Loading...
HomeMy WebLinkAboutC_Overhead_Variance_Request_Comcast_MFP17001586 (2)Sefnco Communications, 4610 Tacoma Ave Sumner, WA 98390 4-5-17 To whom it may concern: City of Renton 1055 South Grady Way Renton, WA 98057 RE: Aerial Variance Request for JT# 195912 To whom it may concern, Sefnco Communication has been contracted to design and engineer this project on behalf of Comcast Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities. Comcast proposed to over lash approximately 5,589’ of aerial fiber along the right of way of 116th heading south to SE 184th where plant will run west to 124th SE. Comcast is requesting that the City of Renton approve this variance request based on the fact that the requirements for undergrounding this proposed over lash will not cause substantial adverse impacts to other persons or entities in the immediate area and will cause undue hardship. 1. Installation of undergrounding facilities will increase the total cost of construction roughly 15-25 times the amount of an aerial over lash on the existing Comcast strand. 2. Potential damage to underground facilities will be increased. 3. Over lash will not cause substantial adverse impact to other persons or entities in the immediate area. Over lashing the cable will be accomplished in a few days, and the residents will not notice any impact. Comcast will clean up the over lashed spans as necessary and identify and remove and existing dead cables along this route. 4. The variance is necessary to prevent any undue hardship due to the increased construction costs if forced to install the proposed extension underground. 5. The granting of the variance will not be materially detrimental to the public welfare because Comcast does agree to underground the cable system, but they are waiving the obligation into the future when all other utilities are underground to prevent an undue hardship against Comcast currently. Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and maintenance of the proposed facilities. If you have any further questions regarding this project, please contact Danny Cooley at (253)686-7592. Thank you for your consideration in this matter. Danny Cooley Construction Coordinator Attachments: 1. Application for ROW permit 2. 11” x 17” Site plan 3. 11” x 17” Design plan 4. Traffic Control Plan