Loading...
HomeMy WebLinkAboutR-401424ii i7 75 N CO 0 N C U O C 0 c 0 c� U) m J STS I I I I _I I I I I I I I I I I STS I E E is— -OTS STS L__ I � Q S O 19 17 I STS � STS 79 V) STS S U �` E % < �\ / zl z � � z O \ / U r'r,I O w. w z STS STS IJ Tr STS - 110) 0 S SI/S — — — 19 OE STS ❑ S\S E STS E STS STS STS E I ❑ E H1111111111111 E 0 E E STS STS E E STS STS STS U � \ ❑ OCn U Z o� E MAINTENANCE CD BUILDING STS STS — STS STS STS xE rftE 00 0 STS - - STS E t- STS E STS STS STS a — LEGEND - — — — — — — - PROJECT LIMITS CONSTRUCTION ENTRANCE WHEEL WASH OR RUMBLE SHORELINE STRIP ®N NEW CATCH BASIN INLET PROTECTION ®E EXISTING CATCH BASIN INLET PROTECTION GENERAL NOTES 1. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICA DATUM 1983(91). VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) = NGVD29 + 3.60 FEET. 2. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR COATINGS SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION. 3. PROTECT AND RETAIN ALL EXISTING UTILITIES AND SITE FEATURES TO REMAIN, SEE SITE REMOVAL PLANS. 4. PROVIDE CATCH BASIN INLET PROTECTION TO ALL CATCH BASINS THAT HAVE POTENTIAL TO RECEIVE SEDIMENT LADEN RUN-OFF DURING CONSTRUCTION. 5. EROSION AND SEDIMENTATION CONTROL FOR IN -WATER WORK SHALL BE AS DESCRIBED IN APPROVED PERMIT DOCUMENTS. TEMPORARY STORMWATER BYPASS WILL BE REQUIRED FOR STORMWATER RUN-OFF CONVEYED THROUGH THE SITE BASED ON THE CONTRACTOR'S CONSTRUCTION PHASING PLAN AND SHALL BE APPROVED BY BOEING. 6. CONTRACTOR SHALL DETERMINE APPROPRIATE SAMPLING POINTS FOR CONSTRUCTION STORMWATER PRIOR TO DISCHARGING IT TO THE EXISTING ONSITE CONVEYANCE SYSTEM OR VIA TEMPORARY OUTFALLS TO LAKE WASHINGTON BASED ON THE CONTRACTORS PHASING PLAN. SAMPLING AND DISCHARGE LOCATIONS SHALL BE COORDINATED WITH BOEING EHS REPRESENTATIVE. 7. CONTRACTOR SHALL PROVIDE CONSTRUCTION FENCING AT AREAS OF THE SITE WHICH DO NOT HAVE EITHER TEMPORARY OR PERMANENT SURFACING BASED ON THE CONTRACTOR'S CONSTRUCTION PHASING PLAN TO PREVENT VEHICULAR ACCESS. 8. CONTRACTOR SHALL DETERMINE IF INTERCEPTOR SWALES AND SUMPS ARE REQUIRED TO ACCOMMODATE FIELD CONDITIONS. SEE DETAIL 3 ON SHEET C501-21D. 9. CONTRACTOR SHALL CONTROL ANY DUST GENERATED BY EQUIPMENT, CONSTRUCTION, OR REMOVAL. 10. EROSIONAL CONTROL MEASURES SHOWN ON THIS PLAN SHALL BE PER THE MOST CURRENT COPY OF THE WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON. 11. CONSTRUCTION OF THE MITIGATION HANGAR MAY OCCUR CONCURRENTLY WITH CONSTRUCTION ACTIVITIES PLANNED AS A PART OF APRON R - AREA 3, CONSTRUCTED UNDER SEPARATE PERMIT. SEE APRON R PLANS FOR CONTINUATION. 12. SEE SHEET C501-2D DETAIL 1 AND 2 FOR INLET PROTECTION. SEE DETAIL 5 FOR SLOT DRAIN PROTECTION. CONSTRUCTION NOTES PROVIDE CATCH BASIN INLET PROTECTION AT ALL EXISTING AND NEWLY INSTALLED DRAINAGE COLLECTION STRUCTURES. SEE NOTE 12. 2� PROVIDE INLET PROTECTION AT SLOT DRAIN. SEE NOTE 12. 3� PROVIDE WHEEL WASH C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 C25 C26 C27 C28 C29 C30 KEY PLAN SCALE : NONE A B C D E F G H J K L R-401424 IN COMPLIANCE WITH CITY OF RENTON STANDARDS i BergerABAM CIVIL PERMIT SET DEVELOPMENT ENGINEERING CALL 48 HOURS �� V3 20 0 20 40 � Ann Fowler 12/14/2018 BEFORE YOU DIG 33301 9th Avenue South, Suite 300 1-800-424-5555 Federal Way, Washington 98003-2600 DESIGN BY: BERGERABAM DATE 10/22/2018 scale feet Frstraka URFACE 12/14 201UTI8Y (206) 431-2300 Fax:(206) 431-2250 12/14/2018 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE �N P. THIS DESIGN B AND/OR CHECKED 10 09 18 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN C180242 0 R G 10/09/18 ORIG MITIGATION HANGAR C180242 ABAM SPT 10/09/18 T� SPT 10/09/18 SHEET WAsh��� G SPECIFICATION IS APPROVED ENGINEER TITLE MITIGATION HANGAR C501-2B C15 APPROVED BY DEPT. DATE BEE 10 09 18 CHECKED RENTON SITE "o R 31271 o ww JOB NO. COMP NO. ��ss�oNaL �APPROVED C 180242 APPROVED CIVIL MASTER SITE RENTON, WA DWG No. RTN—YD—0501-2B