Loading...
HomeMy WebLinkAbout*Call for BidCAG-19-001 CITY OF RENTON Renton Avenue South Resurfacing CALL FOR BIDS Sealed bids will be received by the City of Renton, at the City Clerk's Office, located on the 7th floor of Renton City Hall, until 1:30 PM on Tuesday, February 5, 2019. All supplemental documents, that are allowed to be submitted after this date and time, shall be delivered to the City Clerk's Office. The bids will be opened and publicly read at 2:00 PM on Tuesday, February 5, 2019 in room #511, located on the 5th floor of Renton City Hall. Renton City Hall is located at 1055 South Grady Way, Renton, WA 98057. Approved plans, specifications, addenda, and plan holders list for this project are available on-line through Builders Exchange of Washington, Inc., at http://www.bxwa.com. Click on bxwo.com; Posted Projects; Public Works; City of Renton; Projects Bidding. (Note: Bidders are encouraged to Register as a Bidder, in order to receive automatic email notification of future addenda and to be placed on the Bidders List). Contact Builders Exchange of Washington at 425-258-1303 should you require further assistance. The City of Renton in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally -Assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. The improvement for which bids will be received is described below: Construct the Renton Avenue South Resurfacing Project. The work includes but is not limited to: excavation; grading; sawcutting; removal of pavement; removal of concrete curb, gutter and sidewalk; trench excavation and backfill, water main improvements, fire hydrants, water services, a HAWK signal, street light improvements, planing pavement; forming and placement of concrete curb, gutter, sidewalk and ADA wheelchair ramps; paving with asphalt; adjustments to utility frames, grates and covers; installation of street channelization and video detection; property restoration and all other work necessary to complete the Work as specified and shown in the Contract Provisions. Published: January 10, 2019 and January 17, 2019 Renton Avenue South Resurfacing Call for Bids 2019