LEGEND
ABBREVIATIONS
DATUM NOTES
FIRE AND WATER SERVICE NOTES
yrFAIIONII1l1l►■1:111641111K91]►I1:0]EIId11
EXISTING PROPOSED
&
AND
HSB
HIGH STRENGTH BOLT
1.
HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICAN
1. INSTALL FIRE SERVICE AND WATER SERVICE LINES IN ACCORDANCE WITH WSDOT
1.
THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER
AT
DATUM 1983(91).
STANDARD SPECIFICATION 7-09.
UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
-CW-
-CW- DOMESTIC WATER
I
FIRE WATER MAIN
A
IBC
INTERNATIONAL BUILDING
2.
VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 NGVD29).
(
2. PIPE SHALL BE AWWA C151, CLASS 54 THICKNESS DUCTILE IRON PIPE WITH RUBBER
2.
BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD
FW
-FW-
ABND
ABANDONED
CODE
GASKETS MEETING AWWA C111, AND SHALL HAVE RESTRAINED JOINTS UNLESS
WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
E
- E - POWER LINE
ADA
AMERICANS WITH
ID
INNER DIAMETER
3.
VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988
OTHERWISE NOTED ON THE DRAWINGS.
T
- COMMUNICATION LINE
DISABILITIES ACT
IE
INVERT ELEVATION
(NAVD88) = NGVD29 + 3.60 FEET.
3.
THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE
ACI
AMERICAN CONCRETE
INT
INTERIOR
3. FITTINGS SHALL BE AWWA C110 OR C153, CEMENT LINED DUCTILE IRON MEETING THE
PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN
- A
- A AIR LINE
INSTITUTE
INV
INVERT
REQUIREMENTS OF AWWA C104, WITH RESTRAINED JOINTS. MECHANICAL OR FLANGED
ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION.
PIV
ADD'L
ADDITIONAL
JOINTS SHALL BE USED AS INDICATED ON THE DRAWING.
DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE
®
® POST INDICATOR VALVE
AGG
AGGREGATE
ESC CONSTRUCTION SEQUENCET
CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF
�
� FIRE HYDRANT
AL
ALTERNATE
LF
LINEAR FEET
4. UNLESS OTHERWISE NOTED ON THE DRAWINGS, ALL DUCTILE IRON PIPING AND
CONSTRUCTION.
WV®
WV
® WATER VALVE
AAPPROXIMATE
LG
LIGHT GAGE
FITTINGS SHALL HAVE FLEXIBLE BOLTLESS RESTRAINED JOINTS, WITH A MECHANISM
AR
ANCHOR RODS
1.
ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHOWN ON THE PROJECT DRAWINGS SHALL BE
THAT PROVIDES A POSITIVE AXIAL LOCK BETWEEN THE BELL AND THE SPIGOT TO
-STS-
-STS- STORM DRAINAGE LINE
ARCH
ARCHITECTURAL
M-
INSTALLED PRIOR TO OR AS THE FIRST STAGE OF SITE PREPARATION.
RESTRAIN THE JOINT. TR-FLEX BY U.S. PIPE, OR APPROVED EQUIVALENT. TR-FLEX
4.
STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND
ASTM
AMERICAN SOCIETY FOR
MAT'L
MATERIAL
GRIPPER RING BY U.S. PIPE SHALL BE USED TO RESTRAIN FIELD CUT PIPE, PER
MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH
-SAN-
-SAN- SANITARY SEWER LINE
TESTING MATERIALS
MH
MANHOLE
2.
COMMENCE CONSTRUCTION
MANUFACTURER'S INSTRUCTIONS.
SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK
O
• CLEANOUT
ATR
ALL THREAD ROD
MAX
MAXIMUM
OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
CO
MIN
MINIMUM
3.
SHOULD DEWATERING OF EXCAVATION BECOME NECESSARY, CONTRACTOR SHALL PROVIDE DEWATERING
5. FOLLOW ALL MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR RESTRAINED JOINT
STORM DRAIN MANHOLE /CATCH BASIN TYPE 2
B
MISC
MISCELLANEOUS
PLAN, LABOR AND EQUIPMENT. COORDINATE DEWATERING WITH BOEING CONSTRUCTION MANAGEMENT,
ASSEMBLY. ONCE LOCKING SEGMENTS OF RESTRAINED JOINTS ARE IN PLACE,
5.
ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR
■ CATCH BASIN / SAFE DRAIN
BOUT
BLOCKOUT
MJ
MECHANICAL JOINT
SITE ENVIRONMENTAL ENGINEERING AND THEIR GEOTECHNICAL ENGINEER. PROJECT TEAM WILL
FULLY EXTEND JOINT TO REMOVE SLACK IN LOCKING SEGMENT CAVITY. JOINT
TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER,
-UP-
UNDERGROUND POWER
BLDG
BUILDING
COORDINATE ROLES AND RESPONSIBILITIES FOR PROPER WATER MANAGEMENT.
EXTENSION IS NECESSARY TO OBTAIN MARKED LAYING LENGTH ON PIPE AND TO
DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN
BMP(S)
BEST MANAGEMENT
N-
4.
UPON COMPLETION OF THE PROJECT, STABILIZE ANY REMAINING DISTURBED AREAS AND REMOVE
MINIMIZE GROWTH OR EXTENSION OF LINE WHEN PRESSURIZED.
A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND
O
S.
LIGHT STANDARD
PRACTICES
N
NORTH
BMPS IF APPROPRIATE.
6. ALL FITTINGS AND TRANSITION COUPLINGS SHALL HAVE PRESSURE RATINGS AT LEAST
POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND
A
-A- COMPRESSED AIR LINE
(DEPARTMENT OF ECOLOGY)
NE
NOM
NORTHEAST
NOMINAL
EQUAL TO PIPING PRESSURE RATING.
ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
BOC
BOTTOM OF CONCRETE
5.
REMOVE TRAFFIC CONTROL AND REMAINING EROSION CONTROL AND POLLUTION PREVENTION
U
UNKNOWN UNDERGROUND UTILITY
BOS
BOTTOM OF STEEL
NS
NEAR SIDE
MEASURES UPON APPROVAL BY BOEING.
® o BOLLARD
BOG
BOTTOM OF
NW
NORTHWEST
6.
THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
B
7. FIRE SERVICE PIPING JOINTS SHALL MEET UL 194.
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR
GRo O STATIC GROUND ROD
BRG
BEARING
SEASONAE, THE E SHALL ANTICIPATE THAT N AND
�TIOEENS SPROPOSED IOSITE.
LFACILITI
gTWN BETWEEN c ER
ON TDIAMETER
8. GATE VALVE INSTALLATION SHALL COMPLY WITH AWWA C600 AND AWWA M44.
CONTROL S WI L BET NECESSARY RE COMPLETE SILTATIONORCONTROLOON THE
PEDESTRIAN PATH INDICATOR
OD
OUTSIDE
EROSION CONTROL NOTES
DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO
C
9. INSTALL FIRE AND WATER PIPING WITH 3.0 FEET (MIN.) OF COVER UNLESS
ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL
•
HCB-X BORING (FROM PREVIOUS SOILS INVESTIGATION)
CI
CIP
CAST IRON
CAST IN PLACE
P
1.
ON -SITE EROSION MEASURES AND STORM WATER POLLUTION PREVENTION SHALL BE THE
OTHERWISE INDICATED.
FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES
O
B-1 BORING FROM PREVIOUS SOILS INVESTIGATION
( )
CJ
CONTROL JOINT
PIV
PL
POST INDICATOR VALVE
PLATE
RESPONSIBILITY OF THE CONTRACTOR. ANY PROBLEMS OCCURRING BEFORE FINAL ACCEPTANCE OF
10. PROVIDE ALL PIPE DEFLECTIONS IN ACCORDANCE WITH PIPE MANUFACTURER'S
AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
CL
CMP
CENTERLINE
CORRUGATED METAL PIPE
PMB
PRE-ENGINEERED METAL
THE STORM SEWER BY THE OWNER SHALL BE CORRECTED BY THE CONTRACTOR.
RECOMMENDATIONS.
7.
APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN
BENCHMARK
COL
COLUMN
BUILDING
2.
ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHOWN ON THESE DRAWINGS SHALL BE
APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION
- - - - PAVEMENT LIMITS
CONC
CONCRETE
PREFAB
PREFABRICATED
INSTALLED PRIOR TO OR AS THE FIRST STAGE OF SITE PREPARATION.
11. FIRE LINES SHALL BE DESIGNED BY A LICENSED FIRE PROTECTION ENGINEER. A
FACILITIES.
CONN
CONNECTION
PROJ
PROJECT
SEPARATE, DETAILED PLAN SHALL BE APPROVED BY THE FIRE MARSHALL AND BOEING
OHw OHW ORDINARY HIGH WATER LINE
CONST
CONSTRUCTION
PSI
POUND PER SQUARE INCH
3.
SHOULD THE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES AS SHOWN IN THE
FIRE DEPARTMENT AND INSTALLED BY A WASHINGTON CERTIFIED LEVEL "U"
200' SETBACK FROM ORDINARY HIGH WATER LINE
CONT
CONTINUOUS
PVC
POLYVINYL CHLORIDE
DRAWINGS OR SPECIFIED IN THE NOTES NOT PROVE ADEQUATE TO CONTROL EROSION AND
CONTRACTOR IN ACCORDANCE WITH WAC 212-80-010.
8.
ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO
DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH 30TH) OR SEVEN DAYS DURING THE DRY
-
- EASEMENT BOUNDARY
CONTR
CONTRACTOR
R
SEDIMENTATION, THE CONTRACTOR SHALL INSTALL STRAW WATTLES, SILT FENCE OR ADDITIONAL
12. WRAP ALL DUCTILE IRON PIPE AND ADJACENT VALVES AND FITTINGS WITH 8 MIL
SEASON (APRIL 1ST TOUGH SEPTEMBER 30) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER
- - PARCEL BOUNDARY
CSJ
CONSTRUCTION JOINT
R
RADIUS
FACILITIES AS NECESSARY TO PROTECT ADJACENT PROPERTIES, SENSITIVE AREAS, NATURAL WATER
POLYETHYLENE CONFORMING TO AWWA C105.
METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
CW
DOMESTIC WATER
RJ
RESTRAINED JOINT
COURSES AND/OR STORM DRAINAGE SYSTEMS.
ELEV ELEV MINOR CONTOUR
D
REF
REFERENCE
4.
ALL NECESSARY FACILITIES SHALL BE MAINTAINED ON -SITE TO PREVENT DEBRIS, DUST AND MUD
13. FIRE HYDRANTS SHALL BE WATEROUS PACER HYDRANT MODEL W667-250 U.L. AND
9.
WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES
ELEV ELEV MAJOR CONTOUR
DI
DUCTILE IRON
REINF
REINFORCING
FROM ACCUMULATING ON THE PUBLIC RIGHT-OF-WAY AND BOEING PROPERTY.
F.M. APPROVED, DUCTILE IRON, 3-WAY WITH 5 �/a PUMPER CONNECTION. HYDRANTS
CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH
DIA OR
0 DIAMETER
REQD
REQUIRED
SHALL HAVE STORZ ADAPTER AND CAP INSTALLED. PIPING SHALL HAVE 3.0 FEET
AN ADJUSTMENT PROCESS.
SLOTTED STORM DRAIN
DIP
DUCTILE IRON PIPE
5.
THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE SITE'S CONSTRUCTION
(MIN.) COVER. FURNISH EXTENSION KIT IF GREATER COVER IS NEEDED. FERGUSON
DIM
DIMENSION
S
S
SOUTH
STORMWATER GENERAL PERMIT OR, FOR CONSTRUCTION PROJECTS LESS THAN AN ACRE, THE SITE'S
ITEM AND DESCRIPTION AS FOLLOWS:
10.
COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN
DWG
DRAWING
SCHED, SCG
SCHEDULE
INDUSTRIAL STORMWATER GENERAL PERMIT.
a. HYDRANT DESCIPTION: 5-Y4 WB67 UL/FM 4'OL L/A MJ WHITE
MANUAL.
STORMWATER NOTES
E-
SE
SOUTHEAST6.
THE CONTRACTOR SHALL COORDINATE WITH BOEING SITE ENVIRONMENTAL ENGINEERING ON WHO WILL
b. HYDRANT NO.: SP-WB67LAOLPUL/FM
E
EAST
SEC, SECT
SECTION
OBTAIN ANY REQUIRED STORMWATER SAMPLES.
c. STORZ ADAPTER AND CAP DESCRIPTION: 4-%X5 FNST STORZ ADPT W/CAP
11.
ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN
EA
EACH
SHT
SHEET
(7) DAYS.
1.
ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH APPROVING
EF
EACH FACE
SIM
SIMILAR
7.
THE CONTRACTOR SHALL COMPLETE AN EROSION CONTROL CHECKLIST, CAREFULLY REVIEW IT, AND
15. PROVIDE 3 FEET (MIN.) HORIZONTAL CLEARANCE AROUND ALL BURIED AND EXPOSED
AGENCY STANDARDS AND THE MOST CURRENT COPY OF THE STATE OF
EL OR
ELEV ELEVATION
SOG
SLAB ON GRADE
MAINTAIN ALL STORMWATER POLLUTION PREVENTION MEASURES DAILY. CHECKLISTS SHALL BE
VALVES, FDC's, PIV's, AND VALVE ASSEMBLYS.
12.
THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR
WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
EMBED
EMBEDMENT
SPA
SPACE SPACING
MAINTAINED ONSITE AND BE AVAILABLE FOR REVIEW AT ANY TIME.
WITHIN 24 HOURS FOLLOWING A STORM EVENT.
CONSTRUCTION (WSDOT/APWA) AND AS AMENDED BY THE APPROVING AGENCY.
ENG
ENGINEER
SPEC
SQ
SPECIFICATIONS
SQUARE
16. PROVIDE 300 FEET (MAX.) SPACING BETWEEN FIRE HYDRANTS.
EQ
EQUAL
CB PROTECTION NOTES
2. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO
EQUIV EQUIVALENT STA STATION
STD STANDARD
17. SECTION VALVES SHALL BE FLUSH UNLESS NOTED OTHERWISE. COVERS SHALL MATCH
13.
AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH
BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING
APPROVED PLANS ON FILE WITH BOEING AND THE APPROVING AGENCY. ANY
ESC
EROSION/SEDIMENTATION
STL
STEEL
ADJACENT GRADE. SEE DETAILS ON SHEET M501-1 D.
OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
SIGNIFICANT DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN
CONTROL
APPROVAL FROM BOEING, THE APPROVING AGENCY, AND THE ENGINEER.
EW EACH WAY STRUCT STRUCTURAL
EX, EXIST
EXISTING
SW
SOUTHWEST
1.
CATCH BASIN INSERTS SHALL BE PROVIDED IN THE CATCH BASINS TRIBUTARY TO AREA WHERE CONTRACTOR'S
14.
DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS
3. PRIOR TO FINAL INSPECTION OF THE STORM DRAINAGE SYSTEMS, THE
EXP EXPANSION
CONSTRUCTION ACTIVITIES OCCUR.
GREATER THAN 5,000 SQUARE FEET, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE
CONTRACTOR SHALL CLEAN AND FLUSH ALL PARTS OF THE SYSTEM. ALL
EXT
EXTERIOR
T-
2.
CATCH BASIN INSERTS SHALL BE INCLUDED ON THE WEEKLY INSPECTION CHECKLIST AND MAINTAINED FOR THE
UNDERGROUND UTILITY NOTES
COVERED BY MULCH, SODDING OR PLASTIC COVERING.
ACCUMULATED MATERIAL SHALL BE REMOVED AT THE CLOSEST DOWNSTREAM
T&B
TOP AND BOTTOM
DURATION OF THE PROJECT.
MANHOLE. VELOCITY IN THE PIPE DURING FLUSHING SHALL BE AT LEAST 3 FPS.
F TEMP TEMPORARY
TO TOP OF
15.
ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED
FDC
FIRE DEPARTMENT
3.
CATCH BASIN INSERTS SHALL BE REMOVED FOLLOWING COMPLETION OF CONSTRUCTION AND STABILIZATION OF
1. EXISTING ACTIVE AND ABANDONED UTILITY LOCATIONS SHOWN ON PLANS ARE COMPILED
WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE
4.
PRECAST MANHOLE SECTIONS SHALL CONFORM TO ASTM C478. MANHOLES, CATCH
CONNECTION
TOC
TOP OF CONCRETE
ALL CLEARED AREAS.
FROM SITE SURVEY AND AVAILABLE AS -BUILT INFORMATION. THE CONTRACTOR SHALL
PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST
BASINS, AND DRAINS SHALL BE SET PLUMB TO LINE AND GRADE AND SHALL BE
FF
FINISHED FLOOR
TOF
TOP OF FOOTING
DETERMINE THE EXACT LOCATION OF ALL EXISTING ACTIVE AND ABANDONED UTILITIES
BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF
PLACED ON A FIRM BASE.
FFE
FINISHED FLOOR ELEVATON
TOS
TOP OF STEEL
BEFORE COMMENCING WORK AND SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL
THE PERMANENT FACILITY.
FG FINISH GRADE TYP TYPICAL
DAMAGES THAT HAPPEN DUE TO THE CONTRACTOR'S FAILURE TO LOCATE EXACTLY AND
5.
PVC DRAIN BASIN SHALL BE NYLOPLAST OR APPROVED EQUAL INSTALLED PER
FH
FIRE HYDRANT
POLLUTION PREVENTION NOTES
PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
MANUFACTURER'S RECOMMENDATIONS AND DETAIL ON SHEET C501-6L.
FIN
FINISH
�-
16.
PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO
FM FORCE MAIN UNO UNLESS NOTED OTHERWISE
2. UTILITY ABANDONMENT:
IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE
6.
ALL OPEN GRATES ON DRAINAGE COLLECTING STRUCTURES SHALL BE 20-INCH X
ALL S SHALL
FM
FLOOR
1.
PREVENT OIL AND FUELS FROM ENTERING THE STORM DRAINAGE SYSTEM WITH PROPER CONTAINMENT
a. WIRES SHALL BE REMOVED FROM ALL ELECTRICAL AND DATA CONDUIT TO BE
SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE
24-INCH AIRCRAFT RATED HERRINGBONE PATTERN, EAST IRON WORKS
FND
FOUNDATION
V-
DEVICES.
ABANDONED IN PLACE. ABOVE GROUND CONDUIT CONNECTIONS SHALL BE REMOVED
SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
PRODUCT NUMBER 00775035BOl OR APPROVED EQUAL, UNLESS OTHERWISE
FS
FAR SIDE
VC
VITRIFIED CLAY
2.
SWEEP DIRT FROM PAVING DAILY OR AS NEEDED. THE INTENT IS TO PREVENT DIRT AND DEBRIS
TO A MINIMUM DEPTH OF 24" PRIOR TO ABANDONMENT.
NOTED.
FTG
FOOTING
V, VERT
VERTICAL
FROM VEHICLES AND EQUIPMENT FROM BEING DEPOSITED ON BOEING OWNED STREET AND CITY
b. ALL ABANDONED UNDERGROUND PIPES WITH A DIAMETER OF 8-INCHES OR
AL
VLT
VAULT
GREATER SHALL BE PLUGGED AND FILLED WITH CDF.
STREET PAVEMENT.
7.
ALL 30-INCH SOLID LOCKING LIDS SHALL BE AIRCRAFT RATED AND LID
G
LETTERING SHALL READ "DRAIN". FRAME AND GRATE SHALL BE AIRCRAFT RATED
GA
GAUGE
W
3.
THE CONTRACTOR SHALL PREVENT ALL MATERIAL USED OR GENERATED ON -SITE FROM ENTERING THE
3. PROVIDE DETECTABLE UNDERGROUND WARNING TAPE PER WSDOT SPEC SECTION 9-15.18
WITH MATCHING BOLT PATTERN, NEENAH FOUNDRY PRODUCT NUMBER R-3492-A
GEN
GENERAL
W
WEST
STORM DRAINAGE SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE
FOR ALL NEWLY INSTALLED UNDERGROUND UTILITIES.
OR APPROVED EQUAL.
W/
WAC
WITH
WASHINGTON
CONTAINMENT/SEPARATION AT ALL TIMES. ALL STORMWATER POLLUTION PREVENTION MEASURES
4. PROVIDE BRASS UTILITY MARKER PER DETAIL 2 ON SHEET C501-6K FOR ALL EXISTING
8.
ALL 36-INCH BY 72-INCH DOUBLE LEAF HATCHES SHALL BE AIRCRAFT RATED.
H
H,HORZ
HORIZONTAL
ADMINISTRATIVE CODE
SHALL BE COORDINATED WITH ENVIRONMENTAL ENGINEERING TO ENSURE COMPLIANCE WITH
AND NEWLY INSTALLED UNDERGROUND UTILITIES WITHIN THE PROJECT LIMITS.
NEENAH FOUNDRY PRODUCT R-3498-R3S OR APPROVED EQUAL.
HH
HANDHOLE
WL
WATER LEVEL
APPLICABLE STORMWATER PERMITS.
HDPE
HIGH DENSITY
WSDOT
WASHINGTON STATE
4.
THE CONTRACTOR SHALL CONDUCT DAILY STORMWATER/ENVIRONMENTAL INSPECTION OF THE
5. ALL UTILITY VAULT STRUCTURES AND ASSOCIATED ACCESS LIDS AND HATCHES SHALL MEET
9.
ALL STORMWATER CONVEYANCE PIPE SHALL BE FUSION -BUTT WELDED BLACK
POLYETHYLENE PIPE
DEPARTMENT OF
THE DESIGN LOADING REQUIREMENTS SHOWN ON SHEET C501-1 C.
HDPE (PE 3408) PIPE PER WSDOT STD SPEC 9-05.23 WITH A MAXIMUM SDR
HSA
HEADED STUD ANCHOR
TRANSPORTATION
CONSTRUCTION SITE. SCOPE OF THE INSPECTION WILL BE COORDINATED WITH SITE ENVIRONMENTAL
OF 17 UNLESS NOTED OTHERWISE.
WV
WATER VALVE
ENGINEERING.
6. THE LIFTING FORCE REQUIRED TO OPEN ACCESS LIDS AND HATCHES SHALL BE A
MAXIMUM OF 35-POUNDS. HINGED LIDS AND ACCESS HATCHES SHALL BE EQUIPPED WITH
5.
CONTRACTOR SHALL PROVIDE A TEMPORARY WHEEL WASH AT THE DESIGNATED CONSTRUCTION
A LIFT ASSIST SYSTEM AS REQUIRED TO MEET THE MAXIMUM LIFTING FORCE
10.
USE DETECTABLE WARNING TAPE OVER ALL PIPING.
CONCRETE
ENTRANCE.
REQUIREMENTS.
11.
BOEING STORMWATER STRUCTURE IDENTIFICATION NUMBERS AS SHOWN IN PLANS
SHALL BE ETCHED OR ENGRAVED ON THE GRATE OR LID OF EACH STRUCTURE
AFTER INSTALLATION AND PRIOR TO FINAL ACCEPTANCE OF THE STORM DRAINAGE
1.
PORTLAND CEMENT CONCRETE PAVEMENT
(PCCP) SHALL A MIN COMPRESSIVE STRENGTH
TRAFFIC NOTE
SYSTEMS.
AT 28 DAYS OF F'c=4,000 PSI.
1. DO NOT CLOSE OR OBSTRUCT EXISTING TRAFFIC ROUTES WITHOUT PERMISSION
12. TIDEFLEX CHECK VALVES SHALL BE CHECKMATE INLINE CHECK VALVES MOUNTED
2. CONTRACTOR TO PROVIDE CONCRETE MIX DESIGN FOR HIGH EARLY STRENGTH
GALVANIZED MATERIALS
IN AN UPSTREAM CLAMP CONFIGURATION. VALVE SHALL BE INSTALLED WITHIN
CONCRETE, WHICH MUST HAVE A FLEXURAL STRENGTH
OF 650 PSI IN 14 DAYS AND
FROM BOEING. COORDINATE LOCATION AND TIMING OF ALL ROADWAY CLOSURES
18-INCHES MANHOLE OF CONNECTION. SEE DETAIL 2 ON SHEET C501-6K.
MUST BE OPEN TO TRAFFIC IN 3 DAYS WITH MINIMUM
COMPRESSIVE STRENGTH OF
WITH BOEING PRIOR TO PERFORMING WORK.
1. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC
2500 PSI. IN 28 DAYS, COMPRESSIVE STRENGTH MUST
BE 4000 PSI MINIMUM.
APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND MATERIALS
13.
INSTALL ON ALL CATCH BASINS CURB MARKERS, ULTRATECH INTERNATIONAL,
2. TEMPORARY PAVEMENT MARKINGS SHALL BE PER WSDOT STANDARD SPECIFICATION SECTION 8-23.
OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR COATING
THAT READ "NO DUMPING DRAINS TO WATERWAY".
3.
ALL CONCRETE SHALL CONFORM TO REQUIREMENTS
IN
THE WSDOT STANDARD
SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE
SPECIFICATION SECTION 6-02 UNLESS SPECIFIED
OTHERWISE.
3. REFER TO CHANNELIZATION & SIGN PLANS FOR SIGN REMOVAL AND RELOCATION.
GALVANIZED/ZINC MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF
CONSTRUCTION.
TRENCH NOTE
4. SELF-CONTAINED HYDROBLAST SHALL BE USED FOR THE REMOVAL OF ALL PAINT STRIPING,
TOPOGRAPHIC NOTE
LETTERS, AND MARKINGS.
TRENCH SAFETY IS THE CONTRACTOR'S RESPONSIBILITY. BERGERABAM ASSUMES NO
RESPONSIBILITY. ALL TRENCH SAFETY SYSTEMS SHALL MEET THE REQUIREMENTS OF
THE WASHINGTON INDUSTRIAL SAFETY AND HEALTH ACT, CHAPTER 49.17 RCW.
THE TOPOGRAPHICAL DATA SHOWN ON THESE DRAWINGS HAS BEEN PREPARED IN
ART B M CANgNOT THE ACCURACY
COMIOF THAT
R-40141 0
SECURITY FENCING
INFORMATIONOTHERS.ISE NOT RB LE
FENSURE
OR ANY ERRORS
4), Ber erABAM
CALL 48 HOURS �
BEFORE YOU DIG 33301 9th Avenue South, Suite 300
1-800-424-5555 Federal Way, Washington 98003-2600
(206) 431-2300 Fax:(206) 431-2250
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED
ORIG MITIGATION HANGAR C180242 ABAM SPT 10/09/18
1. CONTRACTOR SHALL PLACE TEMPORARY SECURITY FENCING AROUND ALL WORK AREAS WHERE
PERMANENT FENCING IS BEING REPLACED.
DATE
P.
of WA �f
BOE//V� OD
x
31271 w�
��ssioNaL
CIVIL PERMIT SET
V3
DESIGN BY: BERGERABAM DATE 10/22/2018
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
DRA1
HL
CHE
SPT
ENG
BEE
APPROVED BY
DEPT.
I DATE
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING1001,11
Ann Fowler 12/14/2018
SURFACE WATER UTILITY
rstraka 12/14/2018 ul
IAI L SUBTITLE CURRENT REVISION SYMBOL DATE
10 09 18 GENERAL NOTES, LEGEND, AND ABBREVIATIONS C180242 0 R'l G 10/09/18
10 09 18 SHEET
10 09 18 TITLE MITIGATION HANGAR C501 -1 A C01
RENTON SITE JOB NO. C180242 COMP NO.
CIVIL MASTER SITE RENTON, WA DWG NO. RTN -YD-0501 - 1 A