Loading...
HomeMy WebLinkAboutC_On_Hold_Letter_Update_190108.pdfJanuary 8, 2019 Marissa Gifford HDR, Inc. 929 108th Ave NE, Suite 1300 Bellevue, WA 98004-4361 SUBJECT: UPDATED "On Hold" Notice Puget Sound Energy – Energize Eastside / LUA18-000055 Dear Ms. Gifford: The Planning Division of the City of Renton accepted the above master application for review on March 14, 2018. The review of this project was originally placed “on hold” per the On Hold letter dated June 11, 2018. Per discussions with Kara Durbin of PSE in November 2018, regarding the submitted Critical Areas Report, additional information, that was not included in the original On Hold letter, is now required before the City can continue proceed further. The following updated information will need to be submitted so that we may continue the review of the above subject application: A Consistency Analysis of the Environmental Impact Statement (EIS). UPDATE: A kickoff meeting was held with EA Engineering, Science, and Technology, Inc. on January 3, 2019. A final Consistency Analysis completion date is currently scheduled for April 17, 2019, provided the requested information in item # 2 below is received by January 25, 2019. The cost of the consistency analysis will be paid for by the applicant. A revised Critical Areas Report outlining either how the proposed project would be exempt from the City’s Critical Areas Regulation or would comply with the adopted regulations for mitigation. At this time, your project remains “on hold” pending receipt of the requested information. Please contact me at (425) 430-6598 or jding@rentonwa.gov if you have any questions. Sincerely, / Jill Ding Senior Planner cc: Brad Strauch/Applicant Kara Durbin/PSE Parties of Record