Loading...
HomeMy WebLinkAboutR-404513i (PRIVATEROAD Nil A PORTION OF THE S.W. 1/4 OF SECTION 33, TOWNSHIP 23 NORTH, RANGE PROTECT EXIST. DRAINAGE DITCH +j CONSTRUCTION ENTRANCE, (TYP.) SEE DETAIL SHEET GR-02 l +-. ERA . j ------�' - --- , ROAD C' 21' 8 u" 14 �� 17 0 22 ® LP .w. . OR- ' I 19 I 9 1 1 ` 12 13 �t'< 18 \ - Us 1---------- ---- ----- ---- 10 LIN + �1 ---- -- u G - ----� ------ .... ' ea.=& e � was UMUM arm. I , f V; 23 24 25 V 26 27 23 29 30 31 6 S I OVERFLOW SPILLWAYCO —J (TYP.) / PROTECT EXIST. DRAINAGE DITCH r 10' TEMPORARY CONSTRUCTION ' & GRADING EASMENT a' i M t 3 a.m. mm� + h , , 32 36 1 1 1 I I I I I CONSTRUCTION ,., QUENCE o N s - 34 (1) SCHEDULE A PRE —CONSTRUCTION SEQUENCE WITH THE - DDES SITE INSPECTOR BY CAI -LING (206) 296-6642. (2) PRE —CONSTRUCTION MEETING. (3) R OF ESC SPST SIGN WITH UEAND PHONE PERVISOR (MAYNBECONSOL DATEDNWITH ETHE REQUIRED NOTICE OF CONSTRUCTION SIGN). (4) FLAG OR FENCE CLEARING LIMITS. ' (5) INSTALL CATCH BASIN PROTECTION IF REQUIRED. (6) GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). (7) INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). (8) CONSTRUCT SEDIMENT TRAPS. (9) GRADE AND STABILIZE CONSTRUCTION ROADS. (10) CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. APPROXIMATE EARTHWORK QUANTITIES SITE STRIPPING (12" DEPTH) = 5795 cu yds. CUT CUT = 6495 cu yds. FILL = 3515 cu yds. TOTAL = 2981 net cu yds. CUT (1 1) MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE EARTHWORK QUANTITIES ARE FOR PERMIT PURPOSES ONLY. WITH KING COUNTY STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. QUANTITIES ARE "NEAT LINE" ONLY. THE QUANTITIES DO NOT ACCOUNT FOR ANY SHRINK OR SWELL FACTORS. IT IS THE (12) RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW CONTRACTORS RESPONSIBILITY TO CALCULATE THE EARTHWORK MEASURES SO THAT AS SITE CONDITIONS CHANGE THE VOLUMES FOR BID PURPOSES. 1.1 EROSION AND SEDIMEN I CON I NUL IJ /ALYYH i J 11'4 ACCORDANCE WITH THE KING COUNTY EROSION AND SEDIMENT CONTROL STANDARDS. (13) COVER ALL NAREAS DAYS DURINGWILL THEEDRY SEASON OR TWODAYS MORE THAN 3F_VE DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT. (14) STABIL.IZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. SEDIMENT -TRAP BOTTOM WIDTH = 5 BOTTOM LENGTH = 15 TOP WIDTH = 32 TOP LENGTH = 42 SIDE SLOPES = 3:1 OVER. ELEV. = 502.0 BOTTOM ELEV. = 498.5 5' BENCH ELEV. = 503.0 I T B \ TEMPORARY / PROPOSED SEDIMENT TRAP#1,ASEE aa TABLE ON THIS SHEET AND \ i DETAIL ON SHEET GR-02 CLEARING LIMITS (TYP.) LEGEND FILTER FABRIC FENCE JkKM CONSTRUCTION ENTRANCE —... ------•-- INTERCEPTOR DITCH W/ ROCK CHECK DAMS .� � CLEARING LIMITS _Qn1.R." CUTOFF SWALE Q PROPOSED SEDIMENT BARRIER TO BE USED ONCE CATCH BASIN IS INSTALLED — —HP— -- INDICATES HIGH POINT OF ROAD -- —LP-- — INDICATES LOW POINT OF ROAD ---- --s �-------- EXISTING CONTOUR �-- 006 - - PROPOSED CONTOUR SILT FENCE ar SF EXISTING TREE TO BE RETAINED, >r, SEE SHEET L-3 i NOTE: 1. ROAD GRADE CONTOURS SHOWN ARE AT FINISHED GRADE AND REPRESENT TOP OF ASPHALT. 2. ALL SLOPES SHALL BE AT 3:1 EXCEPT WHERE OTHERWISE NOTED.ALL SLOPE STABILIZATION SHALL BE DONE UNDER THE DIRECTION OF THE GEOTECHNICAL ENGINEER. 3. ACCESS MUST BE MAINTAINED TO THE EXISTING OFFSITE DRIVEWAYS 1 ALONG 116TH AVENUE SE AND 120-TH AVENUE SE. SCALE: 1 " = 50' 50 25 0 50 100 CONTOUR INTERVAL = 2' HORIZONTAL DATUM: WASHINGTON STATE PLANE COORDINATES, NORTH ZONE, NAD '83/'91, BASED ON TIES TO KING COUNTY PUBLISHED CONTROL. VERTICAL DATUM: NAVD '88, BENCH MARK — 4" X4" CONCRETE MONUMENT WITH LEAD AND TACK IN CASE LOCATED AT THE INTERSECTION OF SE 192ND ST AND 116 AVE SE. ELEVATION = 514.98 FEET. j lI I PROTECT EXIST. DRAINAGE DITCH APPROXIMATE LOCATION OF 30'x40' NET CUT MATERIAL STORAGE (2981 CU YDS.) I J -.. ,.... Jam. 1, _Y POWra mm_� SILT FENCE 2' TO PROPERTY LINE, (TYP.) SIGNIFICANT TREE TO BE --' RETAINED, TYP. SEE SHEET L-3 PROPOSED TEMPORARY SEDIMENT TRAP #2, SEE TABLE ON THIS SHEET AND DETAIL ON SHEET GR-02. SEDIMENT TRAP WILL BE REMOVED UPON CONSTRUCTION OF THE PERMANENT POND. COMBINED DETENTION AND WETPOND STORMWATER FACILITY SEE SHEET PD-01 KING COUNTY D.D.E.S. Rev'ew gineer Completion Date Senior n n r Comp do Date AM H. SAN RS P.E. LOPMENT ENGINEER Ap rov I Date Comments: II1�1 Illlf 4I liilji RESTORE EXISTING DRAINAGE DITCH TO ORIGINAL NATURAL CONDITIONS, SEE APPROXIMATE DITCH SECTION ON SHEET GR-02 S.E. 192ntl ST. V- 0 �t V- ! J9 Fu