HomeMy WebLinkAboutMFP19000007DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19000007
IVR Number: 19000007
Permit Informaon
Permit Name:Soos Creek Franchise Permits
Address/Locaon :01/02/2019Application Date:Parcel Number:City Wide
Permit Type:01/02/2019Issue Date:Franchise
Permit Work Class:01/02/2020Expiration Date:Major Utility
Franchise Type:Water/Sewer
Description:2019 BLANKET PERMIT FOR SOOS CREEK WATER & SEWER DISTRICT. FOR INSTALLATION OF NEW SERVICES
TIE INS, AND REPAIR WORK IN ROW. TRAFFIC CONTROL PLAN REQUIRED. ROAD RESTORATION PER CITY OF
RENTON STANDARDS. WORK UNDER THIS PERMIT MUST BE CALLED IN AT START OF JOB (425) 430 7203.
Contacts
Name Address PhoneTypeBilling
Darci Mattioda
Soos Creek Water and Sewer
B: (253)
630-9900x107
Applicant
Soos Creek Water & Sewer District 14616 SE 192nd St
Renton, WA 98058
B: (253) 630-9900ContactX
Ken Den Bergh
SOOS CREEK WATER & SEWER
14616 SE 192nd Street
Renton, WA 98058
B: (253) 630-9900Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES