING.
ALL PIPE AND FITTINGS SHALL BE LAID "IN THE DRY" UNLESS OTHERWISE APPROVED BY ENGINEER. TRENCH EXCAVATIONS SHALL BE DEWATERED BY
USING WELL POINT SYSTEMS, SUMPS WITH PUMPS OR OTHER METHODS APPROVED BY THE DISTRICT. DEWATERING SYSTEMS SHALL BE USED IN
ACCORDANCE WITH GOOD STANDARD PRACTICE AND SHALL BE EFFICIENT ENOUGH TO LOWER THE WATER LEVEL IN ADVANCE OF THE EXCAVATION
AND MAINTAIN IT CONTINUOUSLY TO KEEP THE TRENCH BOTTOM AND SIDES FIRM AND DRY. DEVELOPER/CONTRACTOR SHALL SUBMIT THE
DEWATERING PLAN TO THE DISTRICT FOR REVIEW AT LEAST 10 DAYS PRIOR TO COMMENCING ANY DEWATERING WORK. ALL DEWATERING EFFLUENT
SHALL BE ROUTED THROUGH A DEWATERING POND PRIOR TO RELEASE.
GROUNDWATER SHALL BE CONTROLLED SUCH THAT SOFTENING OF THE BOTTOM OF EXCAVATIONS OR FORMATION OF "QUICK" CONDITIONS OR "BOILS"
DURING EXCAVATION SHALL BE PREVENTED AND NO SOIL SHALL BE ERODED INTO THE EXCAVATION FROM THE SIDES OF EXCAVATION. DEWATERING
SYSTEMS SHALL BE DESIGNED AND OPERATED SO AS TO PREVENT REMOVAL OF THE NATURAL SOILS. THE DEVELOPER/CONTRACTOR SHALL AT ALL
TIMES HAVE ON HAND SUFFICIENT PUMPING EQUIPMENT AND MACHINERY IN GOOD WORKING CONDITION FOR ALL ORDINARY EMERGENCIES, INCLUDING
POWER OUTAGES, AND SHALL HAVE AVAILABLE AT ALL TIMES COMPETENT WORKERS FOR THE OPERATION OF SAID EQUIPMENT.
DEVELOPER/CONTRACTOR SHALL CONTROL SURFACE RUNOFF SO AS TO PREVENT ENTRY OR COLLECTION OF WATER IN EXCAVATIONS AND SHALL
MAINTAIN THE UNDISTURBED STATE OF THE FOUNDATION SOILS AND ALLOW THE PLACEMENT OF ANY BACKFILL TO THE REQUIRED DENSITY. THE
RELEASE OF GROUNDWATER TO ITS STATIC LEVEL SHALL BE PERFORMED IN SUCH A MANNER AS TO MAINTAIN THE UNDISTURBED STATE OF THE
NATURAL FOUNDATION SOILS, PREVENT DISTURBANCE OF COMPACTED BACKFILL, AND PREVENT FLOTATION OR MOVEMENT OF STRUCTURES AND
PIPELINES.
DEVELOPER/CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL PERMIT REQUIREMENTS AND PROVISIONS FOR MONITORING AND
MANAGING WATER DISCHARGED FROM THE EXCAVATION.
3. CONNECTION TO EXISTING SEWER SYSTEM
CONNECTIONS TO EXISTING LINES SHALL BE MADE ONLY WITH THE WRITTEN APPROVAL OF SOOS CREEK WATER & SEWER DISTRICT. THE
DEVELOPER/CONTRACTOR SHALL NOTIFY THE DISTRICT'S FIELD REPRESENTATIVE AND OTHER UTILITIES AT LEAST 48 HOURS IN ADVANCE OF ANY
CONSTRUCTION AND MAKE THE NECESSARY ARRANGEMENTS WITH THE DISTRICT'S FIELD REPRESENTATIVE FOR THE CONNECTION TO THE EXISTING
SEWER SYSTEM. THE DEVELOPER/CONTRACTOR SHALL FURNISH ALL MATERIAL, EQUIPMENT AND LABOR NECESSARY FOR MAKING THE CONNECTION
UNDER THE SUPERVISION OF THE DISTRICT. THE 48-HOUR NOTICE REQUIREMENT SHALL NOT COUNT SATURDAYS, SUNDAYS, AND HOLIDAYS.
WORK SHALL NOT BE STARTED UNTIL ALL OF THE MATERIAL, EQUIPMENT AND LABOR NECESSARY TO PROPERLY COMPLETE WORK IS ASSEMBLED ON
THE SITE. ONCE WORK IS STARTED ON A CONNECTION, IT SHALL PROCEED CONTINUOUSLY WITHOUT INTERRUPTION AND AS RAPIDLY AS POSSIBLE
UNTIL THE CONNECTION IS COMPLETED. BEFORE ORDERING MATERIALS FOR ANY CONNECTION TO AN EXISTING MANHOLE, DEVELOPER/CONTRACTOR
SHALL EXCAVATE THE MANHOLE AND VERIFY OUTSIDE DIAMETER OF ALL PIPES FOR DETERMINING TYPES OF FITTINGS TO BE USED. ALL WORK SHALL
BE COORDINATED WITH THE DISTRICT'S FIELD REPRESENTATIVE. THE EXISTING SEWERS SHALL REMAIN IN SERVICE AT ALL TIMES.
CONNECTIONS TO SANITARY SEWER MANHOLES SHALL BE MADE USING A SAND COLLAR, A CONCRETE COUPLING OR A KOR-N-SEAL BOOT. THE PIPE TO
MANHOLE CONNECTION SHALL BE WATERTIGHT. ANY LEAKS IN THE COUPLINGS OR OTHER AREAS CREATED WHILE CONNECTING TO THE EXISTING
MANHOLE SHALL BE SEALED WITH STRATA TECH ST-520 INJECTION RESIN OR APPROVED EQUAL.
DEVELOPER/CONTRACTOR SHALL RE -CHANNEL EXISTING MANHOLES AS NECESSARY TO SMOOTHLY DIRECT THE FLOW INTO THE EXISTING SYSTEM.
ALL WATER AND/OR CONSTRUCTION DEBRIS SHALL BE REMOVED FROM NEW SEWERS AND NOT BE PERMITTED TO ENTER THE EXISTING SYSTEM. THE
DEVELOPER/CONTRACTOR SHALL BE RESPONSIBLE FOR FLUSHING OUT AND CLEANING ANY EXISTING SEWERS INTO WHICH GRAVEL, ROCKS OR OTHER
DEBRIS HAS ENTERED AS A RESULT OF THE DEVELOPER'S/CONTRACTOR'S OPERATIONS, AND SHALL PAY FOR REPAIR TO LIFT STATIONS OR OTHER
FACILITIES DAMAGED BY SUCH DEBRIS. ALL FLUSHING WATER SHALL BE PUMPED FROM UPSTREAM MANHOLES OR SEWER LINES AND SHALL NOT BE
ALLOWED TO ENTER THE EXISTING SEWER.
MINIMUM SEPARATION BETWEEN SEWER AND WATER MAINS SHALL CONFORM TO SECTION C1-9.1 OF THE "CRITERIA FOR SEWAGE WORKS DESIGN",
CURRENT EDITION, AS PUBLISHED BY THE DEPARTMENT OF ECOLOGY. MINIMUM SEPARATION BETWEEN OTHER UTILITIES SHALL BE 6 INCHES WITH A
SAND CUSHION.
PUGET SOUND ENERGY VAULTS, HAND HOLES AND LIGHT STANDARDS SHALL BE LOCATED NO CLOSER THAN 10 FEET FROM ANY SEWER MAINS AND
STUB SERVICES. DEVELOPER/CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF VAULTS, HAND HOLES, AND LIGHT STANDARDS WITH THE
SEWER STUB SERVICES. NO CONSTRUCTION SHALL START UNTIL THE DEVELOPER/CONTRACTOR HAS FURNISHED THE DISTRICT WITH A WORK SKETCH
FROM PUGET SOUND ENERGY OR A SIGNED HOLD HARMLESS AGREEMENT (FORM SUPPLIED BY THE DISTRICT) IS PROVIDED..
5. THRUST BLOCKING
WHEN DIGGING NEAR FITTINGS ON EXISTING PIPELINES, TEMPORARY BLOCKING SHALL BE INSTALLED TO PREVENT BLOWOUTS. BLOCKING SHALL
ALLOW FOR ANY CONNECTIONS TO THE FITTING TO BE REMOVED WITHOUT DAMAGING THE FITTING. THRUST BLOCKING SHALL CONFORM TO THE
STANDARD DETAILS. WHERE UNFAVORABLE GROUND CONDITIONS ARE ENCOUNTERED, SPECIAL BLOCKING MAY BE REQUIRED AS DIRECTED BY THE
DISTRICT IN THE FIELD.
6. SEWER MAIN TESTING
GRAVITY SEWERS AND APPURTENANCES SHALL BE TESTED AFTER BACKFILLING BY THE LOW-PRESSURE AIR METHOD IN ACCORDANCE WITH SECTION
7-17.3(2) OF THE STANDARD SPECIFICATIONS, EXCEPT WHERE THE GROUND WATER TABLE IS SUCH THAT THE DISTRICT MAY REQUIRE THE INFILTRATION
TEST. FINAL ACCEPTANCE OF THE SEWER MAIN INSTALLATION WILL BE SUBJECT TO THE DISTRICT'S RESOLUTION NO. 1904-S, WHICH ALLOWS A
MAXIMUM PONDING DEPTH OF 3/4-INCH. IN THE EVENT OF CONFLICTS BETWEEN THE STANDARDS ESTABLISHED IN RESOLUTION NO. 1904-S AND THE
STANDARDS SPECIFIED IN SECTION 7-17.3(2) OF THE STANDARD SPECIFICATIONS, THE STANDARDS OF THE RESOLUTION WILL TAKE PRECEDENCE.
7. REPAIR OF PIPELINE FAILURES
BROKEN OR OTHERWISE DEFECTIVE PIPE SHALL BE REMOVED AND REPLACED. REPAIR BANDS OR CLAMPS SHALL NOT BE USED TO REPAIR BROKEN
PIPE.
8. JACKED CROSSING
AT LOCATIONS AS REQUIRED BY THE DISTRICT OR GOVERNING ROAD AGENCY, OR AS PROPOSED BY THE DEVELOPER/CONTRACTOR, SEWER MAIN
CROSSINGS OF ARTERIAL STREETS SHALL BE MADE BY JACKING, DRIVING, OR AUGURING A STEEL CASING PIPE BENEATH THE SURFACE. ALIGNMENT
AND GRADE OF CASINGS FURNISHED SHALL BE SUCH THAT NO ADDITIONAL FITTINGS ARE NECESSARY TO MAKE THE CONNECTION. IF THE CASING DOES
NOT MEET THIS REQUIREMENT, IT SHALL BE ABANDONED BY FILLING THE CASING WITH MOIST SAND AND A NEW CASING INSTALLED TO MEET THE LINE
AND GRADE REQUIREMENTS. NO OPEN EXCAVATION SHALL BE MADE CLOSER THAN 6 FEET FROM THE EDGE OF PAVEMENT.
DIAMETER OF CASING PIPE SHALL BE SUFFICIENT TO ALLOW INSTALLATION OF THE SEWER. WALL THICKNESS SHALL BE SUFFICIENT TO WITHSTAND
INSTALLATION FORCE AND HIGHWAY LOADING WITH A MINIMUM THICKNESS OF'/4-INCH. AFTER THE SEWER MAIN HAS BEEN ADJUSTED TO GRADE, MOIST
SAND SHALL BE TAMPED INTO THE CASING PIPE SO THAT ALL VOIDS WILL BE FILLED. MANUFACTURED CASING SPACERS THAT PROHIBIT MOVEMENT OF
THE PIPE IN ANY DIRECTION WITHIN THE CASING MAY BE USED IN LIEU OF FILLING THE VOID BETWEEN THE SEWER MAIN AND THE CASING WALL WITH
SAND.
10. EXISTING UTILITIES
EXISTING UTILITIES SHOWN ON ANY REFERENCE DRAWINGS PROVIDED BY THE DISTRICT HAVE BEEN PLOTTED FROM THE BEST INFORMATION
AVAILABLE TO THE DISTRICT. THE DEVELOPER/CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES WELL ENOUGH IN
ADVANCE OF THE EXCAVATION TO PREVENT DAMAGE DURING CONSTRUCTION. THE DEVELOPER/CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE RESULTING FROM HIS OPERATIONS ON THE PROJECT.
11. WARRANTY PERIOD
THE DEVELOPER MAKING THE APPLICATION FOR A LINE EXTENSION SHALL BE RESPONSIBLE FOR THE MATERIALS AND FOR SATISFACTORY OPERATION
OF THE FACILITY FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE OF THE COMPLETED PROJECT AND THE BILL OF SALE TO THE DISTRICT.
Know what's below.
Call before you dig.
0
2 d �
o
_j -J
U
3
Y
Z
�
Q
w
m
Q a-C
Q
Q
U
Q
�U
J
0
O�
O
a
O
Ltd
5 o
WW
O:E a)
Z
>Mc0m
Q a)
0f1
Ln
m o m
V
z
-i
�y0 �
M�'N a)
ULU
Na)t0
Mtn a u
m
0
0 0 CL
J N
V) = w
U
z
O
Q
z
O
W
z
J
W
>
O
L
ry
O
W
0
w
z
i
Q
cn
O
W
Lii
U
W
W
LjJ
❑
W
(n
J
z
O
U
PLAN REVIEW ❑04-12 ❑❑
BASE MAP
SHEET 3 OF 4
DRAWING
S-398003