HomeMy WebLinkAboutR-40142775
co
co
0
N
C
U
0
0
c
0
A
0
ca
J
S
C
S
EXIST
ABAN
SEPA
I
I
I
I
CALL 48 HOURS
BEFORE YOU DIG
1-800-424-5555
SYM
ORIG MITIGATION HANGAR
i BergerABAM
33301 9th Avenue South, Suite 300
Federal Way, Washington 98003-2600
(206) 431-2300 Fax:(206) 431-2250
REVISION
BY
C180242 1 ABAM
APPROVED DATE
SPT 10/09/18
SYM
REVISION
BY I APPROVED I DATE
P.
of WAsh� �f
BOE//V� OD
x
31271 w�
��ssioNaL
CIVIL PERMIT SET
V3
DESIGN BY: BERGERABAM DATE 10/22/2018
ACCEPTABILITY IJDM
THIS DESIGN AND/OR CHE
SPECIFICATION IS APPROVED SPT
ENG
APPROVED BY DEPT. DATE BEE
BUILDING 4
20 0 20 40
scale feet
ATE SUBTITLE
10/09/18
10 09 18
10/09/18 TITLE
PRELOAD PLAN
r•IIIIP]1■:I_1I[eL1Gi
RENTON SITE
I F-r_F-NI n
ECOLOGY BLOCK WALL 9/7/2018
VAULT DEMOLITION, REMOVAL, AND DISPOSAL SHALL
/ BE IN ACCORDANCE WITH WSDOT STANDARD
SPECIFICATION SECTION 2-02 AND AS
RECOMMENDED BY THE GEOTECHNICAL ENGINEER.
SEE GEOTECHNICAL REPORT DATED 6/22/2018.
PAVEMENT DEMOLITION. BREAK EXISTING CONCRETE
PAVEMENT INTO SECTION NO GREATER THAN 5' X
5' PRIOR TO PRELOAD PLACEMENT.
DEMOLISH AND REMOVE EXISTING PAVEMENT.
CONSTRUCT LEVEL BASE FOR ECOLOGY BLOCK
WALL, SEE SECTIONS A AND B ON C501-21F FOR
DETAILS.
DEMOLISH AND REMOVE EXISTING PAVEMENT.
CONSTRUCT TEMPORARY ASPHALT PEDESTRIAN
WALKWAY PER DETAIL.
— - INTERCEPTOR SWALE
GENERAL NOTES
1. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH
ZONE, NORTH AMERICAN DATUM 1983(91).
2. VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929.
3. SEE SHEETS C501-2A THROUGH C501-2D FOR TEMPORARY EROSION
AND SEDIMENT CONTROL PLANS.
4. SEE SHEETS C501-3A THROUGH C501-3E FOR CONSTRUCTION
SEQUENCING PLANS.
5. SEE SHEETS C501-6A THROUGH C501-6P FOR PERMANENT STORM
DRAINAGE IMPROVEMENTS.
6. PERMANENT WATER QUALITY TREATMENT FACILITIES SHALL NOT BE
USED TO CONVEY OR CONTAIN CONSTRUCTION STORM WATER. NEW
FACILITIES SHALL BE KEPT OFFLINE UNTIL PROJECT IS COMPLETE.
THE CONTRACTOR SHALL CLEAN AND FLUSH ALL PARTS OF THE
SYSTEM PRIOR. SEE GENERAL NOTES ON SHEET C501-1A AND
C501-1B.
7. SEE SHEETS M501-1A THROUGH M501-11D FOR TEMPORARY AND
PERMANENT FIRE SYSTEM IMPROVEMENTS.
8. SEE SHEET C501-2G FOR SETTLEMENT MONITORING DETAILS.
CONSTRUCTION NOTES
EXISTING STORM LINE TO BE ABANDONED
P� EXISTING STORMWATER DIVERSION VAULT TO BE REMOVED
:� ECOLOGY BLOCK WALL
4� PROPOSED BUILDING 4-87 OUTLINE
PROTECT EXISTING EMPENNAGE CANOPY, BOLLARDS AND
ROLLING DOORS
PROTECT EXISTING SANITARY PIPE, CLEANOUTS, AND
CONNECTION TO BUILDING 4-81
7� EXISTING FIRE MAIN TO BE ABANDONED
BUILDING SETTLEMENT MONITORING POINT. LOCATION PER
GEOTECHNICAL RECOMMENDATION.
GROUND SETTLEMENT MONITORING POINT. LOCATION PER
GEOTECHNICAL RECOMMENDATION. SEE NOTE 8
C10
C11
C12
C13
C14
C15
C16
C17
C18
C19
C20
C21
C22
C23
C24
C25
C26
C27
C28
C29
C30
KEY PLAN
SCALE : NONE
A B C D E F G H J K L
R-401427
I IN COMPLIANCE WITH CITY OF RENTON STANDARDS
C180242 J'IV'UVLO R I Q v^ L 10/09/18
C501-2E C 18
JOB NO. COMP NO.
C180242
RENTON, WA DWG N0. RTN—YD—0501-2E
Cfl
O
L0
m
O
O
00
T
6,
u
00
T
Q
J
CIVIL MASTER
SITE