Loading...
HomeMy WebLinkAboutR-401434I I 1 i BergerABAM CALL 48 HOURS �� I BEFORE YOU DIG 33301 9th Avenue South, Suite 300 I 1-800-424-5555 Federal Way, Washington 98003-2600 (206) 431-2300 Fax:(206) 431-2250 SYM REVISION BY APPROVED DATE SYM ORIG MITIGATION HANGAR C180242 ABAM SPT 10/09/18 REVISION 00-FT SHORELINE SETBACK GENERAL NOTES 4- 8 1 BUILDING SEE LEGEND AND GENERAL NOTES ON SHEET C501-3A o o ° ° ° o o o o W o m I 8'W FIRE \ fW \ I IIVM J � o J e h o o W a' o o °m om om I n NEW 13.80 �• NEW 13.8KV� ---E�— — — E 0 o , to � o 0 0 0 o p o 0 o o o o o o ° o. a o 0 0 0 0 0 BY I APPROVED fl . ED om 1 m I i° � e ° _ I I I ; 0 0 0 0 0 om o 0 0 0 ND P ERo o o mo p � ° o m � m d i BOE/NG°'— I I e e e I Or — AREA I PHASE 3 CONSTRUCTION PHASING KEY PLAN 1. CONTINUE BUILDING 4-87 CONSTRUCTION. 2. SEE APRON R PLANS FOR CONSTRUCTION ACTIVITIES NORTH OF TOWPATH o--]: ° 0 0 0 O ° R-401434 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING Ann Fowler 12/14/2018 01 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED UNAWN HL UAI E 10 09 18 SUBTITLE AREA 3: PHASE 3 CURRENT REVISION C180242 SYMBOL 0 R G DATE 10/09/18 CHECKED SPT 10 09 18 SHEET C501-3D C25- ENGINEER BEE 10 09 18 TITLE MITIGATION HANGAR RENTON SITE CIVIL MASTER SITE RENTON, WA APPROVED BY DEPT. DATE CHECKED JOB NO. C180242 COMP NO. APPROVED APPROVED DWG NO. RTN—YD—0501-3D