HomeMy WebLinkAboutR-401417MATCH LINE - FOR CONTINUATION SEE SHEET C13E-R
T
CD
0
W
75
CD
co
0
N
C
U
O
C
0
c
0
0
ca
J
i BergerABAM
CALL 48 HOURS Nw,00"
BEFORE YOU DIG 33301 9th Avenue South, Suite 300
1-800-424-5555 Federal Way, Washington 98003-2600
(206) 431-2300 Fax:(206) 431-2250
SYM
REVISION
BY
APPROVED
DATE
SYM
REVISION
BY
APPROVED
DATE
J
MITIGATION HANGAR C180242
ABAM
SPT
10/09/18
D
REMOVE 4-404 TRLR & UPGRADE PAINT LINES
J.ANDRE
04/08/10
1
CONCRETE AND ASPHALT REPAIR W4282795
ABAM
12/01/17
E
REPLACE UNDGRND CHILLED WATER LINES TO 4-21 W1716695
ABAM
09/20/13
-
INCORPORATE REV I TO DRAWING
WS
DBS
02/08/18
G
PARTS MOVEMENT ROAD - RECORD W1855883
ABAM
04/03/15
B
INSTALL V8 FEEDER 351461-001
JA/LK
REI
05/15/00
H
737 MAX DUCT BANK - RECORD W1759198
ABAM
04/15/15
C
SITE ADA UPGRADES #7301156.00
DLR GROUPI
LS
08/30/01
-
RENTON AS-BUILTS W5365113-34353
KPFF
KPFF
01/15/18
P.
of WA �f
""A//V"
x
31271 w�
��ssioNaL
ACCEPTABILITY IHL
THIS DESIGN AND/OR CHE
SPECIFICATION IS APPROVED SPT
ENG
APPROVED BY DEPT. DATE BEE
IAI L SUBTITLE
10/09/18
10 09 18
10/09/18 TITLE
CIVIL MASTER
PARTIAL SITE REMOVAL PLAN
MITIGATION HANGAR
RENTON SITE
SITE
120
I E-(-"ENIn
SAWCUT / PROJECT LIMITS
REMOVE CONCRETE PAVEMENT
GENERAL NOTES
1. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM,
NORTH ZONE, NORTH AMERICA DATUM 1983(91). VERTICAL
DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29).
VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN
VERTICAL DATUM 1988 (NAVD88) = NGVD29 + 3.60 FEET.
2. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS
OR ZINC APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR
UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR
ZINC APPLIED MATERIALS OR COATINGS SHALL BE PERMANENTLY
PAINTED OR COATED TO PREVENT EXPOSURE OF THE
GALVANIZED/ZINC MATERIALS PRIOR TO INSTALLATION OR
COMPLETION OF CONSTRUCTION.
CONSTRUCTION NOTES
C10
C11
C12
C13
C14
C15
C16
C17
C18
C19
C20
C21
C22
C23
C24
C25
C26
C27
C28
C29
C30
ABANDON UNDERGROUND UTILITY
PROTECT EXISTING CATCH BASIN AND ADJUST
TO FINISH GRADE
PAVEMENT REMOVAL AS REQUIRED TO INSTALL
NEW UTILITIES
KEY PLAN
SCALE : NONE
A B C D E F G H J K L
R-401417
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
Ann Fowler 12/14/2018 cj%' I �
I..VLLLIVI IC180242 JIIVIUVL J 10/09/18
SHEET
C14E-R C08
JOB N0. COMP NO.
C180242
RENTON, WA DWG N0. RTN—YD-14E—R
O
LO
C`7
O
O
00
X
u
00
Q
J