Loading...
HomeMy WebLinkAboutR-4014252) I ' i Q. dWO�i� LA ^� O 0 co r) SAN 0n Nd8b s CIV � s MBZI 003 OONy n b el Mj w�. L 190 1 304 0-01 I'mm-m-1-mmom MO 2. J .. QO N- I U / N v 3 � 2 3 IV CN 2 cc (53 �K COS to 2 I / / zpo 4Lj/ J rn / / Z / / C/, / N = coo N / / �,� / / W `r' 2 a li N / d v m 1 of n O• /^, / m /� J l if) Z l ill Q O^' / 3 f-) tj rcD �� / Off, lv U E / J `�/ �Nti Via'a�GoIcp wa / 2 / CNN We 3 C/ u, N 3 E Z 0 1 � 1 d / 1 I E \ / <r � o m o W0«8� C; 1 u7 11 E U�NO SANz / �► z 1 „ a NNE Z ^ � � �o � CID /lb dW 0« 8 L C/y / '\ \ ? m zz CMp o 00 rySITS 1 1 co x x �o x x x� N—x 00 SKNE RO&D COV RED WA KWAY I L W W� CO N. i I • a a 0)� W� eH d- c0 N / cpcN� h ��^h �� �� �I (�p N N CO C o� /`j c� zf) W li'N W (j `o W Qit �Go00 LAW Qz �.� mr®i®. o � +l 11 ::_`: • ..:-...:.:.:.. COVERS WALKWAY :: C. D:... Z 0) /� Z b o r LEGEND - — — — — — — - PROJECT LIMITS CONSTRUCTION ENTRANCE o / Q- WHEEL WASH OR RUMBLE SHORELINE STRIP o N U ® NEW CATCH BASIN M; Q Q INLET PROTECTION � � � a � I ® EXISTING CATCH BASIN INLET PROTECTION z c, GENERAL NOTES 1. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICA DATUM 1983(91). VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN ,0/ VERTICAL DATUM 1988 (NAVD88) = NGVD29 + 3.60 FEET. 2. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED \ / J SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR COATINGS SHALL BE \ O / ``� / PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC / MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION. 3. PROTECT AND RETAIN ALL EXISTING UTILITIES AND SITE FEATURES TO REMAIN, SEE SITE m �_/ bREMOVAL PLANS. U \/ 4. PROVIDE CATCH BASIN INLET PROTECTION TO ALL CATCH BASINS THAT HAVE POTENTIAL 0 TO RECEIVE SEDIMENT LADEN RUN-OFF DURING CONSTRUCTION. / 5. CONTRACTOR SHALL DETERMINE APPROPRIATE SAMPLING POINTS FOR CONSTRUCTION / STORMWATER PRIOR TO DISCHARGING IT TO THE EXISTING ONSITE CONVEYANCE SYSTEM BASED ON THE CONTRACTORS PHASING PLAN. SAMPLING AND DISCHARGE LOCATIONS SHALL BE COORDINATED WITH BOEING EHS REPRESENTATIVE. «l / 6. CONTRACTOR SHALL PROVIDE CONSTRUCTION FENCING AT AREAS OF THE SITE WHICH DO NOT HAVE EITHER TEMPORARY OR PERMANENT SURFACING BASED ON THE CONTRACTOR'S CONSTRUCTION PHASING PLAN TO PREVENT VEHICULAR ACCESS. 7. CONTRACTOR SHALL CONTROL ANY DUST GENERATED BY EQUIPMENT, CONSTRUCTION, OR REMOVAL. \ N U / w 8. EROSION CONTROL MEASURES SHOWN ON THIS PLAN SHALL BE PER THE MOST N". LLJ 1 % CURRENT COPY OF THE WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON. 9. PERMANENT WATER QUALITY TREATMENT FACILITIES SHALL NOT BE USED TO CONVEY OR CONTAIN CONSTRUCTION STORM WATER. NEW FACILITIES SHALL BE KEPT OFFLINE I / �.I Cn UNTIL PROJECT IS COMPLETE. THE CONTRACTOR SHALL CLEAN AND FLUSH ALL PARTS / I 0 z OF THE SYSTEM PRIOR. SEE GENERAL NOTES ON SHEET C501-1A AND C501-1 B. o / o 10. CONSTRUCTION OF BIORENTION CELLS SHALL BE PHASED SUCH THAT NO MORE THAN o Q 3 INDIVIDUAL CELL LOCATIONS ARE DISTURBED AND A MAXIMUM OF 25 PARKING / � z STALLS ARE IMPACTED BY CONSTRUCTION ACTIVITIES UNLESS OTHERWISE DIRECTED BY THE ENGINEER. ^ 0 11. SEE SHEET C501-2D DETAIL 1 AND 2 FOR INLET PROTECTION. SEE DETAIL 5 FOR �-� U SLOT DRAIN PROTECTION. 0 CONSTRUCTION NOTES Nd o a w/� w ',;''`c ''' `'';.-;''� PROVIDE CATCH BASIN INLET PROTECTION AT ALL EXISTING AND NEWLY INSTALLED za z Z o DRAINAGE COLLECTION STRUCTURES. SEE NOTE 11. I 2� PROTECT NEWLY INSTALLED WATER QUALITY FACILITIES. �S S(�` PROVIDE INLET PROTECTION WITH BERM OR WATTLE TO PREVENT STORM WATER \ FROM ENTERING BIORENTION CELLS UNTIL PLANTING IS COMPLETE AND ALL co I-0 MULCH AND STREAMBED COBBLES HAVE BEEN PLACED /\� /Q KEY PLAN /60 SCALE NONE �� A B C D E F G H J K L Z 3m z� ` m I C 10 Mi 1 � z C11 C 12 o C13 0 tl _� , QYr�Q, >i • • ®�` ClL rv�� • a� % ♦ 1 C24- � e�c i • 1 R-401425 IN COMPLIANCE WITH CITY OF RENTON STANDARDS i Berg erAl AM CIVIL PERMIT SET DEVELOPMENT ENGINEERING , CALL 48 HOURS �� � /3 20 0 20 40 � Ann Fowler 12/14/2018 BEFORE YOU DIG 33301 9th Avenue South, Suite 300 V 1-800-424-5555 Federal Way, Washington 98003-2600 DESIGN BY: BERGERABAM DATE 10/22/2018 scale feet Frstraka URFAC12/14 2018UTILITY(206) 431-2300 Fax:(206) 431-2250 12/14/2018 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE �N P. THIS DESIGN B AND/OR CHECKED 10 09 18 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN C180242 0 R G 10/09/18 ORIG MITIGATION HANGAR C180242 ABAM SPT 10/09/18 T� SPT 10/09/18 SHEET �F WAsh�o SPECIFICATION IS APPROVED ENGINEER TITLE MITIGATION HANGAR C501-2C C16 APPROVED BY DEPT. DATE BEE 10 09 18 CHECKED RENTON SITE �o R 3A o ww JOB NO. COMP N0. ���SIDNAL ��0 APPROVED C 1 80242 APPROVED CIVIL MASTER SITE RENTON, WA DWG NO. RTN—YD—0501-2C