Loading...
HomeMy WebLinkAboutR-401450N N 00 0 N C U O E 0 c 0 a� c� U) m J — — — — — — — — — — C14F C14E 476A-18 TYPE 1 RIM: 19.31 3 (TYP) N: 184987.72 E: 1300501.89 IE (S) = 16.97 (8" DI) ' • IE (W) = 16.96 (8" DI) 6 , ♦��i�/sue •� • sls 10 10 10 • P • ,, • CB TYPE 1 it 3 TYP� • F. ` ♦' ( ) RIM• 19 42 POWER -3 � ♦ • K1 I 15 � N: 184968.97 C' 1700A7n07 dU LT �� 2 ♦♦� ♦ ♦ G 10't lz ♦♦ ♦ ♦ �5��� s IE (E) = 16.74 ( DI) y ' / �� IE (N) = 16.74 (12" CONC) � ♦ • _ � IE (S) = 16.74 (12" CONC) ��� � v� ♦♦ ♦ � ♦ � so to�!'SyS 8" � 00 00 �''' ♦ �♦' ; .ram• � 48 �F♦• ♦ �• ` 4 1 476-18 ♦♦ // CB TYPE 1 ♦� � ABf\�RIM: 19.10 1 Q ♦ ..� P O W E R , �� E m N: 184944.83 =• 8 i�v ♦♦ VU LT <" E �) = 7.0 (8» DI) E E �-ZA IE (N) = 17.05 (8" DI) J • v> IE (S) = 17.44 (6" EX CI) 1 STORM DRAINAGE SCALE: 1 " = 10' DETAIL G 4,g1 256 25629 19.1 64 C 415 478A-18 1 \ \ \ \\ \ CB TYPE 1 \ �\ RIM: 19.01 LU `b N: 184957.08 y \ E: 1300559.73 \\ IE (S) = 17.15 (8" SLOT DRAIN) 9Q IE (W) = 17.15 (8 DI) 10 ♦ • 21 LF 8 SLOT DRAIN ♦ ' \ i i 1-1\ ���• IE=17.15 • \ • 1 �� \ SLOPE=0.00% � \\ 3 \ ��0�/ �••`��� E RY T UT L DkFO , GENERAL NOTES 1. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICA DATUM 1983(91). VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) = NGVD29 + 3.60 FEET. 2. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR COATINGS SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION. 3. SEE PAVING AND GRADING DETAIL PLAN SHEETS C501-5A THROUGH C501-5D FOR PAVEMENT DETAILS AND GRADING INFORMATION. 4. SEE STORM DRAINAGE DETAIL PLAN SHEETS C501-6A AND C501-6C THROUGH C501-6Q FOR ADDITIONAL STORM SYSTEM IMPROVEMENT DETAILS. 5. SEE UTILITY DETAIL PLAN SHEETS M501-1A THROUGH M501-1 D FOR FIRE WATER SYSTEM IMPROVEMENT DETAIL. SLOTTED DRAIN PER DETAIL 1 ON SHEET C501-61- c> SLOTTED DRAIN CONNECTION PER DETAIL 6 ON SHEET C501-61- REMOVE AND REPLACE EXISTING PAVEMENT AS REQUIRED TO INSTALL PROPOSED IMPROVEMENTS PER DETAILS ON SHEET C501-5D ® PIPE CROSSING. SEE SHEET C501-6D FOR PIPE CROSSING TABLE. CONSTRUCTION NOTES PROVIDE NEW TYPE 1 CATCH BASIN CORE DRILL AND CONNECT NEW STORM PIPE TO EXISTING STRUCTURE WITH KOR-N-SEAL BOOT. ADJUST EXISTING STRUCTURE RIM TO FINISH GRADE PROTECT EXISTING 8-INCH COMPRESSED AIR. POTHOLE AND VERIFY DEPTH AND LOCATION. NOTIFY ENGINEER AND BOEING REPRESENTATIVE IMMEDIATELY IF CONFLICTS ARE FOUND. 4� CONNECT EXISTING PIPE TO NEW STRUCTURE WITH KOR-N-SEAL BOOT :� PROTECT EXISTING DRAINAGE STRUCTURE PROTECT EXISTING POWER. POTHOLE AND VERIFY DEPTH AND LOCATION. NOTIFY ENGINEER AND BOEING REPRESENTATIVE IMMEDIATELY IF CONFLICTS ARE FOUND. R-401450 IN COMPLIANCE WITH CITY OF RENTON STANDARDS iBergerABAMV3 CIVIL PERMIT SET DEVELOPMENT ENGINEERING + �� Ann Fowler 12/14/2018 CALL 48 HOURS BEFORE YOU DIG 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 DESIGN BY: BERGERABAM DATE 10/22/2018 Frstraka URFACE WATER UTILITY } 1-800-424-5555 (206) 431-2300 Fax: (206) 431-2250 12/14/2018 DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY HL 10/09/18 STORM DETAILS C180242 O R G 10/09/18 ORIG MITIGATION HANGAR C180242 ABAM SPT 10/09/18 ��N P. T THIS DESIGN AND/OR CHECKED of WA3A, �i' SPT 10/09/18 SHEET SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE ENGINEER 10 �� 18 TITLE MITIGATION HANGAR CHECKED C501-6B C42 STf RENTON SITE PO R 31271 o ww JOB N0. COMP NO. ���SIDNAL - APPROVED C 180242 APPROVED CIVIL MASTER SITE RENTON, WA DWG NO. RTN-YD-0501-6B co O co O 00 XX u