Loading...
HomeMy WebLinkAboutR-4014320 \ �\ ♦ 1 V 0 O \ 1 \ O ; \ PROPERTY 1-I11� \ I \ I I \ \ I I III \ I I I II II I EASEMENT LINE (TYP) \ 4-81 BUILDING I o � O O Y O O O U O m - W I I I II I \ — I I oo I I I ORDINARY HIGH WATER I I I � I I Ii I I \ I I III I u _ I " II " 1 LAKE WASHINGTON SUMMER o EL 15.18 WINTER o EL 13.18 ♦ I I I I I I 1 i BergerABAM CALL 48 HOURS �� I BEFORE YOU DIG 33301 9th Avenue South, Suite 300 I 1-800-424-5555 Federal Way, Washington 98003-2600 (206) 431-2300 Fax:(206) 431-2250 SYM REVISION BY APPROVED DATE SYM ORIG MITIGATION HANGAR C180242 ABAM SPT 10/09/18 200-FT SHORELINE SETBACK sim a383A00 AdONVO ❑ 00 0 m RAMP/DECK METAL RAMP/DECK w 0 oo o o o I w I I < I I I ------ w ' I � w r' Im o L I I \ w r'1 ` ♦- I s w o � I UA I, _ I I I I 787-@00 w —10 estimated, nose position Iw 2 � - LT I I II za - a I II I I I I Iw I i I I i rg8� LL.i I I I II �w REVISION BY APPROVED DATE Q� ""AFZA V" 0 o'— t z m U LOADING/UNLOADING RAMP METAL(NOT ANCHORED TO GROUND) Oo o ro o m 0 om om om om om om 000b�m I I I I I O.m .m .m .m .m .m .m .m .m .m .m Im m m .m .m .m .m .m .m .m .m .m .m .m 7 ACCEPTABILITY IHL THIS DESIGN AND/OR CHE SPECIFICATION IS APPROVED SPT ENG APPROVED BY DEPT. I DATE BEE IAI L SUBTITLE 10/09/18 10 09 18 10/09/18 TITLE CIVIL MASTER GENERAL NOTES SEE LEGEND AND GENERAL NOTES ON SHEET C501-3A 1 O o o o o o o o o U� 8'W FIRE \ fW \ AREA 3: PHASE 2A CONSTRUCTION PHASING KEY PL4 1. REMOVE "Cl" AIRCRAFT STAGING STALLS •REMOVE ECOLOGY BLOCKS • REMOVE TEMPORARY BUILDINGS • REMOVE SURFACE MOUNT UTILITIES INCLUDING: LIGHT POLES, HARD STANDS, YARD HYDRANTS, FIRE HYDRANTS 2. BEGIN PAVEMENT DEMOLITION WITHIN PRELOAD LIMITS 3. DECOMMISSION AND BEGIN DEMOLITION OF EXISTING WET VAULT 4. REMOVE EXISTING PAVEMENT AS REQUIRED TO CONSTRUCT UTILITY IMPROVEMENTS, INSTALL STORM SEWER SYSTEMS AND UTILITIES, AND BRING TO FINISH GRADE. PROVIDE TEMPORARY/PERMANENT PAVING AS NEEDED FOR UTILITY PROTECTION AND MAINTENANCE OF TRANSIT ROUTES. 5. CONSTRUCT PERMANENT STORMWATER BYPASS FOR OUTFALL 004A. • EX 492A (APRON R), 1082-18 (APRON R), 1083-18 (APRON R), 1084-18 (APRON R), 1085-18 (APRON R), EX 488A (APRON R) 6. BEGIN CONSTRUCTION OF PERMANENT STORMWATER BYPASS FOR OUTFALL 004. • 1091-18 (APRON R), 1081A-18 (APRON R), • 1097-18 (APRON R), 1094-18 (APRON R), 1093-18 (APRON R), 1092-18, 1120-18, 1121-18, 1122-18, 1123-18, 1124-18 7. CONSTRUCT COMBINED OIL/WATER SEPARATOR VAULT, MODULAR WETLANDS, AND BEGIN CONSTRUCTION OF EXISTING DIVERSION VAULT STORMWATER BYPASS • OWS-067, RTU-017, RTU-018 • EX 493B, EX 490C, EX 490D-14, 1125-18, 1126-18 01 i� NEW— NEW 3 .w 0 w � 0 0 R-401432 U. CONSTRUCT CONNECTION TO EXISTING 8-I1'4CH DOMESTIC ATE PEI CE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING Ann Fowler 12/14/2018 01 AREA 3: PHASE 2A MITIGATION HANGAR RENTON SITE SITE I..VLLLIVI IC180242 JIIVIUVLO R I G v^IL 10/09/18 SHEET C501-3B C23- JOB NO. COMP NO. C180242 RENTON, WA DWG N0. RTN—YD—0501-3B