Loading...
HomeMy WebLinkAboutR-40142775 co co 0 N C U 0 0 c 0 A 0 ca J S C S EXIST ABAN SEPA I I I I CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 SYM ORIG MITIGATION HANGAR i BergerABAM 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax:(206) 431-2250 REVISION BY C180242 1 ABAM APPROVED DATE SPT 10/09/18 SYM REVISION BY I APPROVED I DATE P. of WAsh� �f BOE//V� OD x 31271 w� ��ssioNaL CIVIL PERMIT SET V3 DESIGN BY: BERGERABAM DATE 10/22/2018 ACCEPTABILITY IJDM THIS DESIGN AND/OR CHE SPECIFICATION IS APPROVED SPT ENG APPROVED BY DEPT. DATE BEE BUILDING 4 20 0 20 40 scale feet ATE SUBTITLE 10/09/18 10 09 18 10/09/18 TITLE PRELOAD PLAN r•IIIIP]1■:I_1I[eL1Gi RENTON SITE I F-r_F-NI n ECOLOGY BLOCK WALL 9/7/2018 VAULT DEMOLITION, REMOVAL, AND DISPOSAL SHALL / BE IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION SECTION 2-02 AND AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER. SEE GEOTECHNICAL REPORT DATED 6/22/2018. PAVEMENT DEMOLITION. BREAK EXISTING CONCRETE PAVEMENT INTO SECTION NO GREATER THAN 5' X 5' PRIOR TO PRELOAD PLACEMENT. DEMOLISH AND REMOVE EXISTING PAVEMENT. CONSTRUCT LEVEL BASE FOR ECOLOGY BLOCK WALL, SEE SECTIONS A AND B ON C501-21F FOR DETAILS. DEMOLISH AND REMOVE EXISTING PAVEMENT. CONSTRUCT TEMPORARY ASPHALT PEDESTRIAN WALKWAY PER DETAIL. — - INTERCEPTOR SWALE GENERAL NOTES 1. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICAN DATUM 1983(91). 2. VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929. 3. SEE SHEETS C501-2A THROUGH C501-2D FOR TEMPORARY EROSION AND SEDIMENT CONTROL PLANS. 4. SEE SHEETS C501-3A THROUGH C501-3E FOR CONSTRUCTION SEQUENCING PLANS. 5. SEE SHEETS C501-6A THROUGH C501-6P FOR PERMANENT STORM DRAINAGE IMPROVEMENTS. 6. PERMANENT WATER QUALITY TREATMENT FACILITIES SHALL NOT BE USED TO CONVEY OR CONTAIN CONSTRUCTION STORM WATER. NEW FACILITIES SHALL BE KEPT OFFLINE UNTIL PROJECT IS COMPLETE. THE CONTRACTOR SHALL CLEAN AND FLUSH ALL PARTS OF THE SYSTEM PRIOR. SEE GENERAL NOTES ON SHEET C501-1A AND C501-1B. 7. SEE SHEETS M501-1A THROUGH M501-11D FOR TEMPORARY AND PERMANENT FIRE SYSTEM IMPROVEMENTS. 8. SEE SHEET C501-2G FOR SETTLEMENT MONITORING DETAILS. CONSTRUCTION NOTES EXISTING STORM LINE TO BE ABANDONED P� EXISTING STORMWATER DIVERSION VAULT TO BE REMOVED :� ECOLOGY BLOCK WALL 4� PROPOSED BUILDING 4-87 OUTLINE PROTECT EXISTING EMPENNAGE CANOPY, BOLLARDS AND ROLLING DOORS PROTECT EXISTING SANITARY PIPE, CLEANOUTS, AND CONNECTION TO BUILDING 4-81 7� EXISTING FIRE MAIN TO BE ABANDONED BUILDING SETTLEMENT MONITORING POINT. LOCATION PER GEOTECHNICAL RECOMMENDATION. GROUND SETTLEMENT MONITORING POINT. LOCATION PER GEOTECHNICAL RECOMMENDATION. SEE NOTE 8 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 C25 C26 C27 C28 C29 C30 KEY PLAN SCALE : NONE A B C D E F G H J K L R-401427 I IN COMPLIANCE WITH CITY OF RENTON STANDARDS C180242 J'IV'UVLO R I Q v^ L 10/09/18 C501-2E C 18 JOB NO. COMP NO. C180242 RENTON, WA DWG N0. RTN—YD—0501-2E Cfl O L0 m O O 00 T 6, u 00 T Q J CIVIL MASTER SITE