Loading...
HomeMy WebLinkAboutMFP19000006DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19000006 IVR Number: 19000006 Permit Informaon Permit Name:Water District 90 Franchise Permits Address/Locaon :01/02/2019Application Date:Parcel Number:City Wide Permit Type:01/02/2019Issue Date:Franchise Permit Work Class:01/02/2020Expiration Date:Major Utility Job Number:2019 Blanket Permit for Water District Franchise Type:Water/Sewer Description:2019 BLANKET PERMIT FOR WATER DISTRICT #90. FOR INSTALLATION OF NEW SERVICES, TIE INS, AND REPAIR WORK IN ROW. TRAFFIC CONTROL PLAN REQUIRED. ROAD RESTORATION PER CITY OF RENTON STANDARDS. WORK UNDER THIS PERMIT MUST BE CALLED IN AT START OF JOB (425) 430 7203. Contacts Name Address PhoneTypeBilling Tim Johnson Water District #90 15606 E 128th St RENTON, WA 98059 B: (425) 255-9600 C: (425) 351-7762 ApplicantX WD #90 15606 SE 128TH ST Renton, WA 98059 B: (425) 255-9600OwnerX General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES