Loading...
HomeMy WebLinkAboutR-401430T O Nt 0 W 75 co co 0 N C U O 0 c 0 ca J FINISH GRADE SEE SHEETS C501-5A AND C501-513 PAVING AND GRADING DETAILS EXISTING GRADE/TOP OF VAULT DEPTH AS RECOMMENDED REMOVE AND DISPOSE OF CONCRETE BY GEOTECHNICAL ENGINEER STRUCTURAL SLAB VAULT LID IN ITS PROPOSED CONCRETE (3-FOOT MIN) ENTIRETY (TYPICAL) F PAVEMENT SECTION 1 I I I I I I --- ----------------------------- B C501-2H (a) 1-11, C501-2H CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 SYM ORIG I MITIGATION HANGAR REMOVE AND DISPOSE OF CONCRETE STRUCTURAL WALLS TO A MINIMUM DEPTH OF 3-FEET BELOW FINISH GRADE ELEVATION OR AS REQUIRED BY GEOTECHNICAL ENGINEER (TYPICAL) BACKFILL VAULT WITH GRAVEL BACKFILL CLASS B PER WSDOT STD SPEC 9-03.12(1)B. BACKFILL SHALL BE COMPACTED TO AT LEAST 95% MAX DENSITY PER ASTM D1557 WET VAULT REMOVAL SECTION A 50�-2H SCALE: NTS VYr%I LI\ I I V I I I I I\MIVIL AND COVER ('-T� EXISTING WET VAULT REMOVAL PLAN VIEW C11 E-R SCALE: NTS C12E-R i BergerABAM 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax:(206) 431-2250 REVISION BY C180242 1 ABAM BREAK UP STRUCTURAL CONCRETE VAULT FLOOR AS REQUIRED PER GEOTECHNICAL ENGINEER'S RECOMMENDATIONS (TYPICAL) 10" DIA I ASSEMBLI REMOVED PLU BE CONCRETE #5 X #5 Ir'ni ATI!\AI InIAIT WIN STRUCTURE REMOVAL DETAIL 01-21-1 SCALE: NTS OIL SEPARATION COMPONENT REMOVAL DETAIL 501-2H SCALE: NTS APPROVED DATE SYM REVISION BY APPROVED DATE SPT 10/09/18 BOE//V� VENT FG LEGEND REMOVE AND DISPOSE OF EXISTING STRUCTURE EG GENERAL NOTES > 12" OC 1. VAULT DEMOLITION, REMOVAL, AND DISPOSAL SHALL BE IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION SECTION 2-02 AND AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER. SEE 12" OC GEOTECHNICAL REPORT DATED 6/22/2018. HOOKS 2. DE -WATERING SHALL BE PERFORMED IN ACCORDANCE WITH T&B CONSTRUCTION DEWATERING GENERAL NOTES ON SHEET C501-1 B. WET VAULT REMOVAL SEQUENCE 1. INSTALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES. 2. ARRANGE FOR INSPECTION WITH BOEING EHS AND TAKE VAULT OFFLINE. CONTRACTOR SHALL COORDINATE ALL STORMWATER INSPECTION AND SHUTDOWN ACTIVITIES WITH BOEING EHS. 3. DE -WATER. 4. CLEAN AND REMOVE OIL SEPARATION COMPONENTS INCLUDING COALESCING PLATES, OIL SKIMMER, SUPPORT BRACKETS, AND OUTLET PIPE. OIL SEPARATION COMPONENTS SHALL BE STORED UNDER COVER UNTIL THEY ARE REMOVED FROM THE SITE AND DISPOSED. 5. DEMOLISH AND REMOVE VAULT STRUCTURE LID. DEMOLISH AND REMOVE STRUCTURE INTERIOR AND EXTERIOR WALLS TO A MINIMUM DEPTH OF 3-FEET BELOW FINISH GRADE ELEVATION OR AS REQUIRED BY GEOTECHNICAL ENGINEER. 6. BACKFILL TO BOTTOM OF SUBGRADE. nr1/n%1r n A " nI InTII r lMnAI rMALJr LIIVLU YVP\JIL VIL I\LJLI\VVII\ 0L SEPARATION COMPONENT REMOVAL SECTION 1-2H SCALE: NTS REMOVAL OF UNDERGROUND VAULTS REQUIRES A SEPARATE DEMOLITION PERMIT CIVIL PERMIT SET V3 DESIGN BY: BERGERABAM DATE 10/22/2018 ACCEPTABILITY IJDM THIS DESIGN AND/OR CHE SPECIFICATION IS APPROVED SPT ENG APPROVED BY DEPT. DATE BEE IAI t SUBTITLE 10/09/18 10/09/18 10/09/18 TITLE CIVIL MASTER WET VAULT REMOVAL DETAILS MITIGATION HANGAR RENTON SITE SITE R-401430 I IN COMPLIANCE WITH CITY OF RENTON STANDARDS l.. V lxi-II IC180242 JIIVIUVLO R I G v^IL 10/09/18 SHEET C501-2H C21 JOB N0. COMP NO. C180242 -7 RENTON, WA DWG N0. RTN-YD-0501-2H Cfl O L0 m O O 00 T X 0 H �9W