Loading...
HomeMy WebLinkAboutA_Franchise_Permit_20170502_v1DEPARTMENT OF COMMUNITY CITY OF n AND ECONOMIC DEVELOPMENT Ra ton Planning Division 11055 South Grady Way, 61 Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits rentonwa_gov Website: rentonwa.gov F_ FRANCHISE PERMIT APPLICATION ::::] Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.eov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Comcast Cable Communications Management, LLC. Franchise Job Number: 239178 Phone: 253.288.7540 Contact Name: Ken Pontelandolfo Email: kenneljmntele"dnBo@=hle.mncmtmm Joh Site Address: 900 Powell Ave SW Project Name: Orca Bay Seafoods Description of Work: Proof & pull (1) 48ct fiber optic cable 1090' through existing conduit. Bore 40' in landscaping behind sidewalk. Place (1) 2" PVC conduit. Pull through 48 ct fiber. Place new 17" x 30" vault. Please check all that apply: N New Construction ❑ Repair/Relocate a Underground ❑ Overhead ❑ Sidewalk ❑ Street ❑ Open Trench © Bore 4 of feet: 40r Contractor Name: SEFNCO Communications Phone: 253.266.4944 State Contractors License #: SEFNCI*994P9 City of Renton Business License #: ON FILE "I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton's Trench Restoration and Street Overlay Requirements." Signature K I p/VtAI-1 Date 5/11/2017 INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425.430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. au Pre-construcrton meerrnas snap be scneoulea at a maximum of 14 aays prior to the job start date. Plan Review/Development Engineering Date Site construction Inspector Development Engineering Manager Date Date ❑ Approved as submitted rl Pre -Construction Meeting required El Approved with comments or redlines F1 Camera inspection of utilities required Page 1 Published: 3/30/2417