Loading...
HomeMy WebLinkAboutR-401407T C) i W T O rr 0 N 5= U 0 W 0 0 N 00 Q) > 0 Z 0 w z w 0 0 w z c� Un z w 0 0 w c� z 0 m Ln 0 z ml i z CD rK 0 i 0 0 Q i w c� z Q CD z w 0 m N N 0 0 i 0 0 0 0 0 0 MATCH TINE FOR CONTINUATION SEE SHEET C1 3T 10 OkYtCCE / ENC E 18 ttt R00 (EMC) SIN 4„ SW) I. ; = 7.0 �s1s "C 0 SING" U o. 47 SO R i TBP 118.50 L SIGNS€Ut s \ INV NE 15.80 Nj52o56 E / , TOP 18.9 BOT 14.9 FnI u� / ��/-�� jam;, _ �.-. . r a 00 D� o _ w 50.0 INV W 9.8 U 481 C -1 TO 19.20 L~ W INV W 18.40 = INV 17.90 c) BOT 6.5 S 1 w RIM = 19.24 W 1.2' X 1.2' IN ER D ENSION U� # 13328 z 6" PVC (NW) I. = 1 .44 CD WATER LEVEL - 18.54 ~ Q SUMP = 17.54 z z 0 C� 0 LL- LLJ z = 54.6 C-) � o 708 7(5 71.2 7 o i i i i 5505 �1 TO 0 o. 50. 6, - 51 3 Pipe SQ&B 479 � TPP 11�. .2INNER IMENSION teP s 4.'LP� '4(NE) I.E. = 8.55 SUMP = 18.30 C' X 50.5 50.6 50.1 X 0 65Q��+ 2� �5 o 19.17 rn 6.0X 8. 0' T ENSION SUMP = 10.1 ANDO T BANK PER ELECTRICA DR NGS: 600-dwgs c'al\Elec 800v ND RO D OR. B ER J�'- / Q TOP OF LT gOD g' tips OX -c- -0O / Q AV ® A' PAVED PARKING 479A RIM = 19 LID - #11304 RCP ( E) 1. E. = 15.35 M H 1 G 12" RCP 1. E. = 15.25 10 NPS SUMP = 13. 1�4j. CB 479 PMH - 19.53 O RIM P21.0 DIA STRUCTUN§- TYPE 2 X - #19800 0 BRICK CONSTRUCTION CP (E - 15.08 1 (NW) I.E. = 14.98 LL] MH-G 2' (SW) 1. _ .43 AIR/WATER RIM 21.1 n n. \SDMH-G-48(ABAN) RIM 21.2 9 INV S 17.4 y9 INV BOT N 17.0 15.7 j\ C 222 LF n � No. 479A CB -I TOP 1" BELOW ADJACENT UTILIDOR. 0; U'� a a a 06 RAMP - ENTRY ------ PORCH 6" SYM REVISION BY APPROVED DATE SYM REVISION T CONCRETE AND ASPHALT REPAIR W4282795 ABAM 12.01.17 - AS -BUILT - INCORPORATE REVISION P - INCORPORATED JOB W4282795 WS DBS 2.8.18 Q PARTS MOVEMENT ROAD - RECORD U MITIGATION HANGER C180242 KPFF KPFF 10.09.18 R 737 MAX DUCT BANK - RECORD N REPLACE UNDERGND CHILLED WATER LINES TO 4-21 W1716695 ABAM 07.30.14 S 737 MAX DUCT BANK - RECORD P 737 MAX DUCT BANK - RECORD W1759198 ABAM 07.31.14 - RENTON AS-BUILTS S C599 5 1 OR 1�:�•��1»a:�:m�e� �CLCHI' 18.90 ON 4" 0 ATEEL Fw ON @m o� G 1. 1 / 1, /1 1 �I • 1p„wC�„\F 0 sEFw ,1fA� PWR M 4 4p / RIM = .89� 15' IA S D LID 14620 INL PIP oo 1 (SE 1. E. _ .52 �O ENTRY TdUTI LI D R 0 FA PIPE 2" W) I. �32 r \ 0 C p \ Cr' 00 r , P DM 2015 0' X 7.0' INNE DIMES " DIA LID TER 11.15 �° S P = 10. 4 DER ON (S WALL / IN 11 EL RI HO O AR A R/( NDON EW SE E � r � PWR RIM - 27. -'DIA 6 0< \ 0 TO F G / ? / ° RT / / POINT OF ITC \ / EO r / EOT G P 27 / / O TY SEWER HOLE CONC CAU ON b0 R 0 XING r / // T-401405 BY APPROVED DATE ���� °� WAS ���' ACCEPTABILITY SA SPECIFICATION THIS DESIGN APPROVED Un<AVVN T. JOHNSON uHlt 10.09.18 SUBTITLE WS 01.28.15 HE CKED KIRELAND 10.09.18 ENGINEER TITLE APPROVED BY DEPT. DATE W1855883 ABAM 04.03.15 o �� e _ 408 ��or ��crsTER�° J. EWNG 10.09.18 W1759198 ABAM 04.15.15 Z. CRACKED Z. GRAY 10.09.18 W1759198 ABAM 10.31.15 APPROVED SSIONAL E��l APPROVED W5365113-34353 KPFF KPFF 01.15.18 9 as/ CIVIL MASTER �o WATER VALV ESERD PEDESTRIAN MARKING, SEE SDOT STD PLAN 722 TRAFFIC ARROW, SEE WSDOT STD PLAN M-24.40-02 STOP BAR II II II CROSSWALK CHANNELlAEON SIGN, MOUNTED ON PUGET SOUND PRECAST SIGN BLOCK PSB2011 OR EQUIVALENT 0 DETECTABLE WARNING STRIP, SEE WSDOT STD PLAN F45.1002 REMOVE ALL STRIPING AND WHEEL STOPS GENFRAL NOTES 1. ALL EXISTING CHANNELlATION WITHIN PROJECT AREA REMOVED 4" WHITE SOLID PAINT LINE 4" YELLOW CENTERLINE 24" STOP BAR ® 8" WHITE SOLID PAINT LINE 6" YELLOW SOLID PAINT LINE © 8" YELLOW SOLID PAINT LINE 4" RED SOLID PAINT LINE ® 4" YELLOW SOLID PAINT LINE 4" WHITE DASHED PAINT LINE 1O PAINTED CROSSWALK SEE RENTON STD PLAN 127 KEY PLAN �BANDONED CIVIL PERMIT SET V3 DESIGN BY KPFF DATE 10.09. 8 �c yp�G 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 �V www. kpff. co m 20' 10' 0 20 40' 1-401407 SCALE IN FEET CURRENT REVISION SYMBOL DATE CHANNELIZATION PLAN c180242 U 10.09.18 SHEET SEQUENCE NO. MITIGATION "ANGER C14F CT5 RENTON SITE7 DWG N0. RENTON RTNYDC14F